Home / Financial Firm (Unknown - Insurer) / Determination 381380

Determination 381380

Adequacy of cash settlement offered for home building damage and repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2015-06-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$167,498
Non-financial loss—
Amount claimed$170,000
SourceAFCA PDF

Summary

The applicants claimed about $170,000 for foundation and wall damage after a burst pipe and subsequent resin injection repairs, and the FSP offered $45,000 cash. AFCA found the FSP bound by its earlier acceptance and ordered a cash settlement of $167,498, reducing the additional damage by 20 per cent.

Having accepted liability and authorised repairs under the engineer's scope of works, the insurer remained liable for completing them and for most of the additional damage it accepted was caused by the repairs.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim Determination Case No: 381380 Determination Page 1 of 9 Case number : 381380 22 May 2015 1 Overview 1.1 Dispute In January 2013, the Applicants lodged a claim under their home insurance policy with the Financial Services Provider (FSP) for cracking and movement damage to their property. The Applicants believed the damage had been caused by a leaking pipe which had been located and repaired some ten months earlier. The FSP accepted the Applicants’ claim and authorised repairs to the property, including resin injections to stabilise the concrete slab. However, further damage became apparent after the first stage of the repairs. The Applicants say the FSP should be responsible for completing the original works and repairing the additional damage (at an estimated cost of approximately $170,000). The FSP has offered the Applicants a cash settlement of $45,000, to pay for the cost of completing the original works, as well as that part of the additional damage which it considers was caused by the resin injections. However, the FSP says it is not liable for any additional costs. 1.2 Issues and key findings Is the cash settlement offered by the FSP fair and reasonable? The FSP accepted liability for the damage identified by the Applicants’ engineer (A) as having been caused by the burst pipe and authorised its builder to commence repairs based on A’s scope of works. In doing so, it took on the associated risks. Accordingly, it remains liable for the costs of completing the works set out in A’s scope of works, including conventio nal underpinning works given the resin injections have failed. The FSP is also liable for repairing the bulk of the additional cracking and movement damage which, on the balance of probabilities, has been caused by the resin injection works. 1.3 Determination This Determination is substantially in favour of the Applicants. The FSP is to pay the Applicants the amount of $167,498 in full and final settlement of their claim. Case No: 381380 Determination Page 2 of 9 2 Reasons for Determination 2.1 Is the cash settlement offered by the FSP fair and reasonable ? Policy provides cover for burst pipe subject to exclusions The Applicants’ policy provides cover for loss or damage to their property caused by the events listed in the policy (including water leaking or escaping from a pipe), subject to the exclusions set out in the policy. The policy contains general exclusions for loss or damage arising from:  gradual deterioration or erosion;  settling, shrinking or expansion in buildings, foundations or walls; and/or  subsidence or landslide (unless it happens immediately as a result of an earthquake or explosion). Claim arises from burst pipe in early 2012 After discovering water pooled at the side of their home in early 2012, the Applicants engaged a plumber who discovered a burst water pipe behind the toilet cistern in the downstairs bathroom. The Applicants’ plumber confirmed that water leaking from the pipe had filled the foundations of the home, saturating the sub-soil under the concrete slab. The Applicants’ neighbours (who had seen water entering their courtyard) confirmed that the pipe had been leaking for approximately two weeks. When the Applicants initially notified the FSP of the burst pipe, they were told that they were unable to lodge a claim under the policy, as the leak had not caused any damage to the house. However, the Applicants subsequently noticed cracks in the ground floor bathroom, kitchen and bedroom, which slowly expanded to the external walls shortly after. As the Applicants believed this damage was due to the burst pipe, they lodged a claim under the policy in January 2013. FSP accepted Applicants’ original claim and authorised repairs The FSP initially denied the Applicants’ claim based on a report from its engineer (S) which concluded that the cracking and movement damage to the property had been caused by differential foundation movement due to naturally occurring variations in the moisture content of the foundation soils over an extended period of time. The FSP’s engineer (S) acknowledged that the differential movement was most pronounced in the bedroom and bathroom near the burst pipe. However, while S noted that the burst pipe may have contributed to the damage, he considered that there was no hard evidence of this and, in any event, the burst pipe was not the sole cause of the damage. The Applicants disputed the FSP’s denial of their claim and obtained a report from their own engineer (A). In his report dated 22 May 2013, A concluded that the Case No: 381380 Determination Page 3 of 9 observed damage to the property was consistent with the effects of a localised water source (the burst pipe) on the moderately reactive clay soils. In particular, A considered that there was significant foundation moveme nt in the brickwork on the eastern side of the house, which was consistent with ground heave (upwards movement) in the centre of the eastern wall (where the burst pipe was located). A concluded that this heave had caused a significant rotation in the foundation on the eastern side of the building. A noted that the absence of damage to the western wall of the house (away from the burst pipe) indicated that the concrete slab was generally functioning correctly and was able to withstand normal soil loads. Fo llowing receipt of A’s report, the FSP reversed its initial decision and accepted the claim for damage to the eastern side of the property which A had identified as having been caused by the burst pipe. However, the FSP denied liability for any other damage to the home. The FSP subsequently obtained quotations from two of the builders on its panel to carry out the necessary repairs, in accordance with a scope of works prepared by A in November 2013. The FSP initially sought to cash settle the Applicants’ cl aim, due to concerns raised by one of the builders (D) about ongoing movement issues at the property. However, after the Applicants expressed concerns about finding a builder to undertake the repairs, the FSP authorised its other builder (E) to carry out the necessary works. E had confirmed that he was prepared to guarantee the works. In his scope of works dated 28 November 2013, A noted that underpinning works should be undertaken to stabilise the sub-soil area and stop any further movement, before the repairs of the internal and external cracking and movement damage could be carried out. Specifically, A indicated that:  the soil should be underpinned using resin injections, to arrest the excessive movement in the eastern side of the building and the adjacent south-eastern and north-eastern corners;  a settlement period of three months should be allowed following the injections to assess the success of this method, before reviewing the underpinned walls and slab. If the injections had successfully stabilised the sub-soil area, the internal and external repairs could then be completed;  however, if the sub-soil area had not been stabilised following the resin injections, it would be necessary to proceed with an alternative conventional underpinning regime. The FSP’s builder (E) quoted $59,124 to carry out the necessary works. The first stage of the works, being the resin injections carried out by a specialist contractor (U), were completed in February 2014. However, a dispute arose after the Applicants noticed further cracking following completion of these works, and sought to have the FSP undertake additional repairs. Case No: 381380 Determination Page 4 of 9 Dispute concerns extent of FSP’s liability for further repairs Based on advice provided by their engineer (A), the Applicants believe that the re sin injections undertaken by the FSP’s contractor (U) have not effectively stabilised the sub-soil area and arrested the movement in the eastern side of the house. Accordingly, the Applicants say that the FSP should be required to fund the costs of the conventional underpinning works which need to be undertaken to effectively repair the property, at an estimated cost of over $120,000. The Applicants also want the FSP to repair all of the additional cracking damage to the property identified following the resin injection works, as well as the original damage which the FSP had previously accepted as having been caused by the burst pipe (at a total cost of approximately $50,000). After being notified of the additional cracking damage to the property, the FSP engaged a building consultant (IC) and another engineer (T) to determine the cause of the additional damage. Both the FSP’s building consultant (IC) and engineer (T) concluded that none of the additional damage had been caused by the burst pipe in early 2012, and only a small portion of this damage was due to the resin injections carried out by U in February 2014. Both experts noted a number of factors which they considered were contributing to the ongoing movement at the property and queried whether all of the damage identified as part of the original claim had been caused by the burst water pipe in early 2012. In particular, T queried the findings of the Applicants’ engineer (A) that the damage was the result of heave to the eastern side of the building. T noted that A’s conclusions were inconsistent with the results of T’s level surveys in May 2014. Based on discussions with the contractor (U) who carried out the resin injection works, the FSP’s engineer (T) confirmed that these works were limited to the northern end of the house and did not extend to the eastern side of the house or the south-eastern corner. Accordingly, these works did not fully comply with A’s scope of works. In any event , the FSP’s building consultant (IC) concluded that the resin injection works would have been inadequate to stabilise the site under any circumstances, given the extent of ongoing movement. IC considered that A’s original scope of works provided insufficient detail about the underpinning works to be undertaken (by whichever method) and was based on inadequate investigations. In particular, he noted that A had not undertaken level surveys or core moisture sampling. While IC confirmed that the works undertaken to date had failed to return the eastern side of the property to a satisfactory state, he also doubted whether the full underpinning works proposed by the Applicants engineer (A) would be appropriate. Based on the findings of its building consultant (IC) and engineer (T), the FSP considers that its liability for any further repairs is limited to: Case No: 381380 Determination Page 5 of 9  the repair of the initial internal and external damage to the property which it originally accepted as having been caused by the burst pipe; and  the repair of the limited additional cracking damage which it accepts has been caused by the resin injection works in February 2014. The FSP has advised that its builder (E) is no longer willing to undertake any further repairs as, given the findings of the FSP’s experts, E is unable to warrant his work. Accordingly, the FSP has offered to cash settle the Applicants for $45,000. This amount represents the amount of E’s original quote ( $59,124) less the amount paid to U for the resin injection works ($19,000), plus an allowance for the repair of the additional damage to the upstairs bedroom which the FSP accepts was caused by the resin injections in February 2014. FSP is bound by prior acceptance of claim As outlined above, the FSP accepted liability for the cracking and movement damage to the eastern side of the Applicants’ property in 2013, based on the findings of the Applicant’s engineer that the damage had been caused by the burst pipe. The FSP also authorised repairs to the property based on A’s scope of works. Following lodgement of the claim in January 2013, the FSP had ample opportunity to engage appropriately qualified consultants to inspect the property and determine the cause of the claimed damage. After considering the reports prepared by the consultants appointed by each party, the FSP ultimately decided to accept liability for the claim based on A’s report . In circumstances where the works authorised by the FSP have been partly completed, it is not open to the FSP to revisit its liability for the claimed damage, based on reports provided by different consultants after the works had already commenced. Further, once the FSP e lected to repair the property in accordance with A’s scope of works, it effectively assumed the financial and other risks associated with completing those works. An insurer who elects to undertake repairs will not generally be entitled to later elect to cash settle the claim. The Applicants have relied on the position adopted by the FSP in accepting liability and authorising repairs and therefore the FSP remains bound by its prior actions. On this basis, the Panel is satisfied that the FSP remains liable for the costs of completing the repair of the initial damage identified by A as having been caused by the burst pipe, in accordance with the scope of works prepared by A. However, the Panel notes that the Applicants have indicated that they are willing to accept a cash settlement rather than having the FSP carry out the remaining repairs, provided that the cash settlement amount is sufficient to fund the necessary works. Case No: 381380 Determination Page 6 of 9 In these circumstances, and given the fact that the builder appointed by the FSP is no longer willing to continue, the Panel considers that a cash settlement is appropriate. FSP is liable for costs of conventional underpinning works and repair of original internal and external damage As outlined above, when the FSP authorised its builder to carry out repairs in accordance with A’s scope of works, it took on the risk s associated with completing those works. Such risks included the risk that the initial regime of resin injections undertaken by U may not be effective to sufficiently stabilise the eastern side of the property. The engineers (A and T) appointed by both parties agree that the resin injections have not been effective, although they may disagree about the reasons why, and the appropriate next steps. The scope of works prepared by A and approved by the FSP in late 2013 expressly foreshadowed the potential need for conventional underpinning works in the event that the resin injections provided unsuccessful. Accordingly, the FSP remains liable for the costs associated with completing these works. The Applicants’ engineer (A) says that the FSP asked him to obtain quotes from underpinning contractors who would be willing to carry out the necessary works. Accordingly, he obtained quotes from two builders (H and HT) for $121,252 and $130,955 respectively. However, the FSP subsequently denied liability for these works. The FSP says that it has reviewed the underpinning quotes and considers that they are excessive, as they provide for the underpinning of the entire house. However, the Applicants’ engineer (A) has confirmed that H’s quote for $121,252 is for the underpinning works to the eastern side of the house only, as well as the repair of the internal and external damage set out in his original scope of works dated 28 November 2013. On this basis, the Panel considers that the FSP should be required to cash settle the Applicants for the amount of H’s quote ($121,252). Given the complex nature of the works required, the Panel considers that the final cash settlement amount should also include A’s fees for overseeing the underpinning works (estimated to be $5,830 (including GST)). Given the currency of the quotations provided, the FSP is not required to pay interest on the cash settlement amount. FSP is liable for costs of repairing bulk of additional damage As outlined above, the Applicants identified additional cracking and movement damage at the property following completion of the resin injection works. This damage is detailed in a scope of works prepared by the Applicants’ engineer (A) in July 2014. The Applicants have obtained a quotation for $50,520 from their builder (H) for the repair of the additional damage. Case No: 381380 Determination Page 7 of 9 The Applicants say that the additional damage has occurred solely as a result of the resin injection works carried out by U in February 2014. They say that the additional damage occurred on the day the injection works were undertaken and consider that this may have been due to the fact that U did not carry out the resin injections in accordance with the scope of works (potentially leaving the property “unbalanced”). The Applicants’ engineer (A) has confirmed that the additional cracking damage was not evident when he attended the property in 2013. A says that the additional damage has occurred as a result of the reversal of the ground forces induced as part of the resin injection works. A reinspected the property in March 2015 and confirmed that there had been no discernible change to the areas where the additional damage occurred since his previous inspections in April and July 2014. The FSP’s building consultant (IC) and engineer (T) dispute A’s findings that the additional damage was caused by the resin injection works. Both T and IC consider that the areas in which the additional damage was observed are between 8 metres and 13 metres away from the injection sites and are therefore too remote for the damage to have been caused by the resin injections. However, IC notes that the injection works appear to have affected tape placed on an external wall to monitor further damage, at a location 13 metres away from the injection site. However, IC dismisses this as essentially coincidental. The FSP’s consultants ( T and IC) consider that the bulk of the additional damage has been caused by ongoing differential foundation movement due to variations in the moisture content of the surrounding soils. They have identified a number of factors which they consider are likely to be contributing to this movement, including the presence of trees on the eastern side of the property, possible issues with the stormwater drains and downpipes and the manner in which the building was constructed. As outlined above, the FSP’s engineer (T) considers that the results of his level surveys are inconsistent with the initial damage to the property having been caused by the burst pipe. Accordingly, he says other factors must have caused or significantly contributed to the cracking and movement damage at the property. Having carefully considered the available information (including the various consultants’ reports), the Panel considers that, on the balance of probabilities, the additional cracking and movement damage was caused by the resin injection works in February 2014. While the FSP’s experts have identified various factors which may have contributed to ongoing foundation movement at the property, the Panel is not satisfied that there is sufficient independent information available to establish that such factors were responsible for the bulk of the damage. In particular, the Panel notes that the specific issues with the stormwater pipes identified by the FSP’s consultants appear to be relatively minor and are unlikely to have been the primary cause of the damage. While the FSP’s engineer (T) Case No: 381380 Determination Page 8 of 9 referred to the potential effects of tree roots on the underground pipes, subsequent CCTV investigations did not reveal any damage of this nature. The Panel also notes that the weight which can be given to the findings of the FSP’s consultants is limited by the fact that both T and IC did not inspect the property until after the resin injection works had been completed. Accordingly, unlike the Applicants’ engineer (A ), they were not able to directly compare the damage before and after these works. To the extent that the FSP has been prejudiced as a result, this has occurred as a result of the approach it adopted in investigating the original claim. The reports prepared by the various assessors and contractors who inspected the property during the course of the initial claim in 2013 suggest that the cracking and movement damage was located primarily at the eastern side of the property. These reports refer to minimal damage to the western side. The FSP has referred to evidence of past repairs sighted during its initial investigations into the claim. However, it is unclear whether these repairs occurred before the pipe burst, or during the period of almost a year between t he date the pipe burst and the date the Applicants’ claim was lodged. Nevertheless, the Panel accepts that it is likely that some of the additional damage at the property has been caused by naturally occurring differential foundation movement, which is excluded under the policy. Based on the available information, the Panel considers that it is appropriate to attribute 20% of the additional damage to such excluded causes. On this basis, the Panel considers that the FSP should be required to cash settle th e Applicants for $40,416 (being 80% of the amount quoted by the Applicants’ builder (H) for the repair of this damage). Case No: 381380 Determination Page 9 of 9 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only.