The applicants claimed for additional water damage after a second storm during the FSP's contractor-led roof repairs. The FSP offered a $4,045 cash settlement and the applicants sought about $37,500. AFCA partly upheld the complaint, requiring an independent scope review and cash settlement with interest, and found no mould damage established.

Where the extent of storm damage cannot be accurately determined on conflicting evidence, an independent building consultant should reassess the scope before the cash settlement is calculated.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - Storm - FSP Decision - Scope of Repairs Determination Case No: 374897 Determination Page 1 of 6 Case number: 374897 7 April 201 5 1 Overview 1.1 Dispute In April 2014, the Applicants lodged a claim under their home insurance policy for damage to the roof of their property caused by a hail storm. The FSP accepted the claim and arranged for the roof repairs. In June 2014, the FSP’s contractors removed sections of the roof in order to carry out the repairs. Before the repairs could be completed, a second storm occurred which caused water damage to the interior of the property. The FSP accepted liability for the additional damage caused by the actions of its contractors and offered to cash settle the Applicants for $4,045, being its estimated cost of repairing the damage. However, the Applicants say that this amount is insufficient to repair all of the additional damage caused by the second storm. 1.2 Issue and key findings Is the settlement offered by the FSP appropriate? The available information (including the hygienist’s report) confirms that there is no mould damage to the property. However, the information provided is not sufficient to accurately determine the extent of the water damage resulting from the storm, given the conflicting information provided by the parties. In the circumstances, it is appropriate that the FSP be required to appoint an independent building consultant to inspect the property and identify whether there is any additional water damage to the insulation, ceilings and walls which has not been included in the FSP’s final scope of works (on which the settlement amount was based). 1.3 Determination This Determination is partly in favour of the Applicants. Within one month of the Applicants accepting this Determination, the FSP is to make arrangements to finalise the scope of works and cash settle the Applicants for the cost of repairing the damage to the property due to the storm in June 2014, in accordance with the process set out in section 2.1 below. Case No: 374897 Determination Page 2 of 6 2 Reasons for Determination 2.1 Is the settlement offered by the FSP appropriate? Dispute concerns extent of damage caused by second storm The FSP has accepted that it is liable for any additional damage to the Applicants’ property caused by the actions of its contractors in allowing water to enter the property during the repair process. Accordingly, the sole issue in dispute is the extent of the damage to the property due to the second storm in June 2014. The FSP says that the additional damage caused by the storm in June 2014 is limited to water damage to a section of the lounge room ceiling and the insulation above that room. The FSP also included in the cash settlement amount the cost of painting the ceilings and cornices in the laundry, bathroom, bedroom 1 and bedroom 2. However, it appears that the FSP agreed to cover the cost of these repairs as a gesture of goodwill, rather than because it necessarily accepted that this damage was due to the storm in June 2014. The Applicants say that the damage caused by the second storm is far more extensive than has been acknowledged by the FSP. They have provided a report from their builder (M) confirming that all of the ceilings, insulation and perimeter walls need to be replaced due to water damage suffered during the storm, at an estimated cost of $37,500. Exact circumstances in which damage occurred are unclear The parties have provided conflicting information about how much of the roof sheeting had been removed at the time of the storm. The FSP says that only the sheeting above the lounge (at the front left side of the property) had been removed. However, the Applicants say that around 80% of all the roof sheets had been removed. One of the primary concerns raised by the Applicants is that mould has developed on the ceiling linings due to waterlogged insulation batts having been left in the roof cavity following the storm. The Applicants say that the insulation batts were saturated by the storm and were not removed until two weeks later (and even then only partially). They say that this has led to mould and moisture damage on the top side of the ceiling linings. However, the FSP has provided copies of file notes from its builder (D) confirming that the wet insulation batts were removed the day after the storm and the remaining insulation batts were dry. Based on the available information, it is not possible to determine which version of events is correct. However, in the circumstances, I accept that it is possible that (as the Applicants contend) the damage extended beyond the lounge room ceiling. Case No: 374897 Determination Page 3 of 6 Nevertheless, the onus remains on the Applicants to establish that the scope of works proposed by the FSP (on which the cash settlement offer was based) is insufficient to repair all of the damage caused by the storm. Available information does not establish presence of mould As noted above, the Applicants are concerned that the property has suffered mould damage following the storm. The female Applicant suffers from a medical condition which makes her particularly susceptible to the effects of mould. After the Applicants raised their concerns, the FSP engaged a hygienist (P) to determine whether there was any mould present. P attended the property on 10 October 2014 (approximately four months after the storm) and took air and surface samples in a number of areas throughout the property. Following testing of these samples, P confirmed that the mould levels at the property were within normal environmental conditions and therefore no remedial action was required. P noted that:  while the airborne sampling results showed a very high concentration of indoor airborne mould, this was in fact lower than the outdoor concentration;  the main type of airborne spores present were a common environmental fungi that typically fed on decaying organic matter and was not known to produce toxins; and  the surface samples (including those taken in the north and south ceiling spaces) showed (at most) low to very low concentrations of mould. No detectable mould was identified in the lounge room, where significant volumes of water had entered during the storm. The Applicants remain convinced that there is mould growing in the ceiling space. However, they have not provided any independent information which disputes the results of P’s tests. The report provided by the Applicants’ builder (M) does not identify any mould issues at the property. The Applicants say that P did not inspect the whole of the roof space due to access issues. However, P has confirmed that the samples taken in the north and south areas were considered to be typical of mould levels throughout the roof space. Based on the available information, I am not satisfied that the Applicants have established that there is any mould damage to the property. Extent of water damage is unclear The reports prepared by the FSP’s contractors following the storm confirm that there were visible water stains to the ceilings in various rooms of the property. These stains are visible in the photographs taken by the FSP’s builder (D) several days after the storm. D considered that these stains were pre-existing and unrelated to the storm. Nevertheless, the FSP has agreed to cover the costs of re-painting the stains in these areas. Case No: 374897 Determination Page 4 of 6 However, the Applicants say that the damage caused by the storm in June 2014 is so extensive that all of the ceilings (as well as the insulation and the perimeter walls) need to be completely replaced. The Applicants have provided a report prepared by their builder (M) which states that water entering the roof cavity during the storm has caused:  a loss of structural integrity of the gyprock core of the ceiling;  water staining to the ceilings and walls;  increased moisture within the walls due to the effects of capillary action; and  wet and deteriorated insulation throughout the property. Having carefully reviewed the available information, I am not satisfied that it is possible to accurately determine the extent of water damage caused by the storm. T he FSP’s builder (D) considered the observed water damage to the ceilings to be pre-existing. However, it appears that he reached this conclusion in part based on information provided by the FSP’s roofing sub -contractor (O) about the extent of roofing sheets which had been removed at the time of the storm. As noted above, this information is strongly disputed by the Applicants. Further, it is somewhat surprising that this water damage does not appear to have been identified as pre-existing at the time the Applicants lodged their initial claim for hail damage in April 2014. Accordingly, it is possible that the storm in June 2014 caused more extensive damage than has been recognised by the FSP to date. However, I am not satisfied that the water damage caused by the storm is as extensive as identified by the Applicants’ builder (M). M’s report is exp ressed in general terms and does not include any photographs to substantiate the claimed damage. The Applicants have consistently maintained that the scope of works initially prepared by the FSP’s builder (D) is inadequate to repair the storm -related damage. They are concerned that D has deliberately sought to minimise the repairs required, because he (and not the FSP) is ultimately responsible for the cost of these repairs. The initial scope of works prepared by D was later expanded after the damage was inspected by the FSP’s internal assessor (JM). In particular, JM increased the area of the lounge room ceiling and insulation to be replaced and also recommended that the FSP accept liability for the water damage to the lounge room flooring. Given that the additional damage to the property was caused by the FSP’s contractors, and the initial scope of works appears to have been inadequate, it is perhaps not surprising that the Applicants have lost faith in the FSP’s ability to accurately assess the scope of the repairs required. In these circumstances, in order to address the Applicants’ concerns, I consider that the FSP should appoint an independent building consultant (who has not been involved in the claim to date) to inspect the property and identify whether Case No: 374897 Determination Page 5 of 6 there is any additional water damage to the insulation, ceilings and walls which has not been included in the FSP’s final scope of works. To the extent that any such damage is identified, the FSP is to:  obtain a quotation for the necessary repairs, based on a revised scope of works to be prepared by the independent building consultant; and  cash settle the Applicants for an amount reflecting the increased quotation, together with interest calculated at the rate determined in accordance with section 57 of the Insurance Contracts Act 1984 from 27 October 2014 until the payment date. Case No: 374897 Determination Page 6 of 6 3 Supporting information 3.1 FOS approach to this dispute As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this Determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, commentary has been restricted to those issues considered directly relevant to the outcome only. 3.2 Conduct of FSP’s contractors The Applicants have raised various concerns about the co nduct of the FSP’s contractor (D) and sub-contractor (O) during the course of the claim. Among other things, the Applicants say that D and O failed to respond to their concerns about the damage caused by the second storm promptly and appropriately. They also query whether O was properly qualified to carry out the roof repairs. As outlined above, the FSP has not disputed its liability for the failure of its contractors to carry out the roof repairs in a manner which would protect the Applicant’s property from further damage. The only issue in dispute is the extent of the loss which the Applicants have suffered as a result. Accordingly, as the specific issues raised by the Applicants will not affect the outcome of this dispute, it is unnecessary to consider these issues any further.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.