Home / Financial Firm (Unknown - Insurer) / Determination 373581

Determination 373581

Claim denial for swimming pool damage under exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2015-01-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant claimed for damage to his in-ground fibreglass pool, which the FSP denied under exclusions for gradual deterioration, hydrostatic pressure and earth movement. AFCA found the exclusions applied and the FSP was not liable.

Where the insured establishes a prima facie accidental loss, the insurer must prove on balance that the proximate cause falls within an exclusion, which the engineering evidence did for both areas of damage.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Motor Vehicle - Comprehensive - FSP Decision - Denial of Claim - Exclusion/Condition Determination Case No: 373581 Determination Page 1 of 9 Case number: 373581 6 January 201 5 1 Overview 1.1 Dispute The Applicant lodged a claim under his home insurance policy with the Financial Services Provider (FSP) for damage to his in ground fibreglass swimming pool. The FSP denied the claim on the basis that the damage was caused by factors which are excluded under the policy, such as hydrostatic pressure, earth movement, gradual deterioration and wear and tear. The Applicant disputes the FSP’s denial of his claim and wants his swimming pool repaired. 1.2 Issue and key findings Can the FSP deny the claim? The Applicant has established a prima facie claim for accidental damage under the policy, as the damage to his swimming pool was unintended. However, the available information establishes that the damage to the pool was caused by gradual deterioration, hydrostatic pressure and earth movement, each of which is excluded under the policy. Accordingly, the FSP is not liable for this damage. 1.3 Determination This Determination is in favour of the FSP. The FSP is not liable for the Applicant’s claim. Case No: 373581 Determination Page 2 of 9 2 Reasons for Determination 2.1 Can the FSP deny the claim? Application of policy depends on cause of damage The Applicant’s policy provides cover for accidental damage to his property, which is defined to mean damage caused unintentionally. This cover is subject to the conditions and exclusions set out in the polic y. The policy contains exclusions for damage caused by or resulting from:  gradual deterio ration, including wear and tear  any earth movement not caused by earthquake (including erosion, subsidence, collapse, and earth shrin kage or expansion) or  hydrostatic pressure to swimming pools and other in ground structures. It is an accepted principle of general insurance law that an insured bears the onus of establishing that, on the balance of probabilities, they have suffered a loss caused by a risk insured under the policy. This is known as a prima facie claim. If the insured is able to establish a prima facie claim, the onus then shifts to the insurer to show that, on the balance of probabilities, the loss falls within an exclusion clause under the policy or that it is otherwise entitled to deny liability. The FSP has not disputed that the Applicant’s swimming pool sustained damage due to unintended events. In these circumstances, the Panel is satisfied that the Applicant has established a prima facie claim, given the broad cover for accidental damage provided under the policy. Accordingly, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion to deny the Applicant’s claim. In order to do so, the FSP must show that the proximate cause (that is, the real, effective or predominant cause) of the damage to the swimming pool was one of the excluded factors outlined above. Damage to eastern wall and concrete slabs was caused by gradual deterioration Th e Applicant’s swimming pool sustained damage to several areas, namely:  a crack in the eastern side wall  cracking and sinking damage to the pebblecrete concrete slabs surrounding the pool and  a bulge in the western side wall of the pool and a fracture in the pool floor. Both the FSP’s engineer (M) and the Applicant’s engineer (R) concluded that the crack in the eastern side wall of the pool had occurred as a result of gradual deterioration due to exposure to climatic conditions over the 22 year life of the pool. Both engineers also concluded that the damage to the pebblecrete concrete slabs surrounding the pool was due to long-term deterioration . The Applicant’s engineer Case No: 373581 Determination Page 3 of 9 noted that the Applicant himself had confirmed that this damage had not occurred recently, but had developed as a gradual process over the life of the pool. The policy excludes cover for damage caused by gradual deterioration. Accordingly, the FSP is not liable for damage to the eastern side wall of the pool and the concrete surrounds. Damage to western wall and floor was caused by hydrostatic pressure The FSP says that the bulge in the western side of the pool wall was caused by hydrostatic pressure and/or earth movement. In support of its position, the FSP relies on the findings of its engineer (M), who inspected the damage in July 2014 and concluded that:  water had entered the pool lining over an extended period of time, through the major crack in the eastern side of the pool and the gaps between the edge of the pool and the pebblecr ete slabs  this water had then entered the surrounding foundation material, increasing the moisture content and causing it to swell  the resulting increase in hydrostatic pressure exceeded the passive pressure exerted by the pool water, causing the fibreglas s shell of the pool to deflect inwards. M noted that the bulge in the western wall may have been exacerbated when the pool was partly drained to facilitate the repair of the crack in the eastern side, without appropriate stabilisation methods being undertaken. M considered that this would have increased the imbalance of pressures acting on the pool, causing the pool lining to deflect. The Applicant’s engineer (R) has disputed M’s findings as to the cause of the damage. In a report prepared in October 2014, R concluded that the damage had been caused by hydrodynamic pressure created by water travelling along the surface of the hard rock present underneath the water table, during a severe storm on 25 March 2014. R considered that there was no logical basis on which to conclude that the damage had been caused by hydrostatic pressure. The Panel acknowledges that, as engineers, both M and R are appropriately qualified to determine the cause of the damage to the Applicant’s pool. However, having carefully reviewed the available information, the Panel considers that the explanation provided by the FSP’s engineer (M) is more consistent with the circumstances in which the damage arose. In particular, the Panel notes that:  M’s explanation as to the mechanism by which water entered the surrounding soil is consistent with the observed damage to the pool and  R’ s conclusion that there was no basis on which the damage could have been caused by hydrostatic pressure appears to be based in part on his assumption that the pool was filled to its normal level at the time the damage occurred. However, the Applicant has confirmed that, after noticing the initial crack in the eastern wall in March 2014, he had reduced the water level by around 350 m illimetres so that his repaire r could assess the crack . Given that repairs were Case No: 373581 Determination Page 4 of 9 subsequently delayed for several weeks, it seems likely that the water level remained lowered during this period. Photographs taken by the FSP’s assessor during his inspection on 8 April 2014 show that the water level was lower at this time. For the reasons outlined above, the Panel is satisfied that, on the balance of probabilities, the damage to the western wall of the pool was caused by hydrostatic pressure and earth movement. Damage caused in this ma nner is excluded from cover under the policy. Case No: 373581 Determination Page 5 of 9 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. 3.2 Reports Report Key points FSP’s assessor (C) Report - 14 Apr il 2014  The pool had a crack in the right hand (eastern) side wall and the centre of the fibreglass shell. The Applicant had advised that he had noticed this crack around four weeks earlier. There was also bulging on the left hand (western) side wall , which the Applicant had first noticed on 5 April 2014 .  There wa s cracking to the paved edging adjacent to the s kimmer box and to the crack in the right hand side of the shel l. There are also sunken sections of concrete surround (which appears aged and ongoing).  The damage was caused by a combination of movement/settlement and ongoing water entering around the pool, which appeared to have occurred over a period of time, causing the surrounding ba se and soil to subside and placing pressure on the pool shell.  The crack on the eastern side extended through the paved capping surround and about halfway down the side wall. The Applicant had applied silicone to prevent further water leaking behind the pool shell and had also removed a section of the paved capping to allow for repairs.  The Applicant had drop ped the level of the pool water to approximately ha lf way to expose t he crack. The drop in the water level could also have contribute d to a change in the pressure applied to the side walls.  T he concrete surround adjacent to the bulge in the western side wall Case No: 373581 Determination Page 6 of 9 Report Key points had sunk by approximately 25 to 30 millimetres . There was p lant li fe growing in the section that dropped, which indicated that the movement ha d been occurring over a reasonable period of time.  The d amage to the pool has been caused by the difference in hydrostatic pressure between the inside and outside of the pool wall , resulting in cracking and bulging of the fibreglass pool .  However, an engineer should be engaged to determine the cause of the damage. Applicant’s repairer (K) Report - 30 Jun e 2014  The sub ground water around the pool shell is called hydrodynamic pressure while it is moving. As it stops, it is called hydrostatic pressure.  The hydrodynamic pressure is now stopped. At its peak, the hydrostatic pressure should release the hydrostatic valve.  If the pressure comes to o quick around the pool, it will beco me damaged (ie, storm damage) from hydrodynamic pressure.  The damage to the pool was caused by the storm which delivered an amount of water that the pool shell could not handle.  In his over 30 years of experience, K has seen hydrodynamic pressure moving around a pool, distorting its shell out of shape and then the hydrostatic pressure releasing once the moving water stops. This has happened many times even with the pool full . FSP’s engineer (M) Report - 28 July 2014  The pool is approximately 25 to 35 yea rs old and was in average condition given its age.  The hairline crack in the eastern wall of the pool had been caused by age, long - term deterioration from exposure, wear and tear and climatic conditions (such as ultraviolet radiation) degrading the fibregl ass shell material.  The pebblecrete slabs had clearly subsided above the area of the bulge in the western wall of the pool. This had been occurring over an extended period of time given the growth of weeds and moss in the cracks and joints.  The bulging dam age to the western side wall included lateral tears and outward deflection of around 300 millimetres away from the perimeter paving.  This was consistent with the effects of general rain and surface runoff causing hydrostatic pressure to build up within th e surrounding fill material.  The build up of hydrostatic pressure had developed by entering the pool lining itself at the location of the major crack, as well as through gaps between the edge of the pool and the pebblecrete slabs.  This build - up of pressure caused the pool walls to deflect inward as the passive pool water pressure was less than the combined active fill and induced hydrostatic pressures.  Water had freely tracked into the foundation material over an extended period of time, increasing the moisture content of the foundation material and causing it to swell, which had resulted in heaving pressures around the pool wall lining.  The severity of the bulge in the western wall may have been Case No: 373581 Determination Page 7 of 9 Report Key points exacerbated when the pool was partly drained to facilitate the repair of the crack in the eastern side wall. This would have created an imbalance of pressures and induced the deflection of the pool lining.  The damage to the western wall of the pool was clearly consistent with the effects of gradual surrounding gr ound saturation, causing build - up of hydrostatic pressures and movement within the fibreglass shell. FSP’s engineer (M) Report - 9 October 2014  M’s original report had been reviewed by a fibreglass specialist, who had also reviewed the report provided by the Applicant’s repairer (K).  The origin of the eastern side cracking is not clear. However, t here is evidence that the original installation did not include the concrete being formed up under the return flange/coping to create an effective “bond beam” as required by the relevant Australian Standard.  This lack of support could have contributed to a minor fault in the fibreglass shell laminate, which led to the current damage.  The lowering of the pool water would have contributed to the bulging and surface c racking on the western side of the pool, in circumstances where this occurred without support and stabilisation of the wall and floor to prevent external pressures acting once the pressure of the internal pool water wa s reduced . There was no indication tha t any such precaution s had been taken .  In these circumstances, the bulging of the wall would have been the result of external lo ading of the wall, including hydrostatic pressure .  The flow of water and subsoil movement around the pool shell ext ernally could loosely be termed “hydrodynamic” . T o allow for this possibility, the relevant Australian Standard includes provisio n f or adequate sub soil drainage to suit the individual site.  T he lowering of the pool water clearly triggered the deflection of the we stern wall to the cur rent degree. T he pressure which caused this was external soil loading and hydrostatic pressure on the wall as the supporting head pressure of the internal pool water was reduced .  This would also contribute to the settling movement of t he surrounding sub soil causing the paving misalignment. Had the pool shell been stabilised before the water level was lowered, the damage would be able to be repaired and the pool would not require replacement.  It is highly unlikely that hydrodynamic pres sure would have be en the contributing factor. If such pressure had been present to any extent, it would indicate that adequate sub surface drainage had not been provided, as required under the relevant Australian Standard. Applicant’s engineer (R) Report - 28 October 2014  The crack on the eastern side of the pool developed in January 2014. The Applicant’s repairer ( K ) agreed to repair the crack when his work schedule allowed. As an interim measure , epoxy was placed over the crack to allow the normal water level to be re - established.  Before K could complete the repairs , the wa ll of the pool on the western side developed a severe bulge. There was also a fracture in the pool’s floor. This was first noticed during the week ending 29 March 2014. Case No: 373581 Determination Page 8 of 9 Report Key points  The concrete con course slab on the western side of the pool was cast wi th a series of expansion joints, some of which have distorted up to 15 millimetres . This did not occur recently and t he Applicant agrees it has been a gradual process over the 22 year life of the pool .  There is nothing to suggest that the crack on the eastern s ide of the pool is rel ated to the problem on the western side. Fibreglass pools are known to fracture at the coping, particularly when they are exposed to prolonged periods of temperature change w ith climatic conditions.  There is no movement between the pool and the concrete concourse and t he width of the concourse concrete is such that any stress in the fibreglass due to soil pressure would be very small . There is a faint hairline crack in the co ncrete near the split in the fibreglass.  A reasonable hypothesis is that shrinkage of the concrete stressed the shell , causing the crack in the eastern side wall to develop after 22 years. This should be considered a maintenance repair.  As to the bulge in the western wall of t he pool, there is no suggestion the water level in the pool was other than the norm. The pool is set above ground level on both sides (higher on the western side than the eastern side) and there was no flood of water above ground at an y time. Accordingly, there is no logical explanation as to how hydrostatic pressure could cause the failure of the pool.  Failure of the pool due to hydrostatic pressure requires an increase in the net pressure on the floor and the hydrostatic relief valve not work ing or not let ting water into the pool fast enough, so the floor balloons upwards. In these circumstances, t he radius of the walls is drawn inwards, normally by about 50 millimetres . As the water level recedes, the floor is forced down and fracture occurs.  The damage to the western side wall had been caused by hydrodynamic pressure.  According to data from the Bureau of Meteorology (BOM) , there was a storm on 25 March 2014. In his experience, the most dramatic effects of hydrodynamic pressure occur in conjunction with a hard strata such as rock or shale. In the present case, there is rock 500 m illimetres below the water table (900 millimetres below the top of the pool) .  Dur ing a significant storm, water travels along the surface of the rock and the volume of travelling water creates a destructive force. The height of the poo l above ground on the western side is such that one can logically pro pose that damage occurred to that side of the pool as a result of a combination of damage to the sand/cement backfill and high lateral pressure on the pool wall. The pool wall should be cut open to confirm this hypothesis.  The set out of the pool, the level of the pool relative to the exi sting ground level and the BOM records suggest hydrodynamic pressure is the only logical cause of damage to the pool.  The event which caused the failure was the storm on 25 March 2014 (which corresponds with when the Applicant says he first noticed the dam age). During the storm , the site conditions generated a Case No: 373581 Determination Page 9 of 9 Report Key points hydrodynamic pressure which pushed the western side wall of the pool inwards and led to consequential damage to the pool floor.  A failure caused by hydrostatic pressure would not have damaged a single wall of the pool or caused the extent of damage to the wall which occurred in this case.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.