Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim
Determination
Case No: 377306 Determination Page 1 of 8
Case number : 377306 2 7 February 2015
1 Overview
1.1 Dispute
In May 2014, the Applicants lodged a claim under their home insurance policy
with the Financial Services Provider (FSP) for damage caused to their main
bathroom and the sub-floor underneath. The Applicants say the damage was
caused by a leaking sewer pipe.
The FSP denied the claim on the basis that the damage was not caused by the
leaking sewer pipe but by a combination of earth movement and the faulty design
and construction of the bathroom floor, each of which is excluded from cover
under the policy.
1.2 Issues and key findings
Is the FSP liable for the claimed damage?
The Applicants have established a prima facie claim under the policy for damage
caused by the escape of liquid from the leaking sewer pipe. The available
information does not establish that the damage to the bathroom was caused by
factors which are excluded under the policy. Accordingly, the FSP is liable for the
damage caused by the leaking pipe.
How should the claim be settled?
The FSP is required to indemnify the Applicants for the damage caused by the
leaking pipe (including the resulting damage caused by the sinking of the floor,
which compromised the waterproofing membrane). However, the FSP is not liable
for the pre-existing damage to the property and therefore the Applicants are to
bear 20% of the costs of repairing the damage to the bathroom and the sub-floor.
1.3 Determination
This Determination is substantially in favour of the Applicants.
The FSP is required to indemnify the Applicants for the claimed damage in
accordance with the terms of the policy and the process set out in section 2.2
below, provided that the Applicants are to bear 20% of the total costs of repairing
the damage. To the extent that the claim is cash settled, the FSP is to pay interest
on the settlement amount in accordance with section 2.2 below.
Case No: 377306 Determination Page 2 of 8
2 Reasons for Determination
2.1 Is the FSP liable for the damage to the Applicants’ bathroom?
Applicants have established a prima facie claim for escape of liquid
The Applicants are required to show that, on the balance of probabilities, they
have suffered a loss caused by a risk insured against under the policy. This is
known as a prima facie claim.
If the Applicants are able to establish a prima facie claim, then the onus shifts to
the FSP to show that, on the balance of probabilities, it is entitled to rely on an
exclusion under the policy to deny the claim.
The Applicants’ policy provides cover for damage to their property caused by the
insured events listed in the policy (including the escape of liquid from a pipe),
subject to the conditions and exclusions set out in the policy.
The cover provided for damage caused by the escape of liquid extends to
circumstances where the liquid escapes slowly over a period of time (as in the
case of a leaking pipe), provided that the insured could not reasonably have
known that the liquid was escaping.
The Applicants say that the damage to their bathroom was caused by a leak in
the sewer pipe connected to the toilet, which led to extensive moisture enteri ng
the sub-floor soils. They say that this caused the timber stumps to move, resulting
in the subsidence of the tiled floor and the cracking and other damage observed
at the property.
When the Applicants lodged their claim in May 2014, they advised the FSP that
several weeks earlier they had noticed that the bathroom floor was sinking and
there was a strong smell of sewerage.
The plumber (LP) appointed by the FSP to attend the property in May 2014
confirmed that the sewer pipe from the toilet was leaking. LP concluded that the
liquid from the leaking pipe had saturated the soil under the house, which had
caused the footings and piers to sink, resulting in the bathroom floor sinking. LP
noted that the sinking of the floor had in turn damaged the waterproof membrane
in the bathroom, which allowed water to enter the sub-floor when the shower was
used, causing further subsidence.
In these circumstances, I am satisfied that the Applicants have established a
prima facie claim under the policy for damage caused by the insured event of
escape of liquid. While the damage may have occurred gradually over a period of
time, the Applicants could not reasonably be expected to have been aware of the
leak, given the location of the pipe.
Case No: 377306 Determination Page 3 of 8
FSP is liable unless it can show an exclusion applies
Given the Applicants have established a prima facie claim, the FSP is required to
show that, on the balance of probabilities, it is entitled to rely on a policy exclusion
to deny their claim.
In order to establish an exclusion applies, the FSP must show that the proximate
cause of the damage to the Applicants’ bathroom (that is, the real, effective or
dominant cause) was one or more factors which are excluded under the policy.
The FSP says that it is not liable for the Applicants’ claim because the damage to
the bathroom was not caused by the leaking pipe, but by a combination of the
inadequate design and construction of the bathroom floor and the effects of
naturally occurring earth movement, each of which is excluded under the policy.
FSP’s contractors have provided inconsistent views
In support of its position, the FSP relies on a report prepared by its engineer (C)
who inspected the Applicant’s property in July 2014. In his report, C concluded
that:
the bathroom floor had been built using a concrete slab supported by timber
stumps, which were structurally inadequate to support the slab and relied on
the weight of the slab to hold them in place;
as a result, and due to the reactive nature of the foundation soils, the stumps
were prone to movement which had caused the slab to deflect; and
the deflection of the slab had damaged the water proofing system, allowing
water to escape from the shower recess and enter the sub - floor area. This
had caused the timber bearers and joists to decay.
C considered that the damage had been occurring over an extended period of
time (more than five years), due to the extent of the decay to the timber bearers
and the severe corrosion of the corrugated iron under the concrete slab. He also
noted evidence of past repairs to previous cracking and movement damage,
including packing of the timber stumps under the bathroom and sealing of internal
and external cracks.
In its submissions to FOS, the FSP says that the “general expert consensus” is
that the damage was caused by a combination of earth movement and faulty
construction.
However, while the views expressed by the FSP’s other contractors are consistent
with C’s observations about the nature of the damage, their conclusions in relation
to the proximate cause of the damage differ in several significant respects. In
particular, I note that:
as outlined above, the plumber (LP) appointed by the FSP in May 2014
concluded that the proximate cause of the damage was the leaking sewer
pipe (which he considered was the underlying cause of the movement of the
stumps and the resulting damage to the waterproofing membrane);
while the engineer (WB) appointed by the FSP in June 2014 expressed
concerns about the manner in which the bathroom floor had bee n constructed,
he also noted evidence of moisture leakage around the sewer pipe. WB did
Case No: 377306 Determination Page 4 of 8
not express a clear opinion as to which factor was the underlying cause of the
damage; and
after reviewing the reports provided by LP and WB, the FSP’s building
consult ant (AB) concluded that the damage had been caused by “a
combination of” the subsiding slab and the leaking sewer pipe, which had
allowed water to pond under the bathroom . He also stated that the dama ge
had been present for only two to three months, which is inconsistent with it
having occurred over an extended period of time as identified by C.
Available information suggests damage occurred relatively recently
In my view, the available information does not support the conclusions of the
FSP’s engineer (C) that the damage to the bathroom occurred over an extended
period of time due to the effects of naturally occurring earth movement on the
poorly constructed bathroom floor.
The pre-purchase inspection report obtained by the Applicants in January 2013
did not note any significant damage to the bathroom. With the exception of some
minor cracking to the cornice line, the bathroom was described as being in an
“ acceptable ” condition (meaning that it was of a sufficient standard to not require
any remedial or repair work).
The pre-purchase inspection report also described the sub-floor as being in an
acceptable condition. This report includes a photograph of the sub-floor area
under the bathroom, which confirms that the inspector gained access to the sub -
floor for the purposes of the inspection.
While the pre-purchase report notes evidence of water staining and damage to
the subfloor area under the bathroom, this is referred to as “old” damage. The
report does not identify extensive decay of the timber bearers, as observed by the
FSP’s engineer (C) in August 2014.
The pre-purchase report also confirms that the sub-floor was dry at the time of the
inspection and no leaks were identified, which suggests that there were no current
and ongoing issues with the bathroom at that time (particularly if, as the
Applicants suggest, the previous owners were still occupying the property).
The reports prepared by the FSP’s contractors indicate that, by May 2014, the
damage to the bathroom was significant, with the floor having s ubsided by up to
13 millimetres and major cracking apparent to the bathroom and shower area.
Given the extent of the damage to the bathroom and the relatively short time
within which it appears to have developed, it is more likely that the damage was
caused by a specific event (such as the leaking sewer pipe), rather than by
construction and movement issues (which presumably would have been present
throughout the life of the property and would have become apparent over a period
of years rather than months).
The Applicants say that they moved into the house in August 2013 and did not
experience any issues until April 2014, when they noticed the bathroom floor
sinking and a smell of sewerage, following which they lodged their claim. This is
Case No: 377306 Determination Page 5 of 8
also consistent with the damage having occurred within a relatively short space of
time (as is AB’s estimate that the damage did not commence until early 2014).
Available information does not establish exclusion applies
Based on the available information, I am not satisfied that the FSP has
established that, on the balance of probabilities, the proximate cause of the bulk
of the claimed damage to the bathroom was earth movement and/or construction
defects (and not the leaking sewer pipe).
The nature and timing of the damage is more consistent with it having occurred as
the result of a specific event (being the leaking sewer pipe identified in May 2014),
rather than as a result of ongoing factors affecting the property over an extended
period of time.
While the FSP’s engineers (C and WB) concluded that the concrete slab
bathroom floor was not properly supported or reinforced, neither engineer has
provided any specific information which establishes that the construction methods
adopted did not comply with applicable building requirements at the time of
construction.
While C considered the potential impact of the leaking sewer pipe and dismissed
it as minor, C’s report does not pr ovide any further explanation as to the basis on
which he reached this view - for example, whether it was based on the volume of
liquid which would have escaped from the pipe or the manner in which the
escaping liquid wold have affected the surrounding soils. As noted above, the
other contractors engaged by the FSP (including the engineer, WB) gave
significantly more weight to the likely effects of the leaking sewer pipe.
2.2 How should the claim be settled?
FSP is required to indemnify Applicants for damage caused by leaking pipe
For the reasons outlined above, the FSP is not entitled to rely on either of the
policy exclusions referred to, in order to deny the Applicants’ claim. Accordingly,
the FSP is liable to indemnify the Applicants for the damage to their property
caused by the leaking pipe.
The reports prepared by the various contractors confirm that the further damage
to the sub-floor caused by water leaking through the shower arose as a
consequence of the damage to the waterproofing membrane caused by the initial
subsidence of the floor. Accordingly, this damage is also attributable to the
leaking pipe.
However, it is apparent that the Applicants’ property was also subject to pre-
existing and ongoing earth movement, which resulted in the minor cracking and
movement damage identified in the pre-purchase inspection report and the
reports prepared by the FSP’s contractors. The pre -purchase inspection report
also identified pre-existing damage to the corrugated iron slab support and the
timber joists and bearers of the sub-floor in the bathroom area.
Case No: 377306 Determination Page 6 of 8
The Applicants’ policy provides that the FSP will settle a building claim by, at its
election, repairing the damaged property to the same standard, specification or
quality as when new or paying the Applicants the cost (to the FSP) of doing so.
Accordingly, the FSP is to arrange for a scope of works and quotation for the
repair of the claimed damage to be provided by a suitably qualified and
experienced contractor, following which the FSP is to arrange for the repair of the
damage or cash settle the Applicants for the amount of the quotation. Having
regard to the extent of the pre-existing damage, I consider that it is fair in all the
circumstances that the Applicants bear 20% of the total cost of the repairs.
To the extent that the claim is cash settled, the FSP is to pay interes t on the
settlement amount at the rate calculated in accordance with section 57 of the
Insurance Contracts Act 1984 (Cth), from 26 September 2014 until the payment
date.
The FSP is not liable for the costs of $5,388.30 incurred by the Applicants in
replacing the broken sewer pipe. The insured event of escape of liquid specifically
excludes cover for the cost of repairing or replacing the pipe from which the liquid
escaped.
Case No: 377306 Determination Page 7 of 8
3 Supporting information
3.1 FOS approach to this dispute
As advised to the parties, FOS has considered it appropriate to expedite this
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference, due to the nature of the dispute. Accordingly, this dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to add ress
any issues raised by the other. All of the material provided by the parties has
been reviewed and considered for the purposes of this Determination.
This dispute has been decided on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
While the parties have raised numerous issues in their submissions, for the
purposes of this Determination, commentary has been restricted to those issues
considered directly relevant to the outcome only.
3.2 Terms of policy
Subject Terms
Insured event –
escape of liquid
Insured event
Sudden and unexpected escape of liquid at the insured
address from:
baths, sinks, toilets, basins or any fixed plumbing apparatus …
pipes and taps …
We will not cover:
the cost of repair or replacement of the pipe … that the liquid
escaped from, including the cost of repairs to a leaking shower
floor, base, or walls
loss or damage caused by leaking shower floors or bases, tiled
roman baths or shower recess walls …
loss or damage caused by liquid that has escaped slowly over a
period of time, unless it is reasonable that you could not have
known about the liquid escaping.
General exclusion –
earth movement
We will not cover: …
Earth movement
loss or damage caused by erosion, vibration, subsidence,
landslip, landslide, mudslide, collapse, shrinkage or any other
earth movement.
Case No: 377306 Determination Page 8 of 8
Subject Terms
General exclusion –
faulty workmanship
and lack of
maintenance
We will not cover: …
Defects, faulty workmanship, lack of maintenance
loss or damage or the incurring of legal liability caused by a
design fault, structural defect, or faulty workmanship that you
knew about and did not fix before the loss or damage occurred
loss or damage caused by your failure to maintain the home
and/or contents in good condition .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.