Text of the determination
Determination
General Insurance - Small Business/Farm Insurance - Commercial Property - FSP
Decision - Denial of Claim
Determination
Case No: 378226 Determination Page 1 of 9
Case number: 378226 1 June 2015
1 Overview
1.1 Dispute
The Applicant lodged a claim on her business insurance policy with the Financial
Services Provider (FSP) for water damage to her salon on 14 January 2014. A hot
water system leaked and caused damage to the floor and contents.
The FSP provided cover for damage it considered was caused by the event. A
dispute arose as to the refusal to cover damage to a hydrotherapy pedicure unit
(“unit B”) and a head/massage/treatment unit (“unit S”). The FSP considered the
damage to these units was not caused by the hot water system leak.
1.2 Issues and key findings
Is there cover for the type of damage sustained to the units?
The available evidence supports the FSP’s contention that on the balance of
probabilities the respective units were not damaged in the water inundation event.
The FSP is entitled to exclude the claim from cover because the available
evidence supports the FSP’s contention that on the balance of probabilities the
damage to the units was caused by mechanical breakdown. This cause is
excluded under the terms of the cover.
Is the Applicant entitled to any payment or compensation?
As the FSP had reasonable grounds to deny the claim and was not responsible
for the servicing issues with the units, it is not obliged to pay compensation.
1.3 Determination
This Determination is in favour of the FSP.
It is not obliged to cover the Applicant for her loss and need take no further action.
Case No: 378226 Determination Page 2 of 9
2 Reasons for Determination
2.1 Is there cover for the type of damage sustained to the units?
Flooding event at the insured premises
The Applicant lodged a claim for water damage from a leak which affected some
areas of her salon.
It is common ground that the FSP covered much of this damage, with the sole
issue outstanding being its refusal to cover the damage to units B and S.
Scope of cover includes damage to contents
The FSP’s policy provides cover for up t o 10 separate, selectable options.
Included in this are covers for property damage, business interruption, general
and products liability, machinery and others.
Relevant to this claim, the Applicant held “property” cover, which extended to
include contents at the business premises, plant equipment and stock. She did
not hold separate “machinery” cover, which more specifically details cover for
certain types of professional equipment.
To this end, my consideration of this dispute is limited to the policy terms
espoused in section one of the cover (“property”).
Prima facie claim not established as units not damaged by leak
The parties agree that units B and S were damaged. They disagree over whether
the damage was caused in the flooding event reported to the FSP.
The policy provides cover generally for:
“… [damage] not otherwise excluded, to Property Insured whilst at the Situation.”
Damage means:
“…physical loss, destruction of or damage to the property insured caused by any
peril or circumstance not more spe cifically covered or excluded by this policy…
The fact that the units were damaged may suffice to establish a prima facie claim
save that the Applicant contends that they were damaged by water in January
2014, whereas the FSP contends that the units were not damaged in this event. It
says the units had sustained mechanical damage which cause is excluded from
cover.
Only one exclusion has been cited by the FSP. Under its “property” damage
section it says it will not cover losses caused by or as a consequence of:
“… mechanical, hydraulic, electrical, or electronic breakdown, failure, malfunction
or derangement of any instrument, machine, device, or temperature controlling
equipment.”
The onus is on the FSP to establish that the exclusion applies to the Applic ant’s
circumstances.
Case No: 378226 Determination Page 3 of 9
Units were not functioning because of mechanical failure not the leak
Based on the expert evidence of “RL”, I am satisfied on the balance of
probabilities that the damage was not caused by the floor inundation. After
extensive investigation of the units and discussions with other experts, RL formed
the view that the damage was not caused in the insured event.
RL considered that unit B failed due to the ingestion of plastic materials by
degradation of the internal lining to the wash tub. This material was removed
during one of the inspections and this allowed the unit to function again.
The material provided establishes to my satisfaction that on the balance of
probabilities Unit S was damaged sometime prior to the inundation event in 2014.
Having consulted with the HC (the company that sold the units to the Applicant)
and having reviewed emails that passed between the Applicant and HC in 2013,
RL concluded Unit S had a failure of the internal thermostatic mixing valve.
Further this failure had occurred before the water damage event in January 2014.
The only independent expert evidence to the contrary is offered by “CO” in an
email supplied by the Applicant. CO suggests that the respective units were
damaged in the flood but offers no expert analysis to support this conclusion.
There is also a doubt (raised by CO itself) as to its ability to comment on the
damage. Further, RL spoke with CO who says he only visually inspected the units
but did not touch them. Further, the opinion was based on information given by
the Applicant, that the salon had been extensively flooded. I am not satisfied from
the material provided that salon was inundated.
In all the circumstances, I am not persuaded by CO’s opinion.
The Applicant has produced unsworn statements from her son and a beauty
therapist employed by her. They are not independent and do not comment (nor
are they qualified to comment) on the cause of the damage to units.
Having carefully considered all material provided, I am satisfied on the bala nce of
probabilities that the damage was not caused in the water damage event in
January 2014. The damage to both units was effectively due to “mechanical,
hydraulic, electrical, or electronic breakdown”. On this basis, I am satisfied the
FSP is entitled to rely on the policy exclusion and is not responsible for the
claimed loss to the units.
Such cover is provided for under the policy under “machinery” (also subject to
relevant exclusions). This cannot be considered as the FSP submits (and the
Applicant agrees) she had not chosen this level of cover for her situation.
2.2 Is the Applicant entitled to any payment of compensation?
Applicant complains about the FSP’s claims handling
The Applicant complains about the FSP’s approach to the claim and its handling
of the dispute. She is particularly unhappy with the conduct of RL and the
involvement of the original manufacturer, “BG”.
Case No: 378226 Determination Page 4 of 9
BG’s business no longer trades and the Applicant feels the work of him and his
son have not assisted her position on this claim. She further outright denies the
claim that one of the units was moved after the flood event. Whether it was or not,
I am still persuaded on information provided and for the reasons stated that the
FSP can rely on the policy exclusion.
Further leak at the property
During one of the inspections conducted by RL, BG was in attendance. Whilst
looking at unit S, BG caused a water spillage from the unit which affected some of
the floor area at the property.
The spillage was contained and cleaned by the two experts and members of the
Applicant’s staff.
Whilst not optimum, I accept this incident was a consequence of conducting a
proper inspection of the unit.
No evidence has been submitted to attest to further damage caused as a result of
this leak. In the absence of such evidence, I will take this aspect of the dispute no
further.
Repairs for unit S
The Applicant says BG undertook to repair the part he broke through the
inspection of unit S. Despite this, he never returned and the unit remains
unworkable.
RL denies that BG damaged the unit and says it was left in a state (since 2013)
where it should not have been used. The unit still requires repairs.
It is the Applicant’s contention that BG (and/or his son, “AG”) was paid for the
servicing of both units and this has not been done. The businesses run by BG and
AG have since ceased to trade.
This is an issue that is not related to the insurance claim. Issues have been raised
about payments and disputes between these parties that pre-date the loss. I am
not satisfied they have any relevance to the FSP or that they fall within the
jurisdiction of the Service.
Whilst the Applicant alleges BG damaged unit S during his FSP-sanctioned
inspection, no evidence of this damage has been supplied. RL denies anything
was broken.
I cannot be satisfied on the available evidence that the FSP is responsible for any
damage to unit S.
Satisfied no compensation should be paid
The Applicant considers that the FSP has not handled the claim fairly or
reasonably. She seeks compensation for her experience.
Case No: 378226 Determination Page 5 of 9
Whilst the FOS Terms of Reference permits the award of compensation in certain
circumstances, I do not consider it applicable in this instance.
I accept the FSP was not responsible to indemnify the Applicant for the damage
to the two units. The respective causes of this damage were excluded under the
terms of the policy.
In the circumstances, I am of the view the FSP has not been unreasonable in its
approach.
An expert was retained to investigate the cause and formed an opinion that the
claim was not covered by the policy terms. I accept that RL has sufficient
expertise to make this judgement. I accept the FSP was entitled to rely on this
opinion in denying the claim. I also accept that the FSP has acted in timely
manner. The claim for the two units was made on 3 April 2014, the claim was
promptly assessed and an expert engaged. Relying on that expert opinion, the
claim was denied on 8 July 2014
There were numerous ancillary issues raised by the Applicant, though these
primarily related to the performance of BG and AG. These issues are either not
relevant or not pertinent to the FSP’s conduct of the claim and the dispute.
In all the circumstances, I am satisfied the FSP is not required to pay
compensation.
Case No: 378226 Determination Page 6 of 9
3 Supporting information
3.1 FOS approach to this dispute
General information
As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the nature and complexity of the matter. This
dispute has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
A full exchange of the relevant information has taken place between the
respective parties and each party has had the opportunity of addressing any
issues raised.
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
All of the provided material has been read and considered. The parties have
raised numerous issues in their submissions to the Service. For the purpose of
this Determination, commentary is restricted to only those issues considered
relevant to the outcome.
Prima facie claim
There is an onus on an insured to establish on the balance of probabilities that a
claim fits the definition of an insured event. This is known as a prima facie claim.
Should this onus be discharged, it is then the responsibility of the insurer to
establish the application of any exclusion on which it relies to deny the claim.
To be entitled to cover from the FSP, the onus therefore rests with the Applicant
to establish that her loss fits within the scope of what is covered by the FSP’s
policy.
3.2 Extracts from policy
Case No: 378226 Determination Page 7 of 9
3.3 Relevant expert reports
Record Key points
Engineer’s (PM) report
(RL)
29 May 2014
Inspections and photographs were conducted by PM of RL
over several days on 1 and 26 May 2014. On the second
occasion he was accompanied by BG the former owner of
HC, the company that sold the units to the Applicant.
The two units w ere made by the same manufacturer
(“HC”), which went “into voluntary liquidation” in 2012 .
Applicant reported that a third unit was also damaged,
though this has since been discarded. All three units failed
on or about 28 - 29 January 2014, about two weeks a fter the
leak from the hot water unit .
The Applicant said Unit S was relocated to the first floor
after the event .
Unit B remained on the ground floor and was set about
300mm above the corridor floor .
Applicant says she tried but was unable to contact the
manufacturer. She contacted another company (“CO”)
which sells similar equipment. CO unsuccessfully
attempted repairs and provided a report.
RL attended the property with “BG” from HC. The Applicant
was unable to provide the details of the plumber who
move d unit S to the first floor. During the testing of this
unit, it flooded again on the top floor .
Unit B was plumbed to hot and cold water and the sewer.
Upon inspection, RL thought it had not been opened in
years. No electrical fault/problem could be found .
The inspection of unit S revealed the access covers had
been removed prior to inspection. It left RL suspecting it
had not been moved prior to the flooding event, as the
surrounding area was dusty .
The Applicant suggested the last person to inspect unit S
was BG’s son, “AG”. AG was then overseas and
uncontactable at that time .
BG identified an issue with the plastic sheet for unit B,
where pieces were preventing hot water recirculation. This
was attended to and the unit “was then fully functional”. RL
ide ntified this as a maintenance issue .
BG identified that unit S was working correctly, although
water spillage was occurring as a pipe connection to one of
the internal tanks was leaking. The top of the mixing valve
brass body was also open and leaking .
The liquidated HC was sold to AG and his business
partner, under the name “KL” .
KL attended to the servicing of the units for the Applicant
after HC went out of business. RL says KL previously
diagnosed unit S with a “thermostatic mixing valve
problem” and th e Applic ant was “advised not to use it”.
BG said unit S was on the first floor before the flooding
event and was not moved there afterwards, as claimed by
the Applicant. KL went out of business in December 2013,
before the repairs to this unit could be completed .
The Applicant’s plumber “AL” said he did not move unit S
to the first floor and did not attempt any report of unit B .
Case No: 378226 Determination Page 8 of 9
AL said the water level in the corridor from the leak was
less than 20mm deep .
RL reviewed the email from CO and spoke to a
rep resentative at CO who revealed that they sent a
technician to the premises. They visually inspected but did
not touch either unit. Based on the information given by the
Applicant, that the place had been flooded “they made a
judgement call on the basis of how the equipment would
have performed in a similar assumed circumstance of
flooded equipment.”
RL considered there was no “electrical arcing or short
circuit event” to account for the damage to unit B. The
problem was due to “poor servicing” and not event related.
After BG dealt with it, it worked again.
Unit S had a “latent defect” with a loose internal pipe
connection that was not easily identifiable. AG had
previously informed the Applicant not to use the machine
due to the failure of the thermostatic m ixing valve.
Engineer’s
supplementary report
(RL)
20 June 2014
Unit B “did not suffer any damage from the water flooding
event”. It was mounted above the flooding level and failed
due to a lack of maintenance. Ingested material was
removed and the unit ha s returned to working condition .
Unit S also “did not suffer any damage from the water flood
event”. It was also mounted above the flood level and
suffered a failure of its internal thermostatic mixing valve.
This had been diagnosed some time prior to the insured
event and the Applicant was warned not to use it. The unit
requires repair before it can be used again.
Email from RL to FSP
9 February 2015
Email confirms earlier reports that both units failed
because a component failure associated with wear and
tear .
Email 11 October 2013 from AG confirms failure
synonymous with discovery of malfunction of S unit.
Emails between
Applicant and AG (HC)
October - December
2013
Confirms that AG had attended at this time to “look at the B
unit and fix the S unit” .
Spent three hours servicing machines .
Left the B unit in working condition .
As for the S unit, “I advised you before I left that I would
leave cover loose as the thermal mixing valve would need
replacing.”
Email CO
8 April 2014
Our service man J visited y our salon to look at the
electrical equipment that had been damaged due to your
flood .
We are not legally covered to work on any equipment that
is not supplied by us but J’s assessment based on our
similar electrical equipment is that the flood has damaged
the units beyond repair .
Statement from BS
undated
Applicant provided invoices dated 20 November 2012 and
2 August 2013 showing treatments using the S unit and B
unit respectively.
BS beauty therapist for Applicant who used the S unit .
Was in the salon t he day insurance assessors attended .
Recalls “the pool of water caused by the man called B” .
Case No: 378226 Determination Page 9 of 9
Overheard B talking to Applicant before he left saying he
would return the next day to fix the S Unit part he broke .
Statement from S
undated
S is the Applicant’s son and manages the salon .
Noticed water damage when came back for a day in
January .
When soaked wooden flooring removed, white ants
discovered, and as result of this, found out basins were not
working .
S unit next to basins and B unit on the same level b ut
different side .
Because of white ant issue, we discovered the other
equipment problems later, switchboard off because it
tripped the PowerPoint .
Moved basins and S unit upstairs .
Assessor P “looked lost” at the H machines and returned
with B from HC .
B inspected the B unit and said “k eep an eye on it, it
should be right ”.
While B was inspecting the S unit, “ water gushed out” .
B said he would get a part to fix it and would return .
B’s son came out and serviced the B unit, and said he
would come back to s ervice the S unit as well but he had
run out of time .
Since that service day, used machines as normal (but
invoices provid ed were dated before that time).
B’s son never returned and the last time we called the
phone was disconnected .
Email to Applicant f rom
manufacturer of unit H
24 February 2010
Quote for various machines including B unit $22,500 and S
unit $23,000 .
Email to H from
Applicant
26 August 2011
The inner bag of the B unit has broken and we cannot use
the B unit because of this .
Emails between
Applicant and H
July 2012
Re: invoice for service call on S unit completed during
2012 (Applicant says this is the only time she had H look at
the S unit) .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.