Determination 372725

Misleading statements about loan approval; delayed loan settlement and progress payments

FirmFinancial Firm (Unknown - Credit)
Decided2020-12-07
ProductCredit · Home loan
OutcomeFor the complainant in part
Amount awarded$1,084
Non-financial loss$3,500
Amount claimed$119,680
SourceAFCA PDF

Summary

Applicants said the FSP misled them into believing its loans were unconditionally approved and delayed settlement and progress payments, so they began building. AFCA upheld the misleading and delay complaints, awarding $1,083.60 financial loss with 4% simple interest and $3,500 non-financial loss, and rejected claims for penalty interest, rent and fund transfers.

Compensation for misleading conduct is measured by how much worse off the applicant is than without the misrepresentation, so only the interest differential caused by the delay was recoverable.

Issues

Subjects and remedies

pay compensationpay interestpay non financial loss

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Determination Case No: 372725 Determination Page 1 of 10 Case number: 372725 10 November 2015 1 Overview 1.1 Dispute In March 2014, the Applicants applied to the FSP for loans to refinance an existing loan they held with Bank S (Land Loan) and to build a home (Construction Loan) at the property (Property). The Applicants say the FSP misled them to believe it had unconditionally approved the Loans and unreasonably delayed advancing the Loans . 1.2 Issues and key findings Did the FSP mislead the Applicants about its approval of the Loans? The FSP misled the Applicants that it had unconditionally approved the Land and Construction Loans when it required further identification documents. Did the FSP unreasonably delay approving the Land Loan? The FSP unreasonably delayed approving the Land Loan between 22 May and 21 July 2014 by failing to correct an issue with the name on the Property title. Did the FSP unreasonably delay approving the Construction Loan? The FSP unreasonably delayed approving the Construction Loan which meant it delayed releasing progress payments seven and eight to the builder. Have the Applicants suffered loss for which they should be compensated? The Applicants‟ loss from having the builder commence work in mid-April 2014 is the interest differential between the FSP‟s loans and the Bank S loan , being $1,083.60. The Applicants are also entitled to compensation for the stress and inconvenience caused by the FSP‟s delays, totalling $3,5 00. The Applicants have not established their claims for penalty interest paid to the builder or rental costs unnecessarily incurred because of the FSP‟s delay. 1.3 Determination This Determination is substantially in favour of the Applicants. If the Applicants accept this Determination within 30 days, then within the next 14 days the FSP is to compensate the Applicants by crediting to their Loan account:  $1,083.60 (plus simple interest of 4% per annum from 28 April 2014 to the date of payment) financial loss, and  $3,500 non- financial loss arising from the FSP‟s conduct. Case No: 372725 Determination Page 2 of 10 2 Reasons for Determination 2.1 Did the FSP mislead the Applicants about its approval of the Loans? The FSP misled the Applicants about its approval of the Loans Broadly, to succeed in a claim for misleading or deceptive conduct in relation to a financial product or service, the Applicants must be able to show that:  the FSP made a statement or engaged in conduct that was false or misleading (misrepresentation), and  the Applicants relied on the misrepresentation to their detriment. The remedy to misleading conduct is not to make the promise come true. Instead, the question to be asked is how much worse off was the applicant as a result of relying on the misrepresentation compared to the position they would have been in had the misrepresentation not been made. The Applicants say that the FSP misled them on 16 April 2014 to think that it had unconditionally approved the Land and Construction Loans. Based on this, they say that they:  signed the building contract, and  transferred $348,243.60 from Bank S to a transaction account with the FSP. On 16 April 2014, the FSP told the Applicants via email that it had unconditionally approved a $616,000 Land Loan and a $214,000 Construction Loan. On 28 April 2014, the FSP noticed that the Property title stated the female Applicant‟s maiden name whereas the Land and Construction Loan contracts stated her married name. The FSP needed to either change her name on the contracts or provide information required by the Land Property Information (LPI) to change her name on the title. The FSP and the Applicants decided to change the female Applicant‟s name on the Property title because the building contract was also in her married name. The FSP sighted the Property title on 12 March 2014 and electronically imaged a copy of it to its system. The FSP was therefore on notice that the Property title was in the female Applicant‟s maiden name and should not have told the Applicants on 16 April 2014 that it had unconditionally approved the Land and Construction Loans. The FSP‟s conduct in this regard was misleading. The Applicants did not rely on the misrepresentations when entering into the building contract The Applicants say they signed the building contract after the FSP told them it had unconditionally approved the Land and Construction Loans. The information available shows that the female Applicant signed the building contract on 23 September 2013, which was:  49 days before the Applicants first contacted the FSP on 11 November 2013  almost six months before the FSP started assessing the Loan applications on 4 March 2014, and Case No: 372725 Determination Page 3 of 10  almost seven months before the FSP misled the Applicants to believe it had unconditionally approved the Land and Construction Loans on 16 April 2014. The Applicants paid a $59,967.50 deposit to the builder on 3 March 2014. This was the day before the Applicants asked the FSP to start the Loan applications and over one month before the FSP‟s misrepresentation. The factors outlined above show that the Applicants did not rely on the FSP‟s misrepresentation to enter into the building contract because the building contract had already been signed. Further, it does not appear that the Applicants had applied for loans with other credit providers at the same time and the FSP‟s actions caused them to decline any other finance offers. Accordingly, the FSP is not required to compensate the Applicants in relation to the signing of the building contract or payment of the deposit under that contract. The Applicants relied on the misrepresentations when instructing the builder to commence work The Applicants say that they relied on the FSP‟s April 2014 misrepresentations to instruct the builder to “go ahead with the construction”. They say they “did not jump the gun; we did not appoint and award the contract to build the house without getting an approval from a … bank to commit ourselves”. In particular, they requested the FSP officer who managed their application to give them the “go ahead in writing” and he did so, making a signed note to that effect on their working papers. I accept that the Applicants likely instructed the builder to commence work after receiving the FSP‟s email and letters of 16 and 17 April 2014, and the FSP officer‟s signed note. The FSP‟s valuer noted on 2 April 2014 that the Property comprised a cleared site with a shed and water tanks at its rear. On 1 May 2014, the builder submitted progress payments 2, 3, 4 for the completion of work comprising the “concrete pier stage”, “earthworks stage” and “footings and slab stage”. Although it is possible some of this work was undertaken after 2 April 2014, and before the misrepresentations of 16 and 17 April 2014, I accept that the bulk of the work is likely to have occurred after the FSP emailed the Applicants the “unconditional approval” on 16 April 2014, sent them the letters of offer dated 17 April 2014 for the Land and Construction Loans, and the FSP officer gave them the go ahead. The Applicants have referred to work undertaken to demolish the old house on the Property. Since the site was apparently clear when the valuer attended the Property on 2 April 2014, the demolition work must have been undertaken some time earlier and is therefore not something for which the FSP must compensate. The issue of what loss was incurred by the Applicants as a result of them instructing the builder to commence work based on the FSP‟s misrepresentation is considered in section 2.4 below. Case No: 372725 Determination Page 4 of 10 2.2 Did the FSP unreasonably delay approving the Land Loan? The FSP took too long to resolve the issue with the Property title As outlined above, the FSP sighted a copy of the Property title on 12 March 2014 and imaged a copy of it to its system. The FSP issued the Land and Construction Loan contracts on 17 April 2014 and the Applicants returned them on 23 April 2014. The FSP had notice that the title to the Property was in the female Applicant‟s name as at 12 March 2014 and should have taken steps to have it corrected. On 28 April 2014, the FSP noticed the issue with Property title and asked the female Applicant to provide documents to satisfy the LPI‟s requirements . According to the LPI ‟s circular dated August 2009 (r eissued in September 2009), the female Applicant needed to provide one original or certified identification document from “List A” and one from “List B”. On 8 May 2014 (within 10 days of the FSP‟s request) , the female Applicant provided the FSP a certified copy of her Australian citizenship certificate and a certified copy of her Australian p assport. This satisfied the LPI‟s requirements. Yet the FSP kept asking the female Applicant to provide more identification documents and to translate certain documents into English. Had the FSP taken steps to correct the issue with the Property title on 12 March 2014, it is likely that the female Applicant would have provided the required documents to it by 22 March 2014 (10 days later). This was before the FSP unconditionally approved the Land Loan. This means that the FSP should have been in a position to book settlement to refinance the existing loan with Bank S when it received the signed contracts from the Applicants on 23 April 2014. The FSP was ready to book settlement to refinance the existing loan with Bank S on 16 July 2014 and settlement occurred on 21 July 2014. It took the FSP five days complete settlement. It follows that had the FSP been ready to settle on 23 April 2014, it is likely that settlement would have occurred some five days later on 28 April 2014. The FSP therefore unreasonably delayed settlement of the Land Loan from 28 April 2014 to 21 July 2014. 2.3 Did the FSP unreasonably delay approving the Construction Loan? The FSP unreasonably delayed approving the Construction Loan The available information indicates that the Applicants may have had sufficient funds in April 2014 to complete the Property with a mixture of the Construction Loan, funds redrawn from the existing loan with Bank S, a family gift and cash holdings. It was also suggested at one point that the Applicants were to sell an existing property to assist with financing the construction of the Property. As it turned out, the Applicants did not have enough funds to complete the construction of the Property. The FSP noticed that the Applicants had insufficient funds when it received a copy of progress payment seven on 24 July 2014. Case No: 372725 Determination Page 5 of 10 Subsequently, the FSP created a new application on 18 August 2014 and increased the amount of the Construction Loan from $214,000 to $843,000. Had the FSP made reasonable enquiries about the amount of funds the Applicants required, it is likely that the FSP could have assessed and approved a new application for a higher loan amount between 12 March 2014 (the date it sighted the building contract) and 24 July 2014 (the date it received the request for progress payment seven). Had it done so, the FSP would not have been required to obtain the following, which further delayed its approval of the Construction Loan:  new financial information from the Applicants because it had entered into a new financial year, and  a second valuation of the Property on 9 October 2014 which returned the same value as the valuation it obtained on 2 April 2014 (it does not appear that the FSP charged the Applicants for this second valuation). Based on the above factors I accept that the FSP unreasonably delayed settlement of the Construction Loan. That delay impacted the timing of progress payments in the manner discussed below. The FSP delayed releasing progress payments seven and eight to the builder The FSP ‟s delay in approving the Construction Loan meant that the FSP delayed releasing progress payments seven and eight to the builder. The FSP was required to complete a „progress payment report‟ before it released an y progress payments. Allowing the FSP a period of seven days to complete a progress payment report, it should have been in a position to release progress payment seven to the builder on 31 July 2014 (seven days after it received the Applicants‟ payment request on 24 July 2014). The FSP released progress payment seven on 17 October 2014. This means the FSP delayed releasing progress payment seven for 78 days. The FSP received the request for progress payment eight on 8 September 2014. Following the same reasoning as above, the FSP should have been in a position to release progress payment eight on 15 September 2014. Instead the progress payment was paid on 17 October 2014. The FSP therefore delayed releasing progress payment eight for 32 days. 2.4 Have the Applicants suffered loss for which they should be compensated? The Applicants’ loss is the interest differential between the FSP and Bank S The FSP delayed refinancing the Bank S loan between 28 April and 21 July 2014. This is a period of 83 days. At settlement, the FSP transferred $626,995.18 to Bank S and $16,000 to credit cards in male Applicant‟s name. The Applicants have not provided a copy of the final account statement with Bank S as requested. However, the FSP has provided a copy as at 8 October 2013 showing Case No: 372725 Determination Page 6 of 10 that Bank S was applying an annual interest rate of 5.66%. The Reserve Bank of Australia did not change its cash rate between October 2013 and July 2014. In the absence of any information to the contrary, it is reasonable to assume that Bank S also did not change its interest rate during this period. The FSP applied an annual interest rate of 4.90% to the Land Loan. The Applicants‟ loss is the difference between 5.66% and 4.90% (which is 0.76%) on $626,995.18 for 83 days. This equals $1,083.60. The FSP should therefore compensate the Applicants this amount for its delay. The male Applicant has not provided any information to show what, if any, interest he paid to his credit cards between 28 April and 21 July 2014. In the absence of such information, the FSP is not required to provide additional compensation in this regard. It is also unclear how the Applicants met the alleged $460,000 in payments to the builder. The Applicants say they borrowed privately and from friends to pay the builder. Save, however, for providing a statutory declaration from Mr GA, they have not provided supporting information about the source or cost of the funds used to pay the builder. The Applicants say Mr GA worked for the concreter who performed the demolition/excavation work at the Property. On 31 August 2015, Mr GA made a statutory declaration stating that:  he lent the male Applicant $27,000 at bank interest rates  the male Applicant was to start paying him a few hundred dollars a month once he received money from the FSP, and  he has not received any repayment from the male Applicant and this has interfered with his ability to study. Mr GA has not provided details of the interest rate(s) charged and his statutory declaration provides little supporting information about the Applicants‟ claimed loss. In any event, if, as he says, Mr GA lent the male Applicant the $27,000 “at bank intere st rates”, the Applicants are in no worse position for having borrowed from Mr GA than they would be had they obtained the loan funds earlier from the FSP. In the absence of information to show what (if any) additional costs the Applicants incurred in reli ance on the FSP‟s misrepresentation that the Loans were approved, the loss for which the FSP must compensate the Applicants is the interest differential between the FSP and Bank S, being $1,083.60. The information does not support the Applicants’ claim for penalty interest paid to the builder The Applicants say they paid $845 per day in penalty interest to the builder due to the FSP‟s delay in releasing progress payments seven and eight. They say they paid a total amount of $119,680 between 22 April and 30 June 2014. The building contract makes no mention that the Applicants have to pay $845 per day in penalty interest if they delay making a progress payment. Clause 16 of the building contract says: Case No: 372725 Determination Page 7 of 10 16.1 The builder may charge the owner interest at the rate stated in Item 10 of Schedule 1 from the day on which an amount fall due to be paid to the builder up to and including the day that amount is paid. Item 10 of Schedule 1 says if there is no interest rate stated then the applicable rate is the post-judgment rate applicable to judgments in the NSW Supreme Court. Between 1 July and 31 December 2014, this annual rate was 8.5%. Although given the opportunity to do so, the Applicant have not provided receipts or other information to establish that they paid any penalty interest to the builder. I am therefore unable to conclude that the Applicants paid penalty interest to the builder under the building contract. Accordingly, the FSP is not required to compensate the Applicants for their alleged penalty payments under the building contract. The information does not support the Applicants’ claim for rent The Applicants say that the FSP should compensate them for rent of $800 per week (plus an unspecified penalty) they have been required to continue to pay because of delay in the progress of the build. They say that had the FSP “honoured the contract and [made] progress payments to the builder as per the contract… the house would have been finished and we would be living there … at the latest [by] January/February 2015”. The FSP‟s loan processing notes (Notes) document the Applicants‟ request for a “construction loan to build a large investment property” . The Notes describe the supporting security for the Loans as “investment property under construction”. When assessing serviceability for the Loans, the FSP factored in rent (at $2,000 per week) expected to be derived from the newly constructed house at the Property. The contemporaneous material contained in the FSP‟s Notes suggests that the Applicants did not intent to move into the Property but instead anticipated leasing the Property. Further, there are inconsistencies in the information provided as to whether the Applicants continued to rent during the construction period. In early March 2014, the F SP‟s Notes document that the Applicants were renting a townhouse. However in September 2014, when assessing serviceability on their application for further funds to complete the construction, the FSP‟s Notes show that it relied on a family member‟s signed letter stating that “the Applicants live rent free in a home provided by family ” . In contrast, the Applicants say that upon signing the building contract, they leased the premises in which they are currently living for 7 months, and then extended it for a further 3 months. They have provided a couple of pages of what appear to be separate tenancy agreements for the same premises; one showing a rental term from 1 July 2013 until 31 January 2014, and the other showing a rental term from 30 December 2013 until 28 December 2014. The Applicants may have suffered loss in terms of rental income not received from the Property. However the Applicants have provided no information to show that the Case No: 372725 Determination Page 8 of 10 FSP‟s delay in releasing progress payments seven and eight caused a delay in the construction by the builder and hence resulted in a loss of rental income. On balance, I am not satisfied that the Applicants are entitled to be compensated for rent they claimed to have paid because:  the FSP Notes show that the Applicants‟ i ntended to use the Property as an investment property and therefore would have had to pay rent in any event  even if that were not the case, it has not been shown that rent was paid by the Applicants, and  it has not been shown that the delay in the progress payments resulted in a delay in the construction of the Property. The transfer of funds from Bank S to the FSP did not cause loss The Applicants say that , based on the FSP‟s misrepresentation, they redrew $348,243.60 from their existing loan with Bank S o n 13 May 2014 and transferred these funds to the FSP. The Applicants have not provided a copy of the Bank S account statement showing this transfer but there is a credit of this amount to their transaction account with the FSP ending 6430. The Applicants have not explained why they transferred these funds from Bank S to the FSP. It appears that the Applicants are claiming that they had to pay interest on these funds to Bank S while they were not earning interest with the FSP. The Applicants withdrew $348,000 of the Bank S funds 17 days later on 30 May 2014. It would appear that the Applicants used the Bank S funds to make progress payments to the builder prior to the FSP making its progress payments. This means that even if the Bank S funds had not been transferred to the FSP, the Applicants would not have earned interest on them as they were withdrawn soon afterward . The Applicants have not been able to show that they suffered a loss by the transfer of funds from Bank S to the FSP. Accordingly no compensation is payable. The FSP’s delays caused the Applicants undue stress and inconvenience The Financial Ombudsman Service (FOS) has the power to award compensation for non-financial loss an applicant has suffered. FOS takes a conservative approach to awards for non-financial loss. The maximum amount that can be awarded in this dispute is $3,000 per claim. The FSP‟s delay in approving the Land Loan caused the Applicants considerable stress and inconvenience given that they were required to provide additional documents to the FSP even after they had satisfied the LPI‟s requirements . The Applicants had to contact the FSP a number of times between 17 April and 21 July 2014 to follow up on settlement. On that basis I consider it fair that the FSP compensate each Applicant $750 ($1,500 in total) for their non-financial loss in this regard. The FSP has accepted that there was an “unacceptably long delay” in releasing progress payments seven and eight to the builder. The Applicants have described that the builder made a number of calls to them chasing payment, which is confirmed by the builder‟s emails to them and to the FSP. Case No: 372725 Determination Page 9 of 10 In the circumstances I consider it fair that the FSP should compensate each Applicant $1,000 ($2,000 in total) for the stress and inconvenience they suffered in relation to the delayed progress payments . This amount appears reasonable given that the FSP‟s delay in releasing progress payments added to the Applicants‟ earlier stress and inconvenience caused by the FSP‟s delay in approving the Land Loan. The FSP responded appropriately to the Applicants’ complaint The Applicants have complained about the FSP‟s response to their complaint. However, the Applicants have not provided any information to support their claim as requested. According to the information the FSP has provided, the Applicants first raised a complaint internally with the FSP on 20 August 2014 and lodged the FOS dispute on 26 August 2014. The FSP has worked with the Applicants throughout the FOS dispute in trying to get the information it needed to release progress payments seven and eight to the builder. It has also held meetings with them in attempt to resolve the issues in this dispute. The available information suggests the FSP responded appropriately to their complaint. FOS does not award punitive compensation The Applicants complain that FOS has not punished the FSP to “teach it a lesson for its actions causing them misery”. FOS does not require a financial services provider to pay compensation to an applicant in order to punish or censure the provider. An award of compensation is made to compensate the applicant for loss. When deciding on the compensation for loss, FOS does what it considers fair in all the circumstances Based on the reasoning set out in this Determination, I consider it fair in this dispute that the FSP compensate the Applicants for their:  financial loss of $1,083.60 (plus simple interest on that amount at 4% per annum from 28 April 2014 to the date of payment), and  non-financial loss of $3,500. Case No: 372725 Determination Page 10 of 10 3 Supporting information 3.1 FOS process This dispute has been the subject of a Recommendation substantially in favour of the Applicants (except in relation to the loss amount claimed), which was not accepted by the Applicants. I have considered all the material submitted by the parties, both before and after the Recommendation was issued, in order to reach my decision. I am satisfied that the material I relied upon in reaching my findings has been exchanged between the parties. I have had regard what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance as to practice, good industry practice and previous relevant decisions of FOS or its predecessors (though I am not bound by these).

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.