Hydraulic failure after fire repairs; claim for further costs and write-off refused
Text of the determination
Determination
General Insurance - Small Business/Farm Insurance - Commercial Property - FSP
Decision - Denial of Claim - Exclusion/Condition - Service - Service Quality
Determination
Case No: 374516 Recommendation Page 1 of 13
Case number: 374516 2 9 April 2015
1 Overview
1.1 Dispute
The Applicant holds a rural plan policy of insurance (the Policy) with the Financial
Services Provider (FSP). It provides comprehensive cover to a harvesting
machine. On 7 June 2013 a fire event damaged the machine. The FSP elected to
repair the machine and it was returned to the Applicant on 21 September 2013.
The harvesting machine‟s hydraulics repeatedly failed and the Applicant sought
the cost of additional repairs and other costs associated with the machine failure.
The FSP has declined the Applicant‟s claim on the basis the machine failure does
not relate to the original fire damage or repairs.
1.2 Issues and key findings
Was the Applicant entitled to claim for the additional costs to repair the
hydraulic system?
As the FSP elected to repair the machine, it must ensure the repairs were
properly completed. Substantial repairs were undertaken to the hydraulic system
on a number of occasions yet there was a total failure of the hydraulic system.
Substantial allegations were made against the repairer and yet no direct rebuttal
evidence has been adduced from the repairer. The FSP‟s forensic fire expert says
the fire damaged the hydraulic system. The FSP‟s mechanical engineer says
vegetable debris did not destroy the hydraulic pumps yet the FSP‟s experts are
unable to establish the cause of the hydraulic failure.
The Applicant is therefore entitled to many of the claims made but the machine is
not a write-off as the future viability of the machine can be managed with a
program of oil testing as described by the FSP‟s expert. The performance of the
machine since the recent hydraulic service supports the contention the machine is
viable.
Is the Applicant entitled to costs?
The FSP is liable for the alteration to the engine cowl, but the Applicant must
substantiate the costs claimed.
There is no dispute that the fire extinguisher should be replaced and the available
evidence establishes it can be replaced for $50.
Case No: 374516 Determination Page 2 of 13
The available evidence does not establish the damage to the fan/blower
discharge unit was caused by the fire event or repairs.
The FSP is not obliged to pay compensation, due to the machine down time, as it
did not know of the difficulties with the machine until July 2014.
An award of compensation is not justified as no substantiation has been provided
and the investigations undertaken by the FSP were appropriate and timely.
1.3 Determination
This Determination is substantially in favour of the Applicant.
If the Applicant accepts the Determination, then within seven days of acceptance
the FSP is required to pay to the Applicant:
$5,313.17 for the cost of repairing the hydraulics in July 2014
$5,000 which includes the $853.44 for the cost of the recent ser vice
undertaken by W and future costs to ensure the viability of the machine, being
costs attributable to the fire or subsequent repairs
$1,200 for the alteration to the engine cowl but only upon provision of an
invoice to substantiate this part of the claim
$50 to replace the fire extinguisher
For the cost of the recent report from W, providing this cost is substantiated by
the Applicant
Save for the $5,000, the FSP is also to pay statutory interest on any of the
above sums which are already paid by the Applicant from the date of payment
by the Applicant until settlement.
The FSP is not required to write off the machine or pay the Applicant for:
damage to the fan blower discharge
costs accrued due to harvester down time
other compensation
Case No: 374516 Determination Page 3 of 13
2 Reasons for Determination
2.1 Was the Applicant entitled to claim for additional costs to repair
the hydraulic system?
FSP elected to repair the machine and must ensure the repairs were
properly completed
The original assessor report has not been provided in relation to the FSP‟s
election to repair or write-off the machine. However, it is not in dispute that the
FSP elected to repair the harvesting machine and authorised the repairs.
It is noted the main agent of the manufacturer in Australia is MA. The Applicant
purchased the harvesting machine from MA and MA remained the Applicant‟s
ordinary servicer/repairer. Accordingly it appears the FSP approved MA as the
repairer and authorised repairs by MA on this basis.
In those circumstances, the FSP must ensure the repairs are properly completed
and that the machine is returned to the condition it was in before the fire.
FSP’s expert ev idence will be considered in this Determination
The Applicant‟s concerns about the professional qualifications of the FSP‟s
experts have been noted. However, the Panel considers these experts have
appropriate qualifications in the field of mechanical engineering, hydraulics and
forensic services to form an opinion and it would not be appropriate to fail to take
regard of their opinions.
Other observations about the opinions of the FSP‟s experts will be made in the
body of this Determination.
Forensic evidence demonstrates the fire damaged the hydraulic system
The Applicant contends the hydraulic hoses were breached in the fire on 7 June
2013 and contaminants drawn in. The FSP‟s fire forensics expert KS inspected
the machine on17 June 2013 and confirmed the fire was a genuine insured event.
He noted “substantial fire damage within the machinery bay”. He also confirmed
both fuel supply line and hydraulic hoses sustained breaches.
The assessor (RS) also saw the machine after the fire with KS, but the Panel
does not have a contemporaneous report to know what views RS held then.
When RS saw the machine again on 31 July 2014 it had been repaired already by
MA. RS inspected the machine on this second occasion with MA and accepted
what he was told by MA; namely that the hoses and pipes had not burnt through
and so a contaminant from the fire could not have entered the hydraulic system in
that manner.
RS suggests th at KS the FSP‟s forensic fire expert was mistaken due to the
amount of damage. However the Panel notes that KS specifically notes the
presence of both hydraulic oil and diesel fuel. Further, KS is appropriately
qualified to note the difference, despite the fire damage. Given this, the Panel
Case No: 374516 Determination Page 4 of 13
accepts that the hydraulic systems were in fact breached by the fire damage. This
conclusion is also supported by the fact that the repair invoices outline significant
repairs involving hydraulic components.
This places doubt on RS‟s opinion that the hydraulic system was not breached
and any conclusions subsequently drawn by the FSP on this basis.
Allegations made about MA not directly rebutted by MA
Further there is no direct evidence from MA regarding how the repair to the
hydraulic system was conducted. This is concerning given the Applicant‟s various
allegations against MA, how he repaired the machine, what components he used,
what experience he had to undertake the significant fire damage repairs and the
environment in which the repair was conducted.
RS also says that the various hydraulic components are on the opposite side of
the machine to the fire. The Panel accepts this but does not accept that this
establishes that the fire or subsequent repairs are not the cause of the hydraulic
failure or contamination of the hydraulic system, as the fire damage was
significant and the hydraulic system is pervasive throughout the machine.
Expert evidence does not establish the cause of the hydraulic failure but
confirmed a total failure of the hydraulic system
RS reports that MA believed organic material within the system was the primary
reason for the pumps failure which have a tolerance of only three microns. MA is
recorded as stating that the build-up of organic material around the shafts can
harden like straw and wear away the hydraulic motors oil seal or can be forced
under the seal and enter the hydraulic system. Again, there is no direct report
from MA and it is unclear how long the organic material would take to harden and
wear down the seal or if this constitutes the „ glittering substance ‟ viewed in the oil.
This is important considering the servicing conducted on 28 February 2014 should
have noted such an issue. The Applicant notes this issue did occur to another
vehicle he had repaired by MA and asserts the organic material produced by MA
was from this vehicle. MA is not asked to comment. The Applicant‟s assertion has
some force given RS‟s statement that there were no contaminants in the system
when the hydraulic valves were replaced and fitted under warranty in May 2014.
RC doubts vegetable matter caused the destruction of the pumps
In any event, the FSP‟s other expert RC says in his report that he is sceptical the
vegetable based debris caused the destruction of both pumps.
RS reports that MA was „at a loss‟ to explain how the material entered the system
without direct intervention. MA then appears to suggest it has to do with a
replacement hydraulic motor but MA denies it replaced the said motor.
RS says that the motor has a serial number that supports the contention that the
motor was not fitted when the machine was built as it was manufactured in the
45 th week of 2012.
Case No: 374516 Determination Page 5 of 13
The Applicant agrees that not all hydraulic motors are original and says it was MA
who replaced it when the machine was owned by MA and being utilised for
demonstration purposes. But the Applicant also says he bought the machine from
MA in September 2012 which is before the 45 th week in 2012.
The Applicant says that MA did all the work on the machine as it was under
warranty. For example, he produced an invoice from MA for the supply of a
hydraulic motor for this machine on 26 April 2013. This shows a hydraulic motor
was replaced in the right brush.
The Applicant says he did not perform any works to the machine including topping
up the hydraulic oil, as he does not have such specialised equipment to perform
such works in any event. The Applicant says the replacement motor in question
was not replaced by him. He believes MA did this work.
The Applicant also says that says he spoke to the importing agent who advised
the motor was not imported into Australia but must have come in on a machine.
That is, the Applicant could not have purchased the motor. The Applicant also
says that when MA did not have sufficient stock to repair a machine, he would use
material from other machines.
There is no report or statement from MA to clarify this issue further.
Probable MA performed all work to the hydraulics
Moreover, the machine was under warranty with MA who was obliged to conduct
repairs, and the machine and parts are imported from Italy by MA. It is
counterintuitive to suggest the Applicant arranged another person to conduct such
works at his personal cost. Accordingly the Panel accepts that MA has performed
all work to the hydraulics before and after the fire repair.
RS also concludes that the failure of the pumps was not to be attributed to the fire
event or the repairs carried out after the fire as it is highly unlikely that the
machine would manage to work for in excess of 350 hours if contaminants were
present in the hydraulic system after the repairs.
The hydraulic expert, RC, has the same vie w. RC believes the time scale from the
fire repair to July 2014 is too long for the hydraulics failures to be related to fire
damage. He says that ordinarily a hydraulic pump will fail in operation in 1-2 hours
but this harvester had 325 hours of service before the failure. RC concludes these
failures could not be directly related to the fire of 2013 or subsequent repairs.
RC notes that the debris discovered in the hydraulic oil is relative ly small and
should be readily removed by the filters. However, the presence of this debris
opened up the possibility debris was entering the hydraulic circuit. RC could not
confirm how this occurred as the relevant parts had been sent to Italy by MA, to
the manufacturer. This prevented RC from determining the cause of the failure.
RC noted that hydraulic pumps are intolerant of even fine debris if exposed to this
for a long time and it could result in the total destruction of the hydraulic pumps.
However, RC does not indicate a time frame during which fine debris could cause
the total destruction of the hydraulic pumps. RC also does not hypothesise on
how the hydraulic circuit may have been open, such as to allow debris entry.
Case No: 374516 Determination Page 6 of 13
The material establishes there were multiple hydraulic failures after the fire and
the fire repairs between September 2013 and July 2014. The Applicant says the
first failure occurred to the hydraulic conveyor belt due to overheating after only 8
hours work.
He says that up until 20 November 2013 the machine only performed 7 days
harvesting work because of various issues.
It appears the machine then performed little to no work (in the off-season) before
undergoing a service on 28 February 2014 prior to the harvest season. The
service work appears to be unrelated to the hydraulic system other than “a check
of hydraulic pressures.”
The machine had hydraulic issues again commencing in the first week of March
2014 and then a number of further hydraulic issues before it completely failed on
4 July 2014. The Applicant‟s assertion about the theoretical life of new pumps is
unchallenged. That is, that the pumps, replaced as part of the fire damage, should
last at least 7000 hours but have only lasted approximately 325 hours.
RC unable to explain the cause of the failure
Whilst the Panel accepts the evidence of RC that hydraulic failures would
ordinarily occur 1-2 hours after commencing operation, RC has also been unable
to explain the presence of the debris or the cause of the failure so soon after
repairs due to the removal and despatch of those parts by MA to Italy.
The original and subsequent repair works do establish that substantive works
were completed to the hydraulic systems. However, there is no rebuttal evidence
from MA to the Applicant‟s assertions about the repairs and about the use of
components from other machines to complete the repairs.
There is no persuasive explanation by the experts of the repeated hydraulic
systems failures experienced since the fire repairs were conducted. The
harvesting machine has not been placed back into the pre -fire working condition.
This prevents the machine from being used for its intended purpose of harvesting.
It is noted that MA has had several attempts to repair the machine which has still
not been put back into the condition it was prior to the loss. Further, the Panel has
concerns that parts that specifically fit the machine were not available – such as
the engine cowl and perhaps some hydraulic system components.
Applicant should not be penalised because pumps returned to Italy
Whilst the FSP was not aware of the ongoing issues , it is doubtful the FSP would
not have returned the machine to the same repairer, given MA is the only
manufacturer approved repairer in Australia. Accordingly, it is not accepted that
the return of the machine by the Applicant to the repairer has prejudiced the FSP.
Further, the return of the pumps to Italy by MA was not necessarily at the
instigation of the Applicant and while the Panel accepts that the absence of same
pumps has caused evidentiary difficulties, the Panel considers the Applicant
should not be penalised because of these issues.
Case No: 374516 Determination Page 7 of 13
On the available material and for the reasons stated, the Panel is persuaded that
on the balance of probabilities the hydraulics failed because of the fire event or
the subsequent many and significant repairs done by MA.
Therefore the FSP is liable to pay for the costs of repairing the hydraulics in July
2014 in the sum of $5,313.17.
Future viability of machine can be managed with program of oil testing
The Applicant has expressed concerns that the value of the machine has been
diminished as a result of the fire event and the subsequent repairs. He is further
concerned that the repairs done by MA are not guaranteed and that this may
impact the resale value of the machine. He has also expressed concern about
ongoing costs if the contamination is a continuing problem.
RS reported that MA advised that it would not provide a warranty concerning the
hydraulic repairs unless the hydraulic motors that drive the wheels are checked;
that is, that seals and bearings are checked so that there is no grass or vegetation
wrapped around these shafts that would enter the system and re-contaminate the
system. The Applicant was unwilling to pay for the additional labour that would be
required to check the condition of the road wheel hydraulic motor pumps.
The Applicant talked to RC about his concerns about the viability of the machine.
RC recommended that a program of oil testing should be undertaken. In his report
dated 16 October 2014 RC said:
“A program of oil testing should be undertaken such that a sampl e of hydraulic oil
… should be sent to a reputable oil testing laboratory after the harvester has
accumulated 10 hours of service. Tests should be undertaken to look for wear
metals. If the results of this 10 hour test are within acceptable limits, then another
test should be done after a further 20 hours and again, if this provides acceptable
results, a final test should be performed after a further 50 hours. The hydraulic filter
should be changed after each test and the hydraulic oil should be changed in
accordance with the manufacturer‟s recommendations.”
Recent material provided shows that the Applicant engaged W to provide a full
hydraulic service as recommended by RC. The recent material also shows the oil
tester recommended the Applicant “continue sampling at the recommended
interval”. And it was noted “more samples are needed to establish a trend.”
The cost of the service undertaken by W was $853.44. The Applicant has not
provided information about the cost of the oil sample.
In a recent email, the Applicant says that:
“We have now done in excess of 41 hours harvesting since W replaced the oil and
filters without any indication of hydraulic problems…”
In view of the recent hydraulic service conducted by W, and the Applicant‟s advice
that there are no further indications of hydraulic problems after the service, it is
likely that future problems about the viability of the machine may have abated, just
as long as the machine is serviced and oil samples taken as recommended by
RC.
Case No: 374516 Determination Page 8 of 13
The machine is no longer under warranty. The FSP‟s policy does not provide a
Lifetime Guarantee as the repairs were not undertaken by a preferred repairer.
However due to the unique nature of the machine, the preferred repairer benefits
in the policy could not be implemented by the FSP. Nonetheless, the Panel
considers that as the FSP authorised the repairs, it must ensure the repairs were
done properly and that may include future work to ensure the viability of the
machine.
MA will not provide a guarantee and the Panel cannot compel MA to provide a
guarantee.
Machine not a write-off
Taking into account the estimated cost of the additional labour that would be
required to check the condition of the road wheel hydraulic motor pumps, the cost
of the hydraulic service just conducted by W, the cost of the oil sample recently
provided to W and the recommendations by RC about the future work that is
required to guarantee the viability of the machine, the Panel considers it is fair in
all the circumstances that the FSP pay the Applicant a further $5,000 in lieu of a
guarantee for the work undertaken by MA.
2.2 Is the Applicant entitled to other items claimed?
Engine cowl does not match the make of the harvester
There is no dispute between the parties that the engine cowl does not actuall y
match the make of the harvester. A rubber strip has been installed to prevent the
larger gap created by this from blowing extremely hot air onto the driver‟s seat of
the harvester.
It is unclear whether the rubber strip will need replacement on a regula r basis due
to the extreme heat of the air blown from the engine bay and whether this fix will
work long term. It is also unknown whether the gap goes the full way around the
engine bay and/or would let additional debris into the engine bay.
Given the fact that the engine cowl was not properly fitted as it is not an original
manufacturer ‟s part, the FSP is liable for the cost of the rubber stripping fitted to
the machine.
However, the Applicant should properly quantify the cost of the claimed alteration.
He claimed it would cost $1,200 to modify the cover. The FSP indicated it would
pay $1,200 to enable the Applicant have this alteration performed but required an
invoice to substantiate this part of the claim.
The Panel considers that the FSP is liable for the alteration as the original
manufacturer cowl part was not used and the repair is not satisfactory. However
the Applicant must substantiate the cost of this part of the claim.
Case No: 374516 Determination Page 9 of 13
No dispute that the fire extinguisher should be replaced
There is no dispute that the fire extinguisher should be replaced. The assessor
has provided evidence that the replacement cost plus brackets to affix the fire
extinguisher is no more than $50 and the Panel accepts this calculation.
The FSP is to pay the cost of $50 to rep lace the fire extinguisher.
Damage to the fan/blower discharge unit probably not caused by insured
event or repairs
There is evidence that during the fire damage repairs the fan/blower discharge
valve was repaired. Even if the Panel accepts the Applicant‟s contention that
there may have been a design flaw to this item, the claimed damage still needs to
be linked to the fire or the fire repairs in order to establish an entitlement to claim
under the policy and the material provided does not establish this link.
There is no compelling evidence explaining how this item became subsequently
damaged after it was repaired and whether it is linked to harvesting work or
another method of damage.
Accordingly, the FSP is not liable for the claimed damage to this par t of the
machine as a result of the fire event or subsequent repairs. As the policy is an
accidental damage policy, it may respond to a further claim but a further excess
would be payable.
FSP unaware of the costs accruing due to harvester downtime as the
Applicant did not inform it until 21 July 2014
The Applicant commenced having issues with the harvesting machine as early as
20 November 2013 but did not report these issues to the FSP until 21 July 2014.
Accordingly, the FSP was unaware of the downtime experienced by the
harvesting machine and unable to consider what appropriate steps should be
taken so should not be liable for this cost.
Award of compensation not justified
The Applicant also claims the FSP took over a month to advise him that he had to
prove the hydraulic problem was related to the fire claim. He says that as a result
of this delay he incurred excessive downtime and delays due to non-supply of
parts required to keep the other harvester running. He claims compensation for
loss of use due t o the FSP‟s inaction and delay.
The material shows that the claim was made on or about 21 July 2014. The FSP
arranged for its assessor to investigate the matter. The assessor re- attended MA
on 31 July 2014. On the basis of that report, the FSP denied the claim on 6
August 2014.
As the Applicant disputed the decision, the FSP appointed a mechanical
engineer, RC, to provide it with a report and RC began his investigation with a
discussion with the Applicant on 1 October 2014. RC provided a report within a
few weeks. Based on that report the claim was denied again on 17 October 2014.
Case No: 374516 Determination Page 10 of 13
Under the Terms of Reference, FOS may decide that an FSP compensate an
Applicant for consequential financial loss or non-financial loss as a result of a
claim. However an Applicant must substantiate the financial loss and no
substantiation has been provided.
Further, FOS will only consider compensation for non-financial loss where there
has been an unusual degree or extent of physical inconvenience and time taken
to resolve the situation.
FOS takes a conservative approach to the award of compensation. FOS expects
an applicant to be moderately robust and bear the usual stress and inconvenience
which arises in the course of an insurance claim. This includes the time spent in
responding to the FSP in the claim and in the dispute.
Having considered all the material, the Panel considers that the investigations
undertaken by the FSP were appropriate in the circumstances and were
completed without undue delay.
For the reasons outlined, the Panel considers that an award of compensation is
not justified in all the circumstances of the claim and the dispute.
Cost of report from W justified upon proof
The Applicant also claims for cost of reports. FOS may decide that the FSP
contribute to professional costs incurred by an Applicant in the course of a
dispute. Essentially, the Applicant has been his own advocate and expert in this
dispute. The only report provided by the Applicant is a service inspection report
from W dated 20 January 2015.
Having considered the report, the Panel considers that it is fair in all the
circumstances that the FSP pay for the cost of this report (if any) as the Applicant
presented this expert information from W to respond to arguments raised by the
FSP‟s experts.
However the Applicant must establish that he has paid W for the report. If he
wishes to persist with the claim he must provide proof of the cost of the report
from W. Providing the FSP is presented with satisfactory proof of the cost of the
report from W, the FSP is to pay the Applicant for the cost of W‟s report.
The correspondence between the parties in this dispute indicates other claims
made by the Applicant but as substantive proof is not presently adduced that the
other claims relate to the fire event or the subsequent repairs, this Determination
does not address those claims.
Case No: 374516 Determination Page 11 of 13
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference.
This decision has been made by a Panel. The Panel consists of an Ombudsman
and two representatives with consumer and insurance experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised a number of issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
3.2 Extract Policy Wording
“General condi tions
…
What you must and must not do if you make a claim or an event happens that might
lead to you making a claim
You must
..
- Immediately tell Us about the claim or the event and send Us written details
when We require this
..
You must not without Our prior consent
..
- Repair or dispose of any damaged property until We have had the opportunity
to inspect it.
..
What can affect Your entitlements
..
- If You do not do what You are obliged to do under Your policy, We may refuse
to pay a claim or any part of it.
…
You are not insured under section 1 and 2 of this policy against:
1. Wear, tear, corrosion, rust or gradual deterioration.
2. A structural failure, mechanical, electrical, electronic or hydraulic breakdown,
failure of breakage.
…
4. loss of use except as specifically provided in this policy or shown on the
Certificate of Insurance.”
Case No: 374516 Determination Page 12 of 13
3.3 Repair Invoices
Repairer and date of invoice Works Performed
MA “Authorised agent of the
manufacturer”
26 April 2013 (due date 3 May
2013)
Fitted 1 hydraulic motor for right brush $537.50 .
MA
12 July 2013 (although due
date is 23 September 2013)
Transported machine from farm to workshop.
60 hours of labor was performed.
Hydraulic oil ($780), engine oil and coolant are
listed together with filters and return/suction
cartridges.
Cost of works: $6,611.77 (GST inclusive).
MA 16 July 2013 (due date 19
July 2013)
Complete wiring harness, steering valve, air filters,
pre - filters, clamp and fuel hose were provided.
There is significant work to the hydraulic system
performed including replacing 10 hydraulic hoses,
and the hydrostatic pump and work pump.
The engine hood, cable, water tank, turbine and
seat as well as air freight are noted.
The cost of works is $31,245.98 (GST inclusive).
It is also noted that “the extent of the damage to
the engine was unable to be assessed at this
stage” and if a new turbo engine was required it
would cost around $12,126.40 and if a new radiator
was required the cost is $1,926.
MA
4 September 2013 (due date
also 23 September 2013)
Significant work is performed to hydraulic hoses
and fittings. 23 hydraulic fittings are replaced and
15 hydraulic hoses are replaced. (The new hoses
have different numbers to the hoses fitted in July
2013).
5 hydraulic hoses are fitted as per invoice 16826.
Invoice not produced by either party).
The only other works noted are the starter motor,
fan, flange, ECU and writing charge, freight of ECU
and Yanmar parts.
The cost of works was $5,031.63 (GST Inclusive).
MA
19 February 2014 (due date 28
February 2014)
15 hours spent on full machine service prior to
harvest season.
Work was conducted to the bearings, rollers and
air filters and transmission chain.
“Checked hydraulic pressures, recorded.”
The cost of works was $1,527.48.
MA
19 February 2014 (due date 28
February 2014)
Additional invoice for the cost of $415.80 (GST
inclusive) for “yellow paddle and rubber blade
(brush).
MA
7 July 2014 (due date 18 July
2014)
The works describe parts including return/suction
cartridges, hydraulic oil, hydrostatic pump, working
pump and priority valve.
(Save for the priority valve, these parts were in the
invoices 12 and 16 July 2013).
The cost was $5,313.17 (GST incl usive).
Case No: 374516 Determination Page 13 of 13
3.4 Other supporting information
Policy schedules.
Photographs.
FSP‟s expert reports and letters .
MA completion report.
W service inspection report and invoice.
Oil analysis 20 January 2015.
Various submissions of and correspondence from the parties.