Home / Financial Firm (Unknown - Insurer) / Determination 372350
Determination 372350
Hail-damaged garage floor: cash settlement of $6,570.40 disputed and concrete replacement sought
Summary
After hail damage, the insurer offered to cash settle the garage floor rectification at $6,570.40, and the insured wanted a concrete floor. AFCA refused concrete, required the cash settlement to reflect an accessible retail price, and ordered reassessment and step rectification.
An insurer's obligation is limited to like-for-like materials, and a cash settlement must be based on a price the insured can actually access in the open market.
Issues
- Claim amount dispute primary · upheld
“The FSP has not fulfilled its obligations under the terms of the policy. Settlement amount must be based on a retail price.”
- Repairs or contractors secondary · upheld
“Insofar as the step height has been affected by the repairs undertaken... this should be rectified as part of any re-levelling of the floor.”
Subjects and remedies
home or building damagenatural disasterreassess claimrepair or rectify
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
amount - Service - Service quality
Determination
Case No: 372350 Determination Page 1 of 4
Case number : 372350 8 April 2015
1 Overview
1.1 Dispute
The Applicant holds a home building insurance policy with the Financial Services
Provider (FSP) covering his residential address.
On 6 March 2010 the property was damaged by severe hailstorm, for which a
claim was lodged. The FSP accepted the claim and arranged for the required
repairs to be undertaken, including the re-asphalting of the garage floor.
The Applicant was dissatisfied with the qua lity of works undertaken to the garage
floor. The FSP agreed to rectify the damage. The FSP, however, considered its
liability for the works was limited to the figure of $6,570.40, which it proposed to
cash settle. The Applicant disputes that decision.
1.2 Issues and key findings
Is the Applicant entitled to a concrete floor?
The FSP’s obligation is limited to replacing the garage floor with the same
materials as existing, that being asphalt.
Does the FSP’s offer fulfil its obligations under the policy ?
The FSP is entitled to cash settle the rectification costs. However, its settlement
amount must be based on a retail price, which the Applicant can access in the
open marketplace.
1.3 Determination
This Determination is substantially in favour of the Applicant.
Case No: 372350 Determination Page 2 of 4
2 Reasons for Determination
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions. I have taken into account all the material submitted by the
parties, both before and after the Recommendation.
There has been a full exchange of all documents relied on to make this
Determination and each party has had the opportunity to address any issues
raised by the other.
A Case Manager made a Recommendation in this dispute in favour of the
Applicant. The FSP accepted the Recommendation but it was rejected by the
Applicant. A copy of the Recommendation is attached.
The parties made post-Recommendation submissions, which included a quotation
for the asphalt works at the Applicant ’ s garage in the sum of $4,730.
I am satisfied that the findings and outcome in the Recommendation are correct.
2.1 Has the FSP’s offer fulfilled its obligations under the policy ?
The FSP has not fulfilled its obligations under the terms of the policy
The dispute between the parties is over the method and cost of rectification. The
issue is whether asphalt or concrete should be used to replace the garage floor.
The Applicant is not entitled to a concrete garage floor
The Applicant seeks to have the garage floor re-done in concrete rather than
asphalt, as he believes this will better wear over time than asphalt.
I agree with the conclusion in the Recommendation that a n insurer’s obligation is
limited to providing building materials on a like-for-like basis. Therefore, as the
Applicant had an asphalt garage floor prior to the loss occurring, that is what he is
entitled to as a replacement.
The FSP is entitled to cash settle the Applicant for the rectification costs
A cash settlement is appropriate, given that the Applicant wishes to consider his
options with regard to replacing the floor with concrete rather than asphalt.
Alternatively, the Applicant has the option of requesting the FSP authorise one of
its preferred contractors to undertake the re-asphalting of the garage.
The FSP is not entitled to rely on P’s quote
I agree with the Recommendation findings that the FSP cannot rely on P’s quote.
However, P has confirmed that they are not prepared to do the works privately for
the Applicant at the price quoted or at all. The quote from P is not an actionable
quote as the Applicant is not able to access this price privately in the open
marketplace.
Case No: 372350 Determination Page 3 of 4
I also agree with the Recommendation that the Applicant, if he does not want an
FSP contractor to carry out the work, is to source and submit a quote to the FSP
for the rectification works required, with the contractor quoting to replace the
asphalt floor with asphalt. Upon receipt of same, the FSP is to determine its
liability under the policy for the rectification works required. This should include all
ancillary costs set out in the Recommendation.
The costs to stabilise the concrete step
I determine that insofar as the step height has been affected by the repairs
undertaken, as the floor height was raised, this should be rectified as part of any
re-levelling of the floor. However, the FSP is not liable to ensure the step is of
minimum height once the floor level is returned to existing.
Case No: 372350 Determination Page 4 of 4
3 Supporting information
Post-Recommendation submissions
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.