Cracking and movement damage to home and retaining walls after neighbour's excavation

FirmFinancial Firm (Unknown - Insurer)
Decided2015-05-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$6,000
Non-financial loss—
Amount claimed$305,000
SourceAFCA PDF

Summary

The applicants claimed for cracking and movement damage to their home and retaining walls, which they blamed on a neighbour's excavation, and the FSP denied the claim under soil movement and tree root exclusions. AFCA found the FSP liable for the retaining wall damage, to be repaired or cash settled after a scope and quote, but not for the house and yard damage, and ordered $6,000 towards engineering costs.

Soil movement is excluded unless directly caused by an explosion, earthquake or storm, even where excavation is the underlying cause, but the insurer must prove the exclusion applies to the retaining wall damage.

Issues

Subjects and remedies

home or building damagepay claimpay compensationrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim Determination Case No: 375671 Determination Page 1 of 9 Case number : 375671 9 April 2015 1 Overview 1.1 Dispute In May 2013, the Applicants lodged a claim under their home insurance policy with the Financial Services Provider (FSP) for cracking and movement damage to their home. The Applicants believed that the damage had been caused by excavation works carried out at their neighbour’s property. The FSP denied the claim on the basis that the damage was not caused by the excavation works but by naturally occurring earth movement and the effects of tree roots, each of which is excluded under the policy. 1.2 Issues and key findings Is the FSP liable for the damage to the Applicants’ home ? The Applicants have established a prima facie claim under the policy, given the broad cover for accidental damage provided. Accordingly, the onus rests with the FSP to establish that, on the balance of probabilities, the claimed damage was caused by one or more matters which are excluded under the policy. The available information (including the respective engineers’ reports) is not sufficient to establish that, on the balance of probabilities, the cracking and movement damage to the retaining walls was caused by factors which are excluded under the policy, rather than the excavation works. Accordingly, the FSP is liable for this damage. The remaining damage to the house and yard is excluded under the policy exclusion for damage arising from soil movement (other than as a result of earthquake, explosion or storm). Accordingly, the FSP is not liable for this damage. Are the Applicants entitled to reimbursement of costs? The Applicants are entitled to partial reimbursement of costs incurred in obtaining engineers’ reports, as these assisted in identifying the cause of the damage to the retaining walls. However, they are not entitled to reimbursement for any other costs incurred. Case No: 375671 Determination Page 2 of 9 1.3 Determination This Determination is partly in favour of the Applicants. The FSP is to:  obtain a scope of works and quotation for the repair of the damage to the retaining walls in accordance with the process set out in section 2.1 below; and  at its election, either authorise the necessary repairs or cash settle the Applicants for the amount of the quotation. In addition, the FSP is to pay the amount of $6,000 to the Applicants as reimbursement of professional costs incurred. Case No: 375671 Determination Page 3 of 9 2 Reasons for Determination 2.1 Is the FSP liable for the damage to the Applicants’ home ? Policy provides cover unless FSP can show an exclusion applies The Applicants are required to show that, on the balance of probabilities, they have suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the Applicants are able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim. The Applicants’ policy provides cover for accidental damage to their property, subject to the conditions and exclusions set out in the policy. In this context, the courts have interpreted “accidental” to mean “unintended and unexpected.” The FSP has not disputed that the Applicants’ home suffered significant damage as a result of unintended and unexpected events. The engineers’ reports obtained by both parties establish that the building has suffered movement and cracking damage (although the extent of this damage is disputed). On this basis, the Panel is satisfied that the Applicants have established a prima facie claim, given the broad cover for accidental damage provided under the policy. In these circumstances, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion to deny the Applicants’ claim. Dispute concerns damage to various parts of property The Applicants ’ claim concerns damage to the followin g areas of their property:  movement damage to a brick retaining wall along the side boundary of their property;  cracking and displacement damage to a brick retaining wall at the rear of their property, which provides support for landscaping materials at the rear of the house and the galvanised steel pool fence;  settlement and cracking damage to landscaping and pool surrounds in the rear yard of the property;  cracking to a brick footing at the north-east corner of the house (near the retaining walls); and  cracking and movement damage to the exterior and interior of the house. While the Applicants’ claim involves damage to a number of different areas, they say that all of the damage flows from the same underlying cause, being the excavation works carried out by their neighbours in April 2013, in preparation for the installation of a back yard swimming pool. Case No: 375671 Determination Page 4 of 9 The Applicants have obtained a detailed and comprehensive report from their geotechnical engineer (SC) which provides the following explanation of how the damage arose:  the excavation works carried out by the Applicants’ neighbours impacted and undermined a large floating sandstone boulder located across the common boundary at the north- east corner of the Applicants’ property dislodging it from its natural position;  the dislodging of the boulder and the excavation of soil close to the boundary line undermined the footing of the boundary retaining wall along a significant portion of its length, leading to a significant rotation of the boundary wall outward away from the retained earth and cracking and displacement of the rear retaining wall;  the removal of lateral support and the movement of the retaining walls led to lateral movement of the soil mass at the rear of the property, causing settlement of the landscaping around the pool and cracking damage to the pool surrounds;  the destabilisation of the foundation soils resulted in soil movement around the sewer pipe along the common boundary of the property, causing the pipe to crack;  the resulting increase in the soil moisture content due to the leaking pipe caused differential settlement of the brick footings, resulting in cracking and movement damage to the exterior and interior of the house; and  the destabilisation of the foundation soils may have also caused a crack in the swimming pool pipework. The resulting leak has further increased the moisture content of the soil, exacerbating the cracking and movement damage. The FSP has provided a report from its own engineer (MC) which disputes SC’s findings and concludes that the bulk of the claimed damage is due to naturally occurring earth movement and the remainder is due to other excluded factors such as the effects of tree roots (on the rear retaining wall) and long term deterioration (in relation to the sewer pipe). The Panel has carefully reviewed the materials provided by the parties (including the engineers’ reports and the numerous photographs contained therein), for the purpose of determining whether the FSP is liable for the claimed damage to each area of the Applicants’ property. FSP is liable for damage to retaining walls Photographs taken during the course of the excavation works show that the works were conducted very close to the boundary line at the north-eastern corner of the Applicants’ property. The works involved the removal of a significant amount of soil from around and underneath the floating sandstone boulder. The photographs indicate that the excavator used by the builders also directly impacted the boulder itself. Given the nature and extent of the excavation works, the Panel accepts as reasonable the conclusion of the Applicants’ engineer (SC) that the works have undermined the footing of the boundary retaining wall. To the extent that this has Case No: 375671 Determination Page 5 of 9 caused ongoing damage to the boundary retaining wall, the FSP is liable for the repair of this damage. Given the proximity of the excavation works to the rear retaining wall, t he Panel also accepts that these works caused the cracking and displacement damage to the rear retaining wall in the manner described by SC. The FSP ’ s engineer (MC) says that, to the extent there was any damage to the retaining walls, this was caused by naturally occurring earth movement over an extended period of time and/or the effects of the root systems of two small trees growing in and near the retaining walls. However, there is no information to suggest that the retaining walls suffered damage prior to the excavation works being undertaken. The Panel notes that the Applicants were so concerned about the observed damage to the retaining walls that they raised this issue with their local council shortly after the excavation works commenced. Further, MC’s findings as to the effect of tree roots are disputed by the Applicants’ engineer (SC), who advised that the tree identified by MC as affecting the boundary wall had a non-invasive root system, while the pattern of cracking in the rear retaining wall was inconsistent with the effects of tree roots. In the circumstances, the Panel does not consider that the FSP has satisfied its onus of establishing that, on the balance of probabilities, the damage to the retaining walls was caused by factors which are excluded under the policy. Extent of repairs required to retaining walls is unclear The Applicants’ engineer (SC) has described the boundary retaining wall as having experienced significant outward rotation away from the retained earth and towards the neighbours’ property, as a consequence of the excavation works. The Applicants have estimated the cost of repairing this damage at up to $200,000. However, the Applicants have not provided a detailed scope of works or quotation for the repair of the damage. The FSP disputes the extent of the damage to the retaining walls. In particula r, the FSP’s engineer (MC) advised that he observed minimal movement or rotation of the side boundary walls. In these circumstances, the Panel considers that it is appropriate that the FSP be required to:  appoint an appropriately qualified independent engineer (who has not been involved in the claim to date) to prepare a detailed scope of works for the repair of the damage to the side and rear retaining walls; and  obtain a quote from an appropriately qualified builder to undertake the repairs set out in the scope of works. Following receipt of the scope of works and quotation, the FSP is to authorise the builder to carry out the necessary repairs or cash settle the Applicants for the amount of the quotation. Case No: 375671 Determination Page 6 of 9 FSP is not liable for remaining damage to property As outlined above, the Applicants’ engineer (SC) concluded that the excavation works were the underlying cause of the remaining damage to the property (being the damage to the landscaping and pool surrounds, the brick footings and the interior and exterior of the house). SC reached this view on the basis that the excavation works caused soil movement, which broke the sewer pipe causing water to leak into the surrounding soil, resulting in further earth movement which caused the claimed damage. The Panel acknowledges that SC’s report provides a unified theory which links all of the observed damage to the property to the excavation works. However, the Panel considers that the likely connection between the excavation works and the resulting damage necessarily becomes more tenuous as the source of the damage becomes more remote. Further, there is limited objective evidence (other than the Applicants’ account of when the damage was first observed), which links this damage to the excavation works. In this resp ect, the Applicants’ position is hampered by the absence of a dilapidation report describing the condition of their property before the excavation works commenced. While this is apparently due to the Applicants’ neighbours’ failure to comply with council requirements, it necessarily increases the difficulty of establishing that the excavation works caused all of the claimed damage. In any event, even if SC’s explanation of the mechanism by which the damage occurred is accepted in its entirety, the damage to the house and rear yard is excluded from cover due to the policy exclusion for earth movement. As outlined above, SC’s report identifies that the damage to the house and yard has been directly caused by soil movement (albeit resulting from a prior chain of events leading back to the excavation works). The policy clearly and unambiguously states damage caused by or arising from soil movement (including erosion or subsidence) is not covered unless the damage is directly caused by, and occurs within 72 hours of, an explosion, earthquake or storm. The manner in which the relevant exclusion is drafted shows that it is intended to apply in all cases of soil movement, other than those caused by and immediately following an explosion, earthquake or storm. The inclusion of a specific reference to the limited circumstances in which soil movement is covered necessarily means that the general exclusion is intended to operate in all other cases, even where the dominant or effective cause of the damage is another form of accidental damage which is insured against under the policy (such as the excavation works carried out by the Applicants’ neighbour). If the exclusion were intended to operate only where the dominant or effective cause of the damage was the soil movement itself, the additional references to the underlying causes of explosion, earthquake or storm would be unnecessary. Case No: 375671 Determination Page 7 of 9 On this basis, the Panel is satisfied that the PDS clearly and unambiguously provides that damage arising from soil movement (where the underlying cause of the soil movement is excavation works) is excluded from cover under the policy. Accordingly, the FSP is entitled to rely on this exclusion to deny the Applicants’ claim for the remaining damage to their property (other than the damage to the retaining walls discussed above). 2.2 Are the Applicants entitled to reimbursement of costs? Applicants are entitled to partial compensation for professional costs Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a financial services provider to contribute to legal or other professional costs incurred by an applicant in the course of their dispute. A financial services provider will generally not be required to contribute more than $3,000 unless exceptional circumstances apply. The Applicants seek reimbursement for total costs of approximately $105,000 which they have incurred for the purposes of progressing their dispute. The bulk of these costs comprise:  fees of approximately $55,000 paid to their engineer (SC); and  fees of approximately $45,000 paid to their claims adjuster. It was reasonable for the Applicants to obtain reports from an engineer in order to rebut the findings of the FSP’s building consultant. The reports prepared by SC have assisted in identifying the cause of the damage to the retaining walls, for which the Panel has found the FSP is liable under the policy. However, the Panel does not consider that the FSP should be required to reimburse the Applicants for all of SC’s fees, in circumstances where the Panel has found that the FSP is not liable for the remaini ng damage to the property for the reasons outlined above. Further, the Panel considers that the fees incurred for SC’s reports significantly exceed the costs which the Applicants might reasonably be expected to have incurred in obtaining an engineer’s rep ort to support their position. While the Panel does not question the professionalism and thoroughness of SC, his reports provide a level of background and detail which is beyond that reasonably required for the purposes of the present dispute. Accordingly, while it was open to the Applicants to engage SC on whatever terms they saw fit, they did so at their own risk and it is not appropriate that the FSP be required to reimburse them for all of the costs incurred in doing so. Having regard to all of the available information, the Panel considers that the FSP should reimburse the Applicants for the amount of $6,000 in respect of SC’s fees . The Panel is not satisfied that it was necessary for the Applicants to engage a claims adjuster to assist them during the course of this dispute or that the costs incurred in doing so were reasonable. The fees charged by the Applicants’ claims adjuster appear excessive relative to the value of the services provided. Case No: 375671 Determination Page 8 of 9 FOS provides a service that is free for Applicants and it is generally unnecessary for either party to seek professional representation. If an applicant chooses to be represented, they will u sually have to cover their representative’s fees themselves. For these reasons, the Panel does not consider that the FSP should be required to reimburse the Applicants for fees paid to their claims adjuster. Case No: 375671 Determination Page 9 of 9 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. The parties have made extensive submissions and provided voluminous materials. All material information which has been relied on for the purposes of this Determination has been exchanged between the parties, and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. The Applicants have been represented by a claims adjuster for the purposes of this dispute. Any submissions made by the Applicants’ claims adjuster have been treated as having been made by the Applicants themselves, for the purposes of this Determination. 3.2 Terms of policy Subject Terms Accidental damage Accidental loss or damage This insurance will cover you if you suffer accidental loss or damaged to the buildings, unless we state otherwise under the headings “When we will not pay a claim under Buildings and/or Contents” on pages [xx] to [xx] or “When we will not pay a claim under your policy” on pages [xx] to [xx]. Building cover - exclusions This policy does not cover loss, liability, injury or damage:  caused by or arising from soil movement including erosion, landslide, mudslide or subsidence unless it is directly caused by and occurs within 72 hours of an: - explosion; - earthquake; or - storm;  caused by or arising from roots from trees .