Hydraulic failure after fire repairs; claim for further costs and write-off refused

FirmFinancial Firm (Unknown - Insurer)
Decided2015-05-13
ProductGeneral Insurance · Other general
OutcomeFor the complainant in part
Amount awarded$11,563
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's harvesting machine was damaged by fire and repaired by the FSP's nominated repairer, after which its hydraulics repeatedly failed and the FSP declined further costs. AFCA found the hydraulic failure linked to the fire repairs and ordered $11,563.17 in repair, cowl, extinguisher and $5,000 in lieu of guarantee payments plus statutory interest, but refused write-off, downtime and fan/blower claims.

Where the insurer elects repair it must ensure repairs are properly completed, and the claimant need only establish on balance the link between the fire repairs and the loss.

Issues

Subjects and remedies

pay claimpay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of Claim - Exclusion/Condition - Service - Service Quality Determination Case No: 374516 Recommendation Page 1 of 13 Case number: 374516 2 9 April 2015 1 Overview 1.1 Dispute The Applicant holds a rural plan policy of insurance (the Policy) with the Financial Services Provider (FSP). It provides comprehensive cover to a harvesting machine. On 7 June 2013 a fire event damaged the machine. The FSP elected to repair the machine and it was returned to the Applicant on 21 September 2013. The harvesting machine‟s hydraulics repeatedly failed and the Applicant sought the cost of additional repairs and other costs associated with the machine failure. The FSP has declined the Applicant‟s claim on the basis the machine failure does not relate to the original fire damage or repairs. 1.2 Issues and key findings Was the Applicant entitled to claim for the additional costs to repair the hydraulic system? As the FSP elected to repair the machine, it must ensure the repairs were properly completed. Substantial repairs were undertaken to the hydraulic system on a number of occasions yet there was a total failure of the hydraulic system. Substantial allegations were made against the repairer and yet no direct rebuttal evidence has been adduced from the repairer. The FSP‟s forensic fire expert says the fire damaged the hydraulic system. The FSP‟s mechanical engineer says vegetable debris did not destroy the hydraulic pumps yet the FSP‟s experts are unable to establish the cause of the hydraulic failure. The Applicant is therefore entitled to many of the claims made but the machine is not a write-off as the future viability of the machine can be managed with a program of oil testing as described by the FSP‟s expert. The performance of the machine since the recent hydraulic service supports the contention the machine is viable. Is the Applicant entitled to costs? The FSP is liable for the alteration to the engine cowl, but the Applicant must substantiate the costs claimed. There is no dispute that the fire extinguisher should be replaced and the available evidence establishes it can be replaced for $50. Case No: 374516 Determination Page 2 of 13 The available evidence does not establish the damage to the fan/blower discharge unit was caused by the fire event or repairs. The FSP is not obliged to pay compensation, due to the machine down time, as it did not know of the difficulties with the machine until July 2014. An award of compensation is not justified as no substantiation has been provided and the investigations undertaken by the FSP were appropriate and timely. 1.3 Determination This Determination is substantially in favour of the Applicant. If the Applicant accepts the Determination, then within seven days of acceptance the FSP is required to pay to the Applicant:  $5,313.17 for the cost of repairing the hydraulics in July 2014  $5,000 which includes the $853.44 for the cost of the recent ser vice undertaken by W and future costs to ensure the viability of the machine, being costs attributable to the fire or subsequent repairs  $1,200 for the alteration to the engine cowl but only upon provision of an invoice to substantiate this part of the claim  $50 to replace the fire extinguisher  For the cost of the recent report from W, providing this cost is substantiated by the Applicant  Save for the $5,000, the FSP is also to pay statutory interest on any of the above sums which are already paid by the Applicant from the date of payment by the Applicant until settlement. The FSP is not required to write off the machine or pay the Applicant for:  damage to the fan blower discharge  costs accrued due to harvester down time  other compensation Case No: 374516 Determination Page 3 of 13 2 Reasons for Determination 2.1 Was the Applicant entitled to claim for additional costs to repair the hydraulic system? FSP elected to repair the machine and must ensure the repairs were properly completed The original assessor report has not been provided in relation to the FSP‟s election to repair or write-off the machine. However, it is not in dispute that the FSP elected to repair the harvesting machine and authorised the repairs. It is noted the main agent of the manufacturer in Australia is MA. The Applicant purchased the harvesting machine from MA and MA remained the Applicant‟s ordinary servicer/repairer. Accordingly it appears the FSP approved MA as the repairer and authorised repairs by MA on this basis. In those circumstances, the FSP must ensure the repairs are properly completed and that the machine is returned to the condition it was in before the fire. FSP’s expert ev idence will be considered in this Determination The Applicant‟s concerns about the professional qualifications of the FSP‟s experts have been noted. However, the Panel considers these experts have appropriate qualifications in the field of mechanical engineering, hydraulics and forensic services to form an opinion and it would not be appropriate to fail to take regard of their opinions. Other observations about the opinions of the FSP‟s experts will be made in the body of this Determination. Forensic evidence demonstrates the fire damaged the hydraulic system The Applicant contends the hydraulic hoses were breached in the fire on 7 June 2013 and contaminants drawn in. The FSP‟s fire forensics expert KS inspected the machine on17 June 2013 and confirmed the fire was a genuine insured event. He noted “substantial fire damage within the machinery bay”. He also confirmed both fuel supply line and hydraulic hoses sustained breaches. The assessor (RS) also saw the machine after the fire with KS, but the Panel does not have a contemporaneous report to know what views RS held then. When RS saw the machine again on 31 July 2014 it had been repaired already by MA. RS inspected the machine on this second occasion with MA and accepted what he was told by MA; namely that the hoses and pipes had not burnt through and so a contaminant from the fire could not have entered the hydraulic system in that manner. RS suggests th at KS the FSP‟s forensic fire expert was mistaken due to the amount of damage. However the Panel notes that KS specifically notes the presence of both hydraulic oil and diesel fuel. Further, KS is appropriately qualified to note the difference, despite the fire damage. Given this, the Panel Case No: 374516 Determination Page 4 of 13 accepts that the hydraulic systems were in fact breached by the fire damage. This conclusion is also supported by the fact that the repair invoices outline significant repairs involving hydraulic components. This places doubt on RS‟s opinion that the hydraulic system was not breached and any conclusions subsequently drawn by the FSP on this basis. Allegations made about MA not directly rebutted by MA Further there is no direct evidence from MA regarding how the repair to the hydraulic system was conducted. This is concerning given the Applicant‟s various allegations against MA, how he repaired the machine, what components he used, what experience he had to undertake the significant fire damage repairs and the environment in which the repair was conducted. RS also says that the various hydraulic components are on the opposite side of the machine to the fire. The Panel accepts this but does not accept that this establishes that the fire or subsequent repairs are not the cause of the hydraulic failure or contamination of the hydraulic system, as the fire damage was significant and the hydraulic system is pervasive throughout the machine. Expert evidence does not establish the cause of the hydraulic failure but confirmed a total failure of the hydraulic system RS reports that MA believed organic material within the system was the primary reason for the pumps failure which have a tolerance of only three microns. MA is recorded as stating that the build-up of organic material around the shafts can harden like straw and wear away the hydraulic motors oil seal or can be forced under the seal and enter the hydraulic system. Again, there is no direct report from MA and it is unclear how long the organic material would take to harden and wear down the seal or if this constitutes the „ glittering substance ‟ viewed in the oil. This is important considering the servicing conducted on 28 February 2014 should have noted such an issue. The Applicant notes this issue did occur to another vehicle he had repaired by MA and asserts the organic material produced by MA was from this vehicle. MA is not asked to comment. The Applicant‟s assertion has some force given RS‟s statement that there were no contaminants in the system when the hydraulic valves were replaced and fitted under warranty in May 2014. RC doubts vegetable matter caused the destruction of the pumps In any event, the FSP‟s other expert RC says in his report that he is sceptical the vegetable based debris caused the destruction of both pumps. RS reports that MA was „at a loss‟ to explain how the material entered the system without direct intervention. MA then appears to suggest it has to do with a replacement hydraulic motor but MA denies it replaced the said motor. RS says that the motor has a serial number that supports the contention that the motor was not fitted when the machine was built as it was manufactured in the 45 th week of 2012. Case No: 374516 Determination Page 5 of 13 The Applicant agrees that not all hydraulic motors are original and says it was MA who replaced it when the machine was owned by MA and being utilised for demonstration purposes. But the Applicant also says he bought the machine from MA in September 2012 which is before the 45 th week in 2012. The Applicant says that MA did all the work on the machine as it was under warranty. For example, he produced an invoice from MA for the supply of a hydraulic motor for this machine on 26 April 2013. This shows a hydraulic motor was replaced in the right brush. The Applicant says he did not perform any works to the machine including topping up the hydraulic oil, as he does not have such specialised equipment to perform such works in any event. The Applicant says the replacement motor in question was not replaced by him. He believes MA did this work. The Applicant also says that says he spoke to the importing agent who advised the motor was not imported into Australia but must have come in on a machine. That is, the Applicant could not have purchased the motor. The Applicant also says that when MA did not have sufficient stock to repair a machine, he would use material from other machines. There is no report or statement from MA to clarify this issue further. Probable MA performed all work to the hydraulics Moreover, the machine was under warranty with MA who was obliged to conduct repairs, and the machine and parts are imported from Italy by MA. It is counterintuitive to suggest the Applicant arranged another person to conduct such works at his personal cost. Accordingly the Panel accepts that MA has performed all work to the hydraulics before and after the fire repair. RS also concludes that the failure of the pumps was not to be attributed to the fire event or the repairs carried out after the fire as it is highly unlikely that the machine would manage to work for in excess of 350 hours if contaminants were present in the hydraulic system after the repairs. The hydraulic expert, RC, has the same vie w. RC believes the time scale from the fire repair to July 2014 is too long for the hydraulics failures to be related to fire damage. He says that ordinarily a hydraulic pump will fail in operation in 1-2 hours but this harvester had 325 hours of service before the failure. RC concludes these failures could not be directly related to the fire of 2013 or subsequent repairs. RC notes that the debris discovered in the hydraulic oil is relative ly small and should be readily removed by the filters. However, the presence of this debris opened up the possibility debris was entering the hydraulic circuit. RC could not confirm how this occurred as the relevant parts had been sent to Italy by MA, to the manufacturer. This prevented RC from determining the cause of the failure. RC noted that hydraulic pumps are intolerant of even fine debris if exposed to this for a long time and it could result in the total destruction of the hydraulic pumps. However, RC does not indicate a time frame during which fine debris could cause the total destruction of the hydraulic pumps. RC also does not hypothesise on how the hydraulic circuit may have been open, such as to allow debris entry. Case No: 374516 Determination Page 6 of 13 The material establishes there were multiple hydraulic failures after the fire and the fire repairs between September 2013 and July 2014. The Applicant says the first failure occurred to the hydraulic conveyor belt due to overheating after only 8 hours work. He says that up until 20 November 2013 the machine only performed 7 days harvesting work because of various issues. It appears the machine then performed little to no work (in the off-season) before undergoing a service on 28 February 2014 prior to the harvest season. The service work appears to be unrelated to the hydraulic system other than “a check of hydraulic pressures.” The machine had hydraulic issues again commencing in the first week of March 2014 and then a number of further hydraulic issues before it completely failed on 4 July 2014. The Applicant‟s assertion about the theoretical life of new pumps is unchallenged. That is, that the pumps, replaced as part of the fire damage, should last at least 7000 hours but have only lasted approximately 325 hours. RC unable to explain the cause of the failure Whilst the Panel accepts the evidence of RC that hydraulic failures would ordinarily occur 1-2 hours after commencing operation, RC has also been unable to explain the presence of the debris or the cause of the failure so soon after repairs due to the removal and despatch of those parts by MA to Italy. The original and subsequent repair works do establish that substantive works were completed to the hydraulic systems. However, there is no rebuttal evidence from MA to the Applicant‟s assertions about the repairs and about the use of components from other machines to complete the repairs. There is no persuasive explanation by the experts of the repeated hydraulic systems failures experienced since the fire repairs were conducted. The harvesting machine has not been placed back into the pre -fire working condition. This prevents the machine from being used for its intended purpose of harvesting. It is noted that MA has had several attempts to repair the machine which has still not been put back into the condition it was prior to the loss. Further, the Panel has concerns that parts that specifically fit the machine were not available – such as the engine cowl and perhaps some hydraulic system components. Applicant should not be penalised because pumps returned to Italy Whilst the FSP was not aware of the ongoing issues , it is doubtful the FSP would not have returned the machine to the same repairer, given MA is the only manufacturer approved repairer in Australia. Accordingly, it is not accepted that the return of the machine by the Applicant to the repairer has prejudiced the FSP. Further, the return of the pumps to Italy by MA was not necessarily at the instigation of the Applicant and while the Panel accepts that the absence of same pumps has caused evidentiary difficulties, the Panel considers the Applicant should not be penalised because of these issues. Case No: 374516 Determination Page 7 of 13 On the available material and for the reasons stated, the Panel is persuaded that on the balance of probabilities the hydraulics failed because of the fire event or the subsequent many and significant repairs done by MA. Therefore the FSP is liable to pay for the costs of repairing the hydraulics in July 2014 in the sum of $5,313.17. Future viability of machine can be managed with program of oil testing The Applicant has expressed concerns that the value of the machine has been diminished as a result of the fire event and the subsequent repairs. He is further concerned that the repairs done by MA are not guaranteed and that this may impact the resale value of the machine. He has also expressed concern about ongoing costs if the contamination is a continuing problem. RS reported that MA advised that it would not provide a warranty concerning the hydraulic repairs unless the hydraulic motors that drive the wheels are checked; that is, that seals and bearings are checked so that there is no grass or vegetation wrapped around these shafts that would enter the system and re-contaminate the system. The Applicant was unwilling to pay for the additional labour that would be required to check the condition of the road wheel hydraulic motor pumps. The Applicant talked to RC about his concerns about the viability of the machine. RC recommended that a program of oil testing should be undertaken. In his report dated 16 October 2014 RC said: “A program of oil testing should be undertaken such that a sampl e of hydraulic oil … should be sent to a reputable oil testing laboratory after the harvester has accumulated 10 hours of service. Tests should be undertaken to look for wear metals. If the results of this 10 hour test are within acceptable limits, then another test should be done after a further 20 hours and again, if this provides acceptable results, a final test should be performed after a further 50 hours. The hydraulic filter should be changed after each test and the hydraulic oil should be changed in accordance with the manufacturer‟s recommendations.” Recent material provided shows that the Applicant engaged W to provide a full hydraulic service as recommended by RC. The recent material also shows the oil tester recommended the Applicant “continue sampling at the recommended interval”. And it was noted “more samples are needed to establish a trend.” The cost of the service undertaken by W was $853.44. The Applicant has not provided information about the cost of the oil sample. In a recent email, the Applicant says that: “We have now done in excess of 41 hours harvesting since W replaced the oil and filters without any indication of hydraulic problems…” In view of the recent hydraulic service conducted by W, and the Applicant‟s advice that there are no further indications of hydraulic problems after the service, it is likely that future problems about the viability of the machine may have abated, just as long as the machine is serviced and oil samples taken as recommended by RC. Case No: 374516 Determination Page 8 of 13 The machine is no longer under warranty. The FSP‟s policy does not provide a Lifetime Guarantee as the repairs were not undertaken by a preferred repairer. However due to the unique nature of the machine, the preferred repairer benefits in the policy could not be implemented by the FSP. Nonetheless, the Panel considers that as the FSP authorised the repairs, it must ensure the repairs were done properly and that may include future work to ensure the viability of the machine. MA will not provide a guarantee and the Panel cannot compel MA to provide a guarantee. Machine not a write-off Taking into account the estimated cost of the additional labour that would be required to check the condition of the road wheel hydraulic motor pumps, the cost of the hydraulic service just conducted by W, the cost of the oil sample recently provided to W and the recommendations by RC about the future work that is required to guarantee the viability of the machine, the Panel considers it is fair in all the circumstances that the FSP pay the Applicant a further $5,000 in lieu of a guarantee for the work undertaken by MA. 2.2 Is the Applicant entitled to other items claimed? Engine cowl does not match the make of the harvester There is no dispute between the parties that the engine cowl does not actuall y match the make of the harvester. A rubber strip has been installed to prevent the larger gap created by this from blowing extremely hot air onto the driver‟s seat of the harvester. It is unclear whether the rubber strip will need replacement on a regula r basis due to the extreme heat of the air blown from the engine bay and whether this fix will work long term. It is also unknown whether the gap goes the full way around the engine bay and/or would let additional debris into the engine bay. Given the fact that the engine cowl was not properly fitted as it is not an original manufacturer ‟s part, the FSP is liable for the cost of the rubber stripping fitted to the machine. However, the Applicant should properly quantify the cost of the claimed alteration. He claimed it would cost $1,200 to modify the cover. The FSP indicated it would pay $1,200 to enable the Applicant have this alteration performed but required an invoice to substantiate this part of the claim. The Panel considers that the FSP is liable for the alteration as the original manufacturer cowl part was not used and the repair is not satisfactory. However the Applicant must substantiate the cost of this part of the claim. Case No: 374516 Determination Page 9 of 13 No dispute that the fire extinguisher should be replaced There is no dispute that the fire extinguisher should be replaced. The assessor has provided evidence that the replacement cost plus brackets to affix the fire extinguisher is no more than $50 and the Panel accepts this calculation. The FSP is to pay the cost of $50 to rep lace the fire extinguisher. Damage to the fan/blower discharge unit probably not caused by insured event or repairs There is evidence that during the fire damage repairs the fan/blower discharge valve was repaired. Even if the Panel accepts the Applicant‟s contention that there may have been a design flaw to this item, the claimed damage still needs to be linked to the fire or the fire repairs in order to establish an entitlement to claim under the policy and the material provided does not establish this link. There is no compelling evidence explaining how this item became subsequently damaged after it was repaired and whether it is linked to harvesting work or another method of damage. Accordingly, the FSP is not liable for the claimed damage to this par t of the machine as a result of the fire event or subsequent repairs. As the policy is an accidental damage policy, it may respond to a further claim but a further excess would be payable. FSP unaware of the costs accruing due to harvester downtime as the Applicant did not inform it until 21 July 2014 The Applicant commenced having issues with the harvesting machine as early as 20 November 2013 but did not report these issues to the FSP until 21 July 2014. Accordingly, the FSP was unaware of the downtime experienced by the harvesting machine and unable to consider what appropriate steps should be taken so should not be liable for this cost. Award of compensation not justified The Applicant also claims the FSP took over a month to advise him that he had to prove the hydraulic problem was related to the fire claim. He says that as a result of this delay he incurred excessive downtime and delays due to non-supply of parts required to keep the other harvester running. He claims compensation for loss of use due t o the FSP‟s inaction and delay. The material shows that the claim was made on or about 21 July 2014. The FSP arranged for its assessor to investigate the matter. The assessor re- attended MA on 31 July 2014. On the basis of that report, the FSP denied the claim on 6 August 2014. As the Applicant disputed the decision, the FSP appointed a mechanical engineer, RC, to provide it with a report and RC began his investigation with a discussion with the Applicant on 1 October 2014. RC provided a report within a few weeks. Based on that report the claim was denied again on 17 October 2014. Case No: 374516 Determination Page 10 of 13 Under the Terms of Reference, FOS may decide that an FSP compensate an Applicant for consequential financial loss or non-financial loss as a result of a claim. However an Applicant must substantiate the financial loss and no substantiation has been provided. Further, FOS will only consider compensation for non-financial loss where there has been an unusual degree or extent of physical inconvenience and time taken to resolve the situation. FOS takes a conservative approach to the award of compensation. FOS expects an applicant to be moderately robust and bear the usual stress and inconvenience which arises in the course of an insurance claim. This includes the time spent in responding to the FSP in the claim and in the dispute. Having considered all the material, the Panel considers that the investigations undertaken by the FSP were appropriate in the circumstances and were completed without undue delay. For the reasons outlined, the Panel considers that an award of compensation is not justified in all the circumstances of the claim and the dispute. Cost of report from W justified upon proof The Applicant also claims for cost of reports. FOS may decide that the FSP contribute to professional costs incurred by an Applicant in the course of a dispute. Essentially, the Applicant has been his own advocate and expert in this dispute. The only report provided by the Applicant is a service inspection report from W dated 20 January 2015. Having considered the report, the Panel considers that it is fair in all the circumstances that the FSP pay for the cost of this report (if any) as the Applicant presented this expert information from W to respond to arguments raised by the FSP‟s experts. However the Applicant must establish that he has paid W for the report. If he wishes to persist with the claim he must provide proof of the cost of the report from W. Providing the FSP is presented with satisfactory proof of the cost of the report from W, the FSP is to pay the Applicant for the cost of W‟s report. The correspondence between the parties in this dispute indicates other claims made by the Applicant but as substantive proof is not presently adduced that the other claims relate to the fire event or the subsequent repairs, this Determination does not address those claims. Case No: 374516 Determination Page 11 of 13 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. This decision has been made by a Panel. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. 3.2 Extract Policy Wording “General condi tions … What you must and must not do if you make a claim or an event happens that might lead to you making a claim You must .. - Immediately tell Us about the claim or the event and send Us written details when We require this .. You must not without Our prior consent .. - Repair or dispose of any damaged property until We have had the opportunity to inspect it. .. What can affect Your entitlements .. - If You do not do what You are obliged to do under Your policy, We may refuse to pay a claim or any part of it. … You are not insured under section 1 and 2 of this policy against: 1. Wear, tear, corrosion, rust or gradual deterioration. 2. A structural failure, mechanical, electrical, electronic or hydraulic breakdown, failure of breakage. … 4. loss of use except as specifically provided in this policy or shown on the Certificate of Insurance.” Case No: 374516 Determination Page 12 of 13 3.3 Repair Invoices Repairer and date of invoice Works Performed MA “Authorised agent of the manufacturer” 26 April 2013 (due date 3 May 2013)  Fitted 1 hydraulic motor for right brush $537.50 . MA 12 July 2013 (although due date is 23 September 2013)  Transported machine from farm to workshop.  60 hours of labor was performed.  Hydraulic oil ($780), engine oil and coolant are listed together with filters and return/suction cartridges.  Cost of works: $6,611.77 (GST inclusive). MA 16 July 2013 (due date 19 July 2013)  Complete wiring harness, steering valve, air filters, pre - filters, clamp and fuel hose were provided.  There is significant work to the hydraulic system performed including replacing 10 hydraulic hoses, and the hydrostatic pump and work pump.  The engine hood, cable, water tank, turbine and seat as well as air freight are noted.  The cost of works is $31,245.98 (GST inclusive).  It is also noted that “the extent of the damage to the engine was unable to be assessed at this stage” and if a new turbo engine was required it would cost around $12,126.40 and if a new radiator was required the cost is $1,926. MA 4 September 2013 (due date also 23 September 2013)  Significant work is performed to hydraulic hoses and fittings. 23 hydraulic fittings are replaced and 15 hydraulic hoses are replaced. (The new hoses have different numbers to the hoses fitted in July 2013).  5 hydraulic hoses are fitted as per invoice 16826. Invoice not produced by either party).  The only other works noted are the starter motor, fan, flange, ECU and writing charge, freight of ECU and Yanmar parts.  The cost of works was $5,031.63 (GST Inclusive). MA 19 February 2014 (due date 28 February 2014)  15 hours spent on full machine service prior to harvest season.  Work was conducted to the bearings, rollers and air filters and transmission chain.  “Checked hydraulic pressures, recorded.”  The cost of works was $1,527.48. MA 19 February 2014 (due date 28 February 2014)  Additional invoice for the cost of $415.80 (GST inclusive) for “yellow paddle and rubber blade (brush). MA 7 July 2014 (due date 18 July 2014)  The works describe parts including return/suction cartridges, hydraulic oil, hydrostatic pump, working pump and priority valve.  (Save for the priority valve, these parts were in the invoices 12 and 16 July 2013).  The cost was $5,313.17 (GST incl usive). Case No: 374516 Determination Page 13 of 13 3.4 Other supporting information  Policy schedules.  Photographs.  FSP‟s expert reports and letters .  MA completion report.  W service inspection report and invoice.  Oil analysis 20 January 2015.  Various submissions of and correspondence from the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.