Defective hail roof repairs by the FSP's contractor and disputed cash settlement amount
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
Amount - Service - Service Quality
Determination
Case No: 376305 Determination Page 1 of 9
Case number : 376305 2 8 April 2015
1 Overview
1.1 Dispute
The Applicant lodged a claim under his home insurance policy with the Financial
Services Provider (FSP) after his home suffered hail damage in March 2010. The
FSP accepted the Applicant’s claim and authorised repairs to the property.
The Applicant says that the roofing works carried out by the FSP’s roofing
contractor were not completed to an acceptable standard and the subsequent
rectification repairs are also inadequate. He wants the FSP to pay for the cost of
replacing the roof (including all purlins) and repairing additional damage caused
by the FSP’s contractor.
1.2 Issues and key findings
Is the FSP liable for the cost of replacing the roof?
The available information establishes that the initial roofing works carried out by
the FSP’s roofing contractor (BS) were inadequate. The FSP is liable for the cost
of redoing these works.
While it appears that the roof purlins have sustained some damage as a result of
BS’s work practices, the extent of this damage is unclear. In the circumstances, it
is appropriate that the FSP contribute to the cost of replacing the roof purlins.
Is the FSP liable for the remainder of the disputed damage?
The FSP remains liable for repairing the damage caused by the hail storm as set
out in the initial scope of works. The FSP is also liable for repairing the additional
damage resulting from the poor roof repairs and the actions of the FSP’s roofing
contractor.
1.3 Determination
This Determination is substantially in favour of the Applicant.
The FSP is to pay the Applicant the amount of $135,000 in full and final
settlement of his claim.
Case No: 376305 Determination Page 2 of 9
2 Reasons for Determination
2.1 Is the FSP liable for the cost of replacing the roof?
Initial roof repairs were inadequate and should be redone
After assessing the Applicant’s claim, the FSP accepted that roofs over various
parts of the property had been damaged by hail and needed to be replaced. The
roofing works were carried out by the FSP’s contra ctor (BS) in October 2010 and
involved the replacement of roofing sheets, flashings and box gutters.
During the course of the roofing works, the Applicant expressed concern about
the quality of the works and the work practices employed by BS. The Applicant
has provided a number of photographs which clearly show issues with the works,
including misaligned and incorrectly installed roofing screws, elongated screw
holes and sagging roof sheets.
In response to the Applicant’s concerns, the FSP engaged a buildin g consultant
(MS) to carry out a quality review of the repairs. In his report, MS identified a
number of specific issues with the repairs and described them as being “generally
sub- standard”. While MS noted that some of the issues were purely aesthetic, he
also recognised that the architectural design of the Applicant’s home meant that
large sections of the roofs were visible from the upper balconies.
Given the poor quality of the works carried out by BS, MS recommended that all
of the roof sheets, box gutters and flashings be replaced, as well as the insulation
and roofing wire.
Despite the findings in MS ’ s report, the FSP did not arrange for the roofing work
to be redone, but instead allowed BS to attempt rectification of the initial repairs. It
appears that the rectification works primarily involved the application of silicone to
various areas of concern.
When the Applicant remained dissatisfied with the quality of the roofing works, his
concerns were reviewed by the FSP’s internal consultant (FW) who agreed to
accept liability for the replacement of the roofs. However, the Applicant and the
FW could not agree on the extent of the works required (and, in particular, the
extent of any damage to the purlins). Accordingly, the proposed settlement did not
proceed.
The FSP has subsequently disputed whether the full replacement of the roof is
required. The FSP says that a structural engineer should be appointed to
determine the extent of the repairs required in order to address the issues with
BS’s original wo rks.
Having carefully reviewed the available information (including the numerous
photographs provided by both parties), the Panel is satisfied that the initial roofing
works carried out by BS were clearly inadequate.
Case No: 376305 Determination Page 3 of 9
The reports provided by the FSP’s contractors confirm that the Applicant’s
property was in immaculate condition prior to the hailstorm. Once the FSP had
accepted liability for hail damage to the roofs of his property, the Applicant was
entitled to have the roofs repaired (or replaced) to a condition equivalent to that
prior to the storm.
The poor standard of the works carried out by BS was clearly confirmed by the
FSP’s own building consultant (MS), as well as by a second builder (M) who was
engaged to quote on the proposed re-roofing (which ultimately did not proceed).
The FSP itself accepted full liability for the replacement of the roof on more than
one occasion during the course of the claim.
In these circumstances, the Panel considers that the FSP is liable for the costs of
redoing the roofing works undertaken by BS, as confirmed by MS – that is, the
replacement of the roofing sheets, flashings and box gutters.
FSP is to cash settle Applicant for $68,000 for cost of redoing roofing works
Given the issues experienced with the FSP’s contrac tors to date, the Panel
considers that the FSP should cash settle the Applicant for the cost of redoing the
roofing works, so that he can engage his own contractor to complete the repairs
to his satisfaction.
During the course of negotiations with the Applicant in 2011, the FSP reviewed
two quotes for redoing the roofing works – a quotation for approximately $38,467
provided by the FSP’s contractor and a quotation for approximately $56,100
provided by the Applicant’s builder.
The FSP has subsequently obtained a quote for approximately $68,000 from its
own builder (B) for the replacement roofing works. B’s quote was provided in
March 2015, based on the original scope of works for the roof repairs (which was
subsequently incorporated into a more extensive scope of works prepared by the
Applicant).
While B did not have an opportunity to conduct a full inspection of the roof, his
quote was based on the original scope of works prepared by the FSP’s assessor
following the hail storm, assuming that the complete replacement of the roofs was
required.
In these circumstances, the Panel is satisfied that the amount of $68,000 quoted
by B represents the fair and reasonable cost of undertaking the necessary works.
Extent of damage to roof purlins is unclear
The Applicant says that the manner in which the roofing works were carried out by
BS has damaged the purlins throughout the roof areas, such that all of the purlins
(including those for the garage, patio and workshop) now need to be replaced.
The extent to which the purlins need to be replaced has a significant impact on
the cost of the necessary works. The Applicant has advised that the replacement
of all of the purlins requires the removal and replacement of the internal ceilings at
Case No: 376305 Determination Page 4 of 9
the property (as these are suspended), as well as the removal and reinstallation
of the electrical wiring.
Based on the quote provided by the FSP’s builder (B) in March 2015 (based on
the Applicant’s scope of works), it appears that the cost of replacing all the purlins
(together with the additional costs associated with the ceilings and rewiring) is in
the vicinity of $65,000.
The Applicant says that the damage to the purlins has occurred due to:
BS having stored heavy roofing materials on the roofs during the course of the
works which has caused the purlins to deflect; and
the manner in which BS installed the Tek screws fixing the roof sheets onto
the purlins (ie alongside the existing screws), which has damaged the purlins
to the extent that they cannot be reused when the roofing s heets are replaced.
The Applicant has provided photographs which confirm that BS placed a mobile
crane on the lower ground floor roof of the property, which he used to deposit the
replacement roofing material on top of the existing roofs.
The FSP has acknowledged that the storing of roofing materials on the existing
roofs could have resulted in deflection damage to the purlins, although it says
there is no conclusive information which confirms this occurred in the present
case.
Nevertheless, the FSP accepted liability for damage to one of the purlins in the
lower roof area after a consulting engineer (S) confirmed that there was a slight
deflection in the flange of this purlin. S was appointed by the Applicant with the
FSP’s agreement.
However, the FSP says that there is no information to establish that any of the
other purlins have suffered damage such that they need to be replaced.
In his report, S considered concerns raised by the Applicant in relation to
“sagging” of the upper roof following complet ion of the roofing works.
S confirmed that there was a noticeable sag in the upper roof sheeting in the
direction of the purlin spans. However, he noted that the extent of the deflection
was within accepted tolerances under relevant building standards.
S also confirmed that, while the roof had been designed with a slope of 3
degrees, following the roofing works, the slope of the ground floor roof in places
was as low as 1.4 degrees and the slope of the upper floor roof was as low as 1.5
degrees.
While S confirmed that the reduced slope should not affect the watertightness of
the roof (as it remained within the manufacturer’s guidelines), he acknowledged
that it did affect the aesthetic appeal of the roof.
S was unable to conclusively determine whether the sagging of the upper roof
sheets had been caused by the work methods employed by BS.
Case No: 376305 Determination Page 5 of 9
However, the Panel is satisfied that the numerous and detailed photographs taken
by the Applicant during the course of the works establish that the roof did not
have a noticeable sag at the time the works commenced. Accordingly, the Panel
considers that it is reasonable to assume that any issues with the profile of the
roof following the works were caused by BS.
The Panel notes that, while S’s reports confirm that the roo f sheets were sagging
in the direction of the purlin spans, it is not entirely clear whether this is due to any
underlying deflection of the purlins, or whether it is an issue which may be
adequately addressed by replacing the roofing sheets themselves.
In this respect, the Panel notes that several experts consulted during the course
of the claim have advised that it is not possible to determine the extent of the
damage (if any) to the purlins without removing the roof sheets.
S’s final report does not di scuss in any detail whether the installation of the Tek
screws caused significant damage to the purlins. In an earlier draft of his report, S
noted that inadequate fixing of the Tek screws could have a detrimental effect on
water tightness, but did not suggest that this necessitated the replacement of the
purlins themselves.
The Applicant has recently provided a report from his building consultant (BG)
which states that the extent of the deflection to the roof purlins is sufficient to
reduce the pitch of the roof. BG considered that the reduced pitch of the roof was
the most likely cause of the various leaks identified, which he noted had occurred
in areas remote from the earlier water damage.
BG considered that the issues with the roof had most likely been caused by the
FSP’s original roofing contractor (BS) placing heavy materials on the roof while
undertaking the roofing works. BG advised that, as a result, all of the purlins (as
well as the roof sheets, flashing and box gutters) need to be replaced.
Based on the available information, the Panel considers that it is quite possible
that the work practices of the FSP’s original roofing contractor (BS) caused
damage to the roof purlins, beyond the single purlin for which the FSP has
accepted liability.
However, the Panel does not accept that the available information establishes
that the damage extends to all of the roof purlins.
The reports provided by the various experts are primarily concerned with the
damage to the upper and lower level roofs of the main property and do not appear
to specifically address the roof purlins for the garage, workshop and patio (which
the Applicant also wants replaced).
Further, to the extent that the damage to the purlins results in aesthetic issues
only, it is not clear whether all of the purlins are visible from either ground level or
from the upper floor balconies.
Case No: 376305 Determination Page 6 of 9
FSP is to cash settle Applicant for $33,000 for damage to purlins
For the reasons outlined above, the Panel considers that it is not possible to
accurately determine the extent of the damage to the purlins without undertaking
a comprehensive assessment following the removal of all of the roofing sheets.
However, given the extended period of time taken to resolve this dispute and in
the interests of achieving a final resolution, the Panel considers that it is
preferable that the FSP be required to cash settle the Applicant for the estimated
cost of the damage, assuming that some but not all of the purlins need to be
replaced.
Based on the available information, the Panel considers that it is fair in all the
circumstances that the FSP pay the Applicant an additional amount of $33,000 for
damage to the purlins caused by BS in the course of carrying out the roof repairs.
2.2 Is the FSP liable for the remaining damage?
FSP is liable for additional damage in original scope of works
The scope of works prepared by the FSP’s assessor following the hail storm
noted internal water damage to the ceilings in bedrooms 1 and 2, the bathroom,
the entry and the combined kitchen/dining/family room, hail damage to a fly
screen and damage to sections of the render on the exterior of the property.
It appears from the available information that the FSP has not yet repaired this
damage, due to the issues which arose in relation to the roof repairs.
Accordingly, the FSP remains liable for the cost of repairing this damage.
FSP is liable for additional damage claimed by Applicant
The detailed scope of works prepared by the Applicant in March 2015 includes
additional internal water damage to the property which the Applicant says was
caused either by the initial hail storm or by the inadequate roof repairs carried out
by BS, which resulted in ongoing leaks.
The Applicant’s scope of wo rks also includes other items of damage which he
says were caused by BS during the course of the repairs (for example, chips to
the render on the exterior of the property).
In each case, the Applicant has provided photographs identifying the particular
damage claimed. The Applicant has obtained a quote for $195,988 from his
builder for the cost of repairing all of the claimed damage (which includes the
replacement of the roof and all of the purlins, as discussed above).
During the course of the claim, the FSP accepted liability for certain additional
damage caused by water leaks and/or BS’s repairs. For example, in late 2010,
the FSP accepted liability for additional water damage to bedroom 1 and the rear
garage caused by BS leaving the parapet walls uncovered during the course of
the repairs. In May 2014, the FSP accepted liability for various chips to the render
caused by BS.
Case No: 376305 Determination Page 7 of 9
However, the FSP says that it has not been given the opportunity to inspect all of
the additional items of damage included in the Ap plicant’s scope of works and to
assess whether they have been caused by the hail storm in March 2010, ongoing
roof leaks, the actions of BS or other factors.
The Applicant raised concerns about ongoing water damage to the ceilings in
various rooms of the property at a number of stages during the course of the
claim. During negotiations between the parties in April 2012, the FSP sought to
arrange a further inspection of the ceilings in order to address the Applicant’s
concerns.
The reports prepared by the various experts suggest that the methods employed
by BS (and, in particular, the poor manner in which the roof sheets were affixed)
may give rise to ongoing leaks. The photographs provided by the Applicant
indicate that some of the internal water damage has occurred in areas other than
those which suffered damage during the hail storm.
The Applicant has also raised concerns about damage caused by BS to the
exterior of the property with a number of the FSP’s representatives at various
times, including while the works were being carried out.
The Panel accepts that the FSP’s ability to assess all of the additional damage
may have been restricted. However, the FSP’s builder (B) did attend the property
in early 2015 and ran through the various items of damage with the Applicant,
following which he provided a quote based on the Applicant’s scope of works.
Other than being denied access to the roof, it is not clear to what extent B’s
inspection was restricted.
Further, the Panel considers that the FSP had multiple opportunities to carry out a
detailed inspection of the additional items of damage claimed by the Applicant
during the early stages of the claim. However, rather than thoroughly investigate
the Applicant’s concerns when he initially raised them, the FSP ap pears to have
attempted to apply a “stop - gap” solution to the quality issues associated with BS”s
inadequate roof repairs.
In these circumstances, and having regard to the detailed photographic
information available, the Panel is satisfied that the FSP is liable for the bulk of
the additional damage claimed by the Applicant, as set out in his scope of works.
Based on the quote provided by the FSP’s builder (B), the cost of repairing this
additional damage is approximately $29,000. Having regard to the nature and
extent of the additional damage, the Panel considers that this amount represents
the fair and reasonable cost of repairing the additional damage.
2.3 How should the claim be settled?
FSP has unreasonably delayed claim
It is clear that the Applicant’s claim has taken an extraordinary length of time to
resolve, given that it is now over five years since the hail storm in March 2010.
Case No: 376305 Determination Page 8 of 9
The Panel considers that the FSP failed to respond appropriately to the issues
raised by the Applicant in relation to the initial roof repairs, despite the FSP’s own
engineer (MS) confirming that the initial repairs were “sub - standard” and
recommending a full roof replacement.
The FSP did not provide the Applicant with a copy of MS’s report until more than
a year after his initial request. At one stage, the FSP advised the Applicant that he
would need to lodge a complaint with the builders registration board, if he wanted
his roof replaced.
The FSP engaged BS to carry out the roof repairs and was therefore responsible
for the quality of his work and for ensuring that any quality concerns were
addressed promptly and appropriately.
Despite later accepting liability for the replacement of the roof, the FSP and the
Applicant were by that stage unable to resolve their remaining issues in relation to
the additional damage claimed. The Applicant’s property was (by all accounts) in
immaculate condition prior to the hail storm and he was entitled to have it restored
to the same condition following the repairs.
However, the Panel accepts that the FSP is not responsible for all of the delays in
resolving the claim. At various times during the course of the claim, the Applicant
was unavailable for extended periods of time due to due to health issues or
because he was travelling overseas. The actions of third parties have also
contributed to the delay.
FSP should cash settle Applicant for $135,000
For the reasons outlined above, the Panel considers that the FSP should cash
settle the Applicant for a total of $130,000 for the cost of redoing the roof repairs,
replacing the damaged roof purlins (and associated works) and repairing the
additional damage caused by the hailstorm.
The FSP says that the cash settlement amount should be reduced to reflect the
value of roof sheeting for the pergola, which was provided to the Applicant (at his
request) but never installed.
The Applicant seeks compensation for six weeks’ worth of te mporary
accommodation, which his builder (BG) has advised is required while the repairs
are carried out. He also says that a margin should be added to the builders’ quote
to ensure that the cash settlement amount is sufficient to fund the necessary
repairs.
Having regard to these matters, the Panel considers that it is fair in all the
circumstances that the cash settlement amount be increased by an additional
amount of $5,000, resulting in a total cash settlement of $135,000.
In arriving at this amount, the Panel has taken into account the delays
experienced during the course of the claim. Accordingly, the FSP is not required
to pay interest on the cash settlement amount.
Case No: 376305 Determination Page 9 of 9
3 Supporting information
3.1 Panel approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised numerous issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.