Determination 380872
Denial of awning collapse claim under accidental damage cover
Summary
A 13 metre commercial building awning collapsed and the FSP denied the claim as caused by design errors and corrosion, both excluded under the policy. AFCA found the exclusions applied and the FSP was not liable for the damage.
The exclusions apply by reference to the cause of the damage, not the insured's awareness of it, and section 46 of the Insurance Contracts Act does not assist because the exclusions do not depend on the defect pre-dating the policy.
Subjects and remedies
home or building damagesmsfno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision -
Denial of Claim
Determination
Case No: 380872 Determination Page 1 of 5
Case number : 380872 1 3 May 2015
1 Overview
1.1 Dispute
The Applicant owns a commercial building which is insured under a strata
insurance policy with the Financial Services Provider (FSP) held by the body
corporate.
The Applicant lodged a claim under the policy after a 13 metre long awning at the
front of the building collapsed on 23 December 2014. The FSP denied the claim
on the basis that the damage occurred due to faulty workmanship, which is
excluded under the policy.
The Applicant disputes the FSP‟s decision and says that, in the circumstances, no
reasonable person could have been expected to be aware of the defect which
caused the awning to collapse.
1.2 Issues and key findings
Is the FSP liable for the damage to the building?
The engineer‟s reports provided by the parties establish that the collapse of the
awning was caused by the inadequate design of the anchoring bolts, exacerbated
by corrosion which further reduced the awning‟s reserve structural capacity . The
policy excludes liability for damage caused in this manner.
The policy exclusions relied upon by the FSP to deny the Applicant‟s claim
depend solely on the cause of the collapse. These exclusions apply regardless of
whether or not the Applicant could reasonably be expected to have been aware of
the underlying issues which caused the collapse.
Section 46 of the Insurance Contracts Act 1984 (the Act) does not assist the
Applicant, as the policy exclusions relied on by the FSP do not depend on the
underlying issues with the awning having been present before the policy was
entered into.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is not liable for the damage to the property.
Case No: 380872 Determination Page 2 of 5
2 Reasons for Determination
2.1 Is the FSP liable for the damage to the property?
Policy provides cover unless FSP can show an exclusion applies
The Applicant is required to show that, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the policy. This is known
as a prima facie claim.
If the Applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an
exclusion under the policy to deny the claim.
The strata policy provides cover for accidental damage to the insured property
(being damage which occurs unintentionally and unexpectedly) during the period
of insurance.
The FSP accepts that the awning at the front of the building collapsed
unintentionally and unexpectedly on 23 December 2014. On this basis, the Panel
is satisfied that the Applicant has established a prima facie claim under the policy.
In these circumstances, the FSP bears the onus of establishing that, on the
balance of probabilities, it is entitled to rely on a policy exclusion to deny the
Applicant‟s claim.
The FSP says that it is not liable because the collapse of the awning was caused
by one or more of the following factors, each of which is excluded under the
policy:
errors or omissions in design, plan or specification;
failure of design;
faulty materials or faulty workmanship;
rust, gradual corrosion or developing flaws.
In order to establish an exclusion applies, the FSP must show that the proximate
cause of the damage to the awning (that is, the real, effective or dominant cause)
was one or more of the excluded factors outlined above.
Collapse of awning was caused by excluded factors
Having carefully reviewed the available information, the Panel is satisfied that the
collapse of the awning occurred due to the failure of the anchoring bolts at the
western end as a result of errors or omissions in the design of the awning,
exacerbated by corrosion of the end plate and packing plate at the western end.
The engineer (NA) appointed by the FSP to inspect the damaged awning
concluded that the primary cause of the collapse was the fact that the fascia
beam anchorages did not penetrate into the core filling concrete of the
cantilevering blockwork support beams to a sufficient depth . This meant that the
structural loading s of the fascia beam could not be directly transferred into the
core - filling concrete and therefore the reserve structural capacity of the anchors
Case No: 380872 Determination Page 3 of 5
was much lower than would have been expected had structurally sound anchors
been installed.
NA noted that t he progressive corrosion of the end - plate and packing plate at the
we stern end of the fascia beam had gradually reduce d the reserve structural
capacity of the anchors further , eve ntually initiating the collapse (possibly in
combination with transient wind gu sts).
After reviewing copies of design drawings lodged with the local council prior to the
construction of the awning and undertaking structural calculations, NA confirmed
that the design specifications for the anchorages were inadequate because:
the anchors proposed were not long enough to ensure that they were
embedded into the core-filling concrete of the cantilevering reinforced
blockwork supporting beams; and
the anchors used were not consistent with the manufacturer‟s
recommendations and the designer failed to anticipate the installation of the
packing plate at the end of the fascia beam, which significantly decreased the
available anchorage embedment depth.
The engineer (IE) engaged by the Applicant to inspect the awning agreed with
NA‟s conclusion t hat the awning collapsed because the anchoring bolts had been
inadequately designed and installed. IE also identified deficiencies in the design
of the two intermediate beams incorporated into the awning structure, which he
considered had inadequate load bearing capacity and therefore provided little or
no support to the awning.
However, the Applicant‟s engineer disputed that the inadequate construction of
the awning was the primary (or proximate) cause of the damage. He considered
the primary cause to be the failure of the local council to reject the building
application when the awning was constructed in the 1970s.
Based on the available information (including the engineers‟ reports provided), the
Panel is satisfied that the proximate cause of the damage to the awning ((that is,
the real, effective or dominant cause) was errors in the design of the awning,
which meant that the anchoring bolts did not provide adequate structural capacity.
While the awning remained in place for approximately 40 years, the underlying
inadequacies in its design made it liable to collapse, particularly as sections of the
supporting structure corroded over time.
The failure by the local council and subsequent building inspectors to identify
deficiencies in the design of the awning may have facilitated its collapse.
However, these omissions were not the underlying cause of the collapse.
As outlined above, the policy excludes cover for damage caused by errors or
omissions in designs, plans or specifications and/or rust, corrosion and
developing flaws. Accordingly, the FSP is entitled to rely on these exclusions to
deny the Applicant‟s claim.
Exclusions do not depend on awareness
The Applicant says that, even if there was an inherent defect in the awning which
led to the collapse, he should not be held responsible as no reasonable person
Case No: 380872 Determination Page 4 of 5
could have been expected to be aware of the underlying issues which led to the
collapse.
In particular, the Applicant says that:
the building had passed several building inspections since it was const ructed
in the late 1970s and had never been found to be unsafe. He arranged for an
inspection of the building prior to purchasing it in 2006, which did not identify
any defects; and
he was not aware of any issues with the awning and there were no signs to
suggest that a collapse was imminent. The anchoring bolts were not visible
and it was not possible to identify that the embedment depth was inadequate
without partially removing or dismantling the awning.
The Panel accepts that, given the nature of the issues with the design of the
awning, the Applicant would not reasonably have been aware of these issues until
the awning collapsed.
However, the exclusions relied upon by the FSP are expressed in absolute terms
and therefore their application depends solely on the underlying cause of the
claimed damage, regardless of whether or not the Applicant (or anyone else) was
aware of the issues with the property.
Accordingly, the fact that the Applicant was unaware of the underlying issue with
the awning does not prevent the FSP from relying on these exclusions to deny his
claim.
Section 46 of the Act does not assist the Applicant
Section 46 of the Act prevents an insurer from denying a claim because of a
defect in a thing, where the defect existed before the policy was entered into and
the insured was not aware (and a reasonable person in the circumstances could
not be expected to have been aware) of the defect at the time the policy was
entered into.
The FSP says the strata policy is a “commercial risks insurance contract”.
Regulation 30 of the Insurance Contracts Regulations 1985 (Cth) provides that
section 46 of the Act does not apply to contracts of this nature.
In any event, the courts have confirmed that section 46 of the Act only applies
where an insurer relies on a policy exclusion which operates by reference to the
time at which the relevant defect arose – that is, where the exclusion expressly
refers to the defect having been present before the policy was taken out.
In the present case, the exclusions relied on by the FSP apply to damage which
was caused by errors or omissions in design, plans or specifications and/or rust,
corrosion or developing flaws, irrespective of when those issues arose.
As such, the application of these exclusions does not depend on the relevant
defects having been present before the policy was taken out. Accordingly, the
Panel is satisfied that section 46 of the Act does not operate to assist the
Applicant.
Case No: 380872 Determination Page 5 of 5
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised a number of issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
The Applicant owns the building in his capacity as trustee of a self-managed
superannuation fund. The Applicant has been assisted by his insurance broker
during the course of this dispute. For the purposes of this Determination,
submissions made by the Applicant‟s brok er have been treated as having been
made by the Applicant himself.
3.2 Terms of policy
Subject Terms
Accidental damage
cover
We will pay You up to the Sum Insured specified in the Schedule
for Building(s) and Common Contents, for accidental loss or
damage to the Building(s) or Common Contents which occurs
during the Period of Insurance.
We will not pay You … in respect of any of the matters set out in
the Exclusions or the General Exclusions.
Exclusions We will not be liable in respect of any physical loss, destruction or
damage directly or indirectly caused by or arising out of or in
consequence of or contributed to by: …
wear , tear, fading, gradual corrosion or gradual deterioration,
concrete or brick „cancer‟, wet or dry rot, rust, oxidation,
chipping, scr atching or marring, normal upkeep, making good
or any developing flaws;
error or omission in design, plan or specification or failure of
design;
faulty materials or faulty workmanship.