Home / Financial Firm (Unknown - Insurer) / Determination 377418
Determination 377418
Inadequate storm repairs to shed and settlement method
Summary
Homeowners disputed repairs to a storm-damaged shed by the FSP's repairer. AFCA found the repairs inadequate and ordered a new scope of works, with repair or cash settlement at the applicants' election, while rejecting the fence and contents storage claims. No figure was stated.
The policy lets the FSP elect repair or cash settlement, but where its own expert found the repairs inadequate, a cash settlement based on a revised scope is fair.
Issues
- Repairs or contractors primary · upheld
“I accept that the repair work done by JL was not of the requisite standard.”
- Claim amount dispute secondary · not upheld
“The Applicants are not entitled to insist that its own repairers do the rectification work.”
- Claim denial secondary · not upheld
“I am satisfied that the FSP is not liable for the claimed damage to the fence. No cover for contents storage.”
Subjects and remedies
home or building damagenatural disasterreassess claimrepair or rectify
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
amount – Service – Service Quality
Determination
Case No: 377418 Determination Page 1 of 7
Case number : 377418 14 April 2015
1 Overview
1.1 Dispute
The Applicants lodged an insurance claim for damage caused when a tree fell at
their property in July 2013. The Financial Services Provider (FSP) arranged for
“JL” to attend to repairs. The FSP‟s expert “MB” agreed the repairs were
inadequate and required rectification. The Applicants further seek cover for other
items the FSP has not covered.
The FSP accepts the repairs were inadequate and sa ys JL should attend to the
rectification or it is prepared to cash settle the Applicants. The Applicants want
their own repairer. Some of the problem areas with the shed were present prior to
the insured loss and the FSP considers that these should not be part of the claim.
1.2 Issues and key findings
What is an appropriate settlement for the shed?
A new scope of works should be prepared by “MB” (with the assistance of original
builder “JL” if necessary). Should the Applicant s prefer a cash settlement, then it
should be based on this revised amount. Otherwise, JL can attend to the repairs.
An excess may be deducted from this amount if it has not already been done.
Are the other items covered under the terms of the policy?
I am satisfied the fence was not damaged in the event. The sewing machine has
not been made available for review and the Applicants should do this.
There is no evidence of a need to store the shed‟s contents off -site.
1.3 Determination
This Determination is substantially in favour of the FSP.
It should prepare a new scope of works as detailed herein and assess the claim
for the sewing machine after receipt of the damaged item for review.
At the Applicants‟ election, the claim may be cash settled based on the revised
repair quote or JL may attend to the work. No interest will apply to the settlement.
Case No: 377418 Determination Page 2 of 7
2 Reasons for Determination
2.1 What is an appropriate settlement for the claim?
Parties agree rectification work required at the Applicants’ property
It is not in dispute that the insured shed was damaged as a result of a falling tree
in July 2013. The FSP‟s chosen repairer (“JL”) attended to the necessary repairs.
The Applicants said the repairs were not acceptable. In response, the FSP agreed
to appoint builder “MB” to inspect the shed and report on any fu rther work
required.
MB agreed some work required rectification but also said that some of the issues
with the shed were present prior to the loss and the FSP contends these are not
covered.
As a result of the MB report, the FSP agreed that some work required
rectification. Upon receiving the MB report, the FSP offered the Applicant the
following options:
allow JL to rectify the issues highlighted by MB, or
accept a cash settlement for the estimated value of the rectification work,
being $2,365 (less the applicable policy excess of $375).
The Applicants rejected both options and preferred to have the work done by a
builder of their choice.
Policy provides FSP can repair or pay to repair
The relevant policy terms are set out in section 3 of this Determination. I consider
the policy terms are clear and unambiguous. Pursuant to the terms of the policy, it
is clear that it is at the FSP‟s election whether it pays the Applicants or pays its
nominated repairer. The policy provides the FSP can arrange for the repairs to the
home and if this is done, the FSP provides a lifetime guarantee for that work.
I am satisfied that pursuant to the policy terms that the Applicants are not entitled
to insist that its own repairers do the rectification work.
Not all Applicants’ co mplaints properly the subject of the rectification work
Having considered the report from MB, I accept that the repair work done by JL
was not of the requisite standard. However I also accept the MB report clearly
shows there were issues with the shed that would have made the repair difficult.
The evidence supplied by MB about the problems with the shed is not
contradicted by any expert evidence from the Applicants.
MB notes there are several issues with the shed that are not related to the
damage caused i n the event or the repairs undertaken by JL.
I am therefore satisfied that the FSP is not responsible for the rectification of
these areas, which are set out in detail in MB‟s report as summarised below in
Section 3 of the Determination.
Case No: 377418 Determination Page 3 of 7
In contrast, several issues were highlighted which are directly related to the event
and/or JL‟s repair work. These issues are also set out in detail in MB‟s report and
are summarised below.
The Applicants have not raised additional specific issues that require attention
over and above that highlighted by MB. I am therefore satisfied that the
rectification work may be limited to the scope recommended by MB.
Fair that MB prepare a new scope of works
JL quoted $2,013 to do the work. The FSP admits that an additional $352
(including GST) had to be added for “additional scope” of the work but it is not
clear from the material provided what this work is.
This implies that the quote relied on by the FSP is incomplete or inadequate. To
this end, I am of the view that it is fair in all the circumstances that a complete
scope of works, covering all aspects of the additional work should be prepared.
In fairness to the Applicants and the intent of the MB report, I consider that MB
should attend to prepare a scope of works pursuant to the rectification work he
said was necessary as set out in his detailed report of 7 April 2014.
If necessary, the scope of works may be prepared by MB in conjunction with JL.
Any additional amounts calculated should be included as part of the work to be
done. The policy does allow the FSP to elect that its repairer do the work or that it
cash settle. However, in all the circumstances of this matter, where the FSP‟s own
expert agrees the work done by JL is inadequate, I consider that it is fair in all the
circumstances that if the Applicants prefer, they may choose to accept a cash
settlement of these costs rather than allow JL to attend to the work.
However, it should be noted that the policy provides that if the rectification work is
completed by their own builder this work will not be guaranteed by the FSP.
The FSP notes that an excess applies to this work. I accept that this will be the
case only insofar as an excess has not already been charged for the claim.
Noting that settlement will be based on a revised and up-to-date scope of works, I
also consider that interest on any cash settlement is not to be paid by the FSP (if
a cash settlement outcome is selected by the Applicants).
2.2 Are the other items covered under the terms of the policy?
Fence not damaged in the insured event
Further to the main issue of repairs, the Applicants sought cover for a damaged
sewing machine and fence paling, which they attribute to the falling tree.
It appears the FSP has not assessed the damage to the sewing machine, whilst it
asserts the fence was aged and the damage was not consistent with a falling tree.
Based on the provided photograph, I accept that the fence is old. Further I
consider that a falling tree would have inflicted more and different damage than is
present in the photograph.
Case No: 377418 Determination Page 4 of 7
On balance, noting the apparent age of the fence, I consider it unlikely that the
observed damage was caused by a falling tree. If any significant part of the tree
had struck the fence, I expect that it is more likely that the fence would have
collapsed.
I am satisfied that the FSP is not liable for the claimed damage to the fence.
Claim for sewing machine to be assessed
No evidence has been supplied in relation to the sewing machine, despite the
FSP‟s request for same. If this item had been struck and damaged, it is my view
that the damage would be self-evident. I consider the Applicants should provide
the item and or the repair quote to the FSP for review and assuming it is damaged
in a manner consistent with the reported claim, the FSP should cover it.
No cover for contents storage
The Applicants sought cover under the policy for the storage of contents through
the repair and rectification period. No evidence of this loss was supplied and the
issue was not addressed by the FSP.
In the absence of specific information about the need to store these items, it is
difficult to give consideration to this request.
There is no specific provision in the policy for the storage of contents items off-site
necessitated through damage caused to a building (which in this case was a
shed).
Even if there were, the onus is on the Applicants to establish that it was both
reasonable and necessary to take this action.
In the absence of such evidence, I am of the view that this loss is not covered.
Case No: 377418 Determination Page 5 of 7
3 Supporting information
3.1 FOS approach to this dispute
General information
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to an Ombudsman for
Determination, in line with the Operational Guidelines to the FOS Terms of
Reference.
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
I have reviewed and considered all of the material provided by the parties. While
the parties have raised a number of issues in their submissions, for the purposes
of this Determination I have restricted my commentary to those issues which I
consider directly relevant to the outcome only.
Prima facie claim
There is an onus on an insured to establish on the balance of probabilities that a
claim fits the definition of an insured event. This is known as a prima facie claim.
Should this onus be discharged, it is then the responsibility of the insurer to
establish the application of any exclusion on which it relies to deny the claim.
To be entitled to cover from the FSP, the onus therefore rests with the Applicants
to establish that their loss fits within the scope of what is covered by the FSP‟s
policy.
3.2 Relevant policy extracts
Exclusions for all cover
These exclusions apply to all cover under your policy.
What we don’t cover
Loss, damage, injury or death arising from:
rust, corrosion, gradual deterioration, depreciation, wear or tear
Maintaining and occupying your home
We don't cover loss, damage, injury or death arising from:
faulty design or workmanship
previous damage that has not been repaired
you not maintaining your home in good repair and condition. This means
your home must be watertight, structurally sound, secure and well maintained
you not maintaining your site in good repair and condition
you not taking reasonable care to protect your home or contents against loss or
damage.
Case No: 377418 Determination Page 6 of 7
What we pay for – Buildings Insurance
If we agree to cover your claim under Buildings Insurance, then we will:
► pay the cost to repair or rebuild the part of your home that was damaged
(whichever is lower)
► …
How we settle your buildings claim
We will choose to settle your claim for loss or damage to your home or 'other cover'
in one of the following ways:
1. Arrange for repairers, builders or suppliers to repair or rebuild your home.
If you agree, we can arrange for our preferred repairers, suppliers or builders to
repair or rebuild your home.
2. Pay you the reasonable cost to repair or rebuild your home.
We can choose to:
► pay you
► pay your nominated repairer, supplier or
builder, or
► provide you with store credits from one of our nominated suppliers.
Lifetime guarantee
We provide a „lifetime guarantee‟ when your home is repaired or rebuilt by one of
our preferred repairers or builders.
This means:
► we guarantee the workmanship of repairs that we authorised for the lifetime
of your home
► we will fix any defect caused by poor workmanship.
We will decide on what needs to be done to fix any defect.
When you’re not covered by this guarantee
This guarantee does not apply to: repairs you authorised yourself .”
3.3 Expert report and other supporting information
Record Key points
Quote JL
15 September 2013
JL visited site 11 September 2013.
Prepared scope of works to repair garage as detailed
therein in the amount of $2,013.
Work included sheets on the rear right side, sealing gap
in barge flashing, securing downpipe, installing vertical
timber batons and roof plumbing.
Photograph Shows aged and weathered fence.
Consultant’s report
( MB )
7 April 2014
Attended and photographed the site 17 March 2014.
Issue with the brick wall is not event related and
appears to be a result of the original construction and no
further work required.
The roof sheets were not returned to their original
position as a result of defective plumbing work. This
requires rectification.
Garage was not originally air tight but there are issues
with the repair leaving gaps.
As for rain water into gable end , noted a small gap in
the barge flashing which would allow water to enter and
Case No: 377418 Determination Page 7 of 7
was due to defective work and requires rectification.
Two downpipes were not connected. The Applicant had
disconnected these to harvest water for her garden. This
is not related to the claim but the builder is to secure the
replace downpipe at the rear of the shed.
The gable dint at the rear of the garage may be storm
related and should be covered.
There are “inherent building defects in the current
concrete in fill slab and original wall sheeting”, w ith
concrete missing from the rear of the garage. The
original installation had been poor and would have
hampered the repair process. The pre - existing conditions
made it difficult to see what else the FSP‟s builder could
have done.
Screws were observed co ming out of the repaired corner
of the shed. This was an example of poor workmanship
and should be addressed by the FSP‟s builder.
Scratches were evident on the rear color bond wall
sheeting. MB attributed this to defective plumbing works
and noted it need ed addressing.
There is a variable height issue with the rear wall
sheets installed by the builder, which were not at the
height of the original sheets. This has left a gap or about
20mm in places. Noting the scratches previously
identified and some missin g and ill - fitted screws around
this area, the wall sheeting should be replaced but before
this is done the Applicants are to agree that the finished
external height is the same as what currently exists.
The end of the wall sheeting covering the brickwork o n
the boundary is missing some fixings and screws and
this should be attended to and will be resolved when the
builder replaces the rear wall sheets.
As for the irregular ridgeline in the ridge when the
roofing sheets are replaced the ridgeline can be secu red
to create regular visual appearance.
The original top timber batten has “twisted and shrunk
from its original position”, with the timber now brittle.
Notwithstanding this, the FSP‟s builder screwed the
replacement wall sheeting to the rear elevation of the
shed and some of the screws on the batten are not
secured properly . When the sheets are replaced, a new
timber batten should be installed, though the batten was
not part of the insured event and this would be a variation
as the deformed timber batten was not caused by the
builder or the insurable event.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.