Text of the determination
Determination
General Insurance - Domestic Insurance - Motor Vehicle - Comprehensive - FSP
Decision - Denial of Claim - Exclusion/Condition
Determination
Case No: 373581 Determination Page 1 of 9
Case number: 373581 6 January 201 5
1 Overview
1.1 Dispute
The Applicant lodged a claim under his home insurance policy with the Financial
Services Provider (FSP) for damage to his in ground fibreglass swimming pool.
The FSP denied the claim on the basis that the damage was caused by factors
which are excluded under the policy, such as hydrostatic pressure, earth
movement, gradual deterioration and wear and tear.
The Applicant disputes the FSP’s denial of his claim and wants his swimming pool
repaired.
1.2 Issue and key findings
Can the FSP deny the claim?
The Applicant has established a prima facie claim for accidental damage under
the policy, as the damage to his swimming pool was unintended.
However, the available information establishes that the damage to the pool was
caused by gradual deterioration, hydrostatic pressure and earth movement, each
of which is excluded under the policy. Accordingly, the FSP is not liable for this
damage.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is not liable for the Applicant’s claim.
Case No: 373581 Determination Page 2 of 9
2 Reasons for Determination
2.1 Can the FSP deny the claim?
Application of policy depends on cause of damage
The Applicant’s policy provides cover for accidental damage to his property, which
is defined to mean damage caused unintentionally. This cover is subject to the
conditions and exclusions set out in the polic y.
The policy contains exclusions for damage caused by or resulting from:
gradual deterio ration, including wear and tear
any earth movement not caused by earthquake (including erosion,
subsidence, collapse, and earth shrin kage or expansion) or
hydrostatic pressure to swimming pools and other in ground structures.
It is an accepted principle of general insurance law that an insured bears the onus
of establishing that, on the balance of probabilities, they have suffered a loss
caused by a risk insured under the policy. This is known as a prima facie claim. If
the insured is able to establish a prima facie claim, the onus then shifts to the
insurer to show that, on the balance of probabilities, the loss falls within an
exclusion clause under the policy or that it is otherwise entitled to deny liability.
The FSP has not disputed that the Applicant’s swimming pool sustained damage
due to unintended events. In these circumstances, the Panel is satisfied that the
Applicant has established a prima facie claim, given the broad cover for
accidental damage provided under the policy.
Accordingly, the FSP bears the onus of establishing that, on the balance of
probabilities, it is entitled to rely on a policy exclusion to deny the Applicant’s
claim. In order to do so, the FSP must show that the proximate cause (that is, the
real, effective or predominant cause) of the damage to the swimming pool was
one of the excluded factors outlined above.
Damage to eastern wall and concrete slabs was caused by gradual
deterioration
Th e Applicant’s swimming pool sustained damage to several areas, namely:
a crack in the eastern side wall
cracking and sinking damage to the pebblecrete concrete slabs surrounding
the pool and
a bulge in the western side wall of the pool and a fracture in the pool floor.
Both the FSP’s engineer (M) and the Applicant’s engineer (R) concluded that the
crack in the eastern side wall of the pool had occurred as a result of gradual
deterioration due to exposure to climatic conditions over the 22 year life of the
pool.
Both engineers also concluded that the damage to the pebblecrete concrete slabs
surrounding the pool was due to long-term deterioration . The Applicant’s engineer
Case No: 373581 Determination Page 3 of 9
noted that the Applicant himself had confirmed that this damage had not occurred
recently, but had developed as a gradual process over the life of the pool.
The policy excludes cover for damage caused by gradual deterioration.
Accordingly, the FSP is not liable for damage to the eastern side wall of the pool
and the concrete surrounds.
Damage to western wall and floor was caused by hydrostatic pressure
The FSP says that the bulge in the western side of the pool wall was caused by
hydrostatic pressure and/or earth movement.
In support of its position, the FSP relies on the findings of its engineer (M), who
inspected the damage in July 2014 and concluded that:
water had entered the pool lining over an extended period of time, through the
major crack in the eastern side of the pool and the gaps between the edge of
the pool and the pebblecr ete slabs
this water had then entered the surrounding foundation material, increasing
the moisture content and causing it to swell
the resulting increase in hydrostatic pressure exceeded the passive pressure
exerted by the pool water, causing the fibreglas s shell of the pool to deflect
inwards.
M noted that the bulge in the western wall may have been exacerbated when the
pool was partly drained to facilitate the repair of the crack in the eastern side,
without appropriate stabilisation methods being undertaken. M considered that
this would have increased the imbalance of pressures acting on the pool, causing
the pool lining to deflect.
The Applicant’s engineer (R) has disputed M’s findings as to the cause of the
damage. In a report prepared in October 2014, R concluded that the damage had
been caused by hydrodynamic pressure created by water travelling along the
surface of the hard rock present underneath the water table, during a severe
storm on 25 March 2014. R considered that there was no logical basis on which to
conclude that the damage had been caused by hydrostatic pressure.
The Panel acknowledges that, as engineers, both M and R are appropriately
qualified to determine the cause of the damage to the Applicant’s pool.
However, having carefully reviewed the available information, the Panel considers
that the explanation provided by the FSP’s engineer (M) is more consistent with
the circumstances in which the damage arose.
In particular, the Panel notes that:
M’s explanation as to the mechanism by which water entered the surrounding
soil is consistent with the observed damage to the pool and
R’ s conclusion that there was no basis on which the damage could have been
caused by hydrostatic pressure appears to be based in part on his assumption
that the pool was filled to its normal level at the time the damage occurred.
However, the Applicant has confirmed that, after noticing the initial crack in the
eastern wall in March 2014, he had reduced the water level by around 350
m illimetres so that his repaire r could assess the crack . Given that repairs were
Case No: 373581 Determination Page 4 of 9
subsequently delayed for several weeks, it seems likely that the water level
remained lowered during this period. Photographs taken by the FSP’s
assessor during his inspection on 8 April 2014 show that the water level was
lower at this time.
For the reasons outlined above, the Panel is satisfied that, on the balance of
probabilities, the damage to the western wall of the pool was caused by
hydrostatic pressure and earth movement. Damage caused in this ma nner is
excluded from cover under the policy.
Case No: 373581 Determination Page 5 of 9
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised a number of issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
3.2 Reports
Report Key points
FSP’s
assessor (C)
Report -
14 Apr il 2014
The pool had a crack in the right hand (eastern) side wall and the
centre of the fibreglass shell. The Applicant had advised that he had
noticed this crack around four weeks earlier. There was also bulging
on the left hand (western) side wall , which the Applicant had first
noticed on 5 April 2014 .
There wa s cracking to the paved edging adjacent to the s kimmer box
and to the crack in the right hand side of the shel l. There are also
sunken sections of concrete surround (which appears aged and
ongoing).
The damage was caused by a combination of movement/settlement
and ongoing water entering around the pool, which appeared to have
occurred over a period of time, causing the surrounding ba se and soil
to subside and placing pressure on the pool shell.
The crack on the eastern side extended through the paved capping
surround and about halfway down the side wall. The Applicant had
applied silicone to prevent further water leaking behind the pool shell
and had also removed a section of the paved capping to allow for
repairs.
The Applicant had drop ped the level of the pool water to
approximately ha lf way to expose t he crack. The drop in the water
level could also have contribute d to a change in the pressure applied
to the side walls.
T he concrete surround adjacent to the bulge in the western side wall
Case No: 373581 Determination Page 6 of 9
Report Key points
had sunk by approximately 25 to 30 millimetres . There was p lant li fe
growing in the section that dropped, which indicated that the
movement ha d been occurring over a reasonable period of time.
The d amage to the pool has been caused by the difference in
hydrostatic pressure between the inside and outside of the pool wall ,
resulting in cracking and bulging of the fibreglass pool .
However, an engineer should be engaged to determine the cause of
the damage.
Applicant’s
repairer (K)
Report - 30
Jun e 2014
The sub ground water around the pool shell is called hydrodynamic
pressure while it is moving. As it stops, it is called hydrostatic
pressure.
The hydrodynamic pressure is now stopped. At its peak, the
hydrostatic pressure should release the hydrostatic valve.
If the pressure comes to o quick around the pool, it will beco me
damaged (ie, storm damage) from hydrodynamic pressure.
The damage to the pool was caused by the storm which delivered an
amount of water that the pool shell could not handle.
In his over 30 years of experience, K has seen hydrodynamic
pressure moving around a pool, distorting its shell out of shape and
then the hydrostatic pressure releasing once the moving water stops.
This has happened many times even with the pool full .
FSP’s
engineer (M)
Report - 28
July 2014
The pool is approximately 25 to 35 yea rs old and was in average
condition given its age.
The hairline crack in the eastern wall of the pool had been caused by
age, long - term deterioration from exposure, wear and tear and
climatic conditions (such as ultraviolet radiation) degrading the
fibregl ass shell material.
The pebblecrete slabs had clearly subsided above the area of the
bulge in the western wall of the pool. This had been occurring over an
extended period of time given the growth of weeds and moss in the
cracks and joints.
The bulging dam age to the western side wall included lateral tears
and outward deflection of around 300 millimetres away from the
perimeter paving.
This was consistent with the effects of general rain and surface runoff
causing hydrostatic pressure to build up within th e surrounding fill
material.
The build up of hydrostatic pressure had developed by entering the
pool lining itself at the location of the major crack, as well as through
gaps between the edge of the pool and the pebblecrete slabs.
This build - up of pressure caused the pool walls to deflect inward as
the passive pool water pressure was less than the combined active
fill and induced hydrostatic pressures.
Water had freely tracked into the foundation material over an
extended period of time, increasing the moisture content of the
foundation material and causing it to swell, which had resulted in
heaving pressures around the pool wall lining.
The severity of the bulge in the western wall may have been
Case No: 373581 Determination Page 7 of 9
Report Key points
exacerbated when the pool was partly drained to facilitate the repair
of the crack in the eastern side wall. This would have created an
imbalance of pressures and induced the deflection of the pool lining.
The damage to the western wall of the pool was clearly consistent
with the effects of gradual surrounding gr ound saturation, causing
build - up of hydrostatic pressures and movement within the fibreglass
shell.
FSP’s
engineer (M)
Report -
9 October
2014
M’s original report had been reviewed by a fibreglass specialist, who
had also reviewed the report provided by the Applicant’s repairer (K).
The origin of the eastern side cracking is not clear. However, t here is
evidence that the original installation did not include the concrete
being formed up under the return flange/coping to create an effective
“bond beam” as required by the relevant Australian Standard.
This lack of support could have contributed to a minor fault in the
fibreglass shell laminate, which led to the current damage.
The lowering of the pool water would have contributed to the bulging
and surface c racking on the western side of the pool, in
circumstances where this occurred without support and stabilisation
of the wall and floor to prevent external pressures acting once the
pressure of the internal pool water wa s reduced . There was no
indication tha t any such precaution s had been taken .
In these circumstances, the bulging of the wall would have been the
result of external lo ading of the wall, including hydrostatic pressure .
The flow of water and subsoil movement around the pool shell
ext ernally could loosely be termed “hydrodynamic” . T o allow for this
possibility, the relevant Australian Standard includes provisio n f or
adequate sub soil drainage to suit the individual site.
T he lowering of the pool water clearly triggered the deflection of the
we stern wall to the cur rent degree. T he pressure which caused this
was external soil loading and hydrostatic pressure on the wall as the
supporting head pressure of the internal pool water was reduced .
This would also contribute to the settling movement of t he
surrounding sub soil causing the paving misalignment. Had the pool
shell been stabilised before the water level was lowered, the damage
would be able to be repaired and the pool would not require
replacement.
It is highly unlikely that hydrodynamic pres sure would have be en the
contributing factor. If such pressure had been present to any extent, it
would indicate that adequate sub surface drainage had not been
provided, as required under the relevant Australian Standard.
Applicant’s
engineer (R)
Report - 28
October 2014
The crack on the eastern side of the pool developed in January 2014.
The Applicant’s repairer ( K ) agreed to repair the crack when his work
schedule allowed. As an interim measure , epoxy was placed over the
crack to allow the normal water level to be re - established.
Before K could complete the repairs , the wa ll of the pool on the
western side developed a severe bulge. There was also a fracture in
the pool’s floor. This was first noticed during the week ending 29
March 2014.
Case No: 373581 Determination Page 8 of 9
Report Key points
The concrete con course slab on the western side of the pool was
cast wi th a series of expansion joints, some of which have distorted
up to 15 millimetres . This did not occur recently and t he Applicant
agrees it has been a gradual process over the 22 year life of the pool .
There is nothing to suggest that the crack on the eastern s ide of the
pool is rel ated to the problem on the western side. Fibreglass pools
are known to fracture at the coping, particularly when they are
exposed to prolonged periods of temperature change w ith climatic
conditions.
There is no movement between the pool and the concrete concourse
and t he width of the concourse concrete is such that any stress in the
fibreglass due to soil pressure would be very small . There is a faint
hairline crack in the co ncrete near the split in the fibreglass.
A reasonable hypothesis is that shrinkage of the concrete stressed
the shell , causing the crack in the eastern side wall to develop after
22 years. This should be considered a maintenance repair.
As to the bulge in the western wall of t he pool, there is no suggestion
the water level in the pool was other than the norm. The pool is set
above ground level on both sides (higher on the western side than
the eastern side) and there was no flood of water above ground at
an y time. Accordingly, there is no logical explanation as to how
hydrostatic pressure could cause the failure of the pool.
Failure of the pool due to hydrostatic pressure requires an increase in
the net pressure on the floor and the hydrostatic relief valve not
work ing or not let ting water into the pool fast enough, so the floor
balloons upwards. In these circumstances, t he radius of the walls is
drawn inwards, normally by about 50 millimetres . As the water level
recedes, the floor is forced down and fracture occurs.
The damage to the western side wall had been caused by
hydrodynamic pressure.
According to data from the Bureau of Meteorology (BOM) , there was
a storm on 25 March 2014. In his experience, the most dramatic
effects of hydrodynamic pressure occur in conjunction with a hard
strata such as rock or shale. In the present case, there is rock 500
m illimetres below the water table (900 millimetres below the top of
the pool) .
Dur ing a significant storm, water travels along the surface of the rock
and the volume of travelling water creates a destructive force. The
height of the poo l above ground on the western side is such that one
can logically pro pose that damage occurred to that side of the pool as
a result of a combination of damage to the sand/cement backfill and
high lateral pressure on the pool wall. The pool wall should be cut
open to confirm this hypothesis.
The set out of the pool, the level of the pool relative to the exi sting
ground level and the BOM records suggest hydrodynamic pressure is
the only logical cause of damage to the pool.
The event which caused the failure was the storm on 25 March 2014
(which corresponds with when the Applicant says he first noticed the
dam age). During the storm , the site conditions generated a
Case No: 373581 Determination Page 9 of 9
Report Key points
hydrodynamic pressure which pushed the western side wall of the
pool inwards and led to consequential damage to the pool floor.
A failure caused by hydrostatic pressure would not have damaged a
single wall of the pool or caused the extent of damage to the wall
which occurred in this case.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.