Text of the determination
Determination
Case No: 372690 Determination Page 1 of 9
Case number: 372690 16 December 2015
1 Overview
1.1 Dispute
The Applicants have appointed a representative to act on their behalf in this dispute.
The Applicants intended to build two units on SH property which was purchased
under a Family Trust. To do so, in October 2010 they applied for a construction loan
with the Financial Services Provider (FSP), which was approved in July 2011.The
loan was to be secured by SH property and B property, which the FSP already held
as security for existing borrowings.
The dispute is about whether the FSP delayed:
The assessment of the October 2010 and May 2011 loan applications.
Making progress payments to the builder.
The Case Manager provided the parties with a Recommendation on the issues in
dispute. The Recommendation was in favour of the FSP. A copy of the
Recommendation is attached to this Determination. The Applicants rejected the
Recommendation on the 9 September 2015. The FSP has also put forward
information in relation to the issues raised by Applicants in rejecting the
Recommendation.
1.2 Issues and Key findings
Were the findings of the Recommendation correct?
The findings contained in the Recommendation were correct and are adopted in this
Determination. After the Recommendation the Applicant has raised further issues
which I consider below.
Did the FSP unreasonably delay the assessment of the October 2010 loan
application?
The FSP‟s decision about the acceptable borrower and construction me thod is a
credit risk assessment that the Financial Ombudsman Service (FOS) does not have
the power to review.
Did the FSP unreasonably delay the assessment of the May 2011 loan
application?
Due to the FSP‟s delay between 10 June 2011 and 5 July 2011, the completion of
the units on the SH property was delayed by the same period.
Case No: 372690 Determination Page 2 of 9
Did the FSP unreasonably delay making the progress payment to the Builder?
The FSP made the first progress payment within three weeks of approving the
construction loan. The FSP completed the tasks required in a reasonable time.
Are the Applicants entitled to any compensation?
The FSP should pay to the Applicants $15,196.00
1.3 Determination
This Determination is substantially in favour of the FSP.
However, because the FSP unreasonably delayed processing the May 2011 loan
application, the FSP should pay to the Applicants $15,196.00 in compensation within
14 days of their acceptance of the Determination.
If the FSP fails to make the payment, it will be required to pay the Applicants interest
at 4% pa on a simple interest basis for each day the payment is not made.
Case No: 372690 Determination Page 3 of 9
2 Reasons for Determination
2.1 Were the findings in the Recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
Recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that the case manager‟s Recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs of
the Terms of Reference and any relevant law.
2.2 Did the FSP unreasonably delay the assessment of the October 2010
loan application?
The information does not show that the FSP delayed assessing the application
because of the National Consumer Credit Code
The Applicants ‟ representative says that the FSP delayed in responding to the
Applicants May 2011 application after they had provided further information to the
FSP in April 2011. This was because of changes that had resulted from the National
Consumer Credit Code and a delay by the FSP in informing the Applicants that a
new loan application had to be submitted.
There is no information to support this claim.
The decision about whether the borrower was acceptable was a credit risk
decision for the FSP
I agree with w hat was said by the case manager that the FSP‟s decision about what
type of borrower is acceptable is a credit risk decision that FOS does not have the
power to review.
The FSP’s decision to seek clarification about the nature of the security was
justified
The Applicants ‟ representative disagrees with the way that the FSP classified the
house construction and says that credit risk decisions do not determine „ whether a
house is a house or a transportable home ‟ . Whether the house can be transported
determines this question. The FSP should not have assumed it was a mobile home
when seeing a reference in the paperwork to kit.
In December 2010, the FSP told the Applicants that it required a fixed price building
contract before it would approve the loan. The building contract for each unit stated
that approximately $170,000 was required for „ fabrication of the kit ‟ .
The FSP said it would not provide funds upfront for this cost and that it would not
make a progress payment to the builder unless the house was fixed to the site. The
Case No: 372690 Determination Page 4 of 9
building contracts in their original form were therefore not acceptable to the FSP
because of the ref erence to „fabrication of the kit‟.
I agree with what the case manager said in the Recommendation that the FSP‟s
decision not to accept the building contract was a credit risk decision because it was
concerned about the construction method, and the nature of the units it was taking as
security.
Even if it were the case that the units were fixed to the land and not mobile in nature,
it appears that the building contract did not say this. Therefore, the FSP was entitled
to raise this as an issue.
Rather than declining the loan application, the FSP said that it would reconsider the
matter if the Applicants provided an amended builders contract showing progressive
payments for each stage and removal of the reference that a payment was required
for „Fabrication of Kit‟.
These were reasonable requests for the FSP to make.
By February 2011, the Applicants had not supplied the amended documents and the
loan application lapsed.
I agree with the case manager that as at February 2011, when the original loan
application lapsed, the FSP had not caused any unreasonable delay in assessing the
application.
2.3 Did the FSP unreasonably delay the assessment of the May 2011
loan application?
The FSP Valuer ’s enquiries raised a concern about B property
As stated in the Recommendation, on the 20 May 2011, the Valuer told the FSP that
the B property was only zoned as suitable for two dwellings , and that they had asked
Council whether development approval for three dwellings existed (Development
Approval). Council replied that this approval was not recorded for the property. The
Valuer told the FSP its valuation of the property was subject to confirmation that
approval existed.
Because of this issue, the FSP placed its consideration of the loan application on
hold until this matter was resolved.
The Applicants representative says that the Development Approval issue should not
have held up the loan assessment because:
The FSP already held B property as security for existing loans and had obtained
prior valuations of the property, which had not raised this issue.
The FSP refused to provide contact details of its Valuer and these were
eventually obtained by the Applicant when he was later independently
contacted by the Valuer.
The Valuer‟s enquiries with the Council had been superficial and inadequate.
While the Recommendation says that proper enquiries of the Council by the
FSP were enough to reveal the development had been approved , he does not
recall this being the case. If his recollection is correct, the Applicants contacted
Case No: 372690 Determination Page 5 of 9
Council on 23 May 2011 and approval documents were provided by Council to
the Applicant.
Regardless of who contacted the Council and resolved the Development Approval
issue, given the issue had been raised, the FSP was entitled to have it resolved so
that it could be satisfied the security it was intending to take over B property in
relation to the new loan meet the zoning requirements.
It was open to the Applicants to contact Council to obtain the required documents to
establish that approval was in place, and this could have been done without any prior
discussion with the Valuer. There is no information to show that the FSP told the
Applicants that the investigation and resolution of issue was to be undertaken solely
by the FSP.
As the Applicants were providing B property as security, it was also incumbent on
them to be proactive in resolving the issue, and providing to the FSP evidence from
Council that it had issued approval for the construction of the three dwellings on the
property.
The fact the FSP already held B property as security for the existing loans and had
obtained prior valuations of the property, which had not raised this issue, does not
change my view given the property was being take as security for the new loan.
For these reasons, the FSP acted appropriately in relation to this issue .
The FSP did not delay the assessment of loan application before 9 June 2011
After reviewing the information, I agree with what the case manager has said that
there is no information to show that the FSP caused an unreasonable delay in
assessing the loan application before 9 June 2011.
The Applicants representative by email dated 9 June 2011 provided a brief
chronology of the loan assessment, and stated that it did not believe the loan
assessment had been unreasonably delayed at that stage.
My view is supported by FOS ‟ Banking Specialist who after reviewing relevant
information has said that in her opinion t he FSP‟s loan assessment had not been
unreasonably delayed at this stage.
The FSP delayed the assessment of loan application from 10 June 2011 and
should have reviewed the Family Trust Deed earlier
I also agree with what the case manager has said that the information shows that the
FSP caused an unreasonable delay in assessing the loan application between 10
June 2011 and 5 July 2011, and that the FSP should have reviewed the Family Trust
Deed earlier. I adopt the case manager‟s reasons for saying this and the se are
repeated in this Determination.
Case No: 372690 Determination Page 6 of 9
2.4 Did the FSP unreasonably delay making progress payments to the
Builder?
The FSP needed to be satisfied about other matters before it released the first
progress payment
As stated in the Recommendation, the FSP approved and issued the loan documents
on 5 July 2011 and these were returned by the Applicants on 8 July 2011. The first
progress payment was released on the 27 July 2011.
The Applicant's representative says that the payment request and invoices
(Documents) were included in the envelope with the contract documents when he
first hand delivered them to the F SP‟s document CBD area on 8 July 2011 . The FSP
accepts that this is the case, but adds that on the 14 July 2011 further information
was requested.
As stated in the Recommendation, it was necessary for the following to occur before
the FSP was in a position to release the first progress payment:
The FSP requested Council approved building plans for the SH property and
the correct builders warranty insurance certificate; and
The FSP ordered a progress inspection report in relation to the work already
completed on the SH property (Information).
It appears that the Information was received between 15 and 27 July 2011.
I agree with the view of the Banking Specialist that this Information was required by
the FSP, and until it was received, the FSP was entitled to not make the first
progress payment to the builder.
Given the above, I am not satisfied that the FSP unreasonably delayed making the
first progress payment to the builder because it was necessary for the FSP to obtain
the Information before it made the payment.
2.5 Did the FSP cause the Applicants to suffer any loss?
The FSP caused the Applicants a loss of net rental income
Due to the FSP‟s delay between 10 June and 5 July 2011, the completion of the units
on the SH property was likely to have been delayed by that same period. The SH
area was experiencing an economic boom at the time , and the units attracted tenants
immediately at high prices.
The Applicants have provided the rental schedule for the 2011/2012 financial year,
which shows:
The SH units were available for rent for 38 weeks in that financial year.
Gross rental income was $150,968.
Water charges were $5,496.
Gross rental income was $8,666.67 per month for each unit, which equals $7,122 for
each unit for 25 days. This is $14,244 of lost gross rental income.
Case No: 372690 Determination Page 7 of 9
Interest on the fully drawn loan of $1,090,522 at 6.81% pa for 25 calendar days is
$5,086. The Applicants would have also had approximately $515 of extra water
charges.
Based on these figures, the Applicants‟ lost net rental income for 25 days was
$8,643.
The FSP should therefore pay to the Applicants $8,643, plus interest of $1,553 (total
$10,196). I consider it fair and appropriate to calculate interest from 1 July 2011 to
December 2015 at 4% pa (calculated on a simple interest basis).
The FSP should compensate the Applicants $3000 for professional costs
The Applicants‟ representative has raised certain questions regarding the $3000
compensation limit stated in FOS‟ Terms of Reference (TOR) that can be awarded
towards legal or other professional costs incurred by an applicant in pursuing a
dispute with FOS.
Under paragraph 9.4 of FOS‟ TOR, FOS may ask a financial services provider to
contribute to the legal or other professional costs incurred by an applicant in pursuing
a FOS dispute to a maximum of $3000 (unless there are exceptional circumstances
to say that the provider should contribute more).
FOS determines, based on the available information, whether a financial services
provider should contribute to such costs, and whether there are exceptional
circumstances to justify an award greater than $3000.
In deciding whether exceptional circumstances exist, we consider what is fair in the
circumstances and take into account such matters as:
The complexity of the dispute.
Whether the d ispute raised legal issues on which, despite FOS‟ involvement, the
applicant reasonably needed advice.
Whether the d ispute involved complex financial data on which, despite FOS‟
involvement, the applicant reasonably needed finance advice.
Whether the applicant genuinely required expert assistance.
The representative says:
He is employed as a broker and also provides accounting services, and that it
was necessary to involve the accounting practice to resolve the „valuation
issue‟ .
The Applicants incurred professional accounting costs of $21,077.
On the available information, there are no exceptional circumstances that justify the
Applicants being awarded more that $3000 towards their cost of pursuing the
dispute.
Case No: 372690 Determination Page 8 of 9
FOS’ assessment of costs claimed
Costs incurred FOS’ assessment
$6300 was incurred in dealing with
the „valuation delay and concern‟ .
The Applicants say that the ir
accountant‟s involvement was
necessary because of their
understanding of the development.
For the reasons referred to earlier, the FSP
was entitled to seek resolution of the
D evelopment A pproval issue before the
loan application could be progressed any
further an d any costs the Applicants have
incur red in relation to this should be borne
by the Applicants.
$3500 was inc urred for providing the
chronology and the supply of any
documents to FOS that would have
been incurred by the Applicants if
they had been dealing directly with
FOS.
While I see no significant reason why a
large part of this t h i s information could not
ha ve been provided by the Applicants - to
the extent the Applicants required
a ssistance , the $3000 awarded provides
sufficient compensation for these costs.
The remaining costs relate to dealing
with the FOS dispute.
The Applicants representative says
given the complex nature of the
issues and given the „interesting‟
response from the FSP, the
Applicants were required to be
represented.
It was largely not necessary for the
Applicants to be represented by
accountants to deal with the issues raised
by the dispute , as the issues were not of
such a complex nature that required their
involvement. For example, accounting
services were not needed to present expert
information to respond to an argument
raised by the FSP .
The FSP should pay to the Applicants $3000 towards their professional costs.
The FSP should compensate the Applicants $2000 for stress and anxiety
The Applicants representative says that the $1000 non-financial loss compensation
awarded by the case manager is inadequate given that Applicants suffered a high
level of stress because:
The builder threatened to take legal action to recover funds for the completed
building work.
They worried that the FSP might not approve a continuation of other existing
lending if the FSP continued to incorrectly consider the security for the property as
unsatisfactory because of the Development Approval issue. Their concern
increased over time as it was proving more difficult to convince the FSP that the
Valuer had been incorrect with their initial enquiries about the Development
Approval.
The stress extended to the Applicants personal relationship and long-standing
relationship with the representative ‟s office .
Case No: 372690 Determination Page 9 of 9
The FSP says that while there were some delays that were caused by it, the
Applicants should receive no compensation because the circumstances of the
dispute did not lead to unreasonable or excessive inconvenience to the Applicants.
While it is understandable that the Applicants would have experienced stress
because of the FSPs delay in approving the loan between 10 to June and 5 July
2011, for the reasons discussed above, I do not accept that the FSP was not entitled
to seek information to show that B property met the planning requirements (this was
necessary so that the FSP could be satisfied the security for the new and existing
loan was not affected by the planning issue).
Given the circumstances of this dispute, including the fact that the Applicants
contributed to the situation they found themselves by starting construction work
before to they had received unconditional loan approval from the FSP, the FSP
should pay $1000 to each Applicant (a total of $2000) as non-financial loss arising
from the FSP ‟s delay in assessing the loan application between 10 June and 5 July
2011.
2.6 Other Matters
Time given to Applicant to respond to Recommendation was appropriate
The Applicants‟ representative has requested information as to why the Applicant s
were required by FOS to provide a response rejecting the Recommendation within 7
days.
The case manager sent a letter to the Applicants dated 26 August 2015, requesting
detailed reasons within 7 days as to why they rejected the Recommendation.
The letter also stated that FOS will only agree to an extension of time to provide a
response or further submission in exceptional circumstances, the decision maker will
issue a final decision on the information available, and that any further submissions
received before the final decision was issued would be considered by the decision
maker.
FOS determines under its TOR, what timeframes parties are required to provide a
response. The timeframe given to the Applicants to provide their response was per
FOS‟ normal time frames.
As such, I consider that FOS acted as per its normal process in informing the
Applicants that they were expected to provide reasons for their rejection of the
Recommendation within 7 days.
Applicants ’ request to have a meeting with FOS
The A pplicants‟ representative has requested that a FOS representative meet at their
office in Western Australia to discuss the dispute, and to clarify many of the points
raised so that FOS understands what has occurred between the parties.
I have considered the request for a meeting and formed the view that based on the
available information I have an understanding of the circumstances of the dispute
and as such, a meeting was not considered necessary.
Recommendation
Credit - Business Finance - Business Loa ns - Instructions - Delay
3 Overview
3.1 Dispute
The Applicants purchased the SH property as a Family Trust asset. The Applicants
intended to construct two units on the SH property, and applied for a construction
loan in October 2010. The FSP approved the construction loan in July 2011.
The Applicants say that the FSP unreasonably delayed its assessment of the
construction loan application, and delayed making progress payments to the Builder.
3.2 Issues and key findings
Did the FSP unreasonably delay its assessment of the October 2010
application?
The FSP‟s decision about the acceptable borrower and construction method is a
credit risk assessment that FOS does not have the power to review.
Did the FSP unreasonably delay its assessment of the May 2011 application?
It was reasonable for the FSP to seek confirmation that the dwellings on the B
property were approved by the local Council. However, the information it was then
provided indicated that it was likely that the dwellings were approved. The FSP had
previously taken the B property as acceptable security, and should have taken more
active steps sooner to satisfy itself that the dwellings were approved.
Did the FSP unreasonably delay making progress payments to the Builder?
The FSP made the first progress payment within three weeks of approving the
construction loan. The FSP completed the tasks required in a reasonable time.
What loss did the FSP cause to the Applicants?
The Applicants suffered a loss of net rental income, increased professional costs and
stress and inconvenience.
3.3 Recommendation
This Recommendation is substantially in favour of the FSP.
However, the FSP did cause a 25 day delay, and should compensate the Applicants
for the loss caused. The FSP should pay the Applicants $12,643.
Case No: 372690 Recommendation Page 2 of 8
4 Reasons for Recommendation
4.1 Did the FSP unreasonably delay its assessment of the October 2010
application?
FOS cannot consider a dispute about the FSP’s credit risk decisions
FOS does not have the power to consider a dispute about a financial services
provider ‟s assessment of the credit risk posed by a borrower or the security to be
required for a loan.
However, FOS can consider a dispute about whether a financial services provider
has unreasonably delayed its loan assessment, or unreasonably delayed providing
the funds for an approved loan.
The Applicants says that the FSP unreasonably delayed its assessment of the
October 2010 loan application
The Applicants say that the FSP initially caused unreasonable delay because:
It declined the original loan application because it was concerned about the
involvement of the Family Trust.
Once the Family Trust issue was resolved, the FSP declined the loan
application because it incorrectly believed the „kit‟ home was a transp ortable
home.
In considering this matter, I have reviewed the parties‟ responses, the FSP‟s credit
assessment notes and decision comments.
The FSP’s decision about an acceptable borrower is a credit risk decision
The FSP says it was initially unwilling to approve a construction loan because its
policies prevented construction lending where a trust was involved. In this case, the
Family Trust was the beneficial owner of the SH property. The FSP says that its
policy was later relaxed, and by 30 November 2010 it had deemed the loan
application “conditionally eligible”.
The FSP‟s decision about what type of borrower is acceptable for each loan type is a
credit risk decision that FOS does not have the power to review. The Applicants
might argue the FSP misapplied its own policy, or delayed in considering whether to
make an exception to their policy. However, even if this was shown, the Trust issue
did not affect the final timing of the eventual loan approval. This is because the
October 2010 application lapsed be cause of the FSP‟s concerns with the building
contract and construction method.
The FSP’s decision not to accept the building contract was a credit risk
decision
In December 2010, the FSP told the Applicants that it required a fixed price building
contract before it would approve the construction loan. The building contract for each
unit stated that approximately $170,000 was required for “fabrication of the kit”. The
Case No: 372690 Recommendation Page 3 of 8
FSP said it would not provide funds upfront for this cost, and that it would not make a
progress payment to the Builder unless the house was fixed to the site. The building
contracts in their original form were not acceptable to the FSP.
The Applicants disagree with the way that the FSP classified the house construction.
However, the FSP‟s decision about whether it was comfortable with the construction
method and building contract was a credit risk decision relating to the security that
FOS does not have the power to review.
Rather than declining the loan application, the FSP said that it would reconsider the
matter if the Applicants provided an amended construction payment schedule. By
February 2011, the Applicants had not supplied the FSP with such a schedule, and
the loan application lapsed.
As of the time (February 2011) when the original application lapsed, the FSP had not
caused unreasonable delays.
4.2 Did the FSP unreasonably delay its assessment of the May 2011
application?
A new loan application was lodged in May 2011
The Applicants lodged a new loan application in May 2011, and the FSP provided
conditional approval. One of the conditions of approval was that the FSP was
satisfied with the valuation of the security properties, which included the A pplicants‟ B
property. The Applicants had constructed three units on the B property in 2006, but
the B property remained on a single title (i.e. it had not been sub-divided).
The Valuer’s initial enquiries raised a concern about the B property
On 20 May 2011, the Valuer reported to the FSP that the B property was only zoned
as suitable for two dwellings. The Valuer had asked the local Council whether the
Applicants had development approval for three dwellings. The Council had replied
that there was no development approval listed for the B property. The Valuer told the
FSP its valuation of the B property was subject to confirmation of development
approval.
The FSP placed its consideration of the construction loan application on hold until
this matter was clarified. The Applicants say that the development approval issue
should not have held up the loan assessment. This is because:
The FSP already held the B property as security for existing loans, and had
obtained prior valuations of the property. These previous valuations had not
raised any concerns, and the FSP had accepted the valuations.
The Valuer‟s enquiries with the Council had been superficial and inadequate.
It was reasonable for the FSP to seek confirmation of development approval
The FSP was relying on the B property as providing security of over $1 million. If the
dwellings on the property did not have appropriate development approvals, this
would significantly affect the value of the B property. In the circumstances, it was
Case No: 372690 Recommendation Page 4 of 8
reasonable for the FSP to seek confirmation of proper approvals before it continued
its loan assessment.
The Applicants argued that the FSP had previously accepted the B property as valid
security. However, the FSP was not obliged to approve new lending secured by the B
property if it discovered there was a defect with its existing security.
The fact that it was reasonable for the FSP to be concerned is reflected in Mrs S‟s
email to the construction company that built the dwellings on the B property. In her
email dated 9 June 2011 to the builder for the B property, Mrs S expressed concern
about the consequences if there had not been proper approvals granted. This
suggests that the Council‟s response had left the Applicants concerned about
whether all proper approvals had been obtained.
As of 9 June 2011, the FSP had not unreasonably delayed its loan assessment
Between 20 May and 10 June 2011, there was communication between the relevant
parties about the development approval matter. One of these parties was the
company that provided the Applicants with accountancy, financial advice and
mortgage broking services (the Broker).
The Applicants expressed frustration to the Broker about the FSP‟s unwillingness to
accept that the B property had development approval. The Broker responded in an
email dated 9 June 2011 and stated that:
The Broker provided a brief chronology of the loan assessment, and stated that
it did not believe the loan assessment had been unreasonably delayed at that
stage.
The Broker‟s office had contacted the Council directly and had also been told
that the there was no development approval. The Broker noted that Mr S was
the “only person [the Council] had confirmed it too”.
I have asked a FOS Banking Specialist to review the available documents relating to
the FSP‟s loan assessment. The Banking Specialist has had extensive experience in
the banking and financial services industry and regularly provides FOS with advice
about banking practice. The Banking Specialist‟s view is that the FSP‟s loan
assessment had not been unreasonably delayed at this stage.
Based on the available information, including the Banking Specialist‟s opinion, it has
not been established that the FSP caused an unreasonable delay before 9 June
2011.
The FSP received documents indicating the B property had development
approval
By 10 June 2011, the FSP had the following information available:
Its previous valuation of the B property from October 2009, which stated that
there were three dwellings and that its “current use” was “permitted”.
A copy of a Council approved Building Licence dated 17 March 2006 and
stamped building plans.
A Council rates notice referring to a multiple dwelling property. This suggests
that the Council was aware of the number of dwellings and had approved these.
Case No: 372690 Recommendation Page 5 of 8
The Valuer was not satisfied that the Building Licence was sufficient confirmation of
proper Council approval. The Valuer noted that the Licence required compliance with
any further conditions in a development approval. While this was true, the Licence
did not suggest that such a development approval was yet to be approved.
As outlined above, it was reasonable for the FSP to initially have concerns. However,
the information provided to the FSP by this stage (10 June 2011) indicated that it was
highly likely that the Counci l had granted development approval. There was not much
more the Applicants could provide, short of the actual development approval. The
Applicants had already asked the Council to provide a copy of this and were waiting
for a response.
Active involvement from the FSP was sufficient to resolve the issue
Between 13 June and 28 June 2011, the following occurred:
The FSP suggested that the Broker might want to contact the Valuer directly to
discuss the matter.
The Valuer told the Broker it had provided an updated report to the FSP on 21
June 2011. FOS has not received a copy of any updated report, and it is
unclear what this report said.
On 28 June 2011, the FSP‟s credit area involved an FSP Valuation Risk Manager.
The Valuation Risk Manager contacted the Council. Within 24 hours, the Council
provided the FSP a copy of the Council‟s letter dated 15 December 2005 confirming
its approval of the triple dwelling. This shows that proper enquiries to the Council
from the FSP were enough to reveal the development approval.
The FSP should have already vetted the Trust Deed
The FSP proceeded to vet the trust structure, and then unconditionally approved the
construction loan on 5 July 2011.
The FSP had decided not to vet the Trust Deed until the B property issue was
resolved. This may have been to save time and expense if the loan application did
not proceed.
However, the FSP should have already vetted the Trust deed before July 2011. This
is because:
The Family Trust was the beneficial owner of the SH property, and the FSP had
been aware of this since October 2010. The FSP already had security over the
SH property.
If asked, the Applicants were willing to bear the expense of the Trust vetting in
order to ensure the soonest possible loan approval.
The FSP unreasonably delayed its assessment of the loan application
By 10 June 2011, the FSP had significant information to support that the B property
had a development approval. It is also significant that it already held security over the
B property and had prior valuations.
Case No: 372690 Recommendation Page 6 of 8
In the circumstances, it would have been reasonable for the FSP to take active steps
earlier, such as involving the Valuation Risk Manager. The period between 10 June
and 5 July 2011 represents an unreasonable delay caused by the FSP.
4.3 Did the FSP unreasonably delay making progress payments to the
Builder?
The FSP needed to complete several more tasks before it released the first
progress payment
The FSP approved the construction loan on 5 July 2011 and issued the construction
loan contract documents. The Applicants returned the completed documents to the
FSP on 8 July 2011, and the FSP released the first progress payment on 27 July
2011. In between those dates the following occurred:
The FSP requested council approved building plans for the SH property, the
corr ect Builder‟s Warranty Insurance Certificate, progress payment authority
forms and the Builder‟s invoices.
The FSP ordered a progress inspection report in relation to the work already
completed on the SH property.
The Applicants say that the FSP lost the progress payment authorities and invoices
that they provided to the FSP on 8 July 2011, and had to request them again on 17
July 2011. However, the Applicants have not provided any information to support that
the authorities and invoices were provided on 8 July 2011. The invoices provided by
the FSP have fax header‟s stating 17 July 2011.
The Banking Specialist‟s view is that the information required by the FSP was
necessary and that the FSP completed the required tasks within a reasonable time.
Based on the available information, it has not been established that the FSP delayed
in releasing the progress payments.
4.4 What loss did the FSP cause to the Applicants?
The FSP caused the Applicants a loss of net rental income
Due to the FSP‟s delay between 10 June and 5 July 2011, the completion of the units
on the SH property was delayed by that same period of time. The SH area was
experiencing an economic boom at the time and the units attracted tenants
immediately at high prices.
The Applicants have provided the rental schedule for the 2011/12 financial year. This
states that:
The SH units were available for rent for 38 weeks in that financial year
Gross rental income was $150,968
Water charges were $5,496
Gross rental income was $8,666.67 per month for each unit, which equals $7,122 for
each unit for 25 days. This is $14,244 of lost gross rental income.
Case No: 372690 Recommendation Page 7 of 8
Interest on the fully drawn loan of $1,090,522 at a percentage rate of 6.81% for 25
calendar days equals $5,086. The Applicants would have also had approximately
$515 of extra water charges.
Based on these figures, the foregone net rental income for 25 days was $8,643 .
FOS can award compensation for the cost of seeking professional advice
Our processes are designed so that applicants can bring disputes to FOS without
needing professional assistance. So, if an applicant chooses to be represented, this
will usually be at their own cost.
In some limited cases, we may require a financial services provider to reimburse the
reasonable fees charged by an adviser. When we assess this issue, we will take into
account the complexity of the dispute and whether the dispute raised issues that
reasonably required the applicant to obtain expert advice. The FOS Terms of
Reference state that FOS will not require a financial services provider to contribute
more than $3,000 to an applicant‟s cost of pursuing the dispute, unless exceptional
circumstances apply.
The FSP should compensate the Applicants for some of the Broker’s extra
charges
The Applicants have claimed compensation of $21,077 in relation to the costs they
incurred using the professional services of the Broker. These include the costs of
dealing with the loan assessment process, and the subsequent cost of pursuing the
FOS dispute. The Applicants have provided the Broker‟s invoices to support their
claim.
It was reasonable for the Applicants to incur the following costs of using the Broker‟s
services:
In June 2011, for assistance in dealing with the Council, Valuer and the FSP.
To provide a chronology and documents (includi ng correspondence, emails etc)
from their file records so that the Applicants could pursue a dispute against the
FSP.
The FSP should compensate the Applicants $3,000 for their costs incurred in this
regard.
The Applicants elected to use the Broker as their representative in the FOS dispute.
A substantial proportion of the costs claimed by the Applicants relate to this. The
circumstances of this dispute are not so exceptional that the FSP should be required
to contribute more than $3,000 to the Applicants‟ c osts.
The FSP caused the Applicants stress and inconvenience
The Applicants have claimed compensation for the stress and inconvenience of
dealing with the FSP‟s delay.
By late June 2011, the Builder was threatening to take legal action to recover funds it
was owed for completed building work. Therefore, it is understandable that the
Case No: 372690 Recommendation Page 8 of 8
Applicants experienced a high degree of stress due to the delay in the construction
loan approval.
However, the Applicants made a significant contribution to the situation in which they
found themselves. The Applicants had commenced construction work prior to
receiving unconditional loan approval from the FSP.
Despite this, the FSP‟s delay in assessing the loan application would have caused
stress and inconvenience to a reasonable applicant in the circumstances. The FSP
should pay $500 to each Applicant ($1,000 in total) as compensation for their non-
financial loss.