Determination 382074

Storm roof damage settlement and make-safe service

FirmFinancial Firm (Unknown - Insurer)
Decided2015-05-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

After storm damage to her roof, the FSP accepted 25% of the roof damage and the applicant sought full roof replacement. AFCA ordered the FSP to pay 50% of the roof replacement cost, interest on any cash settlement, and $1,000 for non-financial loss.

The policy covers only the reasonable cost of repairing the storm-damaged portion, but poor make-safe work and subsequent storm damage justify the FSP accepting 50% of the roof cost, plus compensation for the handling.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - Service - Service Quality Determination Case No: 382074 Determination Page 1 of 6 Case number : 382074 1 3 May 2015 1 Overview 1.1 Dispute The Applicant lodged a claim under her Home Insurance Policy (the policy) for storm damage to her property. The FSP accepts the claim in relation to storm damage, but maintains only 25% of the damage to the roof is covered by the policy. The FSP has accepted all internal water damage and damage to the roof caused by possums. The Applicants rejects the FSP’s offer and seeks replacement of the entire roof. She also complains of the FSP’s service quality. 1.2 Issues and key findings Is the Applicant entitled to have the roof replaced? The Applicant is not entitled to have the entire roof replaced, because :  the policy is a defined events policy  the policy does not cover the cost to create a uniform effect throughout the home  some of the roof damage is excluded from cover. Is the FSP’s offer of settlement adequate? The FSP must pay 50% of the cost of replacing the roof because:  the make safe work was inadequate  the offer did not account for additional damage to the roof. Is the Applicant entitled to compensation? The FSP must pay the Applicant $1,000 in compensation pursuant to the FOS Terms of Reference. 1.3 Determination This Determination is partially in favour of the Applicant. The FSP must pay 50% of the cost of replacement of the roof. If the FSP cash settles any aspect of the Applicant’s claim, the FSP is to pay interest on the settlement amount (not including the 9.3 Compensation), in accordance with the Insurance Contracts Act 1984 (the Act), from the date of denial of the claim, until the date of settlement. The FSP must pay $1,000 in compensation pursuant to the FOS Terms of Reference. Case No: 382074 Determination Page 2 of 6 2 Reasons for Determination 2.1 Is the Applicant entitled to have the roof replaced? The policy covers defined events The policy covers loss or damage caused by defined events, such as storm, subject to terms and conditions. The Applicant has the onus to establish the damage is caused by an event covered by the policy. Once so established, the onus shifts to the insurer to establish the existence of any exclusions on which it relies. It is not disputed that storm events have caused substantial da mage to the property. The FSP has accepted all internal damage as well as all damage caused by the possums entering the roof cavity. The related contents claim has been settled. What is in dispute is the settlement as it relates to the damaged roof. The policy does not cover the cost to create a uniform effect throughout the home The policy clearly states, where the FSP chooses to repair or rebuild the building, it will make reasonable attempts to match the existing materials on the building, but it will not pay to repair or replace undamaged materials or sections of the building in order to create a uniform effect. It is noted the original roof tiles at the insured property are no longer available. As the FSP has elected to cash settle the Applicant, whic h it is entitled to do under the policy, its obligations are limited to the reasonable cost of repairing the damaged portion of the roof, with materials of a similar kind and quality. Some of the roof damage is excluded from cover While it is accepted the roof sustained significant storm damage to certain areas, the FSP’s experts identified wear and tear damage and issues with the installation of the roof, which pre-dated the storm events. The FSP’s roof expert (RC) , inspected the property on 6 October 2014. RC found evidence of deterioration, lack of appropriate maintenance works to address loss of bonding and deterioration of the mechanical fastenings used to hold the metal tile panels in place. RC concluded approximately 25% of the roof has damage consistent with storm events. Evidence of general deterioration and lack of appropriate maintenance was found in other areas not damaged by the storm. These items are clearly excluded from cover under the policy. The Applicant provides no expert evidence to the contrary. Accordingly, the Applicant is not entitled to have the entire roof replaced under the policy. Case No: 382074 Determination Page 3 of 6 2.2 Is the FSP’s offer adequate? The make safe work was inadequate It is noted that a significant amount of make safe work had to be carried out to address the storm damage and prevent ongoing water ingress. The parties agree the make safe works were inadequate. RC noted the shortfalls with the make safe repairs is the primary issue in regard to rainwater ingress. The FSP accepts all internal water damage regardless of the cause but maintains it is only liable for 25% of the damage to the roof. However, it is evident the poor make safe work led to further internal damage and potentially aggravated the fragile condition of the roof. Additional damage has not been considered While the Applicant seeks replacement of the entire roof, she provides no expert evidence to contradict RC’s findings . However, she does advise there was a subsequent storm on the night of 6 October 2014, after RC’s assessment . Further damage was caused to the roof, at this time, with water entering the property through the sunroom and living room ceiling. While this damage was accepted as storm related and included in the updated scope of works, the FSP maintains the 25% roof damage assessment by RC. In November 2014, the FSP’s assessor (VD) considered a 50/50 apportionment of the cost to replace to roof would be reasonable. In light of the poor make safe work and the additional damage that occurred subsequent to RC’s assessment , it is fair in the circumstances the FSP accepts 50% of the damage to the roof. The FSP has agreed to cover the damage caused by possums entering the roof cavity, despite the policy exclusion regarding damage caused by wildlife and rodents. This is fair in the circumstances, as the possums entered the roof cavity as a result of the storm created openings. The settlement by the FSP must therefore include the cost of rectifying all damage caused by the possums. 2.3 Is the Applicant entitled to compensation? The FSP must pay some compensation Under FOS’s Terms of Reference, compensation for non -financial loss may be awarded to an Applicant where, as a result of the manner in which the insurer has handled their claim, they have experienced an unusual degree or extent of physical inconvenience, time taken to resolve their claim or interference with their expectation of enjoyment or peace of mind. However, FOS adopts a conservative approach to the award of compensatio n for non-financial loss, and expects applicants to be reasonably robust and to bear the usual inconvenience associated with making an insurance claim. The amount of compensation FOS can award in these circumstances is limited to $3,000. Case No: 382074 Determination Page 4 of 6 It is clear the Applicant has suffered physical inconvenience and interference with her expectation of enjoyment and peace of mind as a result of the claim. Despite the FSP’s argument that they were acting promptly to the Applicant’s requests and could not authorise repairs without assessing each new area of damage, it is evident better and more thorough make safe works could have been undertaken to prevent the extent of the damage and inconvenience that occurred. There were also errors to and delays in finalizing appropriate scopes of work, which lead to further time delays and aggravated the situation for the parties involved. It is fair in the circumstances the FSP pay the Applicant compensation in the sum of $1,000, pursuant to the FOS Terms of Reference. Case No: 382074 Determination Page 5 of 6 3 Supporting information 3.1 Expert Evidence Record Key points FSP’s assessor (RM) Site report dated 29 July 2014  Damage sustained to the residence are a direct result of water ingress from the loose lifting roof tiles sheets, due to storm damage.  Many tiles are loose and lifting and the roof appears to be very fragile .  …they [possums] have entered through storm damage sections of the tile roof (owner is not responsible for this).  Insured is responsible for flashing repairs to the skylight as it is wear and tear related… FSP’s roof expert ( RC ) Report dated 6 October 2014  My inspection of the roof of this house found the presence of dislodged panels of metal roof tiles that are consistent with a storm/wind event.  It is my professional opinion that approximately a quarter of the roof has been dislodged or has all loose panels of metal roof tiles.  My inspection of areas of the roof not affected by recent storm damage did find evidence of general loss of bonding (general deterioration) of the straight shank clouts as such this indicates a lack of appropriate maintenance works and also that the original installation method is fallible.  My inspection of the roof found that rainwater leakage that is occurring from the site of the skylight installation into the kitchen is the result of a combination of product failure with some wear and tear issues evidence with the front lead flashing.  Mt inspection of the installation method of the eaves gutter to this house found an obvious pre - existing plumbing installation fault that has allowed rainwater overflow onto the eaves living with resultant water stains evidence to numerous areas of the outdoor eaves lining. FSP’s Assessor (VD) Email 7 November 2014  … I am going to ask (JL) how much to replace the entire roof in metal and how much to r eplace with tiles, and I think 50/50 contribution by you and insurers would be a good compromise…” 3.2 FOS Terms of Reference ‘ 9.3 Other compensation … b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensates the Applicant for non-financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant’s expectation of enjoyment or peac e of mind has occurred; Case No: 382074 Determination Page 6 of 6 (ii) … The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Disput e.’