Home / Financial Firm (Unknown - Insurer) / Determination 372791
Determination 372791
Refusal of further lawn and subsoil drainage damage after tree collapse
Summary
The applicant claimed for lawn saturation and subsoil drainage damage after a tree fell on his property, following an accepted home claim. AFCA found no prima facie evidence that the tree damaged the drainage, so the FSP's refusal stood.
The policy is an insured events policy and the applicant did not establish that the fallen tree damaged a drainage system causing the lawn saturation.
Issues
- Claim denial primary · not upheld“I am satisfied the FSP is entitled to rely upon the terms and conditions of the policy to refuse further payment of the Applicant's claim.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - Service - Delay in claim
handling
Determination
Case No: 372791 Determination Page 1 of 5
Case number : 372791 29 May 2015
1 Overview
1.1 Dispute
The Applicant lodged a claim under his Home Insurance Policy held with the
Financial Services Provider (FSP) following damage sustained when a tree
collapsed on the property on 17 April 2012. The FSP accepted liability for damage
resulting from the collapse and has settled the Applicant’s claim .
The Applicant now claims for additional damage including damage to a subsoil
drainage system in the Applicant’s front lawn. The FSP has denied the damage
arises from an insured event.
This matter has been subject to a Recommendation. The Recommendation
issued by the Case Manager was in favour of the Applicant. The FSP has
disputed the Recommendation.
1.2 Issues and key findings
Is the FSP entitled to refuse payment of the Applicant’s claim ?
The FSP is entitled to refuse the Applicant’s claim for further damage because:
The policy is an insured events policy.
The evidence presented does not establish that the Applicant has suffered
damage to a drainage system caused by the insured event.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is entitled to rely upon the terms and conditions of the policy to deny
liability with respect to the Applicant’s claim for the additional damage.
Case No: 372791 Determination Page 2 of 5
2 Reasons for Determination
There has been a full exchange of material between the parties and each party
has had the opportunity of addressing the issues that arise from the material
exchanged.
Following rejection of the Recommendation, the FSP supplied a further
submission and a number of photographs. The FSP maintains that there is no
evidence to support the Applicant’s claim that there was damage sustained to the
drainage system when the roots of the tree lifted out of the ground.
The Applicant claims the FSP has incorrectly assessed this as the damage was to
his front lawn not the Council lawn.
This Determination follows consideration of all of the information exchanged
including the additional information provided following the Recommendation. The
Determination is based on what is fair in all the circumstances having regard to
the relevant legal principles, good industry practice, terms of the policy and prior
Determinations where applicable.
2.1 Is the FSP entitled to refuse the Applicant’s claim ?
The FSP is entitled to refuse the Applicant’s claim.
There is no dispute that the Applicant’s property sustained impact damage when
a tree collapsed on 17 April 2012. The FSP accepted liability for the damage and
conducted the appropriate repairs save for damage to a side fence to which the
FSP contributed 50% of the cost as the fence was a shared fence.
It was only after completion of the repairs that the Applicant identified what he
believed was further damage to his front lawn. He believed the lawn was always
wet following the repairs. This led to people walking mud through his house.
Attempts to restore the lawn had failed and he now seeks cover for the damage to
the lawn and internal carpets.
The Applicant initially considered that the damage to the front lawn was due to a
leaking pipe under the soil. The FSP has provided reports to indicate that no
leaking pipe was identified. Plumber S conducted a pressure test and no leakage
was detected.
The Applicant now believes that the ongoing damage and dampness to the front
lawn is caused by damage sustained to a subsoil drainage system.
The Applicant has provided a report from a plumber O dated 21 July 2014. O
identifies that inspection of the front yard ground water found that the old subsoil
drainage had been damaged by the tree that fell over and was not replaced. O
believed that when the new front fence footing and brick wall was installed, the
subsoil drainage system was not replaced. In a subsequent report dated 11
November 2014, O stated that an agg line was torn out of the ground by the tree
falling over.
Case No: 372791 Determination Page 3 of 5
The FSP’s assessor’s and plumber’s reports had not addressed the issue of the
agg line damage.
I note that there is no evidence provided by the Applicant or by O to identify the
presence of a subsoil agg drainage system. There is no evidence that O actually
observed an agg line that was torn out of the ground. There is no evidence from
the Applicant that this had been observed.
The FSP in rejecting the Recommendation has provided photographs taken at the
time of the initial assessment. A photograph identifies a damaged water pipe that
had been lifted when the tree collapsed. There is no evidence in the photograph
of any subsoil drainage system or agg line or any aggregate being displaced by
the roots of the collapsed tree.
I accept the FSP’s argument that if a subsoil drainage system or agg line was
damaged then this would have been immediately visible to the FSP’s assessor
and an estimator. There is no evidence of either observing such damage.
I am persuaded by the information provided by the FSP that most likely the
s aturation of the front lawn area of the Applicant’s property since the collapse of
the tree is due to:
The fact that the tree is no longer there to absorb subsoil water.
A changed direction of the flow of the water following the collapse of the tree.
The use of sleepers creating a wall causing the water flowing from adjoining
properties to flow onto the Applicant’s front lawn.
In the circumstances, I am not satisfied that the Applicant has established a prima
facie claim that the saturation of the front lawn was due to damage sustained to
the subsoil drainage or agg line from the impact of fallen tree.
I am satisfied the FSP is entitled to rely upon the terms and conditions of the
policy to refuse further payment of the Applicant’s claim.
Case No: 372791 Determination Page 4 of 5
3 Supporting information
3.1 Expert evidence
Record Key points
FSP’s Assessor Report inspected insured property on 20 April 2012 and estimated
it to be 20 - 50 years old
noted impact from a fallen tree which had:
damaged front block rendered fence
side timber fence
interrupted water and electricity services
Applicant’s father’s car.
‘G’ Builder Scope of
works (FSP)
5 July 2012
estimated cost of repairs at $20,154.86
noted water services damaged by the tree from meter to
the house approximately 20LM
also damage to small section of water services from main
to the house 6LM.
‘J’s’ Assessment
Report (FSP)
consultant ‘B’ re - attended the insured site due to concerns
raised by the Applicant about the front lawn being so wet
B found it to be wet under feet
B noted the Applicant lived on the lowest block of the street
and the adjoining property was found to be firm at the time
colo rbond fence on treated pine installed
a plumber had conducted prior tests of the downpipes and
gutter to the street to see if any blockage, none found
B noted the fallen tree was big and might have been
soaking the moisture in the front yard.
‘S’s’ Plumber
Comments (FSP)
29 May 2013
called out to suspected water pipe leak to front driveway
area i.e. water laying in front lawn area and driveway
estimated home t o be around 60 years old
conducted pressure test on water service and no leakage
detected
S believed stormwater build up from higher properties in
the area is the issue. May be addressed by installation of
sub surface drainage.
Email from B to FSP
30 May 2013
attended insured property with S on 29 May 2013
the dwelling fence between the two properties has treated
pine sleepers which divert the run - off water from properties
above and spills over the insured front yard causing it to
become soft under foot
co ncluded the repairs under the claim had nothing to do
the concerns raised regarding the front yard being soft
under foot.
Case No: 372791 Determination Page 5 of 5
‘O’s’ Plumber Report
(Applicant)
21 July 2014
inspected front yard and found the old subsoil drainage
pipes had been damaged by tree that fell and had not been
replaced at the time
the falling of the tree had changed the direction of the
subsoil water flow which was now pooling in the front yard
new a gg drainage system needs to be installed along the
fence and down along the front brick fence out to the table
drain .
‘O’s Plumber Report
(Applicant)
11 November 2014
report in addition to previous report following inspection of
the damaged a gg line drainage
O confirmed the a gg line was torn out of the ground by the
tree falling over
a gg pipe line had not been replaced since the tree fell over
estimated the cost to replace the damaged a gg line at
between $1,700 to $1,900 which will stop the flooding in
the front yard.
FSP rejection of
Recommendation
Submission
2 April 2015
The consultants did not note the presence of or damage to
the a gg line . Photographs do not identify damage to an
a gg line or aggregate.
Photographs showing timber paling fence that would have
allowed water from adjacent properties flow through and
under the fence.
Photographs showing color bond fence built on pine
sleepers preventing water flow.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.