Home / Financial Firm (Unknown - Insurer) / Determination 381839

Determination 381839

Storm damage to boundary retaining wall declined

FirmFinancial Firm (Unknown - Insurer)
Decided2015-05-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners claimed for a collapsed boundary retaining wall after a storm, and the FSP limited its liability to the colourbond fence and shed. AFCA found the structure was a garden retaining wall excluded from storm cover and that the FSP's settlement offer was reasonable.

A wall built to hold back earth is a retaining wall under the policy definition, and storm damage to such walls is excluded regardless of the fence on top.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition Determination Case No: 381839 Determination Page 1 of 12 Case number : 381839 19 May 2015 1 Overview 1.1 Dispute The Applicants hold a home building policy underwritten by the Financial Services Provider (FSP) covering their residential property. On 15 October 2014 the Applicants lodged a claim with the FSP after an external wall had collapsed during a storm. The FSP limited its liability for the claim on the basis that storm damage to retaining walls is specifically excluded from cover , and that the loss arose as a result of other causes which are specifically excluded by the policy terms. The FSP accepted the damaged shed and fencing under the claim. 1.2 Issues and key findings Was the FSP entitled to limit its liability for the claim? The FSP was entitled to limit its liability for the claim because:  loss or damage to retaining walls caused by the insured event of storm is excluded from cover  however, the evidence suggests the loss arose from causes specifically excluded from cover  the Applicants were provided with a copy of the policy documents  the FSP has complied with its statutory obligations  the FSP‟s offer for the accepted damage adequately discharges its liability under the terms of the policy. 1.3 Determination This Determination is in favour of the FSP. The FSP is entitled to limit its liability for the claim to the colourbond fence and shed only, as well as nine months‟ worth of temporary fencing costs. The FSP is not required to indemnify the Applicants for the collapsed retaining wall as loss or damage to retaining walls from storm damage is excluded by the policy terms. Case No: 381839 Determination Page 2 of 12 2 Reasons for Determination 2.1 Is the FSP entitled to limit its liability for the claim? The Applicants have established a prima facie claim It is settled law that the Applicants carry the initial onus to establish loss or damage arising from an event covered by the terms and conditions of the policy. Once the Applicants have established a prima facie claim, the onus then shifts to the FSP to demonstrate that one or more of the listed exclusions operates to defeat the claim or it is not covered under some other basis. The FSP‟s policy is a defined events policy. Therefore, the policy only responds where the damage has been caused by one or more of the listed events, subject to any exclusions. One of these listed events is „storm and rainwater‟ . However, the insured event of storm and rainwater specifically excluded loss or damage caused by this event to retaining walls. Further, the policy contains general exclusions which apply to the policy as a whole. Two of these exclusions are loss or damage caused by tree roots and hydrostatic pressure. The collapsed wall is correctly classed as a retaining wall The crux of this dispute centres on whether the structure that collapsed could reasonably be considered to be a retaining wall for the purposes of the policy. The Applicants contend that the collapsed structure is a fence. As there are no limitations to cover for fences in the policy, the FSP is liable for the claim. They rely on case law set down in the case of Warringah Properties Pty Limited v Babij (Snr) & 1 Ors [2006] NSWSC 702 as well as the Dividing Fences Act 1991 No 72. The Applicants also state the structure cannot be considered a retaining wall as it is joined to their house as is therefore a „structural improvement‟ for the purposes of the policy. Conversely, the FSP argues the structure has been correctly identified as a retaining wall. All of the material provided including the engineering evidence, council documents and plans drawn up by the Applicants‟ engineer to rebuild the structure uniformly refer to it as a „retaining wall‟. The policy specifically defines what the FSP considers to be a „garden retaining wall‟, being a wall that is not part of the residential building, and designed to hold back or prevent the movement of earth. The FSP‟s position has merit. Where the FSP intends a certain term to have a specific meaning or a meaning which is not normally attributed to the word, it is required to define it in the policy terms. The FSP is then entitled to rely on that definition, providing it has clear ly Case No: 381839 Determination Page 3 of 12 informed the insured of the policy terms. That issue will be addressed further in the Determination. However, although the FSP has specifically defined what it considers to be a „garden retaining wall‟ for the purposes of the policy, its definition is consistent with the generally accepted meaning of the term which refers to a wall which is constructed and designed to hold back or retain earth. Photographs of the structure, both pre and post- collapse show that the Applicants‟ property is elevated from street level and is what is referred to as a „cut and fill‟ site. That is, the site is not constructed on its natural elevation but is „filled‟ with earth to have it sit higher. As it is a corner block, two sides are enclosed with a brick wall which clearly starts from street level, up to the level of the house. Photographs after the collapse show a mass of earth behind the structure. Accordingly, the earth behind was being retained in place by the wall. That the earth has not suffered a total collapse upon the failure of the wall does not necessarily mean the purpose of the wall was other than to hold it in place. It is of note that all of the material submitted by the parties, from the engineers‟ documents to that provided by the local council refer to the structure as a retaining wall. The expert evidence will be also addressed in more detail later in this Determination. However, it is clear that the consensus from the experts is that the wall is a retaining wall. That it might extend to the house and along the boundary line, does not change the fact that the structure was built with the purpose of retaining soil. The FSP submits that the word “garden” is superfluous to the retaining wall definition. In my view the reference to “garden” is directed to retention of earth abutting the garden as distinct from the residential buildings. Therefore, for the purposes of this claim, the FSP was entitled to assess it on the basis that the item being claimed for is a retaining wall. Expert evidence The FSP appoin ted engineering firm “C” to inspect the collapsed wall and tender an option as to the cause. C considered the cause of the wall collapse was related to a number of factors including the effect of tree roots, hydrostatic pressure and inadequate drainage. C also considered the structure was not designed for the effects of the added colourbond fence which sat on top. The increased loading on the wall when the fence was subjected to extreme winds, combined with the heavy rain on the day and the factors listed above, led to the wall collapse. Accordingly, whilst C considers the storm events on the day may have been a factor in the cause of the collapse at that particular period in time, as opposed to any other, this was only one cause of the loss and not the domi nant one. In layman‟s terms, the storm was „the straw that broke the camel‟s back‟. It is accepted that C is suitably qualified and experienced in this matter to comment and in the absence of conflicting information, the FSP is entitled to rely on their findings. Case No: 381839 Determination Page 4 of 12 The Applicants’ expert The Applicants disagree with C‟s findings and sourced their own report from engineering firm “A”. A considered that there was no evidence of hydrostatic pressure build up as the site had adequate drainage. Tree roots were not active and therefore were not a factor in the collapse. The wall was in structurally sound condition prior to the loss with no signs of damage. A considered the proximate cause of the loss was the heavy wind on the day, which „caught‟ the colourbond fe nce causing it to act like a sail, and pull the retaining wall down. In circumstances where there are conflicting expert reports, consideration must be given to the contents of each and a decision made as to which carries greater weight. After careful con sideration, C‟s report is to be preferred. Records provided by the Applicants‟ council show they requested attendance from the council arborist as early as April 2013, some 18 months prior to the loss. Whilst an arborist is not qualified to comment in relation to structural matters, it is noted that the arborist observed damage to the retaining wall at that time, albeit they concluded the trees were not a factor in this damage happening. Indeed, it would appear that the Applicants‟ approach to the council i nitially was due to concern that the trees were the cause of damage to the retaining wall. C has provided historical pictorial evidence of the wall, which shows repaired stepped cracking evident as early as 2009. Photographs of the remaining section of the wall post collapse, show a marked outward lean. These factors demonstrate the wall was experiencing long term issues, which were evident as far back as 2009. Accordingly, A‟s conclusion that the wall was in structurally sound condition and would have remained so but for the storm event is flawed. The policy specifically excludes loss or damage to retaining walls arising from the insured event of storm and rainwater (see relevant policy provisions 3.3 below) However, regardless of which engineer‟s conclusion is to be preferred, the fact remains that the policy specifically excludes loss or damage to retaining walls which arises as a result of the insured event of storm and rainwater. Accordingly, even if A‟s findings that the loss arose as a result of storm damage are accepted, the policy will not respond to the loss as damage of this nature is specifically excluded. There is no suggestion that any other insured event is the cause of the loss, to enable the Applicants to claim under another section of the policy. Case No: 381839 Determination Page 5 of 12 The Applicants were provided with the policy documents The Applicants state the FSP did not specifically inform them of the limitation in cover as it pertains to retaining walls. The Applicants allege the FSP failed to comply with its obligations pursuant to Sections 13 and 35 of the Insurance Contracts Act 1984 (the Act) to clearly inform them of the policy terms and to act towards them with utmost of good faith. Accordingly, the Applicants assert the FSP is not entitled to deny the claim. Section 35 of the Act provides in order for an insurer to rely on a policy limitation or exclusion, the FSP must clearly inform the insured before the contract is entered into, of the limits of cover. Section 69 of the Act provides that where it is not reasonably practical to give the information orally or in writing before a contract is entered into, the insurer will be deemed to have complied with Section 35 of the Act providing it confirms the information in writing within 14 days of the contract being entered into. It is generally accepted that it is not practical to verbally inform an insured of all of the policy terms and conditions where the policy is incepted via telephone, and provision of the PDS within 14 days is deemed to have satisfied the requirements of the Act to „clearly inform‟ of the terms of cover before the contract was entered into. The customer then has the option of cancelling the contract during the cooling off period once they have received the PDS and had an opportunity to review it if they are dissatisfied with the cover offered. The onus rested with the Applicants to review the policy documentation to ensure the level of cover provided met with their particular needs. The Applicants concede they received the policy documents approximately one week after inception. Accordingly, the FSP has complied with its obligations pursuant to Section 35 of the Act. Regardless, even if it were found that the FSP had not complied with its obligations pursuant to Section 35 of the Act, the remedy is not an automatic acceptance of the claim as asserted by the Applicants. Rather, the Insurance Contract Regulations 1985 (the Regulations) provide that where an insurer has failed to comply with Section 35 of the Act, the cover reverts to what is known as „standard cover‟ as contemplated by the Regulations. The Regulations set out a minimum level of cover that any person would reasonably expect to be provided from a prescribed contract of insurance, such as a home building policy. However, the Regulations provide that storm or rainwater damage to retaining walls is excluded from the standard cover provisions. Accordingly, the Regulations do not assist the Applicants in this regard. Case No: 381839 Determination Page 6 of 12 Utmost good faith The Applicants assert the FSP has not acted towards them with utmost good faith as required pursuant to Section 13 of the Act. It is unclear as to on what basis the Applicants have formed this view, other than that being that the loss is not covered by the policy. Section 13 of the Act provides that a contract of insurance is a contract based on utmost good faith and there is implied in such a contract a provision requiring each party to act towards the other party in respect of any matter arising under, or in relation to it with utmost good faith. It is well established that the requirement of utmost good faith does not only equate to dishonesty but the lack of utmost good faith has elements in common with an absence of “clean hands” or a failure to act utterly fairly and reasonably. Whilst it is accepted the Applicants were ultimately dissatisfied with the FSP‟s carriage of the claim as well as the final decision, it has not been demonstrated any of the FSP‟s conduct was in breach of its obligations pursuant to Section 13 of the Act. It is not a breach of the Act to decline a claim or issue a policy that does not provide the level of cover the Applicants were ultimately seeking. Other matters The Applicants also seek reimbursement for a number of associated costs such as the cost of temporary fencing, council fees and architecture. The FSP has offered to cover the cost of temporary fencing until 28 July 2015, representing nine months of hire. However, it considers the remainder of the costs are associated with the retaining wall itself and it therefore has no liability for these costs. Review of the documents provided show that the costs are indeed related to the rebuilding of the retaining wall. As this is not covered by the policy terms, the FSP is not obliged to reimburse the Applicants for these expenses. In the circumstances, the FSP‟s offer to cover the costs of temporary fencing at the property until 28 July 2015 is fair in all the circumstances. The FSP’s offer is reasonable in the circumstances The Applicants remain concerned about the FSP‟s management of the claim, particularly surrounding the FSP‟s original advice that the claim would be declined in its entirety. It appears the FSP has, after changing its stance on a couple of occasions, resiled from this position and accepted the damage to the colourbond fence and pool pump shed. Whilst it is not optimal claims handling from the FSP, the FSP is certainly entitled to re-assess any claim made against it and correct any errors made in its initial assessment. In this instance, the error has been rectified and has resulted in the Applicants having a more favourable outcome. Case No: 381839 Determination Page 7 of 12 The Applicants have not been prejudiced as a result of the FSP‟s ini tial decision to decline the claim in its entirety. The Applicants have not challenged the amount offered in settlement for the damaged colourbond fence and shed, and accordingly the FSP‟s offer of $9,494.72, plus fencing allowance until July 2015, adequa tely discharges its liability for same under the terms of the policy. Case No: 381839 Determination Page 8 of 12 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to its nature, it was appropriate to proceed directly to a Determination in line with the Operational Guidelines to the FOS Terms of Reference. There has been a full exchange of information between the parties and each party has had the opportunity to address any issues raised by the other. Material supplied by the parties will only be referred to in this decision where relevant and in context. 3.2 Expert Evidence Record Key points FSP’s expert ( C ) Engineer‟s report 31 Oct 2014  the property was inspected on 20 October 2014 in the presence of the insured  the dwelling is approximately 40 years old and has been owned by the insured for the past 11 years  the natural slope of the property is from north to south and is situated on a cut and fill land, which is enclosed by a number of brick retaining walls and fence s  approximately two weeks prior to inspection the boundary retaining wall along the west elevation of the property collapsed during a storm event  numerous tree branches were broken during the event and the insured advised he had been petitioning the counci l to remove these trees for seven years without success  the insured believes these trees are affecting his property  the property was subject to strong gale winds and substantial rainfall on the date in question  the northern section of the retaining wall co mprised of a double brick wall with metal ties connecting the internal and external faces of the wall  it was 230mm wide and approximately 15mtrs long. The height of the wall varied from 1600mm at the north to 2500mm at the south  a 1600mm high metal fence h ad been attached on top of the brick wall along the entire length of the affected area  chicken mesh had been installed as horizontal reinforcement within the mortar bedding although it was unable to be determined what method had been used for the vertical spacing, given the dilapidated condition of the wall  no vertical reinforcement was observed  at the time of inspection the retaining wall had collapsed entirely and the retained soil exposed  repointing and an aged horizontal crack were evident to the southern return wall  the brickwork at the bottom was a different colour and Case No: 381839 Determination Page 9 of 12 texture to that at the time  there were two different types of drainage installed behind the wall, being the bottom section fitted with weep holes at the base of the wall and the mi ddle section of the embankment contained weep holes and an agricultural pipe surrounded by gravel, which discharged at the south end of the wall  this suggests the wall was constructed in at least two stages  it is likely the bottom section was constructed a t the same time as the residence and the ground was subsequently backfilled to the level of the rear patio for the construction of the pool area, resulting in an increase in height of the retaining wall  corrugated metal sheets with round metal posts were i nstalled behind the top section of the retaining wall  long term corrosion was observed to the metal sheets and metal ties within the wall  the majority of the top of the wall was adjoined by a 2mtr wide garden  the southern section was adjoined by a concrete slab. No surface drainage was observed at this location  approximately 30% of the soil beneath the concrete slab had collapsed  there were no indications that movement was occurring to the in - ground pool and surrounds  numerous large tree roots were observed in the exposed embankment immediately behind the brickwork  a row of large tree more than 8mtrs in height was located approximately 700mm from the west elevation of the property and approximately 1mtr form the affected wall  a row of trees more than 3mtrs h igh was also observed in the neighbouring property to the north  the single skin retaining wall with piers at the west elevation had rotated significantly towards the west and was temporarily propped  the southern section of the property‟s west boundary was supported by a 700mm high retaining wall  numerous aged cracks up to 6mm wide and undulations were observed, particularly in the vicinity of the row of trees  the decorative brick pillars had sustained impact damage, the insured confirmed this was not part o f the loss  google images showing the condition of the wall in both 2009 and 2013 show a repaired stepped crack  the wall has experienced movement for an extended period of time resulting in cracking to the walls  this movement has resulted from external fact ors such as inadequate surface drainage and the presence of trees  hydrostatic pressure is also likely to be a factor  there was no surface drainage to the garden bed atop the wall and water would pond against the top of the wall during heavy rainfall  this m ay overload the subsurface drainage system resulting in an increase of the hydrostatic pressure over Case No: 381839 Determination Page 10 of 12 the wall  the root systems of the trees were exerting an outward pressure on the wall, which has contributed to the damage  strong winds can have a detriment al effect on structures that have not been properly designed for their intended use  during storm events, wind gust will exert significant pressure over the metal fence attached to the top of the retaining wall, which in turn is transferred to the retaining wall  the wall was not designed for this purpose  the present condition of the exposed soil behind the wall is unstable and will require retaining as soon as possible to prevent further collapse  given the outdated condition of the wall it cannot be replaced as it was, and will require upgrading to meet with current standards . Applicant s ’ expert (A) Engineer‟s report 12 Jan 2015  inspections were undertaken on 28 October 2014 and 13 January 2015 for the purposes of determining the cause of the damage to the b oundary brick retaining wall and colourbond fencing during a storm event  the inspection was limited to visual observations  the site contains a split level house and side retaining walls, which are approximately 30 - 35yrs old  the collapsed existing brick bou ndary retaining wall and colourbond fence are located on the western side  the height of the collapsed retaining wall varies between 1.7 - 2.2mtrs  the backyard adjacent to the damaged retaining wall consists of an in - ground pool, concrete paved area, pergola structure and garden area  the surface stormwat er is collected by a drainage system consisting of pits, floor wastes and trench grates  blue metal, granular backfill and aggline drainage were exposed at the bottom of the collapsed wall  no visible tree roots were observed around the collapsed wall from the street trees located on the council strip close to the damaged section of wall  the small tree roots observed belong to trees removed in the past and are not active root systems  the trees located on the adjoining property are only fruit trees with no impact on the retaining walls  the soil bank behind the collapsed retaining wall has been exposed for almost three months as a vertical cut and there is no sign of cracking or collapsing  there are no plans or drawings available of the original structure  the insured informed of the following:  the retaining wall was in good structural condition and had no structural cracks prior to the storm  the wall had an adequate drainage system in place as well as drainage re lief pressure pipes at the mid height and weep holes at the bottom of the wall  there was also a surface drainage outlet Case No: 381839 Determination Page 11 of 12  the wall had no water stains and seepage water always freely drains to the street, the drainage system in the backyard was functioning a nd there was no evidence of blocking or overflowing  the gusty winds during the storm were very heavy and had a major impact on the fence which caused it and the retaining wall to collapse  the conclusion is the damage to the retaining wall is clearly as a result of the significant wind pressure applied on the colourbond fence during the storm event  the conclusion by is C that the wall damage was due to the combined effect of hydrostatic pressure and tree root is not valid and seems to be based on assumption only  observation and investigation concludes that the wind gust impact on the colourbond fence caused the collapse  this is supported by the following reasoning:  no evidence of tree roots in the exposed bank  the council had previously inspected the trees a nd concluded they were not contributing to any damage to the wall, and took no action to remove the trees  the wall had sufficient granular backfill and sub - soil drainage, therefore hydrostatic pressure could not have developed behind the wall  prior to the event the wall had no structural concerns or dampness issues  there is no evidence of movement to the concrete pavement or swimming pool which clearly suggests the surface and seepage water have no drainage issues  the unsupported vertical bank has been expo sed for three months and there is no evidence of any collapse or cracking of soil, which proves the seepage had only minor impact on the wall drainage system  therefore it is concluded that the strong winds on the day have clearly had an impact on the colou rbond fence which in turn transferred to the retaining wall, causing it to collapse . Applicant’s expert (W) Arborist inspection of trees (Council notes) Various from 12 Apr 2013 to 20 Nov 2014  owner would like three tree on side of residence causing damage to brick retaining wall to be removed and replaced with smaller, less invasive trees  trees inspected and to be retained as not contributing to damage to wall  no evidence to suggest trees causing damage to storm water pipe  trees structurally sound an d in acceptable health, no action required  tree reassessed after retaining wall collapsed, owner thinks due to tree roots  the trees again appeared to be structurally sound and doesn‟t appear to be creating damage to the foundations of the house or the part of the retaining wall that is still standing  major structural failure of the retaining wall, which caused it to fall across council footpath. Case No: 381839 Determination Page 12 of 12 3.3 Relevant policy provisions DEFINITIONS - THE MEANING OF CERTAIN WORDS USED IN THIS PRODUCT DISCLOSURE STATEMENT These words have particular meaning wherever they are used in this PDS. These words and their meaning are defined below. … garden retaining wall - a wall, which is not part of the residential building, designed to hold back or prevent the movement of earth. … lnsured event 6. Storm and rainwater Including loss or damage from:  the escape of rainwater from any water pipe, drain or gutter  surface run-off rainwater from surrounding areas that occurs within 24 hours of a storm . We will NOT cover: … X loss or damage to:  garden retaining walls GENERAL EXCLUSIONS APPLYING TO THE WHOLE POLICY We will not cover: … Hydrostatic pressure X loss or damage caused by the force and pressure of fluids that are at rest. … Trees, shrubs or plants X loss or damage or the incurring of legal liability caused by the roots of trees, plants or shrubs. 3.4 Relevant Legislation Sections 13, 35 and 69 of the Act. 

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.