Cracking and movement damage to home and retaining walls after neighbour's excavation
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim
Determination
Case No: 375671 Determination Page 1 of 9
Case number : 375671 9 April 2015
1 Overview
1.1 Dispute
In May 2013, the Applicants lodged a claim under their home insurance policy
with the Financial Services Provider (FSP) for cracking and movement damage to
their home. The Applicants believed that the damage had been caused by
excavation works carried out at their neighbour’s property.
The FSP denied the claim on the basis that the damage was not caused by the
excavation works but by naturally occurring earth movement and the effects of
tree roots, each of which is excluded under the policy.
1.2 Issues and key findings
Is the FSP liable for the damage to the Applicants’ home ?
The Applicants have established a prima facie claim under the policy, given the
broad cover for accidental damage provided. Accordingly, the onus rests with the
FSP to establish that, on the balance of probabilities, the claimed damage was
caused by one or more matters which are excluded under the policy.
The available information (including the respective engineers’ reports) is not
sufficient to establish that, on the balance of probabilities, the cracking and
movement damage to the retaining walls was caused by factors which are
excluded under the policy, rather than the excavation works. Accordingly, the FSP
is liable for this damage.
The remaining damage to the house and yard is excluded under the policy
exclusion for damage arising from soil movement (other than as a result of
earthquake, explosion or storm). Accordingly, the FSP is not liable for this
damage.
Are the Applicants entitled to reimbursement of costs?
The Applicants are entitled to partial reimbursement of costs incurred in obtaining
engineers’ reports, as these assisted in identifying the cause of the damage to the
retaining walls. However, they are not entitled to reimbursement for any other
costs incurred.
Case No: 375671 Determination Page 2 of 9
1.3 Determination
This Determination is partly in favour of the Applicants.
The FSP is to:
obtain a scope of works and quotation for the repair of the damage to the
retaining walls in accordance with the process set out in section 2.1 below;
and
at its election, either authorise the necessary repairs or cash settle the
Applicants for the amount of the quotation.
In addition, the FSP is to pay the amount of $6,000 to the Applicants as
reimbursement of professional costs incurred.
Case No: 375671 Determination Page 3 of 9
2 Reasons for Determination
2.1 Is the FSP liable for the damage to the Applicants’ home ?
Policy provides cover unless FSP can show an exclusion applies
The Applicants are required to show that, on the balance of probabilities, they
have suffered a loss caused by a risk insured against under the policy. This is
known as a prima facie claim.
If the Applicants are able to establish a prima facie claim, then the onus shifts to
the FSP to show that, on the balance of probabilities, it is entitled to rely on an
exclusion under the policy to deny the claim.
The Applicants’ policy provides cover for accidental damage to their property,
subject to the conditions and exclusions set out in the policy. In this context, the
courts have interpreted “accidental” to mean “unintended and unexpected.”
The FSP has not disputed that the Applicants’ home suffered significant damage
as a result of unintended and unexpected events. The engineers’ reports obtained
by both parties establish that the building has suffered movement and cracking
damage (although the extent of this damage is disputed).
On this basis, the Panel is satisfied that the Applicants have established a prima
facie claim, given the broad cover for accidental damage provided under the
policy.
In these circumstances, the FSP bears the onus of establishing that, on the
balance of probabilities, it is entitled to rely on a policy exclusion to deny the
Applicants’ claim.
Dispute concerns damage to various parts of property
The Applicants ’ claim concerns damage to the followin g areas of their property:
movement damage to a brick retaining wall along the side boundary of their
property;
cracking and displacement damage to a brick retaining wall at the rear of their
property, which provides support for landscaping materials at the rear of the
house and the galvanised steel pool fence;
settlement and cracking damage to landscaping and pool surrounds in the
rear yard of the property;
cracking to a brick footing at the north-east corner of the house (near the
retaining walls); and
cracking and movement damage to the exterior and interior of the house.
While the Applicants’ claim involves damage to a number of different areas, they
say that all of the damage flows from the same underlying cause, being the
excavation works carried out by their neighbours in April 2013, in preparation for
the installation of a back yard swimming pool.
Case No: 375671 Determination Page 4 of 9
The Applicants have obtained a detailed and comprehensive report from their
geotechnical engineer (SC) which provides the following explanation of how the
damage arose:
the excavation works carried out by the Applicants’ neighbours impacted and
undermined a large floating sandstone boulder located across the common
boundary at the north- east corner of the Applicants’ property dislodging it from
its natural position;
the dislodging of the boulder and the excavation of soil close to the boundary
line undermined the footing of the boundary retaining wall along a significant
portion of its length, leading to a significant rotation of the boundary wall
outward away from the retained earth and cracking and displacement of the
rear retaining wall;
the removal of lateral support and the movement of the retaining walls led to
lateral movement of the soil mass at the rear of the property, causing
settlement of the landscaping around the pool and cracking damage to the
pool surrounds;
the destabilisation of the foundation soils resulted in soil movement around the
sewer pipe along the common boundary of the property, causing the pipe to
crack;
the resulting increase in the soil moisture content due to the leaking pipe
caused differential settlement of the brick footings, resulting in cracking and
movement damage to the exterior and interior of the house; and
the destabilisation of the foundation soils may have also caused a crack in the
swimming pool pipework. The resulting leak has further increased the
moisture content of the soil, exacerbating the cracking and movement
damage.
The FSP has provided a report from its own engineer (MC) which disputes SC’s
findings and concludes that the bulk of the claimed damage is due to naturally
occurring earth movement and the remainder is due to other excluded factors
such as the effects of tree roots (on the rear retaining wall) and long term
deterioration (in relation to the sewer pipe).
The Panel has carefully reviewed the materials provided by the parties (including
the engineers’ reports and the numerous photographs contained therein), for the
purpose of determining whether the FSP is liable for the claimed damage to each
area of the Applicants’ property.
FSP is liable for damage to retaining walls
Photographs taken during the course of the excavation works show that the works
were conducted very close to the boundary line at the north-eastern corner of the
Applicants’ property.
The works involved the removal of a significant amount of soil from around and
underneath the floating sandstone boulder. The photographs indicate that the
excavator used by the builders also directly impacted the boulder itself.
Given the nature and extent of the excavation works, the Panel accepts as
reasonable the conclusion of the Applicants’ engineer (SC) that the works have
undermined the footing of the boundary retaining wall. To the extent that this has
Case No: 375671 Determination Page 5 of 9
caused ongoing damage to the boundary retaining wall, the FSP is liable for the
repair of this damage.
Given the proximity of the excavation works to the rear retaining wall, t he Panel
also accepts that these works caused the cracking and displacement damage to
the rear retaining wall in the manner described by SC.
The FSP ’ s engineer (MC) says that, to the extent there was any damage to the
retaining walls, this was caused by naturally occurring earth movement over an
extended period of time and/or the effects of the root systems of two small trees
growing in and near the retaining walls.
However, there is no information to suggest that the retaining walls suffered
damage prior to the excavation works being undertaken. The Panel notes that the
Applicants were so concerned about the observed damage to the retaining walls
that they raised this issue with their local council shortly after the excavation
works commenced.
Further, MC’s findings as to the effect of tree roots are disputed by the Applicants’
engineer (SC), who advised that the tree identified by MC as affecting the
boundary wall had a non-invasive root system, while the pattern of cracking in the
rear retaining wall was inconsistent with the effects of tree roots.
In the circumstances, the Panel does not consider that the FSP has satisfied its
onus of establishing that, on the balance of probabilities, the damage to the
retaining walls was caused by factors which are excluded under the policy.
Extent of repairs required to retaining walls is unclear
The Applicants’ engineer (SC) has described the boundary retaining wall as
having experienced significant outward rotation away from the retained earth and
towards the neighbours’ property, as a consequence of the excavation works. The
Applicants have estimated the cost of repairing this damage at up to $200,000.
However, the Applicants have not provided a detailed scope of works or quotation
for the repair of the damage.
The FSP disputes the extent of the damage to the retaining walls. In particula r,
the FSP’s engineer (MC) advised that he observed minimal movement or rotation
of the side boundary walls.
In these circumstances, the Panel considers that it is appropriate that the FSP be
required to:
appoint an appropriately qualified independent engineer (who has not been
involved in the claim to date) to prepare a detailed scope of works for the
repair of the damage to the side and rear retaining walls; and
obtain a quote from an appropriately qualified builder to undertake the repairs
set out in the scope of works.
Following receipt of the scope of works and quotation, the FSP is to authorise the
builder to carry out the necessary repairs or cash settle the Applicants for the
amount of the quotation.
Case No: 375671 Determination Page 6 of 9
FSP is not liable for remaining damage to property
As outlined above, the Applicants’ engineer (SC) concluded that the excavation
works were the underlying cause of the remaining damage to the property (being
the damage to the landscaping and pool surrounds, the brick footings and the
interior and exterior of the house).
SC reached this view on the basis that the excavation works caused soil
movement, which broke the sewer pipe causing water to leak into the surrounding
soil, resulting in further earth movement which caused the claimed damage.
The Panel acknowledges that SC’s report provides a unified theory which links all
of the observed damage to the property to the excavation works. However, the
Panel considers that the likely connection between the excavation works and the
resulting damage necessarily becomes more tenuous as the source of the
damage becomes more remote.
Further, there is limited objective evidence (other than the Applicants’ account of
when the damage was first observed), which links this damage to the excavation
works.
In this resp ect, the Applicants’ position is hampered by the absence of a
dilapidation report describing the condition of their property before the excavation
works commenced. While this is apparently due to the Applicants’ neighbours’
failure to comply with council requirements, it necessarily increases the difficulty
of establishing that the excavation works caused all of the claimed damage.
In any event, even if SC’s explanation of the mechanism by which the damage
occurred is accepted in its entirety, the damage to the house and rear yard is
excluded from cover due to the policy exclusion for earth movement.
As outlined above, SC’s report identifies that the damage to the house and yard
has been directly caused by soil movement (albeit resulting from a prior chain of
events leading back to the excavation works).
The policy clearly and unambiguously states damage caused by or arising from
soil movement (including erosion or subsidence) is not covered unless the
damage is directly caused by, and occurs within 72 hours of, an explosion,
earthquake or storm.
The manner in which the relevant exclusion is drafted shows that it is intended to
apply in all cases of soil movement, other than those caused by and immediately
following an explosion, earthquake or storm.
The inclusion of a specific reference to the limited circumstances in which soil
movement is covered necessarily means that the general exclusion is intended to
operate in all other cases, even where the dominant or effective cause of the
damage is another form of accidental damage which is insured against under the
policy (such as the excavation works carried out by the Applicants’ neighbour).
If the exclusion were intended to operate only where the dominant or effective
cause of the damage was the soil movement itself, the additional references to
the underlying causes of explosion, earthquake or storm would be unnecessary.
Case No: 375671 Determination Page 7 of 9
On this basis, the Panel is satisfied that the PDS clearly and unambiguously
provides that damage arising from soil movement (where the underlying cause of
the soil movement is excavation works) is excluded from cover under the policy.
Accordingly, the FSP is entitled to rely on this exclusion to deny the Applicants’
claim for the remaining damage to their property (other than the damage to the
retaining walls discussed above).
2.2 Are the Applicants entitled to reimbursement of costs?
Applicants are entitled to partial compensation for professional costs
Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a
financial services provider to contribute to legal or other professional costs
incurred by an applicant in the course of their dispute. A financial services
provider will generally not be required to contribute more than $3,000 unless
exceptional circumstances apply.
The Applicants seek reimbursement for total costs of approximately $105,000
which they have incurred for the purposes of progressing their dispute. The bulk
of these costs comprise:
fees of approximately $55,000 paid to their engineer (SC); and
fees of approximately $45,000 paid to their claims adjuster.
It was reasonable for the Applicants to obtain reports from an engineer in order to
rebut the findings of the FSP’s building consultant. The reports prepared by SC
have assisted in identifying the cause of the damage to the retaining walls, for
which the Panel has found the FSP is liable under the policy.
However, the Panel does not consider that the FSP should be required to
reimburse the Applicants for all of SC’s fees, in circumstances where the Panel
has found that the FSP is not liable for the remaini ng damage to the property for
the reasons outlined above.
Further, the Panel considers that the fees incurred for SC’s reports significantly
exceed the costs which the Applicants might reasonably be expected to have
incurred in obtaining an engineer’s rep ort to support their position. While the
Panel does not question the professionalism and thoroughness of SC, his reports
provide a level of background and detail which is beyond that reasonably required
for the purposes of the present dispute.
Accordingly, while it was open to the Applicants to engage SC on whatever terms
they saw fit, they did so at their own risk and it is not appropriate that the FSP be
required to reimburse them for all of the costs incurred in doing so.
Having regard to all of the available information, the Panel considers that the FSP
should reimburse the Applicants for the amount of $6,000 in respect of SC’s fees .
The Panel is not satisfied that it was necessary for the Applicants to engage a
claims adjuster to assist them during the course of this dispute or that the costs
incurred in doing so were reasonable. The fees charged by the Applicants’ claims
adjuster appear excessive relative to the value of the services provided.
Case No: 375671 Determination Page 8 of 9
FOS provides a service that is free for Applicants and it is generally unnecessary
for either party to seek professional representation. If an applicant chooses to be
represented, they will u sually have to cover their representative’s fees
themselves.
For these reasons, the Panel does not consider that the FSP should be required
to reimburse the Applicants for fees paid to their claims adjuster.
Case No: 375671 Determination Page 9 of 9
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
The parties have made extensive submissions and provided voluminous
materials. All material information which has been relied on for the purposes of
this Determination has been exchanged between the parties, and each party has
had the opportunity to address any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised a number of issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
The Applicants have been represented by a claims adjuster for the purposes of
this dispute. Any submissions made by the Applicants’ claims adjuster have been
treated as having been made by the Applicants themselves, for the purposes of
this Determination.
3.2 Terms of policy
Subject Terms
Accidental damage Accidental loss or damage
This insurance will cover you if you suffer accidental loss or
damaged to the buildings, unless we state otherwise under the
headings “When we will not pay a claim under Buildings and/or
Contents” on pages [xx] to [xx] or “When we will not pay a claim
under your policy” on pages [xx] to [xx].
Building cover -
exclusions
This policy does not cover loss, liability, injury or damage:
caused by or arising from soil movement including erosion,
landslide, mudslide or subsidence unless it is directly caused by
and occurs within 72 hours of an:
- explosion;
- earthquake; or
- storm;
caused by or arising from roots from trees .