Home / Financial Firm (Unknown - Insurer) / Determination 379925

Determination 379925

Cracking and movement damage claim denied

FirmFinancial Firm (Unknown - Insurer)
Decided2015-04-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$215,000
SourceAFCA PDF

Summary

The complainants claimed for cracking and movement damage to their home, attributed to a leaking council water main, estimated at about $215,000 to rebuild. AFCA found the damage largely predated the leak and resulted from gradual foundation movement, so the FSP is not liable.

Although a prima facie claim was established, the FSP showed the bulk of the damage predated the leak and the leak caused no significant additional damage, and gradual deterioration is not covered.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim Determination Case No: 379925 Determination Page 1 of 7 Case number : 379925 2 1 April 2015 1 Overview 1.1 Dispute In August 2014, the Applicants lodged a claim under their home insurance policy with the Financial Services Provider (FSP) for cracking and movement damage to their home (as well as internal water damage). The Applicants believe the damage was caused by a leaking council water main discovered in September 2013. The FSP denied the claim on the basis that the damage was not caused by the leaking water main but was pre-existing and had occurred as a result of gradual deterioration over a long period of time . The Applicants dispute the FSP’s d enial of their claim. They say that their home is now uninhabitable and needs to be demolished and rebuilt at an estimated cost of approximately $215,000. 1.2 Issues and key findings Is the FSP entitled to deny the claim? The available information (including the numerous photographs provided) establishes that the bulk of the cracking and movement damage to the Applicants’ property existed before the leak from the water main commenced. As the leaking water main has not caused any significant additional and ongoing damage to the Applicants’ property, the FSP is not liable for the Applicants’ claim . 1.3 Determination This Determination is in favour of the FSP. The FSP is not liable for the Applicants’ claim . Case No: 379925 Determination Page 2 of 7 2 Reasons for Determination 2.1 Is the FSP entitled to deny the claim? Applicants have established a prima facie claim The Applicants are required to show that, on the balance of probabilities, they have suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the Applicants are able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim. The Applicants’ policy provides cover for loss or damage caused by the events listed in the policy (including liquid bursting from a water main), subject to the conditions and exclusions set out in the policy. The Applicants say that their home suffered significant cracking and movement damage (as well as internal water damage), caused by water overflowing from a burst council water main which inundated their house and yard. The FSP doe s not dispute that a leaking water main at the front of the Applicants’ property was discovered and repaired by the council in September 2013. The Applicants have provided photographs taken in September 2013 which show water leaking from the council water main flowing into the sub-floor area of their house. The engineer (M) appointed by the FSP to inspect the damage in October 2014 confirmed that water entering the sub-floor space would have caused the reactive clay foundation soils at the property to swell. It is well established that swelling of reactive clay foundation soils can result in cracking and movement damage to the dwelling above. In these circumstances, the Panel is satisfied that the Applicants have established a prima facie claim under the policy. Accordingly, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to deny the Applicant’s claim. The FSP says that the cracking and movement damage to the property existed before the leaking water main which was discovered in September 2013. Leak from water main commenced between April and September 2013 The Applicants say that they left the property in March 2013 to relocate to another town, following which the property remained empty for approximately six months. The Applicants discovered the broken council water main when they returned to the property in September 2013. The photographs taken by the Applicants in September 2013 show that water leaking from the broken water main was clearly visible at the front of their property. As the Applicants did not become aware of the leak until September Case No: 379925 Determination Page 3 of 7 2013, it must have commenced during the six months they were absent from the property. The Applicants had previously lodged a claim for water damage to their property in March 2013, caused by severe weather events in March 2012 and/or November 2012. In the course of investigating the Applicants’ prior claim, the FSP appointed a n assessor (C) who attended the property on 4 April 2013 and an engineer (D) who attended on 18 April 2013. Photographs taken by C and D at this time do not show any sign of water leaking from the council water main, nor was this mentioned by D in his report. Accordingly, it is likely that the leak from the water main commenced sometime between 18 April 2013 (when D inspected the property) and 23 September 2013 (when the Applicants photographed the escaping water). Cracking and movement damage pre-existed the leaking water main The Applicants say that their house has sunk into the ground and sustained extensive cracking and movement damage, due to water flowing from the leaking water main into the sub-floor area. They have provided a number of photographs showing the nature and extent of this damage. The Panel accepts that the Applicants’ property has suffered extensive damage. However, having carefully reviewed the available information (including the numerous photographs provided by both parties), the Panel considers that the bulk of this damage existed prior to the leaking water main. The FSP’s assessor (C) and engineer (D) (who attended the property in April 2013 to assess the Applicants’ previous claim) took a number of photographs of the damage to various areas of the property at that time. For the reasons outlined above, the Panel is satisfied that the leak from the water main commenced after April 2013. Accordingly, the photographs taken by C and D can be assumed to show condition of the property prior to the water leak. The engineer (M) appointed by the FSP to investigate the current claim did not attend the Applicants’ property until October 2014 (almost a year after the broken water main had been discovered and repaired). This delay was due to the fact that the Applicants did not lodge a claim for the leaking water main until August 2014, after initially attempting to pursue the council for the claimed damage. Following his inspection, M prepared a detailed and comprehensive report in which he compared his photographs of the property in October 2014 with similar photographs taken by C and D showing the nature and extent of the damage in April 2013. As noted above, in his report M acknowledged that the leaking water main had caused water to flow into the sub-floor area, resulting in swelling of the foundation soils and potential movement damage to the floors and walls. Case No: 379925 Determination Page 4 of 7 However, after comparing his photographs of the damage with those taken by C and D, M concluded that the bulk of the damage already existed before the leak commenced. In particular, M noted that C ’s photographs established that the “doming” of the floors in the rooms towards the front of the property (caused by upwards movement or “heaving” of the foundation soils) existed prior to the water leak. This is also reflecte d in D’s observations of the damage in April 2013. Photographs taken by C and D in April 2013 also showed existing cracking damage to various internal and external walls , separation of the wall cladding and roof fixings in various parts of the property and cracking to the rear concrete slab. M accepted that the leak from the council water main had initially exacerbated the doming of the floors, resulting in some of the existing cracks widening and caused hinged doors at the property to jam (as noted by the Applicants in September 2013). However, M confirmed that, in the eighteen months since the leak had been repaired, the foundation soils had dried out and the property had essentially returned to its pre-leak condition (as shown in the photographs taken by C and D in April 2013). Having carefully reviewed M’s report, the Panel is satisfied that it establishes that the bulk of the cracking and movement damage to the Applicants’ property existed prior to the leak from the council water main. The Panel has found the comparative photographs taken in April and September 2013 (and displayed side by side in M’s report) particularly helpful in this regard. As the leaking water main did not cause any significant additional and ongoing cracking and movement damage to the Applicants’ property, the FSP is not liable for this aspect of the Applicants’ claim. Cracking and movement damage was not caused by an insured event For the reasons outlined above, the Panel has found that the leaking water main did not cause the cracking and movement damage to the property. In these circumstances, it is not strictly necessary for the Panel to consider whether the FSP has established that the damage was caused by factors which are excluded under the policy. However, the Panel notes the concerns expressed by the Applicants about the findings of the FSP’s engineers (D and M) regarding the underlying cause of the cracking and movement damage to the property. Both engineers concluded that the damage had occurred as a result of naturally occurring movement of the foundation soils over the estimated 80 year life of the property, as a result of changes in soil moisture content due to factors such as:  the likely intermittent flooding of the site by a nearby river, before a levee bank was built in the mid-1950s and extended in 1974;  water from regular rainfall events flowing into the sub-floor area due to the perimeter paving sloping back towards the house; and Case No: 379925 Determination Page 5 of 7  the lack of ventilation of the sub-floor area due to the manner in which the house was constructed. The Applicants say that D and M’s reports cannot be relied upon as they refer to the house being supported on a number of timber stumps, whereas in fact there are a limited number of timber stumps only, with the remainder of the walls being supported by brick piers. Having reviewed the photographs provided by the Applicants (as well as those included in M’s report), the Panel is satisfied that the house has a combination of timber and brick footings. However, the Panel does not accept that this necessarily invalidates the findings of the FSP’s engineers as to the cause of damage. Both engineers confirmed that the observed damage was due to long term changes in the moisture content of the reactive clay foundation soils. Such changes can cause cracking movement damage, regardless of the type of footings in place. The Panel considers that, as engineers, D and M are appropriately qualified to determine the cause of the cracking and movement damage to the Applicants’ property. Having carefully reviewed the available information, the Panel is satisfied that the enginee rs’ reports provide a logical and reasonable explanation as to how the damage occurred, which is consistent with the observed facts. The Applicant has provided a copy of a report from his builder (S) which states that the foundations of the house need to be replaced and the rear concrete slab has failed due to the volume of water under the building. However, S’s report does not provide any further detail regarding the source of this water or identify how or when the damage occurred. In these circumstances, the Panel is satisfied that, on the balance of probabilities, the cracking and movement damage to the Applicants’ property occurred gradually over an extended period of time. Damage caused in this manner is not covered under the policy. Applicants have not established leak caused additional water damage The FSP has previously cash settled the Applicants’ earlier claim for internal water damage to their property caused by the severe weather events in March 2012 and/or November 2012. This cash settlement included allowances for the replacement of carpets and contents items, as well as the repair of internal cosmetic damage to various parts of the property. The Applicants say that the leak from the council water main discovered in September 2013 caused additional damage to the interior of their property, including water damage to carpets and furniture. However, the Panel is not satisfied that the Applicants have established that any such further damage occurred. The FSP’s engineer (M) reported that there was no evidence to suggest that the water had flowed above ground level and the photographs taken by the Applicants in September 2013 do not show water entering the property. Case No: 379925 Determination Page 6 of 7 The Applicants have not provided any independent information (for e xample, invoices or receipts) confirming that they repaired the property or replaced their contents items following settlement of their previous claim, despite being invited by the FSP to do so. Further, based on the various photographs provided, it does not appear that the Applicants replaced the carpets and/or furniture at the property, following the cash settlement of their earlier claim. The property appears to have remained largely in the same state between April 2013 and October 2014. Case No: 379925 Determination Page 7 of 7 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Re ference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material p rovided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. 3.2 Chronology of key events Date Details March 2012  [M] River flooded. 15 November 201 2  Applicant s’ property is damaged by storm . 25 March 2013  Applicants lodge claim with FSP for damage caused by storm in November 2012 . March 2013  Applicants relocate to another town. April 2013  FSP’s engin eer (D ) attends property to assess damage from storm in November 2012 . September 2013  Applicants return to property. November 2013  Applicants contact FSP to dispute partial denial of claim for storm damage, on basis that council water main is broken. 22 August 2014  Applicants lodge claim for damage caused by burst water main . September 2014  FSP’s assessor attends property to assess claimed damage . October 2014  FSP’s engineer (M ) attends property to inspect damage .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.