Determination 380630
Denial of storm-damaged wall collapse claim under exclusions
Summary
The insured claimed for a storm-damaged east elevation wall of a commercial building, which the FSP declined under faulty design and known-defects exclusions. AFCA found the exclusions not established and ordered the FSP to indemnify the insured with interest if cash settled.
The insurer bears the onus of proving a known-defects exclusion, and proof that the insured merely had reasonable awareness of concerns falls short of knowledge of a defect.
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Determination
General Insurance - Small Business/Farm Insurance - Commercial Property - FSP
Decision - Denial of Claim - Exclusion/Condition
Determination
Case No: 380630 Determination Page 1 of 7
Case number : 380630 11 June 2015
1 Overview
1.1 Dispute
The Applicant lodged a claim upon a business insurance policy (the policy) held
with the Financial Services Provider (FSP). The Applicant is seeking cover for the
partial collapse of a wall during a period of strong winds.
The FSP has declined the claim on the basis the damage arose from inadequate
and faulty construction which is clearly excluded from cover („the first exclusion‟).
Alternatively, the FSP also maintains the Applicant was reasonably aware of the
said defects arising from an earlier insurance claim with another insurer and these
defects were not brought to the FSP‟s attention at inception of the policy („the
second exclusion‟).
1.2 Issues and key findings
What is the scope of the policy?
The policy provides cover for loss or damage arising from sudden, unexpected
unforeseen circumstances subject to the specified limitations and exclusions
within the policy.
Is the FSP required to cover the damage claimed?
The FSP is obliged to accept the Applicant‟s claim. The available evidence
establishes the first exclusion cannot apply to damage caused by wind and/or
storm and the FSP has failed to discharge its burden of proof in respect of the
second exclusion.
The FSP has failed to demonstrate that at policy inception the Applicant ‘kne w’
(Panel emphasis) about the continuing existence of des ign faults in the building‟s
east elevation wall.
1.3 Determination
This Determination is in favour of the Applicant.
The FSP is to indemnify the Applicant pursuant to the terms of the policy. In the
event the FSP elects to cash settle the Applicant, section 57 interest as per the
Insurance Contracts Act 1984 (the Act) is to apply as from 2 October 2014, the
date of the FSP‟s IDR decision.
Case No: 380630 Determination Page 2 of 7
2 Reasons for Determination
2.1 What is the scope of the policy?
The policy is an accidental damage contract of insurance
The policy provides cover for loss or damage arising from sudden, unexpected
unforeseen circumstances subject to the specified limitations and exclusions
within the policy.
The available evidence reasonably establishes that the partial collapse of the
insured building‟s east elevation wall, subject of the claim, occurred during a
significant storm event (high wind speeds of up to approximately 100kmph).
These are circumstances which fall within the scope of cover available under the
policy.
In light of this, the FSP bears the onus of proof to demonstrate, on the balance of
probability, the application of a policy exclusion(s) enabling it to deny the claim.
The FSP in declining the claim first referred to the policy exclusion relating to loss
or damage caused by faulty workmanship and/or faulty design. The FSP was
contacted by the Service‟s Case Manager regarding the concerns he held with
respect to the scope of this exclusion.
The FSP on considering the Case Mana ger‟s concerns acknowledges this
particular exclusion relied upon is limited to loss or damage arising from
circumstances of the different forms of earth movement and does not extend to
storm/wind damage, which is the undisputed cause of the damage in this case.
For the sake of completeness the Panel determines the wording of the first
exclusion is not engaged where the loss is caused by storm/wind damage.
2.2 Is the FSP required to cover the damage claimed?
The loss claimed is not excluded from cover under the policy
In the alternative, the FSP has sought to decline the Applicant‟s claim in line with
the general policy exclusion for loss or damage caused by faults or defects known
to the insured at the time the policy was incepted and not brought to the attention
of the FSP.
The Panel determines, on the balance of probability, that the FSP has not met its
onus establishing this policy exclusion, such as to permit declinature of the
Applicant‟s claim, for reasons discussed below.
The FSP has failed to prove the Applicant knew of the building defects at
policy inception
As previously discussed the FSP bears the onus of proof demonstrating that at
policy inception the Applicant knew of the building defects and failed to advise the
FSP of same.
Case No: 380630 Determination Page 3 of 7
It is not disputed between the parties that at policy inception the Applicant
revealed the building had been the subject of a previous insurance claim in 2012
with another insurer. The FSP‟s screen shots of the incepting process reflect this,
as does the Applicant‟s Certificate of Insurance (COI). The relevant screen shot
discloses the name of the previous insurer and that a prior claim had been paid in
the preceding three years; the COI records that in 2012, $16,000 was paid for
„storm damage to building‟. The 2012 damage involved the partial collapse of the
south end of the east elevation wall, due to the actions of storm/winds.
However, the FSP contends that in the process of attending to the damage
remediation in 2012, the Applicant had been relevantly advised by his engineer
(D) that the „ties used between the block work and the columns were inadequate‟.
Further that their engineer (IL), in respect of the cause of the 2014 failure of „a 40
metre section of blockwork along the east elevation‟, relevantly concluded:
„Insufficient ties between blockwork wall and the portal frame structure has
resulted in failure of the bond beams and subsequent blockwork.‟
As a result the FSP submits:
„…the second (D) report was completed on 28 March 2013, some 15 months prior
to the subject claim. The FSP submits this timeframe constitutes a reasonable
awareness of concerns with the adequacy of the steelwork ties. The FSP submits
that no evidence has been presented demonstrating that the applicant (sic) acted
upon the advice of (D). In such circumstances where there is a known defect and
the defect is not disclosed, the FSP submits the policy excludes loss arising from
the defect‟.
At the outset, the Panel accepts that the expert evidence reasonably supports a
conclusion that faulty building ties were the likely cause in 2014 of the „failure of a
40 metre section of blockwork along the east elevation‟. However, it must now
consider what effect, if any, this has upon the FSP‟s capacity to demonstrate its
exclusion has been enlivened.
The Panel notes it is not disputed between the parties that the Applicant, pursuant
to the 2012 insurance claim, engaged the services of a builder who successfully
remediated the damage such that for approximately 15 months the building and
its east elevation wall was fit for purpose. Further, that the relevant policy
exclusion, now solely relied upon by the FSP, can only be enlivened where it can
demonstrate, on the balance of probability that the Applicant ‘knew’ (Panel
emphasis) of a defect; however, the language employed by the FSP in its Notice
of Response to the Service dated 21 January 2015 and replicated above falls far
short of that standard. Namely ‘a reasonable awareness of concerns with the
adequacy of the steelwork ties’ (Panel emphasis), does not equate to the
probative standard encompassed by the phras e „defects known to you‟.
Accordingly, the Panel determines the FSP has failed to demonstrate that on the
balance of probability, the Applicant at policy inception „knew‟ that the building ties
were still inadequate in respect of the east elevation wall, notwithstanding that his
commissioned builder had completed remediation of the damage arising from the
December 2012 insurance claim.
Case No: 380630 Determination Page 4 of 7
For the sake of completeness, the Panel from its own perspective does not
believe, based on the evidence provided by the parties, that the Applicant at
policy inception did „know‟ that the building ties in the east elevation wall remained
defective; as a layperson he was entitled to rely upon the remediation work
performed by his commissioned builder. Accordingly, he could only advise the
FSP at policy inception what he actually „knew‟.
In light of the Panel‟s determination it is unnecessary for it to consider the
Applicant‟s other arguments, advanced by him in prosecuting his case.
Case No: 380630 Determination Page 5 of 7
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous FOS decisions.
The parties have made extensive submissions and provided voluminous
materials. All material information which has been relied on for the purposes of
this Determination has been exchanged between the parties, and each party has
had the opportunity to address any issues raised b y the other.
3.2 Relevant expert evidence
The parties, especially the FSP, have made available numerous reports from
consultants commissioned to the claim. The Panel has limited reference to
information more relevant to and considered in providing the Determi nation.
Record Key points
D’s (Engineer) Interim
Report
18 February 2012
visited assess to assess damaged wall in relation to a
report provided by the insurer‟s (previous insurer)
appointed engineer
found that works completed by the FSP‟s builder were not
satisfactory and required immediate rectification works
no physical inspection completed and the original building
documentation was not available
the location of the damage, direction of the rotation of the
wall and prevailing wind direction all corre late with the side
wall section and likely cause of damage experienced
D provided a number of recommendations (steps) to be
undertaken in order to make safe/repair the wall.
D’s Scope of works and
comments
D provides and concluded:
the masonry bond beams on the east wall have not
been constructed as detailed on the engineering
(design) drawings
average spacing of the bond beams were to be
2,200mm however were built with average spacing of
3,100mm
masonry brick ties were at random spacing and were
not welde d to the columns as shown in engineer‟s
drawings
the existing structure and masonry wall would have
been structurally adequate under the design as per
the engineer‟s drawing and had the approved wall ties
Case No: 380630 Determination Page 6 of 7
been used, to withstand the forces noted on the
des ign engineer‟s computations
the lack number of wall ties welded to the columns
and brick piers not running all the way to the top of the
wall appears to have increased the overall span of the
bond beams, causing the failure and collapsing of the
masonry wa ll.
IL Structural Inspection
Report
14 July 2014
the insured building had been constructed 20 years prior
an the Applicant had purchased the property five years ago
since the property had been purchased structural works
had been completed to provide addit ional support to
sections of the blockwork wall
a 40m section of the wall along the east elevation had
collapsed following strong winds
blockwork piers encasing steel vertical members internally
had been constructed at inconsistent heights with no pier
ext ending full height of the wall
the collapsed section of blockwork was located directly
adjacent to the smallest piers within the structure
piers were not keyed into the east elevation blockwork wall
with mortar sighted flush against brickwork
steel blockwork ties were sporadically sighted „hooked‟
onto steel columns and tied to mortar joints. No significant
pattern was visible and very few ties at higher level
block ties had not been welded onto steel vertical
members at every fourth course as nomina ted in design
documents
block ties above the height of brick piers were sporadic
and often defective therefore not providing any restraint
mortar joints to the collapsed section were found to be of
very sandy nature
significant displacement and bowing sigh ted to adjacent
section of blockwork. Make safe contractors were advised
to remove the entire wall in order to secure area
IL concluded:
inspection confirmed inadequate construction of
masonry, specifically ties to the steelwork, was the
sole cause for fa ilure of the east elevation wall
the construction of the wall was not in line with its
design and had it been it would have been able to
withstand with the wind pressures applied on the day
of loss (even with the open door)
without any doubt the inadequate construction of the
east elevation wall is the sole cause for all recorded
damage.
3.3 Relevant policy terms
“ Page 6
General exclusions
These general exclusions apply to all sections …
Known defects
Case No: 380630 Determination Page 7 of 7
We will not pay for loss or damage caused by faults or defects known to You or any
employee whose knowledge in law would be deemed to be Yours and not disclosed to
Us at the time this insurance was arranged.
…
Page 20
Exclusions
…
2. We will not cover You for loss or damage caused by:
…
(g) creeping, heaving, normal settling, shrinkage, seepage, vibration, expansion in
buildings, pavements, roads, car parks and the like:
(i) error or omission in design, plan or specification or failure during testing;
(ii) f aulty materials or workmanship;”