Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim - Exclusion/Condition
Determination
Case No: 381839 Determination Page 1 of 12
Case number : 381839 19 May 2015
1 Overview
1.1 Dispute
The Applicants hold a home building policy underwritten by the Financial Services
Provider (FSP) covering their residential property.
On 15 October 2014 the Applicants lodged a claim with the FSP after an external
wall had collapsed during a storm. The FSP limited its liability for the claim on the
basis that storm damage to retaining walls is specifically excluded from cover , and
that the loss arose as a result of other causes which are specifically excluded by
the policy terms. The FSP accepted the damaged shed and fencing under the
claim.
1.2 Issues and key findings
Was the FSP entitled to limit its liability for the claim?
The FSP was entitled to limit its liability for the claim because:
loss or damage to retaining walls caused by the insured event of storm is
excluded from cover
however, the evidence suggests the loss arose from causes specifically
excluded from cover
the Applicants were provided with a copy of the policy documents
the FSP has complied with its statutory obligations
the FSP‟s offer for the accepted damage adequately discharges its liability
under the terms of the policy.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is entitled to limit its liability for the claim to the colourbond fence and
shed only, as well as nine months‟ worth of temporary fencing costs.
The FSP is not required to indemnify the Applicants for the collapsed retaining
wall as loss or damage to retaining walls from storm damage is excluded by the
policy terms.
Case No: 381839 Determination Page 2 of 12
2 Reasons for Determination
2.1 Is the FSP entitled to limit its liability for the claim?
The Applicants have established a prima facie claim
It is settled law that the Applicants carry the initial onus to establish loss or
damage arising from an event covered by the terms and conditions of the policy.
Once the Applicants have established a prima facie claim, the onus then shifts to
the FSP to demonstrate that one or more of the listed exclusions operates to
defeat the claim or it is not covered under some other basis.
The FSP‟s policy is a defined events policy. Therefore, the policy only responds
where the damage has been caused by one or more of the listed events, subject
to any exclusions.
One of these listed events is „storm and rainwater‟ . However, the insured event of
storm and rainwater specifically excluded loss or damage caused by this event to
retaining walls.
Further, the policy contains general exclusions which apply to the policy as a
whole. Two of these exclusions are loss or damage caused by tree roots and
hydrostatic pressure.
The collapsed wall is correctly classed as a retaining wall
The crux of this dispute centres on whether the structure that collapsed could
reasonably be considered to be a retaining wall for the purposes of the policy.
The Applicants contend that the collapsed structure is a fence. As there are no
limitations to cover for fences in the policy, the FSP is liable for the claim. They
rely on case law set down in the case of Warringah Properties Pty Limited v Babij
(Snr) & 1 Ors [2006] NSWSC 702 as well as the Dividing Fences Act 1991 No 72.
The Applicants also state the structure cannot be considered a retaining wall as it
is joined to their house as is therefore a „structural improvement‟ for the purposes
of the policy.
Conversely, the FSP argues the structure has been correctly identified as a
retaining wall. All of the material provided including the engineering evidence,
council documents and plans drawn up by the Applicants‟ engineer to rebuild the
structure uniformly refer to it as a „retaining wall‟.
The policy specifically defines what the FSP considers to be a „garden retaining
wall‟, being a wall that is not part of the residential building, and designed to hold
back or prevent the movement of earth.
The FSP‟s position has merit.
Where the FSP intends a certain term to have a specific meaning or a meaning
which is not normally attributed to the word, it is required to define it in the policy
terms. The FSP is then entitled to rely on that definition, providing it has clear ly
Case No: 381839 Determination Page 3 of 12
informed the insured of the policy terms. That issue will be addressed further in
the Determination.
However, although the FSP has specifically defined what it considers to be a
„garden retaining wall‟ for the purposes of the policy, its definition is consistent
with the generally accepted meaning of the term which refers to a wall which is
constructed and designed to hold back or retain earth.
Photographs of the structure, both pre and post- collapse show that the Applicants‟
property is elevated from street level and is what is referred to as a „cut and fill‟
site. That is, the site is not constructed on its natural elevation but is „filled‟ with
earth to have it sit higher. As it is a corner block, two sides are enclosed with a
brick wall which clearly starts from street level, up to the level of the house.
Photographs after the collapse show a mass of earth behind the structure.
Accordingly, the earth behind was being retained in place by the wall.
That the earth has not suffered a total collapse upon the failure of the wall does
not necessarily mean the purpose of the wall was other than to hold it in place.
It is of note that all of the material submitted by the parties, from the engineers‟
documents to that provided by the local council refer to the structure as a
retaining wall. The expert evidence will be also addressed in more detail later in
this Determination. However, it is clear that the consensus from the experts is that
the wall is a retaining wall. That it might extend to the house and along the
boundary line, does not change the fact that the structure was built with the
purpose of retaining soil. The FSP submits that the word “garden” is superfluous
to the retaining wall definition. In my view the reference to “garden” is directed to
retention of earth abutting the garden as distinct from the residential buildings.
Therefore, for the purposes of this claim, the FSP was entitled to assess it on the
basis that the item being claimed for is a retaining wall.
Expert evidence
The FSP appoin ted engineering firm “C” to inspect the collapsed wall and tender
an option as to the cause. C considered the cause of the wall collapse was
related to a number of factors including the effect of tree roots, hydrostatic
pressure and inadequate drainage. C also considered the structure was not
designed for the effects of the added colourbond fence which sat on top. The
increased loading on the wall when the fence was subjected to extreme winds,
combined with the heavy rain on the day and the factors listed above, led to the
wall collapse.
Accordingly, whilst C considers the storm events on the day may have been a
factor in the cause of the collapse at that particular period in time, as opposed to
any other, this was only one cause of the loss and not the domi nant one.
In layman‟s terms, the storm was „the straw that broke the camel‟s back‟.
It is accepted that C is suitably qualified and experienced in this matter to
comment and in the absence of conflicting information, the FSP is entitled to rely
on their findings.
Case No: 381839 Determination Page 4 of 12
The Applicants’ expert
The Applicants disagree with C‟s findings and sourced their own report from
engineering firm “A”.
A considered that there was no evidence of hydrostatic pressure build up as the
site had adequate drainage. Tree roots were not active and therefore were not a
factor in the collapse. The wall was in structurally sound condition prior to the loss
with no signs of damage.
A considered the proximate cause of the loss was the heavy wind on the day,
which „caught‟ the colourbond fe nce causing it to act like a sail, and pull the
retaining wall down.
In circumstances where there are conflicting expert reports, consideration must be
given to the contents of each and a decision made as to which carries greater
weight.
After careful con sideration, C‟s report is to be preferred.
Records provided by the Applicants‟ council show they requested attendance
from the council arborist as early as April 2013, some 18 months prior to the loss.
Whilst an arborist is not qualified to comment in relation to structural matters, it is
noted that the arborist observed damage to the retaining wall at that time, albeit
they concluded the trees were not a factor in this damage happening.
Indeed, it would appear that the Applicants‟ approach to the council i nitially was
due to concern that the trees were the cause of damage to the retaining wall.
C has provided historical pictorial evidence of the wall, which shows repaired
stepped cracking evident as early as 2009. Photographs of the remaining section
of the wall post collapse, show a marked outward lean.
These factors demonstrate the wall was experiencing long term issues, which
were evident as far back as 2009.
Accordingly, A‟s conclusion that the wall was in structurally sound condition and
would have remained so but for the storm event is flawed.
The policy specifically excludes loss or damage to retaining walls arising
from the insured event of storm and rainwater (see relevant policy provisions
3.3 below)
However, regardless of which engineer‟s conclusion is to be preferred, the fact
remains that the policy specifically excludes loss or damage to retaining walls
which arises as a result of the insured event of storm and rainwater.
Accordingly, even if A‟s findings that the loss arose as a result of storm damage
are accepted, the policy will not respond to the loss as damage of this nature is
specifically excluded.
There is no suggestion that any other insured event is the cause of the loss, to
enable the Applicants to claim under another section of the policy.
Case No: 381839 Determination Page 5 of 12
The Applicants were provided with the policy documents
The Applicants state the FSP did not specifically inform them of the limitation in
cover as it pertains to retaining walls. The Applicants allege the FSP failed to
comply with its obligations pursuant to Sections 13 and 35 of the Insurance
Contracts Act 1984 (the Act) to clearly inform them of the policy terms and to act
towards them with utmost of good faith. Accordingly, the Applicants assert the
FSP is not entitled to deny the claim.
Section 35 of the Act provides in order for an insurer to rely on a policy limitation
or exclusion, the FSP must clearly inform the insured before the contract is
entered into, of the limits of cover.
Section 69 of the Act provides that where it is not reasonably practical to give the
information orally or in writing before a contract is entered into, the insurer will be
deemed to have complied with Section 35 of the Act providing it confirms the
information in writing within 14 days of the contract being entered into.
It is generally accepted that it is not practical to verbally inform an insured of all of
the policy terms and conditions where the policy is incepted via telephone, and
provision of the PDS within 14 days is deemed to have satisfied the requirements
of the Act to „clearly inform‟ of the terms of cover before the contract was entered
into.
The customer then has the option of cancelling the contract during the cooling off
period once they have received the PDS and had an opportunity to review it if
they are dissatisfied with the cover offered. The onus rested with the Applicants to
review the policy documentation to ensure the level of cover provided met with
their particular needs.
The Applicants concede they received the policy documents approximately one
week after inception.
Accordingly, the FSP has complied with its obligations pursuant to Section 35 of
the Act.
Regardless, even if it were found that the FSP had not complied with its
obligations pursuant to Section 35 of the Act, the remedy is not an automatic
acceptance of the claim as asserted by the Applicants.
Rather, the Insurance Contract Regulations 1985 (the Regulations) provide that
where an insurer has failed to comply with Section 35 of the Act, the cover reverts
to what is known as „standard cover‟ as contemplated by the Regulations.
The Regulations set out a minimum level of cover that any person would
reasonably expect to be provided from a prescribed contract of insurance, such
as a home building policy.
However, the Regulations provide that storm or rainwater damage to retaining
walls is excluded from the standard cover provisions. Accordingly, the
Regulations do not assist the Applicants in this regard.
Case No: 381839 Determination Page 6 of 12
Utmost good faith
The Applicants assert the FSP has not acted towards them with utmost good faith
as required pursuant to Section 13 of the Act. It is unclear as to on what basis the
Applicants have formed this view, other than that being that the loss is not
covered by the policy.
Section 13 of the Act provides that a contract of insurance is a contract based on
utmost good faith and there is implied in such a contract a provision requiring
each party to act towards the other party in respect of any matter arising under, or
in relation to it with utmost good faith.
It is well established that the requirement of utmost good faith does not only
equate to dishonesty but the lack of utmost good faith has elements in common
with an absence of “clean hands” or a failure to act utterly fairly and reasonably.
Whilst it is accepted the Applicants were ultimately dissatisfied with the FSP‟s
carriage of the claim as well as the final decision, it has not been demonstrated
any of the FSP‟s conduct was in breach of its obligations pursuant to Section 13
of the Act.
It is not a breach of the Act to decline a claim or issue a policy that does not
provide the level of cover the Applicants were ultimately seeking.
Other matters
The Applicants also seek reimbursement for a number of associated costs such
as the cost of temporary fencing, council fees and architecture.
The FSP has offered to cover the cost of temporary fencing until 28 July 2015,
representing nine months of hire. However, it considers the remainder of the costs
are associated with the retaining wall itself and it therefore has no liability for
these costs.
Review of the documents provided show that the costs are indeed related to the
rebuilding of the retaining wall. As this is not covered by the policy terms, the FSP
is not obliged to reimburse the Applicants for these expenses.
In the circumstances, the FSP‟s offer to cover the costs of temporary fencing at
the property until 28 July 2015 is fair in all the circumstances.
The FSP’s offer is reasonable in the circumstances
The Applicants remain concerned about the FSP‟s management of the claim,
particularly surrounding the FSP‟s original advice that the claim would be declined
in its entirety. It appears the FSP has, after changing its stance on a couple of
occasions, resiled from this position and accepted the damage to the colourbond
fence and pool pump shed.
Whilst it is not optimal claims handling from the FSP, the FSP is certainly entitled
to re-assess any claim made against it and correct any errors made in its initial
assessment. In this instance, the error has been rectified and has resulted in the
Applicants having a more favourable outcome.
Case No: 381839 Determination Page 7 of 12
The Applicants have not been prejudiced as a result of the FSP‟s ini tial decision
to decline the claim in its entirety.
The Applicants have not challenged the amount offered in settlement for the
damaged colourbond fence and shed, and accordingly the FSP‟s offer of
$9,494.72, plus fencing allowance until July 2015, adequa tely discharges its
liability for same under the terms of the policy.
Case No: 381839 Determination Page 8 of 12
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to its
nature, it was appropriate to proceed directly to a Determination in line with the
Operational Guidelines to the FOS Terms of Reference.
There has been a full exchange of information between the parties and each party
has had the opportunity to address any issues raised by the other. Material
supplied by the parties will only be referred to in this decision where relevant and
in context.
3.2 Expert Evidence
Record Key points
FSP’s expert ( C )
Engineer‟s report
31 Oct 2014
the property was inspected on 20 October 2014 in the
presence of the insured
the dwelling is approximately 40 years old and has been
owned by the insured for the past 11 years
the natural slope of the property is from north to south
and is situated on a cut and fill land, which is enclosed by
a number of brick retaining walls and fence s
approximately two weeks prior to inspection the boundary
retaining wall along the west elevation of the property
collapsed during a storm event
numerous tree branches were broken during the event
and the insured advised he had been petitioning the
counci l to remove these trees for seven years without
success
the insured believes these trees are affecting his property
the property was subject to strong gale winds and
substantial rainfall on the date in question
the northern section of the retaining wall co mprised of a
double brick wall with metal ties connecting the internal
and external faces of the wall
it was 230mm wide and approximately 15mtrs long. The
height of the wall varied from 1600mm at the north to
2500mm at the south
a 1600mm high metal fence h ad been attached on top of
the brick wall along the entire length of the affected area
chicken mesh had been installed as horizontal
reinforcement within the mortar bedding although it was
unable to be determined what method had been used for
the vertical spacing, given the dilapidated condition of the
wall
no vertical reinforcement was observed
at the time of inspection the retaining wall had collapsed
entirely and the retained soil exposed
repointing and an aged horizontal crack were evident to
the southern return wall
the brickwork at the bottom was a different colour and
Case No: 381839 Determination Page 9 of 12
texture to that at the time
there were two different types of drainage installed
behind the wall, being the bottom section fitted with weep
holes at the base of the wall and the mi ddle section of the
embankment contained weep holes and an agricultural
pipe surrounded by gravel, which discharged at the south
end of the wall
this suggests the wall was constructed in at least two
stages
it is likely the bottom section was constructed a t the same
time as the residence and the ground was subsequently
backfilled to the level of the rear patio for the construction
of the pool area, resulting in an increase in height of the
retaining wall
corrugated metal sheets with round metal posts were
i nstalled behind the top section of the retaining wall
long term corrosion was observed to the metal sheets
and metal ties within the wall
the majority of the top of the wall was adjoined by a 2mtr
wide garden
the southern section was adjoined by a concrete slab. No
surface drainage was observed at this location
approximately 30% of the soil beneath the concrete slab
had collapsed
there were no indications that movement was occurring
to the in - ground pool and surrounds
numerous large tree roots were observed in the exposed
embankment immediately behind the brickwork
a row of large tree more than 8mtrs in height was located
approximately 700mm from the west elevation of the
property and approximately 1mtr form the affected wall
a row of trees more than 3mtrs h igh was also observed in
the neighbouring property to the north
the single skin retaining wall with piers at the west
elevation had rotated significantly towards the west and
was temporarily propped
the southern section of the property‟s west boundary was
supported by a 700mm high retaining wall
numerous aged cracks up to 6mm wide and undulations
were observed, particularly in the vicinity of the row of
trees
the decorative brick pillars had sustained impact damage,
the insured confirmed this was not part o f the loss
google images showing the condition of the wall in both
2009 and 2013 show a repaired stepped crack
the wall has experienced movement for an extended
period of time resulting in cracking to the walls
this movement has resulted from external fact ors such as
inadequate surface drainage and the presence of trees
hydrostatic pressure is also likely to be a factor
there was no surface drainage to the garden bed atop the
wall and water would pond against the top of the wall
during heavy rainfall
this m ay overload the subsurface drainage system
resulting in an increase of the hydrostatic pressure over
Case No: 381839 Determination Page 10 of 12
the wall
the root systems of the trees were exerting an outward
pressure on the wall, which has contributed to the
damage
strong winds can have a detriment al effect on structures
that have not been properly designed for their intended
use
during storm events, wind gust will exert significant
pressure over the metal fence attached to the top of the
retaining wall, which in turn is transferred to the retaining
wall
the wall was not designed for this purpose
the present condition of the exposed soil behind the wall
is unstable and will require retaining as soon as possible
to prevent further collapse
given the outdated condition of the wall it cannot be
replaced as it was, and will require upgrading to meet
with current standards .
Applicant s ’ expert (A)
Engineer‟s report
12 Jan 2015
inspections were undertaken on 28 October 2014 and 13
January 2015 for the purposes of determining the cause
of the damage to the b oundary brick retaining wall and
colourbond fencing during a storm event
the inspection was limited to visual observations
the site contains a split level house and side retaining
walls, which are approximately 30 - 35yrs old
the collapsed existing brick bou ndary retaining wall and
colourbond fence are located on the western side
the height of the collapsed retaining wall varies between
1.7 - 2.2mtrs
the backyard adjacent to the damaged retaining wall
consists of an in - ground pool, concrete paved area,
pergola structure and garden area
the surface stormwat er is collected by a drainage system
consisting of pits, floor wastes and trench grates
blue metal, granular backfill and aggline drainage were
exposed at the bottom of the collapsed wall
no visible tree roots were observed around the collapsed
wall from the street trees located on the council strip
close to the damaged section of wall
the small tree roots observed belong to trees removed in
the past and are not active root systems
the trees located on the adjoining property are only fruit
trees with no impact on the retaining walls
the soil bank behind the collapsed retaining wall has
been exposed for almost three months as a vertical cut
and there is no sign of cracking or collapsing
there are no plans or drawings available of the original
structure
the insured informed of the following:
the retaining wall was in good structural condition and
had no structural cracks prior to the storm
the wall had an adequate drainage system in place as
well as drainage re lief pressure pipes at the mid height
and weep holes at the bottom of the wall
there was also a surface drainage outlet
Case No: 381839 Determination Page 11 of 12
the wall had no water stains and seepage water always
freely drains to the street, the drainage system in the
backyard was functioning a nd there was no evidence of
blocking or overflowing
the gusty winds during the storm were very heavy and
had a major impact on the fence which caused it and the
retaining wall to collapse
the conclusion is the damage to the retaining wall is
clearly as a result of the significant wind pressure applied
on the colourbond fence during the storm event
the conclusion by is C that the wall damage was due to
the combined effect of hydrostatic pressure and tree root
is not valid and seems to be based on assumption only
observation and investigation concludes that the wind
gust impact on the colourbond fence caused the collapse
this is supported by the following reasoning:
no evidence of tree roots in the exposed bank
the council had previously inspected the trees a nd
concluded they were not contributing to any damage to
the wall, and took no action to remove the trees
the wall had sufficient granular backfill and sub - soil
drainage, therefore hydrostatic pressure could not have
developed behind the wall
prior to the event the wall had no structural concerns or
dampness issues
there is no evidence of movement to the concrete
pavement or swimming pool which clearly suggests the
surface and seepage water have no drainage issues
the unsupported vertical bank has been expo sed for
three months and there is no evidence of any collapse or
cracking of soil, which proves the seepage had only
minor impact on the wall drainage system
therefore it is concluded that the strong winds on the day
have clearly had an impact on the colou rbond fence
which in turn transferred to the retaining wall, causing it
to collapse .
Applicant’s expert (W)
Arborist inspection of
trees (Council notes)
Various from 12 Apr
2013 to 20 Nov 2014
owner would like three tree on side of residence causing
damage to brick retaining wall to be removed and
replaced with smaller, less invasive trees
trees inspected and to be retained as not contributing to
damage to wall
no evidence to suggest trees causing damage to storm
water pipe
trees structurally sound an d in acceptable health, no
action required
tree reassessed after retaining wall collapsed, owner
thinks due to tree roots
the trees again appeared to be structurally sound and
doesn‟t appear to be creating damage to the foundations
of the house or the part of the retaining wall that is still
standing
major structural failure of the retaining wall, which caused
it to fall across council footpath.
Case No: 381839 Determination Page 12 of 12
3.3 Relevant policy provisions
DEFINITIONS - THE MEANING OF CERTAIN WORDS USED IN THIS PRODUCT
DISCLOSURE STATEMENT
These words have particular meaning wherever they are used in this PDS. These words
and their meaning are defined below.
…
garden retaining wall - a wall, which is not part of the residential building, designed to
hold back or prevent the movement of earth.
…
lnsured event
6. Storm and rainwater
Including loss or damage from:
the escape of rainwater from any water pipe, drain or gutter
surface run-off rainwater from surrounding areas that occurs within 24 hours of a storm
.
We will NOT cover:
…
X loss or damage to:
garden retaining walls
GENERAL EXCLUSIONS APPLYING TO THE WHOLE POLICY
We will not cover:
…
Hydrostatic pressure
X loss or damage caused by the force and pressure of fluids that are at rest.
…
Trees, shrubs or plants
X loss or damage or the incurring of legal liability caused by the roots of trees,
plants or shrubs.
3.4 Relevant Legislation
Sections 13, 35 and 69 of the Act.