Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim
Determination
Case No: 373659 Determination Page 1 of 12
Case number : 373659 2 July 2015
1 Overview
1.1 Dispute
The Applicant’s three storey townhouse was insured under a residential strata title
insurance policy with the Financial Services Provider (FSP). The Applicant lodged a
claim under the policy for damage to the property following a storm in March 2013.
The FSP accepted liability for water damage to the walls and ceilings, but denied
liability for damage to several timber windows at the property. The FSP says this
damage existed prior to the storm and was caused by factors such as gradual
deterioration and a lack of maintenance, which are excluded under the policy.
The FSP also denied liability for costs incurred by the Applicant in removing and
replacing a timber deck installed over the roof of the property, in order to rectify the
leaking roof.
1.2 Issues and key findings
Is the FSP liable for the damage to the windows?
The damage to the Applicant’s windows represents a combination of pre -existing
damage due to gradual deterioration over time, additional damage caused by the
storm in March 2013 and further damage resulting from the delays (by both parties)
in progressing the claim.
Having regard to the relative contribution of each of these factors, it is fair in all the
circumstances that liability for the damage be borne between the FSP (as to 30%)
and the Applicant (as to 70%).
Is the FSP liable for the removal and reinstatement of the deck?
The policy does not provide cover for the removal and reinstatement of the deck, in
the circumstances of the current claim.
Case No: 373659 Determination Page 2 of 12
1.3 Determination
This Determination is partly in favour of the Applicant.
The FSP is to cash settle the Applicant for the amount of $7,728. The FSP is not
required to pay interest on this amount and is not liable to the Applicant for the
costs of removing and reinstating the timber deck.
Case No: 373659 Determination Page 3 of 12
2 Reasons for Determination
2.1 Is the FSP liable for the damage to the windows?
Policy provides cover subject to exclusions
The Applicant is required to show that, on the balance of probabilities, he has
suffered a loss caused by an event which is insured against under the terms of the
policy. This is known as a prima facie claim.
If the Applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to establish that, on the balance of probabilities, it is entitled to rely on an
exclusion under the policy or is otherwise entitled to deny the Applicant’s claim.
The App licant’s policy provides cover for accidental loss or damage to his home,
subject to the conditions and exclusions set out in the policy.
The FSP has acknowledged that the property was damaged by a storm in March
2013. On this basis, I am satisfied that the Applicant has established a prima facie
claim.
The FSP accepted liability for internal water damage to the walls and ceilings in the
first floor open plan living area of the property, which was caused by rainwater
entering through the roof during the storm.
However, the FSP says it is not liable for water damage to the timber frames of
several windows located on the first floor at the front and rear of the property. The
FSP says this damage existed prior to the storm and was caused by factors such
as wear, tear, gradual deterioration and a lack of maintenance, which are excluded
under the policy.
As the FSP is seeking to rely on an exclusion to deny the claim, it bears the onus of
establishing that, on the balance of probabilities, the claimed damage to the
Applicant’s windows pre-existed the storm in March 2013 and/or was caused by the
excluded factors referred to above.
Window frames showed signs of deterioration prior to the storm
Prior to purchasing the property in late 2012, the Applicant obtained a pre-purchase
inspection report from a building consultant (BM). This report was based on an
inspection of the property undertaken in August 2012, approximately six months
before the storm.
The report prepared by BM describes the interior and exterior of the property as
being in fair to good condition, having regard to the age of the property (which was
around twenty years old at the time).
BM’s report provides a relatively detailed des cription of various parts of the property
and includes several photographs illustrating his assessment as to the condition of
the property.
Case No: 373659 Determination Page 4 of 12
In his report, BM stated that the timber window frames installed on all three levels of
the property had generally been well maintained, although there was evidence of
moderate timber deterioration.
BM noted that such deterioration was most evident to the window sill and sliding
door frame at the rear of the ground floor bedroom. This area was identified as
needing prompt wood filling repairs to slow down the deterioration process and
potentially requiring replacement in the longer term if the timber deterioration could
not be arrested.
BM described the remainder of the timber window frames as having minor to
moderate levels of timber deterioration. In particular, he noted moderate levels of
deterioration to the windows in the front and rear bedrooms and the upper decking
area. However, he confirmed that none of these windows required replacement at
the time of the inspection.
BM noted that, by their nature, the timber window frames at the property were very
susceptible to deterioration caused by moisture absorption, and would require
monitoring and regular filling, sanding and repainting in order to prolong their
serviceable life.
In relation to the first floor windows which are the subject of the current claim, BM
noted that the windows in the living area were in fair condition for their age and the
windows in the dining and kitchen area were in fairly good condition for thei r age.
BM’s report reflects that the first floor window frames showed some signs of timber
deterioration, but not to an extent that they required replacement in the short to
medium term. Had they done so, it is likely that BM would have specifically noted
this, as he did the more severe damage to the window frame at the rear of the
ground floor bedroom.
Having carefully reviewed BM’s report, I am comfortable that it provides an accurate
assessment of the condition of the windows prior to the storm in March 2013.
The FSP’s engineer (JM) has suggested that the window frames and other areas of
the property may have been freshly painted at the time of BM’s inspection, so as to
hide any pre-existing damage.
In his report, BM noted that the property should not require repainting for another
three to four years, in the context of a recommended repainting cycle of between
five to seven years. This suggests that the property was most recently painted in
around 2010, two years before BM’s inspection.
BM’s report incl udes a close-up photograph of one of the painted window frames in
the upper (3 rd floor) decking area which he noted as having moderate timber
deterioration. This suggests that BM’s inspection was detailed enough to identify
issues with the window frames, even though they had been repainted.
The builder (PO) and engineer (JM) appointed by the FSP to examine the window
frames concluded that the nature and extent of the rot and deterioration of the
timber was such that it could only have occurred over an extended period of time.
Accordingly, they concluded that the damage was due to a lack of maintenance.
Case No: 373659 Determination Page 5 of 12
However, for various reasons (which are discussed further below), it appears that
the FSP’s consultants did not inspect the damage to the windows until over a year
after the storm in March 2013. Given the possibility that further damage occurred
during the intervening period, I consider that limited reliance only can be placed on
the observations of the FSP’s consultants in this regard.
The FSP’s engineer (JM) also suggested that the fact that the window frames at
one of the neighbouring townhouses had been replaced indicated that the
Applicant’s window frames were approaching the end of their useful life. However,
the Applicant has noted that the window frames of the two other townhouses had
not been replaced. Accordingly, limited weight can be placed on JM’s observation.
For the reasons outlined above, I am satisfied that the timber window frames which
are the subject of the current claim had suffered some grad ual deterioration prior to
the storm in March 2013. However, I do not accept that this damage was such that
the windows were in an advanced state of deterioration and required replacement
in the short to medium term, as suggested by the FSP.
Storm caused additional damage to window frames
As outlined above, the FSP accepted liability for internal water damage to the walls
and ceiling on the first floor of the property, which occurred during the storm in
March 2013.
The report prepared by the FSP’s builder (PO) who initially inspected the property
in July 2013 indicated that water had entered through the roof above the first floor
open plan living area. However, PO noted that it had not yet been possible to
identify the exact source of the leak because the roof could not be accessed without
removing the timber decking installed above the roof.
The FSP denied cover for the issues with the roof itself, apparently on the
assumption that these issues had been caused by gradual deterioration over time.
PO’s repor t dated July 2013 does not mention any significant damage to the timber
window frames. It appears that this damage was not assessed until some time later,
after the Applicant had rectified the leaking roof and approached the FSP in relation
to the repair of the resulting internal damage.
The FSP’s assessor (AS) who re -inspected the property in March 2014 noted that
the Applicant had advised that during the storm a year earlier, he had observed
water leaking from the ceilings above the kitchen bench and above the windows on
the north and south walls. AS considered that the cause of the water entry was
most likely due to the inadequate waterproofing of the roof-top deck.
AS noted that some of the damage to the timber window frames appeared to be
relatively recent and therefore may have been caused by the storm in March 2013,
while the remaining damage appeared to be ongoing, given the softness of the
timber and the fact that the paint was starting to peel.
The Applicant arranged for the building inspector (BM) who undertook the pre-
purchase inspection report to reinspect the window frames in May 2014. BM
advised that, since his original inspection, water from the roof above the open plan
Case No: 373659 Determination Page 6 of 12
living area had penetrated the internal ceilings and walls, causing timber
deterioration around the sills and frames of the timber windows.
BM considered that the nature of the deterioration was consistent with water
entering through the roof during a storm (and subsequent leaks), rather than water
entering through the exterior of the window frames due to gradual deterioration. He
noted that water had penetrated the joins of the window frames, resulting in mould
growth due to the humid environment created by the effects of the sun on the glass
in the windows.
The photographs included in BM’s re -inspection report show signs of staining to the
eaves, window frames and ceilings, which is consistent with water having entered
through the roof, rather than through the window frames themselves.
BM confirmed that the degree of deterioration observed had not been present at the
time of his original inspection in August 2012. He has since noted that only the first
floor windows at the property (the subject of the current claim) are leaking, while no
such problems exist with the ground floor and second floor windows.
The FSP’s builder (PO) and engineer (JM) dispute BM’s conclusions that the bulk of
the damage to the window frames was due to the storm.
The builder (PO) says that the timber seals and frames of the windows have rotted
such that they are no longer watertight, as a result of being exposed to the
elements over a long period of time and the Applicant’s failure to undertake proper
maintenance.
While the FSP’s engineer (JM) accepted that water had leaked from the roof into
the window heads during the storm, he considered that the windows had also
experienced more general timber decay issues. JM considered that it was not
possible to attribute the damage to the single storm in March 2013, given that
storms of this nature were a relatively common occurrence.
As noted above, the FSP’s consultants (AS, PO and JM) did not inspect the
damage to the window frames until a year after the storm occurred. In these
circumstances, I find it difficult to accept their conclusions that the bulk of the
damage existed prior to the storm.
I consider it likely that at least some of the additional damage to the window frames
was caused by the storm in March 2013, given the FSP’s engineer (JM) has
accepted that the windows were affected by water entering through the roof during
the storm, and the Applicant’s building consultant (BM) has confirmed that the
claimed damage was not present to any significant extent in August 2012.
Delays contributed to further damage
The Applicant’s building inspector (BM) and the FSP’s engineer (JM) have both
indicated that the deterioration of the window frame timbers has worsened due to
the passage of time following the storm.
Having carefully reviewed the claim history, I consider that both the Applicant and
the FSP bear some responsibility for these delays.
Case No: 373659 Determination Page 7 of 12
It appears that the Applicant did not lodge his claim until almost two months after
the storm in March 2013, following which the FSP did not assess the claim until a
further two months had passed.
As outlined above, the initial assessment carried out by the FSP’s builder (PO)
focussed primarily on the water damage to the walls and ceilings, and appears not
to have given any significant consideration to the condition of the windows.
A more extensive assessment of the windows at this stage would have been helpful
in determining the extent of the damage attributable to the storm, as opposed to the
subsequent delays.
When the FSP advised the Applicant of its decision in relation to his claim (in mid-
July 2013), it advised that he was responsible for rectifying the issues with the roof.
However, it was not until approximately five months later that the Applicant
arranged for the roof top decking to be removed and the waterproofing membrane
replaced, in order to address these issues. It is likely that the condition of the
windows deteriorated further during this time.
After the Applicant notified the FSP that he had attended to the rectification of the
roof, there were further delays while the FSP arranged for a re-inspection of the
resultant internal damage.
The Applicant says he understood that he had to leave the windows in their
damaged state until his claim had been finally resolved.
However, I do not accept that the Applicant’s ac tions in this regard were entirely
reasonable, given the FSP had recommended that he arrange for the immediate
rectification of the roof and had clearly advised him that it would not be liable for
any further resultant damage arising from his failure to do so.
The Applicant has referred to an email received from the FSP in October 2014,
which he says led him to believe that he should not proceed with the repairs to the
property at that time.
However, I do not accept that the Applicant’s understanding ac curately reflects the
content of the FSP’s email.
In its email, the FSP confirmed its position that there was no cover under the policy
for the damage to the windows and recommended that the Applicant act as a
prudent uninsured and proceed to repair the property. The FSP noted that it would
not necessarily indemnify the Applicant for the full amount as, in the event FOS
found in the Applicant’s favour, it may be entitled to obtain a comparative quote.
As the Applicant is an experienced lawyer, I am comfortable that he could
reasonably be expected to have understood the meaning of the FSP’s email. In any
event, over sixteen months had passed since the FSP’s initial claim decision by the
time the Applicant received this email, during which time it is likely f urther damage
had already occurred.
Case No: 373659 Determination Page 8 of 12
Wayne Tank principle does not apply
The FSP says that it is entitled to deny the Applicant’s claim for damage to the
windows based on the Wayne Tank principle.
This is an established principle of insurance law which provides that, where a loss
is caused by two or more proximate causes operating interdependently and
concurrently, and at least one cause is excluded while the others are not, the
exclusion clause operates to allow the insurer to deny the claim in its entirety.
However, the Wayne Tank principle does not apply in the circumstances of the
present case.
For the reasons outlined above, I consider that the claimed damage to the
Applicant’s windows represents a combination of pre -existing damage due to
gradual deterioration over time, additional damage caused by the storm in March
2013 and further damage resulting from the delays in rectifying the leaking roof and
progressing the Applicant’s claim.
In these circumstances, the damage is due to a series of causes operating
consecutively, rather than one or more causes operating interdependently and
concurrently, as is required in order for the Wayne Tank principle to apply.
FSP should contribute to cost of replacing windows
For the reasons outlined above, I am satisfied that at least part of the damage to
the windows was caused by the storm in March 2013, exacerbated by subsequent
delays for which both parties bear some responsibility. However, I also accept that
the windows showed signs of timber deterioration prior to the storm.
Having regard to the relative contribution of these various causes, I consider that it
is fair in all the circumstances that liability for the damage to the window frames be
borne between the FSP (as to 30%) and the Applicant (as to 70%).
The FSP builder (PO) has provided a quote for $25,760 for the replacement of the
window frames. Accordingly, the FSP is required to cash settle the Applicant for
$7,728.
In determining this amount, I have taken into account the delays experienced during
the claim process. Accordingly, the FSP is not required to pay interest on the
settlement amount.
2.2 Is the FSP liable for the removal and reinstatement of the deck?
Applicant had deck removed and roof repaired in late 2013
In November 2013, the Applicant arranged for the removal of the timber deck
installed on top of the roof above the open plan living area, so the cause of the
leaking roof could be addressed. The roof-top deck had been laid over a waterproof
membrane installed over the roof above the open plan living area.
Case No: 373659 Determination Page 9 of 12
Once the decking had been removed, the Applicant’s plumber (AP) assessed the
roof, pipes and flashings to identify the cause of the water entry during the storm in
March 2013.
While it appears that AP did not conclusively identify the source of the leak, he
installed new metal flashings on top of the waterproof membrane to prevent water
flowing off the wall onto the membrane and reduce the risk of further leaks. The
Applicant also arranged for the waterproof membrane to be replaced as part of
preventative maintenance (although AP had noted that the membrane appeared to
be in good condition).
FSP is not liable for cost of roof repairs
As noted above, when it initially assessed the Applicant’s claim in July 2013, the
FSP denied liability for the repairs to the roof on the basis that the issues with the
roof were caused by gradual deterioration.
However, it is unclear how the FSP reached this view in July 2013, given the cause
of the leak could not be identified at that time as the roof top deck had not yet been
removed.
The Applicant has not disputed the FSP’s denial of liability for the costs of replacing
the waterproof membrane and installing metal flashings. He has not suggested that
the issues with the roof were caused by the storm in March 2013 or identified any
other possible causes.
While the report prepared by the Applicant’s plumber does not conclusively identify
the source of the leak, in the circumstances I am satisfied that, on the balance of
probabilities, the leak was caused by either a latent defect in the roof or the gradual
deterioration of the roof over time.
The roof was fully covered by the waterproof membrane and timber decking and
therefore was effectively protected from extrinsic influences. The townhouse was
almost twenty years old at the time of the storm and therefore some deterioration of
the waterproof membrane and surrounding areas was likely to have occurred.
The policy excludes cover for damage caused by gradual deterioration and/or latent
defects. Accordingly, the FSP is not liable for the cost of the roof repairs.
Policy does not provide cover for removal and reinstatement of decking
The Applicant seeks reimbursement for the costs of removing and reinstating the
timber decking so that the roof repairs could be undertaken.
The policy provides cover for reasonable exploratory costs incurred in locating the
source of a leak and for costs incurred in order to rectify damage caused by such
exploratory work. However, cover is only available where the source of the leak is a
tank, pipe or other apparatus used to hold or carry liquid.
The Applicant says the timber decking was removed in order to determine whether
there was a leak in the downpipes which carry water from the roof top deck to the
ground.
Case No: 373659 Determination Page 10 of 12
However, there is no suggestion that any issues with the downpipes were ever
identified. The remedial measures undertaken by the Applicant appear to have
been limited to the replacement of the waterproof membrane and the installation of
new metal flashings.
In these circumstances, the FSP is not liable for the cost of removing and
reinstating the timber decking.
The Applicant has referred to other sections of the policy which provide cover for
the removal, storage and restoration of undamaged sections of the property in
certain circumstances. However, I am satisfied that these sections do not apply in
the present case.
Case No: 373659 Determination Page 11 of 12
3 Supporting information
3.1 FOS approach to this dispute
As advised to the parties, FOS has considered it appropriate to expedite this
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference, due to the nature of the dispute. Accordingly, this dispute has not been
the subject of a FOS Recommendation and has proceeded directly to
Determination.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed
and considered for the purposes of this Determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the
purposes of this Determination, commentary has been restricted to those issues
considered directly relevant to the outcome only.
3.2 Terms of policy
Subject Terms
Exclusions We will not pay for loss or damage: ...
caused by lack of maintenance, rust, oxidation, corrosion,
Wear, Tear, fading, gradual corrosion or gradual deterioration,
concrete or brick cancer, developing flaws, wet or dry rot, or
failure to maintain Your Insured Property in a reasonably good
state o f repair ...
caused by inherent vice, latent defect …
Definition of
“Wear,Tear”
Wear, Tear means damage or a reduction in value through age,
ordinary use or lack of maintenance.
Additional benefit –
exploratory costs
We will pay for the reasonable exploratory costs You necessarily
incur in locating the source of bursting, leaking, discharging or
overflowing of tanks, apparatus or pipes used to hold or carry
liquid of any kind.
We will also pay for reasonable costs incurred in:
repairing the area of Your insured Property d amaged by such
exploratory work;
repairing or replacing the defective part or parts of such tanks,
apparatus or pipes, to a limit of $1,000 ;
rectifying contamination damage or pollution damage to land at
Your Situation caused by the escape of liquid, to a limit of
$1,000.
Case No: 373659 Determination Page 12 of 12
Subject Terms
We will not pay for any of these costs if the bursting, leaking,
discharging or overflowing is caused by a building defect, building
movement, faulty workmanship, rust, oxidation, corrosion, Wear,
Tear, gradual corro sion, gradual deterioratio n ... .