Determination 375128

Denial of Claim - Exclusion/Condition

FirmFinancial Firm (Unknown - Insurer)
Decided2014-12-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicants claimed under their home policy after their balcony collapsed following a storm. AFCA found the damage was caused by gradual deterioration and poor design and construction, which the policy excludes, and found the FSP not liable.

The FSP proved on the balance of probabilities that the proximate cause was excluded gradual deterioration and faulty design, and section 46 of the Insurance Contracts Act 1984 does not apply to exclusions that do not depend on pre-policy defects.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition Determination Case No: 375128 Determination Page 1 of 6 Case number : 375128 30 December 2014 1 Overview 1.1 Dispute The Applicants lodged a claim under their home insurance policy with the Financial Services Provider (FSP) after their balcony collapsed following a storm in November 2013. The FSP denied the claim on the basis that the damage had been caused by faulty design and construction and/or gradual deterioration, each of which is excluded under the policy. The Applicants dispute the FSP’s denial of their claim and want their balcony repaired. 1.2 Issue and key findings Can the FSP deny the Applicants’ claim ? The Applicants have established a prima facie claim for accidental damage under the policy, as the damage to the balcony was unintended and unexpected. However, the available information establishes that the damage occurred as a result of gradual deterioration, due to water entering the timber framework over an extended period of time as a result of the manner in which the balcony was designed and constructed. Damage caused in this manner is not covered under the policy. Section 46 of the Insurance Contracts Act 1984 (the Act) does not assist the Applicants, as the application of the policy exclusions relied on by the FSP does not depend on the ongoing issues with the balcony having existed before the date the policy was taken out. 1.3 Determination This Determination is in favour of the FSP. The FSP is no t liable for the Applicants’ claim . Case No: 375128 Determination Page 2 of 6 2 Reasons for Determination 2.1 Can the FSP deny the Applicants’ claim ? Application of policy depends on cause of damage The Applicants’ policy provides cover for accidental damage to their property during the period of insurance, subject to the conditions and exclusions set out in the policy. In this context, the courts have interpreted “accidental” to mean “unintended and unexpected.” The policy contains exclusions for damage caused by:  gradual deterioration, depreciation, wear or tear or  inherent defects, structural defects, faulty workmanship or faulty design. The Applicants say that their balcony “dropped” due to the effects of strong winds and driving rain during the severe storm in November 2013. However, the FSP says that the damage to the balcony was not caused by the storm but has occurred over an extended period of time as a result of water entering the balcony due to its poor design and construction. It is an accepted principle of general insurance la w that an insured bears the onus of establishing that, on the balance of probabilities, they have suffered a loss caused by a risk insured under the policy. This is known as a prima facie claim. If the insured is able to establish a prima facie claim, the onus then shifts to the insurer to show that, on the balance of probabilities, the loss falls within an exclusion clause under the policy or that it is otherwise entitled to deny liability. The FSP has not disputed that the Applicants’ balcony suffered sig nificant damage as a result of unintended and unexpected events. In these circumstances, the Panel is satisfied that the Applicants have established a prima facie claim, given the broad cover for accidental damage provided under the policy. Accordingly, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion to deny the Applicants’ claim. In order to do so, the FSP must show that the proximate cause (that is, the real, effective or predominant cause) of the damage to the balcony was one of the excluded factors outlined above. Available information establishes damage was caused by excluded factors Having carefully reviewed the available information, the Panel considers that the damage to the Applicants’ balcony w as caused by gradual deterioration over a prolonged period of time, due to the inappropriate design and construction of the balcony. The engineer (JH) appointed by the FSP to identify the cause of damage concluded that the collapse of the balcony was due to the extensive decay of the timber support beams caused by water entry, due to the failure of the waterproof membrane. JH noted that the base of the aluminium handrail posts and run-off Case No: 375128 Determination Page 3 of 6 channelled by the tiles along the outer edge of the balcony provide further sources of water entry. Further, JH noted that the two varieties of hardwood used to construct the timber support beams had a very low durability rating and were not recommended for structural use in circumstances (such as the Applicants’ balcony) where they may be exposed to water. Based on the extensive decay observed throughout the timber beams (which is clearly evident in the photographs provided) and the signs of past repairs, JH concluded that the damage had occurred over a period of several years. The conclusions reached by the Applicant’s engineer (LO) as to the cause of damage were generally consistent with JH’s findings. LO confirmed that the deflection (sagging) of the balcony had been caused by the rotting of the timber beams due to water entry over a period of time. LO did not express a view as to the underlying cause of the water entry or refute JH’s comments about the poor design and construction of the balcony. Based on the engineers’ reports, the Panel is satisfied that the damage to the balcony occurred due to water entry over an extended period of time. The Panel also accepts JH’s findings that the underlying cause of the water entry was the poor design and construction of the balcony - in particular, the use of inappropriate timber for the support beams and the failure to adequately ensure that water was not able to enter the timber framework. Accordingly, the damage falls within the policy exclusions for damage caused by gradual deterioration and/or faulty design and construction. The Applicants say that their claim is limited to the collapse of the balcony which occurred immediately following the storm in November 2013, rather than the ongoing damage to the balcony. However, in light of the engineers’ findings, the Panel is satisf ied that the underlying cause of the damage in November 2013 was the ongoing water entry which had occurred over a period of time, resulting in the extensive decay of the timber support beams which ultimately caused the balcony to collapse. Accordingly, the Applicants are not entitled to cover under the policy. Section 46 of the Act does not apply The Applicants say that section 46 of the Act operates to prevent the FSP from denying their claim, on the basis that they were not aware (and could not possibly have been aware) of the ongoing damage to their balcony. Section 46 of the Act prevents an insurer from relying on a policy exclusion which operates by reference to a defect in a thing which existed before the policy was taken out, in circumstances where the insured was not aware (and a reasonable person in the circumstances could not be expected to have been aware) of the defect at the time the policy was taken out. The report provided by the Applicants engineer (LO) states that Applicants could not be expected to have been aware that the timber support beams of the balcony Case No: 375128 Determination Page 4 of 6 were being damaged by water entry, until the balcony began to visibly sag following the storm in November 2013. The Panel accepts that the Applicants were not aware of the damage to t heir balcony caused by the gradual rotting of the timber support beams, given the beams were fully enclosed by fibre cement cladding. However, the courts have confirmed that section 46 of the Act only applies in circumstances where the insurer relies on an exclusion which operates by reference to the time at which the relevant defect arose – that is, where the exclusion expressly refers to the defect having been present before the policy was taken out. The exclusions relied upon by the FSP in the present case apply to damage which was caused by faulty design and workmanship and/or gradual deterioration, irrespective of when these issues arose. As the application of these exclusions does not depend on the relevant defects having been present before the policy was taken out, section 46 does not operate to assist the Applicants. Case No: 375128 Determination Page 5 of 6 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. The Applicants have been represented by their broker for the purposes of this dispute. Any submissions made by the Applicants ’ broker have been treated as having been made by the Applicants themselves, for the purposes of this Determination. 3.2 Reports Record Key points Applicant’s builder (GM) Quote – 24 April 2014  Balcony has suffered water damage. FSP’s a ssessor ( CR ) R eport - 29 May 2014  The Applicants initially advised that the damage to the balcony occurred as a result of the storm on 23 November 2013 . H owever , the Applicants subsequently clarified that the issue became more prominent after the storm . FSP’s e ngineer ( JH ) R eport - 10 June 20 14  The tiled floor of the rear upper level balcony displayed excessive sagging between each of the supporting circular columns to the point where the glass panels in two locations had severe stress cracks in them.  The type of hardwood used for the support beams of balcony is very strong if installed in a dry environment, but does not perform well when exposed to weather. It has a very low durability rating and is not recommended for any structural application if subject to water of any kind .  The f loor tile s along th e outer edge of the balcony had been channelling run - off water into the top edge of the Case No: 375128 Determination Page 6 of 6 Record Key points support beams. Water was also able to enter the floor frame under the base of the aluminium handrail posts.  The floor tile joint and waterproof membrane around each of the circular columns had also failed, allowing water to track around the columns and into the ends of the timber beams.  There was extensive decay in the ends and through the middle of the timber s upport beams, which indicated that the damage had occurred over a consideration period of time (years).  The support beams had been completely encased with fibre cement sheeting which had contributed to the decay as water has become trapped, preventing the beams from ever drying out properly.  The base of the handrail posts also showed long - term sagging of the floor edge. The sagging of the floor had transferred tremendous stress into the handrail system, which had caused the in - fill glass panels to crack.  Th ere were signs of previous repairs (including the use of packing material under the handrail posts and re - grouting of the floor joints), which was further evidence that the damage had been occurring for some time.  The damage to the support beams was a resu lt of a construction defect due to the selection of inappropriate timber for the beams, the use of poor techniques in concealing the beams with fibre cement sheeting and the poor installation of the waterproofing membrane. Applicant’s e ngineer (LO) Report - 26 June 2014  The bearers supporting the balcony showed substantial deflections. The bearers revealed rot due to water entry over a period of time , which had caused the excessive deflection .  He was unable to comment on the joists as they were not exposed, but noted that they may have also suffered rot due to water entry .  No significant staining or other signs of water ingress and timber deterioration were noted other than in the areas where th e fibre cement cladding had been cut away to expose the damaged beams .  Accordingly, t he Applicants could not be expected to have been aware that water entry was damaging the deck over time , until the deflections became apparent .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.