Home / Financial Firm (Unknown - Insurer) / Determination 375956

Determination 375956

Storm damage claim largely denied under policy exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2015-03-06
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The FSP accepted part of the storm claim (water ingress to the ceiling, offered $5,442.91 less GST and excess) and declined the rest as caused by excluded wear, workmanship and design. AFCA upheld the limited scope and ordered the FSP to settle the water damage at a current quotation, with no interest.

Once the insured establishes a prima facie claim the insurer must prove an exclusion applies, and expert evidence showed the remaining damage arose from excluded causes.

Issues

Subjects and remedies

pay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of Claim Determination Case No: 375956 Determination Page 1 of 10 Case number : 375956 4 March 2015 1 Overview 1.1 Dispute The Applicant holds a childcare centre insurance policy with the Financial Services Provider (FSP), for which a claim for storm damage was submitted on 3 July 2014. The FSP accepted the claim for some of the damage to the ceiling. However, the FSP declined the remainder of items claimed as it considered these were not damaged as a result of the storm event. 1.2 Issues and key findings Has the FSP fulfilled its obligations under the terms of the policy? The FSP has fulfilled its obligations under the terms of the policy because:  it has accepted and quantified the damage arising from the claimed event  it has established that the remainder of the damage claimed has arisen as a result of causes specifically excluded from the terms of cover. 1.3 Determination This Determination is in favour of the FSP. The FSP was entitled to limit its liability in respect of the claim to encompass that damage only which arose from the claimed event. The FSP should settle those costs, after obtaining a current quotation from its contractor. The remainder of the damage arose from causes specifically excluded from cover and therefore the FSP is not liable for those losses. Case No: 375956 Determination Page 2 of 10 2 Reasons for Determination 2.1 Has the FSP fulfilled its obligations under the terms of the policy? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties. There has been a full exchange of all documents relied on to make this Determination and each party has had the opportunity to address any issues raised by the other. Expert opinion has been provided by the parties. The Applicant has established a prima facie claim The FSP‟s policy is an accidental damage policy which is subject to specific exclusions from coverage. It is accepted Insurance law that the Applicant carries the onus of proving that an insurable event has occurred. This is known as a prima facie claim. Once the Applicant has established a prima facie claim, the onus shifts to the FSP if it wishes to deny the claim on the basis of an exclusion under the policy. There is no dispute the property was damaged during the storm event by water ingress. There is further no dispute between the parties that the FSP has accepted the Applicant‟s claim for water ingress and offered settlement in the amount of $5442.91, less GST and the policy excess. Accordingly, the Applicant has established a prima facie claim under the terms of the policy and the FSP must now establish it is entitled to limit its liability for the claim, by establishing that the specific exclusions listed, operate to defeat the remainder of the claim. The FSP’s policy contains specific exclusions from cover Whilst the policy will respond to claims for loss or damage arising from storm or water ingress, it specifically excludes loss or damage caused by or arising from or in connection with wear and tear or gradual deterioration, error in or failure of design or faulty materials or workmanship. The expert reports provided confirm some of the damage arose from causes specifically excluded from cover The FSP engaged three building firms to inspect and report on the damage evident at the premises. Whilst building firm “AB” attributed all of the damages evident to the ceilings to the claimed event, firms “CC” and “MS” considered that only the water staining was consistent with the storm event. Both concluded that the delaminating of the plaster linings and cornices had arisen as a result of pre-existing issues with the building. Case No: 375956 Determination Page 3 of 10 Engineering firm “MC” was subsequently engaged to provide an engineer‟s opinion as to the cause of the damage evident. MC considered that there was damage consistent with a water entry event, with water stains to the ceiling linings. However, it was MC‟s opinion that the dropping of the ceiling linings and the delamination of the cornices were not as a result of the claimed event. MC considered these had arisen as a result of a combination of factors, including poor installation techniques, thermal and building movement and the lack of installation of expansion joints at the time of construction. MC concluded that the cause of the cracking and tenting tiles under the stairwell area was as a result of the combination of factors being the lack of expansion joints installed at the time of construction and issues with either the adequacy of the adhesive or the manner of its application. The experts‟ conclusions are supported by the photographs provided. All of these causes are specifically excluded from the terms of cover. It is accepted that MC is appropriately experienced and qualified to comment in this matter and in the absence of conflicting information, the FSP is entitled to rely on his findings. It is also noted that the findings of CC and MS were consistent with the findings of MC. The Applicant has not sourced his own reports The Applicant was given the opportunity by this Service to source his own expert reports as to the cause of the damage. However, the Applicant has not provided any additional information in support of his case. Accordingly, after considering all of the available information, the FSP has established the application of its exclusions to cover under the terms of the policy. Therefore, in the absence of conflicting information, the FSP is entitled to rely on the findings of its expert MC, that the damage not excluded under the policy is limited to the water stained ceilings. On this basis, the FSP is entitled to limit its settlement to reflect only the costs to repair the damage arising as a result of water ingress to the ceiling. The Applicant has not challenged the amount offered by the FSP in settlement of this aspect of his claim, or the FSP‟s entitlement to settle his claim by way of cash payment. However, the quote submitted by M was valid for six months only. The FSP is therefore to request M to adjust their quotation to reflect an accurate cost at today‟s prices to remedy the claim related damage. On this basis, an award of interest is not appropriate. Case No: 375956 Determination Page 4 of 10 Other matters Whilst not relevant to the outcome of this dispute, the Applicant has raised other issues he has concerns with, namely the FSP‟s decision only to assess his property for defects at the time of the claim rather than at inception or renewal. He also question s the qualifications of the FSP‟s experts and why multiple firms were engaged. The Applicant‟s concerns are understandable, however , it is common industry practice to incept a policy without sighting the risk. Instead, most insurers will rely on a set of specific questions regarding the risk to be insured in order to gauge whether they are prepared to offer cover. It is the responsibility of the insured to answer these questions accurately. Where issues become evident at the time of the claim, the FSP is entitled to asses those. It is also not uncommon for an FSP to engage multiple experts or obtain more than one quotation for claimed works. This is part of providing proper and sound assessment of a claim. Case No: 375956 Determination Page 5 of 10 3 Supporting information 3.1 FOS ’s approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to its nature, it was appropriate to proceed directly to a Determination in line with the Operational Guidelines to the FOS Terms of Reference. 3.2 Expert Reports Record Key points FSP’s expert ( AB ) B uilder ‟ s Report 12 Aug 2014  the roof area was inspected and there was no visible storm damage evident  there was one broken tile which was likely caused by foot traffic  the roof was a concrete tiled roof with a metal skillion roof area constru cted in the middle of the property  the roof design is awkward with the pitch tiled roof areas surrounding the skillion roof which comes off a section of tiled roof  where the ends meet the metal sheets to the apex of the tiled roof, this has been capped wit h concrete ridge tiles  there is a number of cement tiles placed on the area where the tiled roof meets the skillion roof, these should be removed  both metal and tiled roof areas seem in fair condition  maintenance was required to the box guttering as there was build up of debris evident  where the metal skillion roof is overlapped by the two tiled areas, this is an awkward angle  if debris builds up around the tiled edges there is a possibility of water overflowing to the ceiling cavity  if water ingress was to occur at this junction it would be due to the design flaw  there was staining to the ceiling evident in the open plan area at the centre which was possibly caused by water ingress due to wind driven rain  the movement, delaminating of cornices and large cra cks to ceiling linings are as a result of storm damage  however a building consultant should be engaged to confirm the cause  as the ceiling linings are delaminating from the roof structure, feelings may collapse at any time  steps should be taken to secure feelings to prevent any type of collapse FSP’s expert ( MS ) Builder‟s Report  not all of the damage seen is consistent with the water ingress event Case No: 375956 Determination Page 6 of 10 31 July 2014  some of the works will not be able to be warranted  there are a number of roof tiles being stored on top of the existing roof, these tiles need to be stored elsewhere  there were large cracks to one part of the living room ceiling, and parts of the ceiling that had dropped in other areas  there was water staining to some parts of the ceiling  some areas had delaminated cornices and there were cracked and lifted floor tiles in one area  the large cracks looked to be more as a result of structural movement  the cornices were wavy which looked to be as a result of poor installation  the dropped and stained cei ling looked to be as a result of water ingress  the cornices in the bathroom had delaminated from the wall tiles, this was as a result of the cornice being glued to the tiles with cornice cement rather than a flexible adhesive  the floor tiles had lifted and cracked as a result of insufficient expansion joints  the water ingress has occurred under the metal skillion roof which was added to the property  the water ingress happened in unusually heavy rain but the box gutter which is installed is quite small for t he area  another contributing factor to the water ingress is the fact that where the metal roof joins the tiled area there is no proper flashing installed, just the tiles sitting over the metal roof FSP’s expert ( CC ) Builder‟s Report 12 Aug 2014  the site was inspected in the company of the insured  the insured advised that a severe storm consisting of strong winds and heavy rain struck the property sometime in March 2014  he is unsure of the exact date  water was witnessed running through the light fittings i n the ceiling in the toddler room  insured punched holes in the ceiling lining to relieve the water build up and to prevent the ceiling from collapsing  insured advised the property was built around 1989 and he had purchased it in 2004  this is an owner occup ied, split level house of double brick construction and roof clad with concrete tiles  the building has been maintained in average condition  there was water staining to the plasterboard ceiling lining in the centre of the lounge room  several penetrations to the plasterboard were evident, where the insured had punctured it to relieve the buildup of water  there was noticeable separation of the plasterboard cornice throughout the residence Case No: 375956 Determination Page 7 of 10  there was also minor and major cracking to the plasterboard ceilings thr oughout  the ceramic floor tiles near the under stair storage area were cracked  where there is evidence of water related damage, the nature of these damages is relatively minor  this leads to a conclusion that the separation of the cornices in various areas, ceiling linings and of the floor tiles underneath the stairwell are due to unrelated maintenance issues relating to natural movement for settlement having occurred in the foundations of the property  the resultant damage has been caused as a result of the box gutter being too small and inadequate to service the large surface area surrounding roof, which led to an overflowing during heavy rain  there are no storm created openings or related damages to the roof  unrelated to the claimed events, the pointing to the ridge capping is in poor condition and proposes a potential leak risk  there are numerous ch ipped/ broken tiles and approximately 30 concrete tiles are loose and not securely fastened to the roof , which pose a risk of being dislodged during strong wind gusts  the insured is responsible for undertaking the maintenance works at the property  we recommend an engineer be engaged to confirm the cause of the cracking FSP’s expert ( MC ) Engineer‟s Report 3 Sep 2014  the property in question is a single story cavity full brick constructed dwelling with a cement tiled roof and a near flat pitched roof made of steel sheeted metal  internal walls are hard set plaster finish ed with gypsum plasterboard ceiling linings  the bui lding is currently used in the capacity of a childcare centre, and appeared to have had a number of conversions and additions post original construction  this includes infilling of the once existing external the pergola to create an internal large playroom  in addition , extensions at the rear of the building , which now accommodates the toddler toilet  the original building construction is estimated to be in the mid 1980‟s  insured advised that there was storm activity in April 2014 whereby water penetrated into areas within the building namely the toddler‟s room, large playroom, change room and kitchen area  after the ceiling was saturated stains have been evident and the ceiling linings have displaced from the ceiling leading to sagging and cracking Case No: 375956 Determination Page 8 of 10  the insured has temporarily re - fixed the ceiling place to mitigate further loss and potential for collapse  at the time of inspection there was no danger of the ceiling collapsing and no danger to the occupants of the dwelling  inspection revealed minor water stains evi dent about the light fittings  sections of the cornices have displaced  sections of the ceiling lining had displaced and been temporarily secured back the ceiling joists  extensive cracking within the ceiling lining has propagated about the abutting sheet joi nts  under the stairwell floor tiles have cracked and lifted and are drummy  the floor tiles appeared to be directly fixed to the concrete slab  the roof cavity and framing was inspected through the manhole access within the toddler room  there was no access into the roof above the large playroom ceiling as the ceiling lining is fixed directly to the roof rafters of near flat pitch  roof framing consists of conventional timber rafters, battens and collar ties supported by load - bearing walls including sarking in stalled beneath the roof tiles  ceiling framing includes timber rafters and hanging beams with installation batts on top of the plasterboard ceiling linings  the plasterboard ceiling lining is fixed directly to the ceiling rafters  there were significant debr is about the sheeting which could cause long - term loading and fixing integrity  the roof and ceiling framing appeared to be structurally sound without any significant movement or displacement evident  sarking about the valley gutter was torn and would allow possible penetration of both water and wind into roof cavity area  notwithstanding the above, no water damage or penetration into the ceiling space was evident  there was no water or mould to the installation batts , which would be expected if there were sign ificant water entry  there were no significant breaks or voids about the tiling or bedding  the roof and box guttering inspected were found to be well - maintained and free - flowing , without any buildup of debris evident  the location of water entry into the tod dler room aligned with the location of the valley gutter  the intersecting junction of the cement roof tiles and the flat metal sheeting does not comply as an acceptable Case No: 375956 Determination Page 9 of 10 flashing method and is considered to be incorrectly constructed  there was incorrect col lar flashing method used around the service ducting and risers  in general plasterboard is not designed to withstand stress due to structural movement or excessive changes in temperature and humidity  the large playroom, having the ceiling fixed directly to the rafters near the flat steel sheeted roof and minimal ceiling cavity, will produce thermal expansion and movement within roof framing and material s, causing cracking of the plasterboard lining  no provision for any expansion joints within the ceiling lining have been installed in the dwelling  plasterboard sheet butt joints should be supported by „back blocking‟ which is the reinforcing system designed to minimise cracking and deformation along the joints, which was not or could not be completed in the dwelling  the omission of such back blocking has exacerbated the severity of crack propagation within the plasterboard ceiling lining within the toddler room and large playroom  in the absence of expansion joints and back blocking provisions, any structural and thermal movement within the ceiling will cause crack propagation in the ceiling lining about the weakest planes  the observed cracking and elimination of the cornices is attributable to pre - existing installation factors  these include the omission of bac k blocking about the plaster sheet, a large amount of debris, wires, service ducting and installation batts creating a dead load over time onto the sheet and fixings and structural movement and excessive changes in temperature  the cracking and detachment w ithin the plasterboard is clearly related to long - term general building defect and thermal movement and is unrelated to the storm event or rainfall entry  the various water stains evident throughout the ceiling is consistent with water entry into the roof c avity during a storm event  water has entered into the roof space at the valley gutters and junction that the cement tiled roof and steel sheeted roof as a result of pre - existing poor flashing techniques combined with high intensity of rainfall  the damage t o the floor tile beneath the stairwell relates to thermal movement and uplift as a result of inadequate provisions of expansion joints at the time of construction  the damage to the tiles has not been as a result of water ingress or saturation  tiles around the uplifted segment were identified as having a drummy or hollow sound  given the large playroom floor area dimension, concrete Case No: 375956 Determination Page 10 of 10 substrate and the direct fixing of tiles it is critical to provide such articulation \ movement joints within the tiles to accommodate expansion or creep  the floor tiles appeared to be laid directly over the concrete slab by using a fixative, therefore any cracking or movement within the concrete slab will directly propagate through the tile adhesive and tile itself  had the fl oor been installed in accordance with the applicable standard, the cracking and tenting of the tiles would likely not have occurred  the cause of the dislodged tiles is attributable to poor workmanship due to the lack of provision for expansion joints  this omission is clearly a pre - existing building defect  the drummy or loo se tiles have likely occurred as the result of one of the following reasons: not enough adhesive under the tiles or dabbing of adhesive which leaves hollow voids, the wrong adhesive has be en used and has not bonded to the tiles or substrate or in wet areas the adhesive was not suitable and has broken down, or the adhesive has skinned before the tile were laid. This means the adhesive was put down and left too long and the surface has dried, preventing a sound bond to the tile  the tile damage is not related to the claimed water entry from the storm and is due to pre - existing poor installation processes in not allowing adequate provision for expansion joint and inadequate adhesive bonding .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.