Home / Financial Firm (Unknown - Insurer) / Determination 380630

Determination 380630

Denial of storm-damaged wall collapse claim under exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2015-06-19
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured claimed for a storm-damaged east elevation wall of a commercial building, which the FSP declined under faulty design and known-defects exclusions. AFCA found the exclusions not established and ordered the FSP to indemnify the insured with interest if cash settled.

The insurer bears the onus of proving a known-defects exclusion, and proof that the insured merely had reasonable awareness of concerns falls short of knowledge of a defect.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of Claim - Exclusion/Condition Determination Case No: 380630 Determination Page 1 of 7 Case number : 380630 11 June 2015 1 Overview 1.1 Dispute The Applicant lodged a claim upon a business insurance policy (the policy) held with the Financial Services Provider (FSP). The Applicant is seeking cover for the partial collapse of a wall during a period of strong winds. The FSP has declined the claim on the basis the damage arose from inadequate and faulty construction which is clearly excluded from cover („the first exclusion‟). Alternatively, the FSP also maintains the Applicant was reasonably aware of the said defects arising from an earlier insurance claim with another insurer and these defects were not brought to the FSP‟s attention at inception of the policy („the second exclusion‟). 1.2 Issues and key findings What is the scope of the policy? The policy provides cover for loss or damage arising from sudden, unexpected unforeseen circumstances subject to the specified limitations and exclusions within the policy. Is the FSP required to cover the damage claimed? The FSP is obliged to accept the Applicant‟s claim. The available evidence establishes the first exclusion cannot apply to damage caused by wind and/or storm and the FSP has failed to discharge its burden of proof in respect of the second exclusion. The FSP has failed to demonstrate that at policy inception the Applicant ‘kne w’ (Panel emphasis) about the continuing existence of des ign faults in the building‟s east elevation wall. 1.3 Determination This Determination is in favour of the Applicant. The FSP is to indemnify the Applicant pursuant to the terms of the policy. In the event the FSP elects to cash settle the Applicant, section 57 interest as per the Insurance Contracts Act 1984 (the Act) is to apply as from 2 October 2014, the date of the FSP‟s IDR decision. Case No: 380630 Determination Page 2 of 7 2 Reasons for Determination 2.1 What is the scope of the policy? The policy is an accidental damage contract of insurance The policy provides cover for loss or damage arising from sudden, unexpected unforeseen circumstances subject to the specified limitations and exclusions within the policy. The available evidence reasonably establishes that the partial collapse of the insured building‟s east elevation wall, subject of the claim, occurred during a significant storm event (high wind speeds of up to approximately 100kmph). These are circumstances which fall within the scope of cover available under the policy. In light of this, the FSP bears the onus of proof to demonstrate, on the balance of probability, the application of a policy exclusion(s) enabling it to deny the claim. The FSP in declining the claim first referred to the policy exclusion relating to loss or damage caused by faulty workmanship and/or faulty design. The FSP was contacted by the Service‟s Case Manager regarding the concerns he held with respect to the scope of this exclusion. The FSP on considering the Case Mana ger‟s concerns acknowledges this particular exclusion relied upon is limited to loss or damage arising from circumstances of the different forms of earth movement and does not extend to storm/wind damage, which is the undisputed cause of the damage in this case. For the sake of completeness the Panel determines the wording of the first exclusion is not engaged where the loss is caused by storm/wind damage. 2.2 Is the FSP required to cover the damage claimed? The loss claimed is not excluded from cover under the policy In the alternative, the FSP has sought to decline the Applicant‟s claim in line with the general policy exclusion for loss or damage caused by faults or defects known to the insured at the time the policy was incepted and not brought to the attention of the FSP. The Panel determines, on the balance of probability, that the FSP has not met its onus establishing this policy exclusion, such as to permit declinature of the Applicant‟s claim, for reasons discussed below. The FSP has failed to prove the Applicant knew of the building defects at policy inception As previously discussed the FSP bears the onus of proof demonstrating that at policy inception the Applicant knew of the building defects and failed to advise the FSP of same. Case No: 380630 Determination Page 3 of 7 It is not disputed between the parties that at policy inception the Applicant revealed the building had been the subject of a previous insurance claim in 2012 with another insurer. The FSP‟s screen shots of the incepting process reflect this, as does the Applicant‟s Certificate of Insurance (COI). The relevant screen shot discloses the name of the previous insurer and that a prior claim had been paid in the preceding three years; the COI records that in 2012, $16,000 was paid for „storm damage to building‟. The 2012 damage involved the partial collapse of the south end of the east elevation wall, due to the actions of storm/winds. However, the FSP contends that in the process of attending to the damage remediation in 2012, the Applicant had been relevantly advised by his engineer (D) that the „ties used between the block work and the columns were inadequate‟. Further that their engineer (IL), in respect of the cause of the 2014 failure of „a 40 metre section of blockwork along the east elevation‟, relevantly concluded: „Insufficient ties between blockwork wall and the portal frame structure has resulted in failure of the bond beams and subsequent blockwork.‟ As a result the FSP submits: „…the second (D) report was completed on 28 March 2013, some 15 months prior to the subject claim. The FSP submits this timeframe constitutes a reasonable awareness of concerns with the adequacy of the steelwork ties. The FSP submits that no evidence has been presented demonstrating that the applicant (sic) acted upon the advice of (D). In such circumstances where there is a known defect and the defect is not disclosed, the FSP submits the policy excludes loss arising from the defect‟. At the outset, the Panel accepts that the expert evidence reasonably supports a conclusion that faulty building ties were the likely cause in 2014 of the „failure of a 40 metre section of blockwork along the east elevation‟. However, it must now consider what effect, if any, this has upon the FSP‟s capacity to demonstrate its exclusion has been enlivened. The Panel notes it is not disputed between the parties that the Applicant, pursuant to the 2012 insurance claim, engaged the services of a builder who successfully remediated the damage such that for approximately 15 months the building and its east elevation wall was fit for purpose. Further, that the relevant policy exclusion, now solely relied upon by the FSP, can only be enlivened where it can demonstrate, on the balance of probability that the Applicant ‘knew’ (Panel emphasis) of a defect; however, the language employed by the FSP in its Notice of Response to the Service dated 21 January 2015 and replicated above falls far short of that standard. Namely ‘a reasonable awareness of concerns with the adequacy of the steelwork ties’ (Panel emphasis), does not equate to the probative standard encompassed by the phras e „defects known to you‟. Accordingly, the Panel determines the FSP has failed to demonstrate that on the balance of probability, the Applicant at policy inception „knew‟ that the building ties were still inadequate in respect of the east elevation wall, notwithstanding that his commissioned builder had completed remediation of the damage arising from the December 2012 insurance claim. Case No: 380630 Determination Page 4 of 7 For the sake of completeness, the Panel from its own perspective does not believe, based on the evidence provided by the parties, that the Applicant at policy inception did „know‟ that the building ties in the east elevation wall remained defective; as a layperson he was entitled to rely upon the remediation work performed by his commissioned builder. Accordingly, he could only advise the FSP at policy inception what he actually „knew‟. In light of the Panel‟s determination it is unnecessary for it to consider the Applicant‟s other arguments, advanced by him in prosecuting his case. Case No: 380630 Determination Page 5 of 7 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. The parties have made extensive submissions and provided voluminous materials. All material information which has been relied on for the purposes of this Determination has been exchanged between the parties, and each party has had the opportunity to address any issues raised b y the other. 3.2 Relevant expert evidence The parties, especially the FSP, have made available numerous reports from consultants commissioned to the claim. The Panel has limited reference to information more relevant to and considered in providing the Determi nation. Record Key points D’s (Engineer) Interim Report 18 February 2012  visited assess to assess damaged wall in relation to a report provided by the insurer‟s (previous insurer) appointed engineer  found that works completed by the FSP‟s builder were not satisfactory and required immediate rectification works  no physical inspection completed and the original building documentation was not available  the location of the damage, direction of the rotation of the wall and prevailing wind direction all corre late with the side wall section and likely cause of damage experienced  D provided a number of recommendations (steps) to be undertaken in order to make safe/repair the wall. D’s Scope of works and comments  D provides and concluded:  the masonry bond beams on the east wall have not been constructed as detailed on the engineering (design) drawings  average spacing of the bond beams were to be 2,200mm however were built with average spacing of 3,100mm  masonry brick ties were at random spacing and were not welde d to the columns as shown in engineer‟s drawings  the existing structure and masonry wall would have been structurally adequate under the design as per the engineer‟s drawing and had the approved wall ties Case No: 380630 Determination Page 6 of 7 been used, to withstand the forces noted on the des ign engineer‟s computations  the lack number of wall ties welded to the columns and brick piers not running all the way to the top of the wall appears to have increased the overall span of the bond beams, causing the failure and collapsing of the masonry wa ll. IL Structural Inspection Report 14 July 2014  the insured building had been constructed 20 years prior an the Applicant had purchased the property five years ago  since the property had been purchased structural works had been completed to provide addit ional support to sections of the blockwork wall  a 40m section of the wall along the east elevation had collapsed following strong winds  blockwork piers encasing steel vertical members internally had been constructed at inconsistent heights with no pier ext ending full height of the wall  the collapsed section of blockwork was located directly adjacent to the smallest piers within the structure  piers were not keyed into the east elevation blockwork wall with mortar sighted flush against brickwork  steel blockwork ties were sporadically sighted „hooked‟ onto steel columns and tied to mortar joints. No significant pattern was visible and very few ties at higher level  block ties had not been welded onto steel vertical members at every fourth course as nomina ted in design documents  block ties above the height of brick piers were sporadic and often defective therefore not providing any restraint  mortar joints to the collapsed section were found to be of very sandy nature  significant displacement and bowing sigh ted to adjacent section of blockwork. Make safe contractors were advised to remove the entire wall in order to secure area  IL concluded:  inspection confirmed inadequate construction of masonry, specifically ties to the steelwork, was the sole cause for fa ilure of the east elevation wall  the construction of the wall was not in line with its design and had it been it would have been able to withstand with the wind pressures applied on the day of loss (even with the open door)  without any doubt the inadequate construction of the east elevation wall is the sole cause for all recorded damage. 3.3 Relevant policy terms “ Page 6 General exclusions These general exclusions apply to all sections … Known defects Case No: 380630 Determination Page 7 of 7 We will not pay for loss or damage caused by faults or defects known to You or any employee whose knowledge in law would be deemed to be Yours and not disclosed to Us at the time this insurance was arranged. … Page 20 Exclusions … 2. We will not cover You for loss or damage caused by: … (g) creeping, heaving, normal settling, shrinkage, seepage, vibration, expansion in buildings, pavements, roads, car parks and the like: (i) error or omission in design, plan or specification or failure during testing; (ii) f aulty materials or workmanship;”

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.