Home / Financial Firm (Unknown - Insurer) / Determination 376305

Determination 376305

Defective hail roof repairs by the FSP's contractor and disputed cash settlement amount

FirmFinancial Firm (Unknown - Insurer)
Decided2015-06-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$135,000
Non-financial loss—
Amount claimed$195,988
SourceAFCA PDF

Summary

An individual's hail-damaged home roof was repaired by the FSP's contractor to an inadequate standard, and the claim took over five years to resolve. AFCA ordered a cash settlement of $135,000 for redoing the roof works, damaged purlins and additional damage, but rejected replacement of all purlins.

The FSP must restore the property to its pre-storm condition, including redoing defective works by its contractor and repairing additional damage those works caused.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount - Service - Service Quality Determination Case No: 376305 Determination Page 1 of 9 Case number : 376305 2 8 April 2015 1 Overview 1.1 Dispute The Applicant lodged a claim under his home insurance policy with the Financial Services Provider (FSP) after his home suffered hail damage in March 2010. The FSP accepted the Applicant’s claim and authorised repairs to the property. The Applicant says that the roofing works carried out by the FSP’s roofing contractor were not completed to an acceptable standard and the subsequent rectification repairs are also inadequate. He wants the FSP to pay for the cost of replacing the roof (including all purlins) and repairing additional damage caused by the FSP’s contractor. 1.2 Issues and key findings Is the FSP liable for the cost of replacing the roof? The available information establishes that the initial roofing works carried out by the FSP’s roofing contractor (BS) were inadequate. The FSP is liable for the cost of redoing these works. While it appears that the roof purlins have sustained some damage as a result of BS’s work practices, the extent of this damage is unclear. In the circumstances, it is appropriate that the FSP contribute to the cost of replacing the roof purlins. Is the FSP liable for the remainder of the disputed damage? The FSP remains liable for repairing the damage caused by the hail storm as set out in the initial scope of works. The FSP is also liable for repairing the additional damage resulting from the poor roof repairs and the actions of the FSP’s roofing contractor. 1.3 Determination This Determination is substantially in favour of the Applicant. The FSP is to pay the Applicant the amount of $135,000 in full and final settlement of his claim. Case No: 376305 Determination Page 2 of 9 2 Reasons for Determination 2.1 Is the FSP liable for the cost of replacing the roof? Initial roof repairs were inadequate and should be redone After assessing the Applicant’s claim, the FSP accepted that roofs over various parts of the property had been damaged by hail and needed to be replaced. The roofing works were carried out by the FSP’s contra ctor (BS) in October 2010 and involved the replacement of roofing sheets, flashings and box gutters. During the course of the roofing works, the Applicant expressed concern about the quality of the works and the work practices employed by BS. The Applicant has provided a number of photographs which clearly show issues with the works, including misaligned and incorrectly installed roofing screws, elongated screw holes and sagging roof sheets. In response to the Applicant’s concerns, the FSP engaged a buildin g consultant (MS) to carry out a quality review of the repairs. In his report, MS identified a number of specific issues with the repairs and described them as being “generally sub- standard”. While MS noted that some of the issues were purely aesthetic, he also recognised that the architectural design of the Applicant’s home meant that large sections of the roofs were visible from the upper balconies. Given the poor quality of the works carried out by BS, MS recommended that all of the roof sheets, box gutters and flashings be replaced, as well as the insulation and roofing wire. Despite the findings in MS ’ s report, the FSP did not arrange for the roofing work to be redone, but instead allowed BS to attempt rectification of the initial repairs. It appears that the rectification works primarily involved the application of silicone to various areas of concern. When the Applicant remained dissatisfied with the quality of the roofing works, his concerns were reviewed by the FSP’s internal consultant (FW) who agreed to accept liability for the replacement of the roofs. However, the Applicant and the FW could not agree on the extent of the works required (and, in particular, the extent of any damage to the purlins). Accordingly, the proposed settlement did not proceed. The FSP has subsequently disputed whether the full replacement of the roof is required. The FSP says that a structural engineer should be appointed to determine the extent of the repairs required in order to address the issues with BS’s original wo rks. Having carefully reviewed the available information (including the numerous photographs provided by both parties), the Panel is satisfied that the initial roofing works carried out by BS were clearly inadequate. Case No: 376305 Determination Page 3 of 9 The reports provided by the FSP’s contractors confirm that the Applicant’s property was in immaculate condition prior to the hailstorm. Once the FSP had accepted liability for hail damage to the roofs of his property, the Applicant was entitled to have the roofs repaired (or replaced) to a condition equivalent to that prior to the storm. The poor standard of the works carried out by BS was clearly confirmed by the FSP’s own building consultant (MS), as well as by a second builder (M) who was engaged to quote on the proposed re-roofing (which ultimately did not proceed). The FSP itself accepted full liability for the replacement of the roof on more than one occasion during the course of the claim. In these circumstances, the Panel considers that the FSP is liable for the costs of redoing the roofing works undertaken by BS, as confirmed by MS – that is, the replacement of the roofing sheets, flashings and box gutters. FSP is to cash settle Applicant for $68,000 for cost of redoing roofing works Given the issues experienced with the FSP’s contrac tors to date, the Panel considers that the FSP should cash settle the Applicant for the cost of redoing the roofing works, so that he can engage his own contractor to complete the repairs to his satisfaction. During the course of negotiations with the Applicant in 2011, the FSP reviewed two quotes for redoing the roofing works – a quotation for approximately $38,467 provided by the FSP’s contractor and a quotation for approximately $56,100 provided by the Applicant’s builder. The FSP has subsequently obtained a quote for approximately $68,000 from its own builder (B) for the replacement roofing works. B’s quote was provided in March 2015, based on the original scope of works for the roof repairs (which was subsequently incorporated into a more extensive scope of works prepared by the Applicant). While B did not have an opportunity to conduct a full inspection of the roof, his quote was based on the original scope of works prepared by the FSP’s assessor following the hail storm, assuming that the complete replacement of the roofs was required. In these circumstances, the Panel is satisfied that the amount of $68,000 quoted by B represents the fair and reasonable cost of undertaking the necessary works. Extent of damage to roof purlins is unclear The Applicant says that the manner in which the roofing works were carried out by BS has damaged the purlins throughout the roof areas, such that all of the purlins (including those for the garage, patio and workshop) now need to be replaced. The extent to which the purlins need to be replaced has a significant impact on the cost of the necessary works. The Applicant has advised that the replacement of all of the purlins requires the removal and replacement of the internal ceilings at Case No: 376305 Determination Page 4 of 9 the property (as these are suspended), as well as the removal and reinstallation of the electrical wiring. Based on the quote provided by the FSP’s builder (B) in March 2015 (based on the Applicant’s scope of works), it appears that the cost of replacing all the purlins (together with the additional costs associated with the ceilings and rewiring) is in the vicinity of $65,000. The Applicant says that the damage to the purlins has occurred due to:  BS having stored heavy roofing materials on the roofs during the course of the works which has caused the purlins to deflect; and  the manner in which BS installed the Tek screws fixing the roof sheets onto the purlins (ie alongside the existing screws), which has damaged the purlins to the extent that they cannot be reused when the roofing s heets are replaced. The Applicant has provided photographs which confirm that BS placed a mobile crane on the lower ground floor roof of the property, which he used to deposit the replacement roofing material on top of the existing roofs. The FSP has acknowledged that the storing of roofing materials on the existing roofs could have resulted in deflection damage to the purlins, although it says there is no conclusive information which confirms this occurred in the present case. Nevertheless, the FSP accepted liability for damage to one of the purlins in the lower roof area after a consulting engineer (S) confirmed that there was a slight deflection in the flange of this purlin. S was appointed by the Applicant with the FSP’s agreement. However, the FSP says that there is no information to establish that any of the other purlins have suffered damage such that they need to be replaced. In his report, S considered concerns raised by the Applicant in relation to “sagging” of the upper roof following complet ion of the roofing works. S confirmed that there was a noticeable sag in the upper roof sheeting in the direction of the purlin spans. However, he noted that the extent of the deflection was within accepted tolerances under relevant building standards. S also confirmed that, while the roof had been designed with a slope of 3 degrees, following the roofing works, the slope of the ground floor roof in places was as low as 1.4 degrees and the slope of the upper floor roof was as low as 1.5 degrees. While S confirmed that the reduced slope should not affect the watertightness of the roof (as it remained within the manufacturer’s guidelines), he acknowledged that it did affect the aesthetic appeal of the roof. S was unable to conclusively determine whether the sagging of the upper roof sheets had been caused by the work methods employed by BS. Case No: 376305 Determination Page 5 of 9 However, the Panel is satisfied that the numerous and detailed photographs taken by the Applicant during the course of the works establish that the roof did not have a noticeable sag at the time the works commenced. Accordingly, the Panel considers that it is reasonable to assume that any issues with the profile of the roof following the works were caused by BS. The Panel notes that, while S’s reports confirm that the roo f sheets were sagging in the direction of the purlin spans, it is not entirely clear whether this is due to any underlying deflection of the purlins, or whether it is an issue which may be adequately addressed by replacing the roofing sheets themselves. In this respect, the Panel notes that several experts consulted during the course of the claim have advised that it is not possible to determine the extent of the damage (if any) to the purlins without removing the roof sheets. S’s final report does not di scuss in any detail whether the installation of the Tek screws caused significant damage to the purlins. In an earlier draft of his report, S noted that inadequate fixing of the Tek screws could have a detrimental effect on water tightness, but did not suggest that this necessitated the replacement of the purlins themselves. The Applicant has recently provided a report from his building consultant (BG) which states that the extent of the deflection to the roof purlins is sufficient to reduce the pitch of the roof. BG considered that the reduced pitch of the roof was the most likely cause of the various leaks identified, which he noted had occurred in areas remote from the earlier water damage. BG considered that the issues with the roof had most likely been caused by the FSP’s original roofing contractor (BS) placing heavy materials on the roof while undertaking the roofing works. BG advised that, as a result, all of the purlins (as well as the roof sheets, flashing and box gutters) need to be replaced. Based on the available information, the Panel considers that it is quite possible that the work practices of the FSP’s original roofing contractor (BS) caused damage to the roof purlins, beyond the single purlin for which the FSP has accepted liability. However, the Panel does not accept that the available information establishes that the damage extends to all of the roof purlins. The reports provided by the various experts are primarily concerned with the damage to the upper and lower level roofs of the main property and do not appear to specifically address the roof purlins for the garage, workshop and patio (which the Applicant also wants replaced). Further, to the extent that the damage to the purlins results in aesthetic issues only, it is not clear whether all of the purlins are visible from either ground level or from the upper floor balconies. Case No: 376305 Determination Page 6 of 9 FSP is to cash settle Applicant for $33,000 for damage to purlins For the reasons outlined above, the Panel considers that it is not possible to accurately determine the extent of the damage to the purlins without undertaking a comprehensive assessment following the removal of all of the roofing sheets. However, given the extended period of time taken to resolve this dispute and in the interests of achieving a final resolution, the Panel considers that it is preferable that the FSP be required to cash settle the Applicant for the estimated cost of the damage, assuming that some but not all of the purlins need to be replaced. Based on the available information, the Panel considers that it is fair in all the circumstances that the FSP pay the Applicant an additional amount of $33,000 for damage to the purlins caused by BS in the course of carrying out the roof repairs. 2.2 Is the FSP liable for the remaining damage? FSP is liable for additional damage in original scope of works The scope of works prepared by the FSP’s assessor following the hail storm noted internal water damage to the ceilings in bedrooms 1 and 2, the bathroom, the entry and the combined kitchen/dining/family room, hail damage to a fly screen and damage to sections of the render on the exterior of the property. It appears from the available information that the FSP has not yet repaired this damage, due to the issues which arose in relation to the roof repairs. Accordingly, the FSP remains liable for the cost of repairing this damage. FSP is liable for additional damage claimed by Applicant The detailed scope of works prepared by the Applicant in March 2015 includes additional internal water damage to the property which the Applicant says was caused either by the initial hail storm or by the inadequate roof repairs carried out by BS, which resulted in ongoing leaks. The Applicant’s scope of wo rks also includes other items of damage which he says were caused by BS during the course of the repairs (for example, chips to the render on the exterior of the property). In each case, the Applicant has provided photographs identifying the particular damage claimed. The Applicant has obtained a quote for $195,988 from his builder for the cost of repairing all of the claimed damage (which includes the replacement of the roof and all of the purlins, as discussed above). During the course of the claim, the FSP accepted liability for certain additional damage caused by water leaks and/or BS’s repairs. For example, in late 2010, the FSP accepted liability for additional water damage to bedroom 1 and the rear garage caused by BS leaving the parapet walls uncovered during the course of the repairs. In May 2014, the FSP accepted liability for various chips to the render caused by BS. Case No: 376305 Determination Page 7 of 9 However, the FSP says that it has not been given the opportunity to inspect all of the additional items of damage included in the Ap plicant’s scope of works and to assess whether they have been caused by the hail storm in March 2010, ongoing roof leaks, the actions of BS or other factors. The Applicant raised concerns about ongoing water damage to the ceilings in various rooms of the property at a number of stages during the course of the claim. During negotiations between the parties in April 2012, the FSP sought to arrange a further inspection of the ceilings in order to address the Applicant’s concerns. The reports prepared by the various experts suggest that the methods employed by BS (and, in particular, the poor manner in which the roof sheets were affixed) may give rise to ongoing leaks. The photographs provided by the Applicant indicate that some of the internal water damage has occurred in areas other than those which suffered damage during the hail storm. The Applicant has also raised concerns about damage caused by BS to the exterior of the property with a number of the FSP’s representatives at various times, including while the works were being carried out. The Panel accepts that the FSP’s ability to assess all of the additional damage may have been restricted. However, the FSP’s builder (B) did attend the property in early 2015 and ran through the various items of damage with the Applicant, following which he provided a quote based on the Applicant’s scope of works. Other than being denied access to the roof, it is not clear to what extent B’s inspection was restricted. Further, the Panel considers that the FSP had multiple opportunities to carry out a detailed inspection of the additional items of damage claimed by the Applicant during the early stages of the claim. However, rather than thoroughly investigate the Applicant’s concerns when he initially raised them, the FSP ap pears to have attempted to apply a “stop - gap” solution to the quality issues associated with BS”s inadequate roof repairs. In these circumstances, and having regard to the detailed photographic information available, the Panel is satisfied that the FSP is liable for the bulk of the additional damage claimed by the Applicant, as set out in his scope of works. Based on the quote provided by the FSP’s builder (B), the cost of repairing this additional damage is approximately $29,000. Having regard to the nature and extent of the additional damage, the Panel considers that this amount represents the fair and reasonable cost of repairing the additional damage. 2.3 How should the claim be settled? FSP has unreasonably delayed claim It is clear that the Applicant’s claim has taken an extraordinary length of time to resolve, given that it is now over five years since the hail storm in March 2010. Case No: 376305 Determination Page 8 of 9 The Panel considers that the FSP failed to respond appropriately to the issues raised by the Applicant in relation to the initial roof repairs, despite the FSP’s own engineer (MS) confirming that the initial repairs were “sub - standard” and recommending a full roof replacement. The FSP did not provide the Applicant with a copy of MS’s report until more than a year after his initial request. At one stage, the FSP advised the Applicant that he would need to lodge a complaint with the builders registration board, if he wanted his roof replaced. The FSP engaged BS to carry out the roof repairs and was therefore responsible for the quality of his work and for ensuring that any quality concerns were addressed promptly and appropriately. Despite later accepting liability for the replacement of the roof, the FSP and the Applicant were by that stage unable to resolve their remaining issues in relation to the additional damage claimed. The Applicant’s property was (by all accounts) in immaculate condition prior to the hail storm and he was entitled to have it restored to the same condition following the repairs. However, the Panel accepts that the FSP is not responsible for all of the delays in resolving the claim. At various times during the course of the claim, the Applicant was unavailable for extended periods of time due to due to health issues or because he was travelling overseas. The actions of third parties have also contributed to the delay. FSP should cash settle Applicant for $135,000 For the reasons outlined above, the Panel considers that the FSP should cash settle the Applicant for a total of $130,000 for the cost of redoing the roof repairs, replacing the damaged roof purlins (and associated works) and repairing the additional damage caused by the hailstorm. The FSP says that the cash settlement amount should be reduced to reflect the value of roof sheeting for the pergola, which was provided to the Applicant (at his request) but never installed. The Applicant seeks compensation for six weeks’ worth of te mporary accommodation, which his builder (BG) has advised is required while the repairs are carried out. He also says that a margin should be added to the builders’ quote to ensure that the cash settlement amount is sufficient to fund the necessary repairs. Having regard to these matters, the Panel considers that it is fair in all the circumstances that the cash settlement amount be increased by an additional amount of $5,000, resulting in a total cash settlement of $135,000. In arriving at this amount, the Panel has taken into account the delays experienced during the course of the claim. Accordingly, the FSP is not required to pay interest on the cash settlement amount. Case No: 376305 Determination Page 9 of 9 3 Supporting information 3.1 Panel approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.