Determination 374897
Adequacy of cash settlement for storm damage after contractor-caused water damage
Summary
The applicants claimed for additional water damage after a second storm during the FSP's contractor-led roof repairs. The FSP offered a $4,045 cash settlement and the applicants sought about $37,500. AFCA partly upheld the complaint, requiring an independent scope review and cash settlement with interest, and found no mould damage established.
Where the extent of storm damage cannot be accurately determined on conflicting evidence, an independent building consultant should reassess the scope before the cash settlement is calculated.
Issues
- Claim amount dispute primary · upheld
“the FSP is to appoint an independent building consultant to inspect the property and identify whether there is any additional water damage”
- Repairs or contractors secondary · upheld
“The FSP has accepted that it is liable for any additional damage to the Applicants' property caused by the actions of its contractors”
Subjects and remedies
home or building damagenatural disasterpay claimpay interestreassess claim
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - Storm - FSP Decision -
Scope of Repairs
Determination
Case No: 374897 Determination Page 1 of 6
Case number: 374897 7 April 201 5
1 Overview
1.1 Dispute
In April 2014, the Applicants lodged a claim under their home insurance policy for
damage to the roof of their property caused by a hail storm. The FSP accepted
the claim and arranged for the roof repairs.
In June 2014, the FSP’s contractors removed sections of the roof in order to carry
out the repairs. Before the repairs could be completed, a second storm occurred
which caused water damage to the interior of the property.
The FSP accepted liability for the additional damage caused by the actions of its
contractors and offered to cash settle the Applicants for $4,045, being its
estimated cost of repairing the damage. However, the Applicants say that this
amount is insufficient to repair all of the additional damage caused by the second
storm.
1.2 Issue and key findings
Is the settlement offered by the FSP appropriate?
The available information (including the hygienist’s report) confirms that there is
no mould damage to the property. However, the information provided is not
sufficient to accurately determine the extent of the water damage resulting from
the storm, given the conflicting information provided by the parties.
In the circumstances, it is appropriate that the FSP be required to appoint an
independent building consultant to inspect the property and identify whether there
is any additional water damage to the insulation, ceilings and walls which has not
been included in the FSP’s final scope of works (on which the settlement amount
was based).
1.3 Determination
This Determination is partly in favour of the Applicants.
Within one month of the Applicants accepting this Determination, the FSP is to
make arrangements to finalise the scope of works and cash settle the Applicants
for the cost of repairing the damage to the property due to the storm in June 2014,
in accordance with the process set out in section 2.1 below.
Case No: 374897 Determination Page 2 of 6
2 Reasons for Determination
2.1 Is the settlement offered by the FSP appropriate?
Dispute concerns extent of damage caused by second storm
The FSP has accepted that it is liable for any additional damage to the Applicants’
property caused by the actions of its contractors in allowing water to enter the
property during the repair process. Accordingly, the sole issue in dispute is the
extent of the damage to the property due to the second storm in June 2014.
The FSP says that the additional damage caused by the storm in June 2014 is
limited to water damage to a section of the lounge room ceiling and the insulation
above that room.
The FSP also included in the cash settlement amount the cost of painting the
ceilings and cornices in the laundry, bathroom, bedroom 1 and bedroom 2.
However, it appears that the FSP agreed to cover the cost of these repairs as a
gesture of goodwill, rather than because it necessarily accepted that this damage
was due to the storm in June 2014.
The Applicants say that the damage caused by the second storm is far more
extensive than has been acknowledged by the FSP. They have provided a report
from their builder (M) confirming that all of the ceilings, insulation and perimeter
walls need to be replaced due to water damage suffered during the storm, at an
estimated cost of $37,500.
Exact circumstances in which damage occurred are unclear
The parties have provided conflicting information about how much of the roof
sheeting had been removed at the time of the storm.
The FSP says that only the sheeting above the lounge (at the front left side of the
property) had been removed. However, the Applicants say that around 80% of all
the roof sheets had been removed.
One of the primary concerns raised by the Applicants is that mould has developed
on the ceiling linings due to waterlogged insulation batts having been left in the
roof cavity following the storm.
The Applicants say that the insulation batts were saturated by the storm and were
not removed until two weeks later (and even then only partially). They say that
this has led to mould and moisture damage on the top side of the ceiling linings.
However, the FSP has provided copies of file notes from its builder (D) confirming
that the wet insulation batts were removed the day after the storm and the
remaining insulation batts were dry.
Based on the available information, it is not possible to determine which version of
events is correct. However, in the circumstances, I accept that it is possible that
(as the Applicants contend) the damage extended beyond the lounge room
ceiling.
Case No: 374897 Determination Page 3 of 6
Nevertheless, the onus remains on the Applicants to establish that the scope of
works proposed by the FSP (on which the cash settlement offer was based) is
insufficient to repair all of the damage caused by the storm.
Available information does not establish presence of mould
As noted above, the Applicants are concerned that the property has suffered
mould damage following the storm. The female Applicant suffers from a medical
condition which makes her particularly susceptible to the effects of mould.
After the Applicants raised their concerns, the FSP engaged a hygienist (P) to
determine whether there was any mould present. P attended the property on 10
October 2014 (approximately four months after the storm) and took air and
surface samples in a number of areas throughout the property.
Following testing of these samples, P confirmed that the mould levels at the
property were within normal environmental conditions and therefore no remedial
action was required. P noted that:
while the airborne sampling results showed a very high concentration of
indoor airborne mould, this was in fact lower than the outdoor concentration;
the main type of airborne spores present were a common environmental fungi
that typically fed on decaying organic matter and was not known to produce
toxins; and
the surface samples (including those taken in the north and south ceiling
spaces) showed (at most) low to very low concentrations of mould. No
detectable mould was identified in the lounge room, where significant volumes
of water had entered during the storm.
The Applicants remain convinced that there is mould growing in the ceiling space.
However, they have not provided any independent information which disputes the
results of P’s tests. The report provided by the Applicants’ builder (M) does not
identify any mould issues at the property.
The Applicants say that P did not inspect the whole of the roof space due to
access issues. However, P has confirmed that the samples taken in the north and
south areas were considered to be typical of mould levels throughout the roof
space.
Based on the available information, I am not satisfied that the Applicants have
established that there is any mould damage to the property.
Extent of water damage is unclear
The reports prepared by the FSP’s contractors following the storm confirm that
there were visible water stains to the ceilings in various rooms of the property.
These stains are visible in the photographs taken by the FSP’s builder (D) several
days after the storm.
D considered that these stains were pre-existing and unrelated to the storm.
Nevertheless, the FSP has agreed to cover the costs of re-painting the stains in
these areas.
Case No: 374897 Determination Page 4 of 6
However, the Applicants say that the damage caused by the storm in June 2014
is so extensive that all of the ceilings (as well as the insulation and the perimeter
walls) need to be completely replaced.
The Applicants have provided a report prepared by their builder (M) which states
that water entering the roof cavity during the storm has caused:
a loss of structural integrity of the gyprock core of the ceiling;
water staining to the ceilings and walls;
increased moisture within the walls due to the effects of capillary action; and
wet and deteriorated insulation throughout the property.
Having carefully reviewed the available information, I am not satisfied that it is
possible to accurately determine the extent of water damage caused by the storm.
T he FSP’s builder (D) considered the observed water damage to the ceilings to
be pre-existing. However, it appears that he reached this conclusion in part based
on information provided by the FSP’s roofing sub -contractor (O) about the extent
of roofing sheets which had been removed at the time of the storm. As noted
above, this information is strongly disputed by the Applicants.
Further, it is somewhat surprising that this water damage does not appear to have
been identified as pre-existing at the time the Applicants lodged their initial claim
for hail damage in April 2014. Accordingly, it is possible that the storm in June
2014 caused more extensive damage than has been recognised by the FSP to
date.
However, I am not satisfied that the water damage caused by the storm is as
extensive as identified by the Applicants’ builder (M). M’s report is exp ressed in
general terms and does not include any photographs to substantiate the claimed
damage.
The Applicants have consistently maintained that the scope of works initially
prepared by the FSP’s builder (D) is inadequate to repair the storm -related
damage. They are concerned that D has deliberately sought to minimise the
repairs required, because he (and not the FSP) is ultimately responsible for the
cost of these repairs.
The initial scope of works prepared by D was later expanded after the damage
was inspected by the FSP’s internal assessor (JM). In particular, JM increased the
area of the lounge room ceiling and insulation to be replaced and also
recommended that the FSP accept liability for the water damage to the lounge
room flooring.
Given that the additional damage to the property was caused by the FSP’s
contractors, and the initial scope of works appears to have been inadequate, it is
perhaps not surprising that the Applicants have lost faith in the FSP’s ability to
accurately assess the scope of the repairs required.
In these circumstances, in order to address the Applicants’ concerns, I consider
that the FSP should appoint an independent building consultant (who has not
been involved in the claim to date) to inspect the property and identify whether
Case No: 374897 Determination Page 5 of 6
there is any additional water damage to the insulation, ceilings and walls which
has not been included in the FSP’s final scope of works.
To the extent that any such damage is identified, the FSP is to:
obtain a quotation for the necessary repairs, based on a revised scope of
works to be prepared by the independent building consultant; and
cash settle the Applicants for an amount reflecting the increased quotation,
together with interest calculated at the rate determined in accordance with
section 57 of the Insurance Contracts Act 1984 from 27 October 2014 until the
payment date.
Case No: 374897 Determination Page 6 of 6
3 Supporting information
3.1 FOS approach to this dispute
As advised to the parties, FOS has considered it appropriate to expedite this
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference, due to the nature of the dispute. Accordingly, this dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other. All of the material provided by the parties has
been reviewed and considered for the purposes of this Determination.
This dispute has been decided on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
While the parties have raised numerous issues in their submissions, for the
purposes of this Determination, commentary has been restricted to those issues
considered directly relevant to the outcome only.
3.2 Conduct of FSP’s contractors
The Applicants have raised various concerns about the co nduct of the FSP’s
contractor (D) and sub-contractor (O) during the course of the claim.
Among other things, the Applicants say that D and O failed to respond to their
concerns about the damage caused by the second storm promptly and
appropriately. They also query whether O was properly qualified to carry out the
roof repairs.
As outlined above, the FSP has not disputed its liability for the failure of its
contractors to carry out the roof repairs in a manner which would protect the
Applicant’s property from further damage. The only issue in dispute is the extent
of the loss which the Applicants have suffered as a result.
Accordingly, as the specific issues raised by the Applicants will not affect the
outcome of this dispute, it is unnecessary to consider these issues any further.