Home / Financial Firm (Unknown - Insurer) / Determination 379925
Determination 379925
Cracking and movement damage claim denied
Summary
The complainants claimed for cracking and movement damage to their home, attributed to a leaking council water main, estimated at about $215,000 to rebuild. AFCA found the damage largely predated the leak and resulted from gradual foundation movement, so the FSP is not liable.
Although a prima facie claim was established, the FSP showed the bulk of the damage predated the leak and the leak caused no significant additional damage, and gradual deterioration is not covered.
Issues
- Claim denial primary · not upheld
“The bulk of the cracking and movement damage existed before the leaking water main; the FSP is not liable for the claim.”
- Inadequate claim investigation secondary · not upheld
“The engineers' reports provide a logical and reasonable explanation of how the damage occurred.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim
Determination
Case No: 379925 Determination Page 1 of 7
Case number : 379925 2 1 April 2015
1 Overview
1.1 Dispute
In August 2014, the Applicants lodged a claim under their home insurance policy
with the Financial Services Provider (FSP) for cracking and movement damage to
their home (as well as internal water damage). The Applicants believe the
damage was caused by a leaking council water main discovered in September
2013.
The FSP denied the claim on the basis that the damage was not caused by the
leaking water main but was pre-existing and had occurred as a result of gradual
deterioration over a long period of time .
The Applicants dispute the FSP’s d enial of their claim. They say that their home is
now uninhabitable and needs to be demolished and rebuilt at an estimated cost of
approximately $215,000.
1.2 Issues and key findings
Is the FSP entitled to deny the claim?
The available information (including the numerous photographs provided)
establishes that the bulk of the cracking and movement damage to the Applicants’
property existed before the leak from the water main commenced. As the leaking
water main has not caused any significant additional and ongoing damage to the
Applicants’ property, the FSP is not liable for the Applicants’ claim .
1.3 Determination
This Determination is in favour of the FSP.
The FSP is not liable for the Applicants’ claim .
Case No: 379925 Determination Page 2 of 7
2 Reasons for Determination
2.1 Is the FSP entitled to deny the claim?
Applicants have established a prima facie claim
The Applicants are required to show that, on the balance of probabilities, they
have suffered a loss caused by a risk insured against under the policy. This is
known as a prima facie claim.
If the Applicants are able to establish a prima facie claim, then the onus shifts to
the FSP to show that, on the balance of probabilities, it is entitled to rely on an
exclusion under the policy to deny the claim.
The Applicants’ policy provides cover for loss or damage caused by the events
listed in the policy (including liquid bursting from a water main), subject to the
conditions and exclusions set out in the policy.
The Applicants say that their home suffered significant cracking and movement
damage (as well as internal water damage), caused by water overflowing from a
burst council water main which inundated their house and yard.
The FSP doe s not dispute that a leaking water main at the front of the Applicants’
property was discovered and repaired by the council in September 2013. The
Applicants have provided photographs taken in September 2013 which show
water leaking from the council water main flowing into the sub-floor area of their
house.
The engineer (M) appointed by the FSP to inspect the damage in October 2014
confirmed that water entering the sub-floor space would have caused the reactive
clay foundation soils at the property to swell. It is well established that swelling of
reactive clay foundation soils can result in cracking and movement damage to the
dwelling above.
In these circumstances, the Panel is satisfied that the Applicants have established
a prima facie claim under the policy. Accordingly, the FSP bears the onus of
establishing that, on the balance of probabilities, it is entitled to rely on a policy
exclusion or is otherwise entitled to deny the Applicant’s claim.
The FSP says that the cracking and movement damage to the property existed
before the leaking water main which was discovered in September 2013.
Leak from water main commenced between April and September 2013
The Applicants say that they left the property in March 2013 to relocate to another
town, following which the property remained empty for approximately six months.
The Applicants discovered the broken council water main when they returned to
the property in September 2013.
The photographs taken by the Applicants in September 2013 show that water
leaking from the broken water main was clearly visible at the front of their
property. As the Applicants did not become aware of the leak until September
Case No: 379925 Determination Page 3 of 7
2013, it must have commenced during the six months they were absent from the
property.
The Applicants had previously lodged a claim for water damage to their property
in March 2013, caused by severe weather events in March 2012 and/or
November 2012.
In the course of investigating the Applicants’ prior claim, the FSP appointed a n
assessor (C) who attended the property on 4 April 2013 and an engineer (D) who
attended on 18 April 2013. Photographs taken by C and D at this time do not
show any sign of water leaking from the council water main, nor was this
mentioned by D in his report.
Accordingly, it is likely that the leak from the water main commenced sometime
between 18 April 2013 (when D inspected the property) and 23 September 2013
(when the Applicants photographed the escaping water).
Cracking and movement damage pre-existed the leaking water main
The Applicants say that their house has sunk into the ground and sustained
extensive cracking and movement damage, due to water flowing from the leaking
water main into the sub-floor area. They have provided a number of photographs
showing the nature and extent of this damage.
The Panel accepts that the Applicants’ property has suffered extensive damage.
However, having carefully reviewed the available information (including the
numerous photographs provided by both parties), the Panel considers that the
bulk of this damage existed prior to the leaking water main.
The FSP’s assessor (C) and engineer (D) (who attended the property in April
2013 to assess the Applicants’ previous claim) took a number of photographs of
the damage to various areas of the property at that time.
For the reasons outlined above, the Panel is satisfied that the leak from the water
main commenced after April 2013. Accordingly, the photographs taken by C and
D can be assumed to show condition of the property prior to the water leak.
The engineer (M) appointed by the FSP to investigate the current claim did not
attend the Applicants’ property until October 2014 (almost a year after the broken
water main had been discovered and repaired). This delay was due to the fact
that the Applicants did not lodge a claim for the leaking water main until August
2014, after initially attempting to pursue the council for the claimed damage.
Following his inspection, M prepared a detailed and comprehensive report in
which he compared his photographs of the property in October 2014 with similar
photographs taken by C and D showing the nature and extent of the damage in
April 2013.
As noted above, in his report M acknowledged that the leaking water main had
caused water to flow into the sub-floor area, resulting in swelling of the foundation
soils and potential movement damage to the floors and walls.
Case No: 379925 Determination Page 4 of 7
However, after comparing his photographs of the damage with those taken by C
and D, M concluded that the bulk of the damage already existed before the leak
commenced.
In particular, M noted that C ’s photographs established that the “doming” of the
floors in the rooms towards the front of the property (caused by upwards
movement or “heaving” of the foundation soils) existed prior to the water leak.
This is also reflecte d in D’s observations of the damage in April 2013.
Photographs taken by C and D in April 2013 also showed existing cracking
damage to various internal and external walls , separation of the wall cladding and
roof fixings in various parts of the property and cracking to the rear concrete slab.
M accepted that the leak from the council water main had initially exacerbated the
doming of the floors, resulting in some of the existing cracks widening and caused
hinged doors at the property to jam (as noted by the Applicants in September
2013).
However, M confirmed that, in the eighteen months since the leak had been
repaired, the foundation soils had dried out and the property had essentially
returned to its pre-leak condition (as shown in the photographs taken by C and D
in April 2013).
Having carefully reviewed M’s report, the Panel is satisfied that it establishes that
the bulk of the cracking and movement damage to the Applicants’ property
existed prior to the leak from the council water main.
The Panel has found the comparative photographs taken in April and September
2013 (and displayed side by side in M’s report) particularly helpful in this regard.
As the leaking water main did not cause any significant additional and ongoing
cracking and movement damage to the Applicants’ property, the FSP is not liable
for this aspect of the Applicants’ claim.
Cracking and movement damage was not caused by an insured event
For the reasons outlined above, the Panel has found that the leaking water main
did not cause the cracking and movement damage to the property.
In these circumstances, it is not strictly necessary for the Panel to consider
whether the FSP has established that the damage was caused by factors which
are excluded under the policy.
However, the Panel notes the concerns expressed by the Applicants about the
findings of the FSP’s engineers (D and M) regarding the underlying cause of the
cracking and movement damage to the property.
Both engineers concluded that the damage had occurred as a result of naturally
occurring movement of the foundation soils over the estimated 80 year life of the
property, as a result of changes in soil moisture content due to factors such as:
the likely intermittent flooding of the site by a nearby river, before a levee bank
was built in the mid-1950s and extended in 1974;
water from regular rainfall events flowing into the sub-floor area due to the
perimeter paving sloping back towards the house; and
Case No: 379925 Determination Page 5 of 7
the lack of ventilation of the sub-floor area due to the manner in which the
house was constructed.
The Applicants say that D and M’s reports cannot be relied upon as they refer to
the house being supported on a number of timber stumps, whereas in fact there
are a limited number of timber stumps only, with the remainder of the walls being
supported by brick piers.
Having reviewed the photographs provided by the Applicants (as well as those
included in M’s report), the Panel is satisfied that the house has a combination of
timber and brick footings.
However, the Panel does not accept that this necessarily invalidates the findings
of the FSP’s engineers as to the cause of damage. Both engineers confirmed that
the observed damage was due to long term changes in the moisture content of
the reactive clay foundation soils. Such changes can cause cracking movement
damage, regardless of the type of footings in place.
The Panel considers that, as engineers, D and M are appropriately qualified to
determine the cause of the cracking and movement damage to the Applicants’
property. Having carefully reviewed the available information, the Panel is
satisfied that the enginee rs’ reports provide a logical and reasonable explanation
as to how the damage occurred, which is consistent with the observed facts.
The Applicant has provided a copy of a report from his builder (S) which states
that the foundations of the house need to be replaced and the rear concrete slab
has failed due to the volume of water under the building. However, S’s report
does not provide any further detail regarding the source of this water or identify
how or when the damage occurred.
In these circumstances, the Panel is satisfied that, on the balance of probabilities,
the cracking and movement damage to the Applicants’ property occurred
gradually over an extended period of time. Damage caused in this manner is not
covered under the policy.
Applicants have not established leak caused additional water damage
The FSP has previously cash settled the Applicants’ earlier claim for internal
water damage to their property caused by the severe weather events in March
2012 and/or November 2012. This cash settlement included allowances for the
replacement of carpets and contents items, as well as the repair of internal
cosmetic damage to various parts of the property.
The Applicants say that the leak from the council water main discovered in
September 2013 caused additional damage to the interior of their property,
including water damage to carpets and furniture.
However, the Panel is not satisfied that the Applicants have established that any
such further damage occurred. The FSP’s engineer (M) reported that there was
no evidence to suggest that the water had flowed above ground level and the
photographs taken by the Applicants in September 2013 do not show water
entering the property.
Case No: 379925 Determination Page 6 of 7
The Applicants have not provided any independent information (for e xample,
invoices or receipts) confirming that they repaired the property or replaced their
contents items following settlement of their previous claim, despite being invited
by the FSP to do so.
Further, based on the various photographs provided, it does not appear that the
Applicants replaced the carpets and/or furniture at the property, following the cash
settlement of their earlier claim. The property appears to have remained largely in
the same state between April 2013 and October 2014.
Case No: 379925 Determination Page 7 of 7
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Re ference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material p rovided by the
parties. While the parties have raised a number of issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
3.2 Chronology of key events
Date Details
March 2012 [M] River flooded.
15 November 201 2 Applicant s’ property is damaged by storm .
25 March 2013 Applicants lodge claim with FSP for damage caused by storm in
November 2012 .
March 2013 Applicants relocate to another town.
April 2013 FSP’s engin eer (D ) attends property to assess damage from
storm in November 2012 .
September 2013 Applicants return to property.
November 2013 Applicants contact FSP to dispute partial denial of claim for storm
damage, on basis that council water main is broken.
22 August 2014 Applicants lodge claim for damage caused by burst water main .
September 2014 FSP’s assessor attends property to assess claimed damage .
October 2014 FSP’s engineer (M ) attends property to inspect damage .