Cash settlement amounts for storm water damage, mould and skylight

FirmFinancial Firm (Unknown - Insurer)
Decided2015-04-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$12,000
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The homeowners disputed cash settlements for storm water damage and a damaged skylight, and asked for new-for-old replacement. AFCA ordered an additional $12,000 (including $2,000 for mould remediation) and required the insurer to assess any further water damage found during repairs, but rejected the claim for replacing undamaged skylights.

The policy allowed cash settlement on a similar-condition basis, so the water damage settlement was fair, but the skylight and mould settlements were insufficient on the available evidence and were increased.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building and Contents - FSP Decision - Settlement amounts Determination Case No: 375132 Determination Page 1 of 8 Case number : 375132 6 March 2015 1 Overview 1.1 Dispute The Applicants lodged a claim under their home insurance policy with the Financial Services Provider (FSP) for water damage to the interior of their home following a storm in November 2013. They lodged a separate claim for cracking damage to a skylight, which occurred accidentally in or around August 2013. The FSP accepted the Applicants’ claims and cash settled them for the estimated cost of repairing the damage. However, the Applicants say that the cash settlement paid in relation to each claim is insufficient to allow them to carry out the necessary repairs. 1.2 Issues and key findings Is the cash settlement for the water damage sufficient? The FSP was entitled to settle the Applicants’ claim based on the scope of works and quotation provided by its builder (C). The available information establishes that the cash settlement is generally sufficient to cover the claim related repairs. However, the FSP is required to pay the Applicants an additional amount of $2,000 for further mould remediation works and is required to assess its liability for any additional damage discovered during the repair process. Is the cash settlement for the damaged skylight sufficient? Under the terms of the policy, the FSP is not required to replace the two undamaged skylights. However, the cash settlement is not sufficient to cover all of the costs associated with the damaged skylight. The FSP is to pay the Applicants an additional amount of $10,000 in respect of these costs. 1.3 Determination This Determination is partly in favour of the Applicants and partly in favour of the FSP. The FSP is to pay the Applicants an additional amount of $12,000 in full and final settlement of their claim. In the event that additional water damage is discovered during the course of the repairs, the FSP is to assess its liability for such damage in accordance with the terms of the policy. The FSP is not required to pay interest on this amount. Case No: 375132 Determination Page 2 of 8 2 Reasons for Determination 2.1 Is the cash settlement for water damage sufficient? Policy does not require claim to be settled on “new for old” basis The Applicants say that the FSP should be required to settle their claim on a “new for old” basis. The water damage to the Applicants’ home occurred during the policy period that commenced on 24 August 2013. The FSP has confirmed that the terms and conditions of the policy that applied during this period are as set out in the Product Disclosure Statement (PDS) dated 24 May 2013. The terms of the policy (as set out in the PDS) provide that the FSP may settle a building claim by repairing the damage to the building or paying the Applicants the cost (to the FSP) of doing so. The policy clearly states that, where the FSP settles a claim in this way, it may choose to do so on the basis that the building will be repaired either:  on a “ new for old ” basis; or  to a similar condition to that which it was in before the damage occurred. In the present case, the FSP elected to cash settle the Applicants for the cost of repairing their home to a similar condition to that which it was in before the water damage occurred. Under the terms of the policy, the FSP is entitled to settle the claim on this basis. The policy does not require the FSP to settle the claim on a “new for old” basis. Cash settlement for building repairs is appropriate In May 2014, the FSP engaged a builder (C) to prepare a scope of works for the repair of the water damage and provide a quotation for the necessary repairs. The FSP cash settled the Applicants for $95,473.37, based on the quotation provided by C. The FSP subsequently paid the Applicants an additional $1,918.67, to reflect the more detailed breakdown of costs provided by C in July 2014. The Applicants have previously reviewed the scope of works prepared by C and confirmed that it addressed all of the damage to their home (other than any additional damage which might be identified during the course of the repairs). However, the Applicants say that the quotation provided by C significantly underestimates the cost of the necessary repairs. The Applicants have provided a quotation from their own builder (SX) (based on C’s scope of works) which indicates that the cost of undertaking the necessary repairs is $289,315.62. The FSP ’s assessor has reviewed the quotations provided by both builders against the industry recognised pricing guide and has confirmed that the amounts Case No: 375132 Determination Page 3 of 8 allowed for particular items in C’s quotation are generally consistent with the rates specified in the pricing guide, while the equivalent amounts allowed under SX’s quotation significantly exceed the rates in the pricing guide. The Applicants say that C’s quote is b ased on the costs of constructing a new property, rather than undertaking repairs to an existing home . They say that C’s quote provides for a “patch - up job” only they will not be able to repair their home to an appropriate standard for this amount. Under the terms of the policy, the FSP is obliged to cash settle the Applicants for the amount that it would cost the FSP to repair the damage to their home. The Applicants have not provided any information which establishes that C would not have been able to properly repair the damage for the quoted amount. The Panel notes that the quotation provided by C was within approximately 10% of a second quotation obtained by the FSP from another builder (B). Further, the FSP offered the Applicants the alternative of having C repair the damage instead of accepting a cash settlement, in which case the Applicants would have been entitled to the benefit of the FSP’s lifetime guarantee for materials and workmanship if the repairs carried out by C proved inadequate. However, the Applicants confirmed their preference for a cash settlement. In these circumstances, the Panel is satisfied that the FSP was entitled to determine the cash settlement amount based on the quotation provided by C. The total cash settlement of $97,392.04 paid by the FSP for the building repairs is fair and reasonable, and complies with its obligations under the policy. FSP should assess any additional damage identified during repair process As noted above, the Applicants say that C’s scope of works and quotation does not provide for the cost of repairing any additional damage discovered during the repair process – for example, possible damage to the electrical and air conditioning systems caused by water entering the roof cavity . The FSP has confirmed that if any additional damage is discovered during the repair process, it will assess its liability for such damage in accordance with the terms and conditions of the policy. The FSP is not required to include in the cash settlement any allowance for additional damage that has not yet been identified. In the event that additional damage is discovered, the FSP’s liability will depend on the cause of the damage and the estimated cost of repairing it. Settlement amount should be increased to allow for mould remediation During the claim process, the Applicant advised the FSP that mould had developed in the basement area of the property. The FSP’s assessor (JR) who inspected the property in May 2014 confirme d the likely presence of mould. However, JR considered that the mould growth had been caused by inadequate waterproofing at the property, which the FSP had previously advised the Applicants was an ongoing maintenance issue. Accordingly, JR noted that any mould remediation measures undertaken by the Case No: 375132 Determination Page 4 of 8 FSP would be ineffective unless the Applicant also addressed the ongoing waterproofing issues. Following receipt of JR’s report, the FSP sought to appoint a mould specialist to confirm the cause of the mould growth at the property and the extent of the remediation measures required. However, the Applicant advised that he did not want any further investigations undertaken at the time, but would prefer the mould issue to be addressed once the building repairs had commenced. The scope of works prepared by C included provision for mould remediation to the areas exposed by the removal of the plasterboard ceiling in the basement. C’s quotation appears to have included limited provision (approximately $1,000) for the co sts of this work. However, C’s quotation (and the resulting cash settlement) does not include any amount for further mould remediation work, to the extent this was required. The absence of a report from a qualified mould specialist makes it difficult to d etermine the extent to which the mould growth in the Applicants’ basement was caused by water damage from the storm in November 2013, as opposed to ongoing maintenance issues at the property. This difficulty has been further compounded by the passage of time. Based on the available information, the Panel is satisfied that there were ongoing mould issues with the property prior to the storm in November 2013. The assessor who attended the property in October 2013 (following an earlier claim lodged by the Applicants) noted that the carpet in the basement area was badly rotted due to long term water entry. However, the Panel also accepts that water entry during the storm in November 2013 is likely to have exacerbated the existing mould issues, and the cash settlement paid to date provides only limited provision for mould remediation. In these circumstances, the Panel considers that the cash settlement amount should be increased by an additional amount of $2,000, to allow for further mould remediation works to the basement area. 2.2 Is the cash settlement for the damaged skylight sufficient? Policy provides for new for old replacement of damaged items While the Applicants’ claim for the damaged skylight was not lodged until 28 November 2013, the damage was recorded as having occurred on 1 August 2013. Accordingly, this damage occurred during the policy period that commenced on 24 August 2012. The FSP has confirmed that the terms and conditions of the policy that applied during the relevant period are as are set out in a PDS dated 9 June 2010. The terms of the policy (as set out in this PDS) provide that the FSP may settle a building claim by repairing the damage to the building or paying the Applicants the cost (to the FSP) of doing so. The policy states that, where the FSP settles a claim in this way, it must do so on a “new for old” basis. Case No: 375132 Determination Page 5 of 8 The FSP has cash settled the Applicants for an amount of $6,712, being the estimated cost of replacing the damaged skylight based on a quotation for $8,712 provided by the FSP’s builder (C) (less the applicable policy excess). The damaged skylight was one of three skylights which are built into the tiled floor of the Applicants’ first floor balcony . The Applicants say that the cash settlement provided by the FSP is insufficient as it provides for the cost of replacing the damaged skylight only. They say that the FSP should pay for the cost of replacing the remaining two undamaged skylights, as the original model is no longer available. Under the terms of the policy, the FSP is only required to repair the damaged parts of the Applicants’ home. The policy clearly states that, where an exact match for the damaged item is not available, the FSP can use the closest matching material available (or cash settle the Applicants for the cost of doing so). Further, the policy provides that the FSP is not required to replace undamaged parts of the home in order to create a uniform appearance (other than in the case of certain specified items such as wall and floor coverings). Accordingly, the FSP is not required to cash settle the Applicants for the cost of replacing the undamaged skylights in order to ensure the three skylights match. The Applicants also say that the removal of the damaged skylight will undermine the integrity of the remaining two and therefore they will also require replacement. However, the Applicants have not provided any independent information that establishes that the undamaged skylights will need to be replaced as part of the repair process. In these circumstances, the Panel is satisfied that the FSP is required to cash settle the Applicants for the cost of replacing the damaged skylight only. Cash settlement for skylight is insufficient The Applicants say that the amount quoted by the FSP’s builder (C) is not sufficient to cover all of the costs associated with the removal of the damaged skylight and the supply and installation of a replacement skylight. In particular, the Applicants say that C’s quote does not include the costs of:  hiring scaffolding and lifting equipment to remove and replace the damaged skylight, and implementing traffic control measures while these works are carried out; and  repairing or replacing the steel support frame for the skylights and the tiles and waterproof membrane of the balcony floor, which will be damaged when the skylight is removed. The Applicants have provided a quotation for $16,880 from their own repairer (S) for the replacement of the damaged skylight . S’s quote includes the costs of scaffolding, lifting equipment and traffic control but excludes costs associated with the steel frame, tiles and waterproofing. The Applicants have also provided a quotation from a second repairer (R) for $55,800.36, which includes the removal and replacement of all of the balcony tiles Case No: 375132 Determination Page 6 of 8 and the waterproof membrane (but allows for the replacement of all three skylights). The scope of works and original quotation provid ed by the FSP’s builder (C) did not specifically provide for scaffolding, lifting equipment and traffic control measures. However, C has subsequently confirmed that its quote did include the costs of lifting equipment and traffic control measures (but has not provided any further details). Further, the FSP has noted that its consolidated quotation (incorporating the repair of the water damage) included an overall allowance of $3,000 for scaffolding. While the Panel accepts that C’s quotation makes some al lowance for the costs of scaffolding, lifting equipment and traffic control measures, it is not clear that this allowance is necessarily sufficient, having regard to the various quotes provided. In relation to the costs associated with the steel frame, tiles and waterproof membrane, it is unclear from the available information whether repairs to these items will be required in connection with the replacement of the damaged skylight (and, if so, to what extent). The FSP’s builder (C) has acknowledged that th e replacement of the skylight may result in some damage to the steel frame, tiles and waterproofing in the surrounding area, which was not included in his quotation. C indicated that he could provide a more accurate quotation after attending the property. However, it appears that C was unable to reinspect the property as the Applicants were reluctant to allow any further contractors to attend until their broader dispute with the FSP had been resolved. Given C’s comments, it appears likely that the quotation (and resulting cash settlement) for the skylight repairs underestimates the extent of the works required. However, the Panel is not satisfied that the additional works required are as extensive as claimed by the Applicants . While the Applicants’ repairer (S) has advised that the tiles and waterproofing for the balcony need to be removed and reinstated, it is not clear whether this is solely due to the proposed replacement of the damaged skylight or is at least partly due to the ongoing issues with the balcony previously identified by the FSP. Further, while the quotation prepared by R includes an amount of $17,773 for the replacement of the tiles, this is based on the assumption that the entire balcony will need to be re-tiled as the original tiles are no longer available. However, the FSP has been unable to confirm this, given that its builder has been unable to reinspect the property. While it is likely that some additional works will be required as a result of the removal and replac ement of the damaged skylight, in the Panel’s view it is more likely that such works will be confined to the area immediately surrounding the damaged skylight and will not extend to the balcony as a whole. Case No: 375132 Determination Page 7 of 8 In the circumstances, after having carefully considered the various quotes provided, the Panel considers that it is appropriate to allow an additional amount of $10,000 for the further works associated with the replacement of the skylight. The Panel is satisfied that the overall increase of $12,000 to the settlement amount (including the additional $2,000 for mould remediation) is fair in all the circumstances. In arriving at this amount, the Panel has taken into account the delays experienced during the course of the claim. Accordingly, the FSP is not required to pay interest on the additional settlement amount. Case No: 375132 Determination Page 8 of 8 3 Supporting information 3.1 Panel approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, the Panel has restricted its commentary to those issues that it considers directly relevant to the outcome only.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.