Scope of floorboard replacement in undamaged lounge-dining area and claim management
Summary
The applicants accepted a water damage claim for bamboo floorboards but disputed the FSP's refusal to replace undamaged floorboards in the adjoining lounge-dining room. AFCA upheld the FSP's position on the scope of cover but ordered $1,250 compensation for poor claim management and delay.
The L-shaped lounge-dining area is a separate room from the hallway where damage occurred, so the policy's uniformity extension does not apply; the claim management nonetheless caused non-financial loss.
Issues
- Claim amount dispute primary · not upheld
“The FSP was entitled to exclude replacement of the floorboards in the combined lounge-dining room under the claim.”
- Poor claim handling secondary · upheld
“The FSP's overall management of the claim was less than ideal.”
- Delay secondary · upheld
“The time taken to complete the drying process of the concrete slab was unreasonable, and there was a delay in sourcing replacement floorboards.”
Subjects and remedies
home or building damagepay non financial loss
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
amount
General Insurance - Domestic Insurance - Home Building - Service - Delay in claim
handling
Determination
Case No: 377974 Determination Page 1 of 5
Case number : 377974 5 May 2015
1 Overview
1.1 Dispute
The Applicants lodged a claim for water damage to bamboo floorboards at the
insured property upon the Home Building policy (the policy) held with the
Financial Services Provider (FSP).
The claim was accepted by the FSP, however, the Applicants remain dissatisfied
with the settlement offer put to them as well as the FSP‟s overall management of
the claim.
1.2 Issues and key findings
Is the FSP obliged to increase its final settlement offer to the Applicants?
The policy provided cover for defined events. The FSP has provided replacement
cover for certain water damaged and undamaged floorboards in the Applicants‟
home. The combined lounge-dining area within the insured dwelling was
undamaged by the escape of water event giving rise to the claim. Under the
relevant policy terms this area is defined as a separate area/room (to the area of
damage).
Accordingly, the FSP is not obliged to include replacement of the floorboards in
this area within the final settlement offered to the Applicants.
Are the Applicants entitled to compensation under the claim?
The FSP‟s overall management of the claim, in terms of the time taken to finalise
its assessment process, failure to secure replacement floorboards in time and
inconvenience caused to the Applicants, was less than ideal.
The FSP is to arrange payment of $1,250 to the Applicants in line with section
9.3(b) of the Financial Ombudsman Service (FOS) Terms of Reference (TOR).
1.3 Determination
This Determination is substantially in favour of the FSP.
The policy allows the FSP to exclude from cover the replacement of undamaged
floorboards in the combined lounge-dining area.
Case No: 377974 Determination Page 2 of 5
The FSP is to arrange payment of compensation to the Applicants in the amount
of $1,250 in line with section 9.3(b) of the FOS TOR.
Case No: 377974 Determination Page 3 of 5
2 Reasons for Determination
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
Recommendation.
There has been a full exchange of all documents relied on to make this
Determination and each party has had the opportunity to address any issues
raised by the other.
A Case Manager made a Recommendation i n this dispute in favour of the FSP.
The FSP accepted the Recommendation but it was rejected by the Applicants. A
copy of the Recommendation is attached.
The Applicants made post-Recommendation submissions based on the fact that
the home had an open plan design, which meant adjacent flooring in the lounge-
dining area should have been replaced under the policy.
They argue a similar replacement happened after a previous flooding. The FSP
has pointed out that this replacement had occurred under a policy with different
replacement terms.
I am satisfied that the findings and outcome in the Recommendation are correct,
save as to the compensation under section 9.3 of the FOS TOR.
2.1 Is the FSP obliged to increase the final settlement offer?
The FSP’s settlement offer is in line with its policy obligations
There was no water damage to the floorboards in the combined lounge-dining
area the subject of this dispute. The FSP otherwise accepted the claim and as a
result the FSP proceeded to authorise the complete replacement of all floorboards
(including undamaged) in the rooms where water damage actually occurred.
This meant these floorboards were different to the existing undamaged original
floorboards in the combined lounge-dining area, which gave ris e to the Applicants‟
concerns.
The policy does extend cover to combining two rooms as one area
This policy has different policy terms for the replacement of damaged areas of
floorboards to the terms under which the Applicants had made a previous claim.
The policy limits the FSP‟s obligation to only replace/repair damage that arises
from circumstances covered under the policy. Further, in the instance an exact
match to original material is not available, the FSP is entitled to use the closest
similar match available.
Case No: 377974 Determination Page 4 of 5
The FSP also must only pay extra (to achieve uniformity) to replace continuously
joined undamaged floor coverings in the same room, stairs, hallway or
passageway where actual insured damage has occurred. The policy clearly states
that a hallway next to a room is considered to be a separate room and is not the
same as the adjoining room.
Further, the policy limits the combination of two areas (rooms) separated by a
doorway, archway or similar opening to only such instances where the areas in
question are lounge and dining rooms. Also, the rooms must have the same floor
covering and the shared doorway archway or similar opening wider than 82cm.
This information and photographs provided show that a hallway/passageway
would be considered a separate room and the policy does not automatically
combine a hallway and a separate adjoining room.
FSP’s assessment of i ts obligations under the policy is reasonable
The Applicants‟ position that the lounge and dining areas are combined as there
exists an opening of 250cm wide between the two areas is accepted. There is no
dispute the “L shaped” lounge-dining area is considered the same room.
However, the matter in dispute and subject to consideration is whether the
adjoining hallway-entrance is a separate room to the combined lounge-dining
room.
I am satisfied from the reasoning in the Recommendation that the FSP
established the combined L shaped lounge-dining area is a separate room to the
hallway/passageway area. The two areas cannot be combined for the purpose of
cover under the claim.
Accordingly, the FSP was entitled to exclude replacement of the floorboards in the
combined lounge-dining room under the claim.
2.2 Are the Applicants entitled to compensation?
The FSP’s overall management of the claim was less than ideal .
FOS is able to award compensation up to a maximum of $3,000 depending on the
seriousness and unusual degree or extent of physical inconvenience, time take n
to resolve the situation or interference with the Applicants ‟ expectation of
enjoyment or peace of mind.
The Applicants have raised their concerns regarding the FSP‟s (and its
representatives ‟ ) management of the claim, time taken to complete the
assessment process and the impact upon their family. The FSP did not respond.
I am satisfied that the Applicants are entitled to compensation for the poor
management by the FSP of this claim. Accordingly the FSP is to arrange payment
of $1,250 by way of compensation to the Applicants in line with section 9.3(b) of
the FOS TOR.
Case No: 377974 Determination Page 5 of 5
The policy contains the Defined Events. There is no specific provision to cover the
cost of electricity for drying the concrete slab in a claim such as this. Moreover,
the policy specifically excludes from cover consequential or extra loss that is not
covered by the policy. Accordingly, I cannot award compensation for the cost of
the electricity used in drying the floor.
3 Supporting information
Post-Recommendation submission
Recommendation
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
amount
General Insurance - Domestic Insurance - Home Building - Service - Delay in claim
handling
Recommendation
Case No: 377974 Recommendation Page 1 of 5
Case number: 377974 20 February 2015
1 Overview
1.1 Dispute
The Applicants lodged a claim for water damage to bamboo floorboards at the
insured property upon the Home Building Policy held with the Financial Services
Provider (FSP).
The claim was accepted by the FSP, however, the Applicants remain dissatisfied
with the settlement offer put to them as well as the FS P‟s overall management of
the claim.
1.2 Issues and key findings
Is the FSP obliged to increase its final settlement offer to the Applicants?
The combined lounge-dining area within the insured dwelling remains undamaged
by the escape of water event giving rise to the claim. In line with the relevant
policy terms this area is a defined as separate area/room (to the area of damage).
Accordingly, the FSP is not obliged to include replacement of the floorboards in
this area within the final settlement offered to the Applicants.
Are the Applicants entitled to compensation under the claim?
The FSP‟s overall management of the claim, in terms of the tim e taken to finalise
its assessment process, failure to secure replacement floorboards in time and
inconvenience caused to the Applicants was less than ideal.
The FSP is to arrange payment of $750 to the Applicants in line with section
9.3(b) of the Service ‟s Terms of Reference (TOR).
1.3 Recommendation
This Recommendation is substantially in favour of the FSP.
The policy clearly allows the FSP to exclude from cover the replacement of
undamaged floorboards in the combined lounge-dining area.
The FSP is to arrange payment of compensation to the Applicants in the amount
of $750 in line with section 9.3 (b) of the Service‟s TOR.
Case No: 377974 Recommendation Page 2 of 5
2 Reasons for Recommendation
2.1 Is the FSP obliged to increase the final settlement offer?
The FSP’s settlement offer is in line with its p olicy obligations
The available evidence establishes the insured building was damaged due to
escape of fluid from the laundry and which inundated sections of the dwelling.
There is no dispute regarding the extent of this inundation and therefore the
actual extent of resultant water damage. There was not water damage to the
floorboards in the combined lounge-dining area subject of this dispute.
The FSP accepted the claim and the information indicates it took an extended
period of time to dry out the concrete slab which was necessary to arrange
replacement of the floorboards.
It is also clear from the evidence that there was a delay in an attempt to source
the replacement floorboards. This resulted in the FSP being unable to source
matching floorboards to the original some months after the date of loss.
As a result the FSP proceeded to authorise the complete replacement of all
floorboards (including undamaged) in the rooms where water damage actually
occurred.
These floorboards were different to the existing undamaged original floorboards in
the combined lounge- dining area giving rise to the Applicants‟ concerns.
The policy does extend cover to combining two rooms as one area
There is no dispute the Applicants were provided with the relevant policy
documentation including the Product Disclosure Statement (PDS) prior to the
loss.
The policy limits the FSP‟s obligation to only replace/repair damage that arises
from circumstances covered under the policy. Further, in the instance an exact
match to original material is not available, the FSP is entitled to use the closest
similar match available.
There is provision for the FSP to extend the scope of cover to pay additional costs
in order to ensure a uniform appearance. However, the limits of this benefit under
the policy are clearly specified.
The FSP will only pay extra (to achieve uniformity) to replace continuously joined
undamaged floor coverings in the same room, stairs, hallway or passageway
where actual insured damage has occurred.
The PDS includes specific examples and explanations to clarify the extent of its
obligations regarding this policy benefit. The policy clearly states that a hallway
next to a room is considered to be a separate room and is not the same as the
adjoining room.
Case No: 377974 Recommendation Page 3 of 5
Further, the policy limits combination of two areas (rooms) separated by a
doorway, archway or similar opening to only such instances where the areas in
question are lounge and dining rooms. Also, the rooms must have the same floor
covering and the shared doorway archway or similar opening wider than 82cm.
This information clearly provides that a hallway/passageway is considered a
separate room and the policy does not automatically combine a hallway and a
separate adjoining room.
FSP’s assessment of is obligations under th e policy is reasonable
The Applicants‟ position that the lounge and dining areas are combined as there
exists an opening of 250cm wide between the two areas is accepted. There is no
dispute the „L shaped‟ dining -lounge area is considered the same room.
However, the matter in dispute and subject to consideration is whether the
adjoining hallway-entrance is a separate room to the combined lounge-dining
room.
The available evidence, relevant to this dispute, establishes:
the extent of resultant water ingress from the laundry was limited to the
adjoining areas only (family room, meals room, hallway leading from the entry
into the above noted areas)
the combined lounge-dining area and adjoining entrance area were not
actually water damaged
the FSP has authorized replacement of the floorboards to the hallway and
adjoining entrance area under the claim
the entrance area is separated from the lounge-dining area by an archway
whilst the dining area is separated from the kitchen by a door
the entrance area is a separate room ( not the same room as the combined
lounge-dining)
the policy only covers extra payment to achieve uniformity for replace
floorboards in the same room
The FSP has been successful in establishing the combined L shaped lounge-
dining area is a separate room to the entrance area. The two areas cannot be
combined for the purpose of cover under the claim.
Accordingly, the FSP was in line with its obligations under the policy was entitled
to exclude replacement of the floorboards in the combined lounge-dining room
under the claim.
2.2 Are the Applicants entitled to compensation?
The FSP’s overall management of the claim was less than ideal
The Service is able to award compensation up to a maximum of $3,000
depending on the seriousness and unusual degree or extent of physical
inconvenience, time take to resolve the situation or interference with the
Applicants‟ expectation of enjoyment or peace of mind.
Case No: 377974 Recommendation Page 4 of 5
The Applicants have raised their concerns regarding the FSP‟s (and its
representatives) management of the claim, time taken to complete the
assessment process and the impact upon their family.
The FSP has elected not to provide any comments in its response to the Service
in this regard. Therefore I will accept the concerns raised by the Applicants to be
an accurate reflection of their experience under the claim.
Having considered the available evidence with respect to the circumstances of the
claim, I am satisfied:
the time taken to complete the drying process of the concrete slab was
unreasonable and other than installing a few blowers and dehumidifiers no
other options were considered/attempted to expedite the process
there was a delay in sourcing the required replacement floorboards which if
had occurred earlier, on balance, would have been successful in sourcing the
original bamboo floorboards
the unreasonable extended presence of drying equipment and the unrepaired
areas of the home would have interfered with the Applicants‟ expectation of
enjoyment and peace of mind.
The refore, having considered the all of the evidence as well as the parties‟
positions, I am satisfied the FSP‟s overall management of the claim was less than
ideal. The FSP is to arrange payment of $750 by way of compensation to the
Applicants in line with s ection 9.3 (b) of the Service‟s TOR.
I acknowledge the Applicant‟s expectation for compensation for consequential
financial loss arising from the use of electricity by the drying equipment. However,
the policy specifically excludes from cover such conseque ntial loss. Therefore, in
line with the TOR I am precluded from awarding any compensation for this
consequential financial loss.
3 Supporting information
3.1 Relevant term of the FOS Terms of Reference
9.3 Other compensation
…
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial
Service Provider compensate the Applicant for non-financial loss but only where:
(i) an unusual degree or extent of ph ysical inconvenience, time take to resolve
the situation or interference with the Applicant‟s expectation of enjoyment or
peace of mind has occurred…
…
The maximum amount of compensation for non-financial loss will be $3,000 per claim
made in the Dispute.
3.2 FOS approach to this dispute
A full exchange of the relevant information has taken place between the
respective parties and each party has had the opportunity of addressing any
issues raised.
Case No: 377974 Recommendation Page 5 of 5
All of the provided material has been read and considered. The parties have
raised numerous issues in their submissions to the Service. For the purpose of
this Recommendation, commentary is restricted to only those issues considered
relevant to the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.