Home / Financial Firm (Unknown - Insurer) / Determination 381578

Determination 381578

claim_amount_dispute

FirmFinancial Firm (Unknown - Insurer)
Decided2015-07-28
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$64,472
Non-financial loss—
Amount claimed$461,264
SourceAFCA PDF

Summary

The applicants claimed about $461,264 for water damage repairs to their holiday unit after the FSP offered $30,000. AFCA ordered the FSP to cash settle $59,160 plus GST for remaining repairs, reimburse $4,337.30 professional fees and $974.40 temporary accommodation, with interest, and refused the kitchen cabinetry and other claims.

Under an indemnity policy the insurer must restore the insured to the position before the loss, so flooring reinstatement and mould remediation were required, but undamaged cabinetry was not shown to be affected by the insured event.

Issues

Subjects and remedies

pay claimpay interestrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision - Claim Amount Determination Case No: 381578 Determination Page 1 of 14 Case number : 381578 30 June 2015 1 Overview 1.1 Dispute The Applicants are beneficiaries under a residential strata title policy between an owners’ corporation and the Financial Services Provider (FSP). The Applicant s lodged a claim for water damage to their holiday property due to a burst pipe. The FSP accepted the claim and arranged for the repairs. Before the repairs were completed, the Applicants complained about the quality of workmanship and the FSP’s contractor ceased work. On 28 July 2014, the FSP made an offer of $30,000 in full and final settlement of the claim. The Applicants consider this amount is insufficient to cover the costs incurred and repairs required. The Applicants seek approximately $461,264.20 as at 6 March 2015, together with interest. 1.2 Issues and key findings Is the FSP liable for further repairs or disputed damage? The FSP is liable for reinstating the flooring, repairing minor defects, remediation of mould and ongoing moisture issues. However, the FSP is not responsible for replacing the kitchen cabinetry. Are the Applicants entitled to any additional costs? The Applicants are entitled to the professional costs incurred to obtain the restoration, flooring and structural engineering inspections and reports. They are not entitled to most of the temporary accommodation costs (see section 2.3 ), neither are they entitled to the claims preparation or management costs claimed. 1.3 Determination This Determination is partially in favour of the Applicants. Within 14 days of the Applicants accepting this Determination, the FSP is required to:  pay the Applicants $59,160 plus GST for outstanding repair and damage costs plus interest  reimburse the Applicants $4,337.30 for professional fees incurred plus interest  reimburse the Applicants $ 974.40 for temporary accommodation costs incurred plus interest (see section 2.2 )  reimburse the Applicants should they incur further temporary accommodation costs during the further repairs, subject to the conditions set out in section 2.3 below. Case No: 381578 Determination Page 2 of 14 2 Reasons for Determination The Applicants are represented by their claims manager in this disp ute. Any submissions made by the Applicants ’ claims manager are treated as having been made by the Applicants themselves, for the purposes of this Determination. 2.1 Is the FSP liable for further repairs or disputed damage? Policy covers accidental damage subject to exclusions It is an accepted principle of insurance law that the Applicants are required to show they suffered a loss covered under the policy. This is known as a prima facie claim. The policy covers the Applicants for accidental loss or damage to their property. The parties do not dispute there was accidental damage caused by a burst water pipe on 28 March 2014, to the Applicants’ unit. Thus a prima facie claim exists. Extent of damage and quality of repairs are in dispute The parties dispute the extent of damage caused by the burst water pipe, the extent or scope of works which is covered, the quality of repairs completed by the FSP’s builder (A) and further damage by tradespeople d uring the course of repairs. The parties have provided extensive information (including numerous consultants’ reports, scopes of work and photographs) in relation to the disputed items of damage. The Panel has carefully reviewed this information for the purpose of determining whether the FSP is liable for each disputed item. The FSP acknowledges it is liable to indemnify the Applicants but only to the extent of the works outlined in the quote provided by A. A has completed the majority of the repairs, howe ver, due to the Applicants’ dispute about the quality of repairs, A stopped working on the unit in or about mid- July 2014. The parties dispute who is responsible for this. The Applicants consider the work by A (and its sub-contractors) to be sub- standard. The Applicants claim the tradespeople who conducted the repairs authorised by the FSP, caused additional damage to the unit. The work commenced by A is still incomplete and is the main subject of this dispute. Case No: 381578 Determination Page 3 of 14 Damage to the kitchen cabinetry is disputed As the Applicants seek to claim this loss, they bear the onus of proving the damage to the kitchen cabinetry was because of the insured loss event, or the FSP’s actions. The information shows the burst water pipe caused damage in the kitchen, mainly to the floor and bottom, parts of the walls and skirting. The Applicants argue the kitchen cabinetry was damaged by the burst water pipe and from the heat of the drying equipment used to dry the property. They say the kitchen was in an excellent condition before the flooding, especially because they use the unit less than five weeks a year and have owned it for over three years. The Applicants provided photographs to show:  some of the lacquer is bubbling off  doors are warped and bowed  handles are loose and rattle  mortise and tenon joints are falling apart  a blower facing the kitchen cabinetry during the drying process. The FSP argues the state of the kitchen cabinetry is age-related and due to wear and tear and not damage from the incident or drying process. The FSP is not liable for the damage to the kitchen cabinetry Having considered the evidence available, the Panel concludes that there is insufficient evidence to establish that the damage is attributable to the flooding and drying process authorised by the FSP. The Panel considers the nature of the damage to the kitchen cabinetry is consistent with elevated levels of moisture and heat. However, the information does not show the damage is attributable to the flooding and drying process. Further, the evidence does not suggest that all the cabinetry is affected to entitle the Applicants to a full replacement, just to ensure all parts match. In the circumstances, the Panel considers the FSP is not liable for replacing the kitchen cabinetry. The Applicants dispute the quality and the limited flooring re-laid by the FSP The FSP arranged for the water damaged parquetry flooring to be removed and replaced (after allowing the concrete slab beneath it to dry) with the existing kitchen cabinetry and island remaining in place. The Applicants dispute the quality of the flooring material used, the manner in which it was laid and coated and the loss of flexibility in the kitchen design (because the original flooring remained underneath the existing cabinetry and was not replaced). The Applicants obtained opinions from a flooring specialist (F) and builder (B) to support their argument to reinstate the flooring. Case No: 381578 Determination Page 4 of 14 The FSP acknowledges there are some (minor) issues to remedy (the visible nail in the lounge room and gap adjacent to the bedroom doorway), but does not accept the quality was sub-standard. Further, the FSP argues the Applicants would not be able to relocate the island (requiring the flooring to be extended underneath it) due to the hardware and electricity wiring located there. The FSP is liable to reinstate the flooring The Panel accepts the Applicants’ arguments in relation to the flooring. In an indemnity contract of insurance, such as this, the insurer is required to bring the insured back to the position they would have been before the loss. The Panel accepts F’s opinion the flooring required more cork expansion joints due to the cabinetry remaining in place. This is clearly unsightly and was unnecessary based on the FSP’s choice not to remove the existing cabinetry before laying the new floor. Although the FSP claims it did not need to remove and replace the flooring underneath the existing cabinetry, because there was no evidence of it being affected by moisture, the Panel is not satisfied the FSP has shown this to be the case. The FSP has not provided any information to show it has tested the moisture levels underneath the kitchen island and cabinetry. The only assessment by the FSP of moisture around this area, was done to the bedroom wall backing onto the kitchen, which showed elevated levels of moisture. F also considered the FSP’s choice to use “out of tolerance boards”, created unacceptable appearance defects. F noted there was not enough attention to detail applied to fine sanding, resulting in visible cross cut sand paper marks. Further, B considered there was inconsistency in the width of the floorboards throughout and a large number of joints used mismatched putty to fill gaps. For the reasons above, the Panel considers the way in which the FSP has reinstated the flooring does not adequately return the Applicants to the position they were in before the burst pipe caused water damage to their floors. Accordingly, the FSP is liable for the reinstatement of the flooring again. The Applicants showed mould issue has not been effectively dealt with The Panel accepts that the FSP has not effectively dealt with the mould issues in the unit, based on the information provided. The Applicants presented information from their restoration specialist (S) and builder (B) to support their position. The information shows:  S found high moisture readings and mould on the plasterboard near the doorway of the bedroom backing onto the kitchen and on the base board near the fridge cavity in the kitchen on 1 August 2014.  S considered this suggested there was an ongoing moisture issue and it was reasonable to expect the wall cavities and kitchen joinery would have mould. Case No: 381578 Determination Page 5 of 14  S carried out mould remediation on 19 September 2014, to accessible places.  S recommended the kitchen joinery be removed to fully inspect the possibility of mould growth and removal of it.  B found mould in the bedroom adjacent to the kitchen.  B recommended moisture readings be taken in the bedroom wall linings and underneath the kitchen joinery. Although the FSP’s position on 29 July 2014, was there was no evidence of mould in the kitchen, S and B’s reports show otherwise. The FSP relies on the reports by A and argues any ongoing moisture issues are related to another incident on 23 July 2014. However, the FSP has not provided any evidence to s upport A’s confirmation the walls were dry as alleged in its reports dated 5 May 2014. The report presented one thumbnail photograph of moisture reading equipment, which does not clearly show the reading or the area being tested. The Panel also does not a ccept the FSP’s assertion the ongoing moisture issues are a result of the incident on 23 July 2014, because of the location of the leak. The FSP also argues the cavity of the fridge enclosure was dry on 17 July 2014, based on the Applicants representative (RH) touching the inside of a hole cut in the plaster wall. However, this does not show the FSP inspected other areas such as the base of the kitchen walls, bedroom walls and underneath the cabinetry. In A’s report dated 11 August 2014, A recommended the wall to the bedroom behind the kitchen be opened up to remove damp or wet insulation. A also noted moisture in the hallway wall, door and ceiling to the bedroom and concrete slab, running along the base of the wall backing onto the kitchen. The information clearly shows the Applicants’ concerns about mould were justified and related to the claimed incident, given the location where the mould was present. The Panel considers the FSP is responsible for the cost of:  inspecting the areas mentioned and remediating where necessary  performing any work to rectify the areas after the remediation is completed  a final inspection and certificate of confirmation that no mould remains  reimbursing the Applicants for the costs associated with S’s work to date. The FSP is responsible for minor damage The FSP acknowledges some aspects of the repairs remain outstanding and it is responsible for removing and replacing the kitchen gables and kicker panels and reinstalling and painting the wall skirtings. The Applicants have also raised issues with some other parts of the unit. The Panel considers the FSP is responsible for the following matters:  stained marble vanity bench top in powder room  scratched tiles in bathroom (where fridges were rolled into for storage)  dented plaster in third bedroom (due to mirror removal)  plaster repair to access the leaking pipe and scuffed paint  paint bubbling in hallway between the bedroom and the door to the laundry  foyer entrance door tracks/guides not installed. Case No: 381578 Determination Page 6 of 14 In relation to the damaged tiles at the entry foyer, the Panel is not satisfied the information establishes the drummy nature of the tiles was caused by or relates to the incident or the actions of the FSP’s contractors. Of note, the Applicants’ own builder (B) did not indicate the dama ge appeared to relate to the claim, but said the condition was similar to that of other units. It is also unclear how the two previously repaired tiles on the eastern edge relate to the claim given the initial reports of damage do not refer to these tiles. However, the policy provides cover for accidental loss or damage to the building. The Applicants clearly consider the damage to the chipped tiles to be unintended and unexpected. There is no indication this damage was not accidental or that it should be excluded from cover. Therefore, it is reasonable for the FSP to cover the cost of repair for the chipped tiles. No evidence the contents are damaged and no cover for engineer sign-off The Applicants claim there may be damage to their contents due to the manner in which they were stored by the FSP’s contractors. However, there is no evidence such damage has occurred. The Panel does not consider it necessary for the FSP to rectify damage that has not been demonstrated and is only a possibility at this time. The Applicants’ request for a hydraulic engineer to sign -off on the repair of the downpipe is not covered under the policy. Further, it is noted the body corporate commissioned a general hydraulic inspection of the building due to the frequency of leakages in or about July 2014. Accordingly, the Panel does not consider this to be a cost the FSP is responsible for paying. The FSP is responsible for the delays to complete the repairs The parties dispute who is responsible for the delay to complete the repairs and therefore responsible for any inconvenience caused. However, it is noted the Applicants are not seeking compensation in this regard. The Panel considers the FSP to be responsible for the delay because the Applicants correctly requested A to stop work due to their concerns. If A had undertaken the repairs in an appropriate and acceptable manner, the Applicants would not have had to intervene and seek the assistance of the Service. Further, once the FSP elected to repair the property in accordance with A’s scope of works, it effectively assumed the financial and other risks associated with completing those works. An insurer who elects to undertake repairs will not generally be entitled to later elect to cash settle the claim. The Applicants have relied on the position adopted by the FSP in accepting liability and authorising repairs and therefore the FSP remains bound by its prior actions. On this basis, the Panel is satisfied the FSP remains liable for the costs of completing the repair of the damage identified by A and is responsible for any consequences of the delays, given the Applicants’ dispute of the works was warranted. Case No: 381578 Determination Page 7 of 14 2.2 The FSP should cash settle the Applicants for the remaining repairs The Panel notes that the Applicants have indicated they are willing to accept a cash settlement rather than have the FSP carry out the remaining repairs. This is due to the time that has passed and subject to the cash settlement being adequate to fund the necessary works. The Panel considers a cash settlement to be appropriate in the circumstances, especially given the concerns with the standard of work by A, were in dispute. The FSP argues the Applicants’ quotes from F and B to reinstate the flooring is excessive compared to its quote from A. However, the Panel accepts the Applicants’ quote from B as being reasonable. This is taking into consideration A’s quote may have been less but it did not result in the FSP properly reinstating the Applicants’ flooring initially. A’s quote also did not allow for the flooring und er the kitchen cabinetry and island, used out of tolerance boards and resulted in an unsatisfactory quality of finish. For the reasons outlined above, the Panel considers that the FSP should cash settle the Applicants for a total of $59,160 plus GST. The amount of $59,160, is made up as follows:  gables, kick panels and skirting ($4,000)  repairs to the stained vanity, scratched tiles, dented plaster, plaster near the leaking pipe, bubbled paint, entrance door tracks/guides and chipped tile ($4,100)  reinstating the flooring ($38,400)  mould inspection and remediation ($2,000)  cleaning and removal of contents ($2,500)  builder’s margin ($8,160). As these estimates were based on 2014 figures and these were available to the FSP, the FSP is to pay interest on the settlement amount from 14 October 2014, to the date of payment, in accordance with the Insurance Contracts Act 1984 (the Act). 2.3 Are the Applicants entitled to additional costs? The Applicants’ unit is owner occupied for approximately five weeks a year Had t he FSP’s agents completed the repairs satisfactorily, the following delays and disputes are unlikely to have occurred. As a result, any further costs incurred by the Applicants as a result of the FSP ’s failure to complete the repairs, should be borne by the FSP. In this instance, until such time as the repairs are completed, the Applicants will be unable to use their property and may incur further temporary rental costs. However, this is not a straightforward matter, given the Applicants concede they only utilise this accommodation about 5 weeks out of 52 in a year. Case No: 381578 Determination Page 8 of 14 On the basis that the further repairs may take up to 4 weeks to complete, on balance it may be possible that the Applicants would require use of the accommodation for a short period of time, give n their history of use. The Panel therefore considers it would be fair in all the circumstances that should the Applicants incur any further accommodation costs during the repair period, the FSP is to reimburse these costs, within the following limits:  reimburse up to $1,100 per day  a maximum of 5 days allowed  subject to providing appropriate receipts etc. The Applicants are not entitled to policy benefit for claim preparation costs The policy provides that the FSP will pay for up to $30,000 in costs necessarily and reasonably incurred by the Applicants, in preparing a claim following loss or damage to the unit as a result of an incident covered under the policy. However, the costs must be incurred with the FSP’s written consent. The Applicants seek the reimbursement of approximately $22,400, paid to their claims manager (M), who is also their representative in this dispute. The Applicants say the FSP’s lack of consent was unreasonably withheld. The FSP argues the claim preparation fees do not fall within scope of the policy. It is clear from M’s schedule of fees, M was involved in the claim since 12 May 2014, when the Applicants first consulted M. There is no evidence the Applicants sought written consent from the FSP at this time. From the information on the file, it appears the Applicants did not seek cover for the costs until an email dated 12 August 2014. The policy only provides for reimbursement of claim preparation costs where the FSP’s prior written consent has been obtained before the relevant costs are incurred. As the Applicants did not obtain the FSP’s prior written consent, they are not entitled to payment of the additional benefit for claim preparation costs. Thus, the Applicants are not entitled to this benefit in accordance with the terms and conditions of the policy. However, the Service can consider whether such costs are payable under paragraph 9.4 of the FOS Terms of Reference. FOS may require a financial services provider to contribute to legal or other professional costs incurred by an Applicant in the course of their dispute. A financial services provider will generally not be required to contribute more than $3,000 unless exceptional circumstances apply. FOS offers a service that is free for Applicants. Usually, if Applicants choose to be represented, they will have to cover the fees themselves. The information shows the Applicants sought this assistance before raising any issues with the FSP about the repairs and well before the FSP was represented by solicitors. Accordingly, the Panel is of the view such costs are not payable in this instance. Case No: 381578 Determination Page 9 of 14 The Applicants are entitled to reimbursement of certain professional costs The Applicants seek reimbursement for the costs of engaging experts to attend inspections, provide reports and advice set out below:  structural engineer’s attendance at on -site meeting and reports ($2,060.30)  mould remediation work and restoration reports ($1,617)  flooring report ($660). In the present case, the Panel accepts it was reasonably necessary for the Applicants to obtain the reports referred to above, in accordance with paragraph 9.4 of the FOS Terms of Reference. It was reasonable for the Applicants to seek the assistance of the structural engineer to attend the site meeting to attempt to resolve the extent of further work required. The mould inspections and restoration reports also assisted in supporting the Applicants’ position. In contrast, the reports from the FSP’s builder were not as detailed or provided reasons to support that the moisture levels across all affected areas had dried to acceptable levels (which it had not). The Applicants also seek the unknown costs of a further mould inspection to be done. As this cost is not incurred yet, it is considered in the above cash settlement figure. The Panel considers the flooring report to have clarified the concerns the Applicants had with the flooring and provided cogent reasons as to why the flooring should be removed and replaced. On this basis, the FSP is to reimburse the Applicants the costs incurred which total $4,337.30 and interest calculated from the date the Applicants paid those costs to the date of payment in line with section 57 of the Act. Management fees are a benefit for the body corporate to claim The Panel does not consider the FSP should be responsible for paying the Applicants $2,000 for management fees. The policy states: “ Maintenance fees We will pay You, up to $2,000 per Lot/Unit, per Incident, maintenance fees and levies owed to You by Lot/Unit Owners during any period where a Lot/Unit is uninhabitable or unfit for its intended use as a result of an Incident covered under Section 1 of the Policy.” The policy defines “you” to mean the body corporate or owners’ corporation but limited to the interests of the owners. In the context of the above policy clause, it is clear the benefit is intended to be for to the owners’ corporation, in circumstances where the owners of the unit have not paid maintenance fees or levies. That is, the benefit is not meant to be provided to a unit owner. Case No: 381578 Determination Page 10 of 14 There is no evidence the Applicants have not paid or owe their strata levies or fees for the period claimed. Given the Applicants are responsible for paying this fee, this claim appears to be a request for a reimbursement. This is not the intention of the policy. Accordingly, as the Applicants have not suffered a loss in this regard and are not entitled to such a benefit, the FSP is not responsible for this aspect of their claim. Neither party has breached their duty of utmost good faith The Applicants argue the FSP has acted without good faith, breached the Act, lacked transparency and repeatedly failed to provide information requested. Under section 13 of the Act, each party to a contract of insurance has a duty to act towards the other party with the utmost good faith, in relation to any matter arising under or in relation to the contract. A failure to comply with this duty is a breach of the Act. The Applicants say the FSP breached its duty of utmost good faith by not advising them of the basis of cover for temporary accommodation and then unreasonably withholding payment for such benefits and other costs claimed. Conversely, the FSP considers the Applicants breached their duty b y delaying completion of the works and claiming an entitlement to temporary accommodation benefits subsequent to this. The Panel accepts the duty of utmost good faith requires an insurer to act consistently with commercial standards of decency and fairness and with due regard to the legitimate interests of an insured as well as to its own interests. Although the Applicants consider the FSP did not adequately advise them of the basis it covered temporary accommodation benefits, there is no evidence they raised this issue with the FSP at the time. As determined above, the Panel does not consider the Applicants caused the delays to completing the works. The Panel does not consider either party has breached their duty, but the parties have had differences of opinion as to how the policy applied to their circumstances. This of itself does not amount to either party failing to comply with their duty of utmost good faith or breaching the Act. Case No: 381578 Determination Page 11 of 14 3 Supporting information 3.1 Panel approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination, the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. 3.2 Key points on relevant material Record Key points FSP’s builder (A) Report 4 April 2014  Inspected property on 28 March 2014.  Water damage to property due to break in waste pipe in wall cavity in hallway, affecting two bedrooms, hallway, kitchen and lounge areas.  Conducted make - safe work in common area of main foyer.  Traced and found source of leak.  Leak repaired to prevent further water entry and damage.  Installed drying equipment to start drying process and prevent further damage.  Removed and relocated furniture to enable removal of timber floor, and structural drying works to underlying concrete floor slab.  Outstanding work includes inspection of walls behind skirtings and wall cavities at random points for mould growth. FSP’s builder (A) Quotation 9 April 2014  Attended on 7 April 2014.  $126,193.25 for works including common and other areas.  Priced to replace timber flooring with the kitchen in place.  Will replace kitchen kick panel to meet with new flooring.  Work to be done to the unit: Item Amount floor finishes $27,050 Case No: 381578 Determination Page 12 of 14 Record Key points joinery 3,200 plastering/drywall (to plasterboard wall lining, skirting , fire/sound check plasterboard lining and wall lining and hallway areas) 500 120 420 carpentry 500 painting & decorating (skirting, walls in living, kitchen, hallway and bedroom 3) 300 1,331 Total (excluding GST) $33,421 FSP’s builder (A) Report 5 May 2014  Moisture in all areas now dry to acceptable levels.  Drying equipment removed.  Repairs can proceed. Applicants’ restoration specialist (S) Scope of Works 11 August 2014  Moisture is well over the expected levels of 19 - 22%.  Plaster in bedroom is still wet.  Mould evident in original area in base board near fridge cavity in the kitchen, bedroom area (backing onto kitchen) and plasterboard in area near doorway (kicker).  Plasterboard along base of wall was degraded due to water damage.  Unable to inspect bedroom wall due to insulation.  Ongoing moisture issue given high readings . FSP’s builder (A) Report 11 August 2014  Hallway wall to left of exposed area showing elevated moisture condition in plasterboard. Staining visible on board.  Hallway door to bedroom, wall and ceiling affected by water which appears to have tracked down wall adjacent to right side of door architrave.  Bedroom, wall to kitchen, elevated moisture condition found within insulated walls to kitchen. Suspect insulation behind plasterboard is affected and holding moisture.  Concrete slab running along base of wall is affected and showing elevated moisture condition.  Recommended the wall is opened up in b edroom to remove damp/wet insulation material. Applicants’ builder (B ) Opinion 3 and 4 September 2014  Concerned with the inconsistency of the board width of the flooring and the large number of joints with putty used to fill gaps.  The island bench and end gables were not removed prior to laying the new floor in the kitchen area. Removal would have ensured no need for the visible expansion joints.  Mould evident in bedroom adjacent to kitchen. Recommended wall linings be removed from bedroom wall and mois ture readings taken underneath kitchen cabinetry. Applicants’ restoration  All mould was removed from accessible surfaces and surfaces coated with anti - microbial treatment. Case No: 381578 Determination Page 13 of 14 Record Key points specialist (S ) Mould Investigation and Removal Report 1 October 2014  Mould growth w as on the plasterboard wall near the bedroom door extending towards the opposite glass sliding doors.  Mould was visible on the surface of the insulation batts in contact with the plasterboard.  Mould was on the insulation and plasterboard removed from the g ap between the hebel and concrete structural walls.  Plasterboard between the hebel wall and kitchen cabinetry was inaccessible so limited inspection and treatment was possible.  Recommended removing kitchen cabinetry to fully examine whether there is mould growth there and to remove it. Applicants’ builder (B) Quotation 7 October 2014  Terrazzo tiled landings (in foyer area) were generally in a similar condition in all units.  Concerns with the workmanship and colour match of previous repairs to two tiles on the eastern edge of the entry as they are not up to a high standard. An exact match is not guaranteed. Applicants’ flooring specialist (F) Report 30 October 2014  Flooring is staggered, squared and laid out correctly.  Bad choices to use out of tolerance bo ards (2 - 3mm run out, rough cut and badly chipped ends filled with incompatible putty colour) creating unacceptable appearance defects.  Cork expansion not glued with PVA to edge, allowing gaps.  Cork expansion butt joins not cleanly/neatly cut and cork appea rs dry with very little coating.  No cork expansion to kitchen gable ends in previous floor because cabinets had been removed.  Cross cut sand paper marks visible. Not enough attention and detail applied to fine sanding.  Recommended boards with unacceptable defects and untidy cork expansions be removed, replaced, resanded and coated, and the removal of kitchen cabinets where flooring needs to be installed. 3.3 Relevant sections of the policy “General Definitions … Rent means payment for the use of land, Buildin gs, Common Area or a Lot/Unit, including any outgoings payable by the tenant or lessee. … Section 1 – Property Insured 1. The Indemnity We will pay You up to the Sum Ins ured specified in the Schedule for Building(s) and Common Contents, for accidental loss or damage to the Building(s) or Common Contents which occurs during the Period of Insuranc e. … 3. Additional Benefits Following loss or damage by any cause not excluded, the following Additional Benefits will be paid in addition to the Sum Insured. 3.1 Temporary Accommodation, Loss of Rent Receivable, Reletting Costs, Maintenance Fees and Removal and Storage Costs of Lot Owners Contents. … 3.1.A Temporary Accommodation Case No: 381578 Determination Page 14 of 14 Where an owner occupied Lot/Unit is uninhabitable or unfit for its intended purpose or access to the Building is prevented as a result of an Incident covered under Section 1 of the Policy, We will pay to the Lot/Unit Owner, an amount equal to the amount that the Lot/Unit could have been Rented for. We will pay this amount until the Lot/Unit becomes fit for occupation or until access to the Building has been re-established, for maximum period of 24 months. ” 3.4 Other relevant information relied upon  Policy schedule and product disclosure statement.  Parties’ submissions, expert reports and photographs.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.