Home / Financial Firm (Unknown - Credit) / Determination 371632

Determination 371632

Financial difficulty - FSP failure to respond to request for assistance

FirmFinancial Firm (Unknown - Credit)
Decided2015-04-30
ProductCredit · Business lending
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$162,068
SourceAFCA PDF

Summary

After a business loan expired, the FSP raised interest margins while the directors were in a forbearance arrangement to repay the debt. AFCA found the FSP did not mislead the applicants about the loan term, but the margin increases were unreasonable, so the FSP must recalculate and refund the excess interest with 5% simple interest, without legal or IA costs.

Under the Code of Banking Practice an FSP assisting a small business in financial difficulty should not apply increased margins before allowing a reasonable time to refinance.

Issues

Subjects and remedies

financial hardshipsmall businesspay interestrefund fees or charges

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Determination Credit - Business Finance - Business Loans - Disclosure - Misleading product/service information Credit - Business Finance - Business Loans - Financial Difficulty - FSP failure to respond to request for assistance Credit - Business Finance - Business Loans - FSP Decision - Denial of application Determination Case No: 371632 Determination Page 1 of 10 Case number : 371632 20 March 2015 1 Overview 1.1 Dispute The Applicants are directors of the Companies and they had several facilities with the FSP since 2007. The Facility relevant to this dispute is a Business Loan that was drawn on 12 October 2012 for a one year term that provided a $1,000,000 increase on their existing lending to allow the Applicant ’s to complete extensions to a Motel Property. The dispute concerns the assistance the FSP provided to the Applicants after the Facility term ended and the FSP decided not to renew it. 1.2 Issues and key findings Whether the FSP misled the Applicants about the term of the Facility The available information does not show that the FSP misled the Applicants about extending the term of the Business Loan. Whether the FSP gave genuine consideration to the Applicants’ requests for financial difficulty assistance. The FSP should have allowed the Applicants time to refinance their debts without the burden of increased interest charges. Whether the FSP has applied fees and interest correctly Other than the increased interest charges, the FSP applied fees and interest correctly. Whether the Applicants are entitled to compensation. The Applicants are not entitled to compensation for the FSP’s legal fees, their own legal fees or the costs of the Investigative Accountant. 1.3 Determination This Determi nation is largely in favour of the Applicants. If they accept it the FSP should recalculate the interest charged from 8 November 2013 to 1 July 2014 as outlined in Section 2.2 below. The FSP should provide this calculation within 14 days of the Determination being issued and if the Applicants accept the Determination, this amount should be paid to them directly as they no longer have facilities with the FSP. Case No: 371632 Determination Page 2 of 10 2 Reasons for Determination 2.1 Whether the FSP misled the Applicants about the term of the Business Loan Prohibition on misleading conduct The prohibition against misleading and deceptive conduct in relation to the provision of financial services arises under section 12DA of the Australian Securities and Investments Commission Act 2001 (Cth) (ASIC Act). Misleading conduct is conduct which leads, or is likely to lead, a person into error or to believe something which is false. Whether conduct is misleading is a question of fact to be decided by all of the relevant circumstances. The term and interest rate of the Business Loan The Business Loan was drawn on 12 October 2012 and had a twelve month term, to expire on 10 October 2013. The interest rate, when drawn, was 6.80% and repayments were interest only and due monthly in arrears . As part of the same variation contract, the FSP con verted the Applicants’ existing $2,770,000 Commercial Facility into a two year Business Loan, payable in pri ncipal and interest instalments of approximately $25,000 per month. The representation The Applicants say that the FSP represented that while the interest rate on the Business Loan might be re-negotiated at the end of the twelve months, the Loan term would be rolled over automatically for a further 12 months to allow them to complete the extensions and start trading with the new improvements . The email they say they relied on is dated 16 October 2012 and says: “ Loan term: 12 months for construction purposes then to be re-negotiated ” They also say that other subsequent representations by the FSP re -enforced their understanding, including the letter sent by the FSP on 12 June 2013 advising them that the expiry date of the Business Loan was approaching. They say that the following statement in this letter: “ if we are unable to finalise arrangements before expiry, re-pricing of the expired facility may occur” implied that only that the pricing of the Business Loan would be negotiated, not the term of the Loan itself. The FSP did not mislead the Applicants about the term of the Facility Case No: 371632 Determination Page 3 of 10 It is my view, taking into account all of the circumstances, that the FSP did not mislead the Applicants that the term of the Business Loan would be automatically rolled over for a further 12 months for the following reasons: The Applicants knew the Business Loan had a twelve month term Although the FSP appears to have contemplated a 24 month period for the $1,000,000 Business Loan when it was preparing the credit submission for the deal 1 , when the Applicants signed the Business Loan contract it clearly stated that the $1,000,000 Business Loan was to expire 12 months from the drawdown dated. This was consistent with it being a construction loan and the understanding that after the extensions to the Motel were complete, the FSP would assess whether it was going to provide funding on the same basis, depending on the value of the completed Motel. Further, by their conduct the Applicants accepted that even though a longer term contract was originally contemplated, the FSP in the end offered only a 12 month term. Specifically, they responded to the FSP’s letter in June 2013 requesting information from them before the expiry of the Business Loan and provided the information requested. They then followed up several times with the FSP, concerned about the imminent expiry of the term in October 2013. There was no representation that it would be rolled over automatically Nor do I accept that the FSP misrepresented that the Business Loan would be automat ically rolled over after 12 months. It was evident from the FSP’s email of 16 October 2012 that any further consideration of the Loan term would need to be “re - negotiated” after 12 months. I believe that this statement is clear in its terms and that it would be evident to experienced business people, as the Applicants are, that any extension to the term would be subject to negotiation and assessment at the end of the 12 month period. The Applicants would also have been aware, from previous construction projects and funding proposals they had with the FSP that it is the commercial discretion of the FSP as to whether it continues to extend funding. I believe that they were aware, by their submissions to the FSP prior to the Business Loan expiring, that any extension of the Business Loan term was subject to their application (and supporting documentation) being viewed favourably by the FSP. While it was disappointing to the Applicants when the FSP decided not to provide the Applicants with a further term, it was entitled to form this view and did not represent to the Applicants otherwise. The Applicants have not shown that they relied on the representation 1 The 10 July 2012 Credit Risk Submission originally proposed structuring the $1,000,000 Business Loan “over 24 months” but this was not apparently accepted by the FSP’s Credit department, who approved the Loan for 12 months only. Case No: 371632 Determination Page 4 of 10 Even if I were to find that the 16 October 2012 email was misleading (and I have not) the email was sent after the date the Applicants signed the contract documentation. This means that the email would not support the Applicants’ claim that they relied on the representation in this email to their detriment (ie to enter into an unfavourable contract) as they had already agreed to the terms of the Business Loan prior to this email being sent. I am satisfied, on the available information, that the FSP did not mislead the Applicants about the term of the Business Loan and that, even if it did, they have not shown how they relied on this representation to their detriment. 2.2 Whether the FSP gave genuine consideration to the Applicants’ requests for financial difficulty assistance. The FSP has obligations to assist small businesses As FSP has obligations under the Code of Banking Practice (CBP) to assist small businesses in financial difficulty. Whether an FSP is able to provide ongoing assistance will be substantially influenced by the ability of the business to demonstrate its ongoing viability. If the business is unable to demonstrate ongoing viability based on reasonably tested information, then I would not expect an FSP to accept further risk. In such circumstances, the assistance required may be to provide a reasonable time to refinance or work with the business to achieve an orderly winding up of the business. I acknowledge that the application of an appropriate interest rate is a commercial decision for the FSP. However, it may not be appropriate to apply a default interest margin when the small business is already experiencing financial difficulty and is in a dialogue, or has made an arrangement, with the FSP about how to overcome those difficulties. The FSP was entitled to appoint an Independent Accountant (IA) The records in Section 3.1 of the Determination below show that the FSP was not engaging effectively with the Applicants from when it sent them a letter in June 2013 to tell them to provide information prior to the Business Loan expiring, until early October 2013, when it extended the term of the Business Loan for 30 days to consider the information. This lack of engagement appears to have been resulted from a change in Relationship Managers. The FSP has acknowledged that there was no delay on behalf of the Applicants. There was no financial loss to the Applicants as a result of this delay, however, as the Business Loan had not expired and standard interest was continuing to apply while they waited for the FSP to assess their information. Once the FSP turned its mind to the Applicants’ financial informa tion, it advised them that it wanted to appoint an IA to verify the progress of the construction and trading figures. The Applicants disputed the appointment of the IA as they say that the construction was 90% complete and that the IA’s subsequent report was of little value. Case No: 371632 Determination Page 5 of 10 I am satisfied that the FSP was entitled to appoint the IA to provide an independent assessment of the Applicants’ position and inform any decision it was to make about extending the funding or providing forbearance. This was an action that it was validly allowed to take under Clause 16.4 of the General Terms for Business Lending that applied to the Business Loan, which states: “If we believes that there is or may be an Event of Default, we may request a person to investigate, report to and advise us on the financial and trading condition of you, a Guarantor and any of your or their Related Entities…You must pay all costs in connection with the investigation”. I am also satisfied that the appointment of the IA was reasonable in the circumstances given the specialised nature of the Applicants ’ industry and the complex nature of the A pplicants’ business structures. I acknowledge that the Applicants say that:  they only ended up agreeing to the appointment of the IA because the FSP said it would require the facilities to be repaid in full otherwise, and  that the report was of no benefit to them. However, after considering the IA ’s report , the FSP decided to provide the Applicants with a period of forbearance until 28 June 2014 which would allow them to complete the construction and refinance their debts, which although it was not their preferred outcome, allowed them to complete the extensions and continue to trade. I am therefore satisfied that, by appointing an I A and applying the IA’s recommendations, the FSP demonstrated its willingness to work with the Applicants, albeit for a short period of time. I am satisfied that in this respect they complied with their obligations to consider the Applicants’ financial difficulty. It is therefore reasonable that the Applicants bear the costs of the IA. These costs have already been charged to them, and repaid by the refinance of the facilities so there is no refund payable to the Applicants for this aspect of the dispute. However, the FSP should have provided the Applicant with time to refinance their debts without the burden of increased interest Even though the FSP allowed the Applicants six months as part of the Deed of Forbearance (Deed) signed on 12 December 2013 to complete the extensions and refinance their debts, it was not reasonable for the FSP to increase the interest rate prior to the Applicants entering the Deed and then again in the form of stepped up increases during the term of the Deed without having first allowed the Applicants a reasonable timeframe to repay their debt. What were the interest rates increased to? Case No: 371632 Determination Page 6 of 10 The account statements show that the FSP declined to renew the $1,000,000 Business Loan on 8 November 2013 and that it expired the $1,000,000 Business Loan and $2,770,000 Business Loan on 10 November 2013. 2 The interest rate on both Loans was increased from 6.15% to 10% on that date 3 . After the Applicants signed the Deed, the FSP then increased the interest rate by 1% every month from 1 March 2014 until the Applicants refinanced on 1 July 2014, at which time the interest rate being charged was 14%, being 7.85% over the agreed rate of 6.15% when the Loans were on foot. The FSP has submitted that it was appropriate for it to increase the interest rate for this period because its “security was at risk” and it says that a tiered interest rate increase was more beneficial to the Applicants than the full overdue rate it could have charged for the forbearance period, which would have been 17.060%. The FSP should have allowed the Applicants three months with no increase in the interest rate It is my view that it was not appropriate for the FSP to apply increased interest margins when the Applicants were in an arrangement with the FSP to overcome their difficulties and they had not, at that time, been given an opportunity to repay their debts without the burden of increased interest. In forming this view I have taken into account the relevant facts:  The Applicants had only been advised that the FSP did not want to continue to finance the business on 8 November 2013 and they had therefore not been given sufficient time to source a refinance before the $1,000,000 Business Loan term expired on 10 November 2013 and the $2,770,000 Business Loan was also called up.  The email the FSP sent to them on 8 November 2013 said that it had agreed to allow them until 1 March 2014 to complete their extensions and that it would be offering th em “ a reduced interest rate as opposed to the contract rate interest only”. As the FSP had formed the view that it was willing to allow the Applicants time to refinance their debts with another FSP, it should have done so without additionally burdening them. While I accept that an FSP is entitled to protect its interests, it should only do what is reasonably necessary to do so, taking into account its obligations to assist a small business in difficulty.  I also accept the Applicants ’ submission that they had no other option but to accept the Deed on the terms offered, and pay the additional interest margins, or to be placed immediately into default and therefore risk being able to refinance at all. 2 The $1,000,000 Business Loan expired on 10 November 2013 and the FSP called up the $2,770,000 Business Loan on this date. The FSP relied on Clause 16.2(i) of the General Terms to do this. 3 The increase of 3.85% was the Overdue Rat e the FSP charges when a Facility term expires or is expired and is not repaid, as allowed in Section 16.3(d) of the General Terms and as defined at page 38 of the General Terms. Case No: 371632 Determination Page 7 of 10 What loss have the Applicants incurred? If the FSP had given genuine consideration to the Applicants’ financial difficulty it would have allowed them a short period of time, namely three months, to refinance their debt at a standard interest rate. That is, they should have renewed the $1,000,000 Business Loan for a further three months and allowed the $2,770,000 Business Loan to remain on foot, both at an interest rate of 6.15%. After that time, as the Applicants had not refinanced, it would have been entitled to expire the Loans, increase the margin to 10% and then enter into an arrangement with them to step up the interest rates until they refinanced. For these reasons, the FSP should refund the difference between the standard interest charges of 6.15% and the increased interest it charged between 8 November 2013 and 8 February 2014 (being the three months it should have allowed without additional interest to refinance). It should then refund the difference between the interest it charged from 8 February 2014 to 1 July 2014 and the interest it should have charged if it had implemented the following step up margins:  8 February 2014 to 8 April 2014: the Loans would have expired and the Overdue Rate would be payable in addition to the standard rate of 6.15%, bringing the interest rate to 10%  8 April to 8 May 2014- the interest rate would increase to 11%  8 June 2014 to 1 July 2014- the interest rate would increase to $12% Additionally, as the amount the Applicants would have refinanced would have been less if the FSP had complied with its obligations, the FSP should also pay interest on the amount that it refunds at 5% pa calculated on a simple interest basis from 1 July 2014 to the date it makes the refund. Within 14 days of this Determination being issued, the FSP should provide to the Applicant and to FOS the calculations for this refund to allow the Applicant to consider this when deciding whether to accept the Determination. If the Applicants accept the Determination, the refund should be made directly to the Applicants into an account that they nominate as they no longer have any facilities with the FSP. 2.3 Whether the FSP has applied fees and interest correctly. Other than the interest charged at the increased margins, discussed above, the FSP charged interest and fees correctly in line with the Facility contract. 2.4 Whether the Applicants are entitled to compensation. The Applicants are entitled to the refund of interest discussed above. They are not entitled to compensation for:  The FSP’s legal fees that resulted from the drafting of the Deed because the FSP was entitled to request a Deed be entered into. Even though I have Case No: 371632 Determination Page 8 of 10 found, above, that the FSP should not have included increased interest margins in the Deed, that does not mean it wasn’t entitled to prepare a Deed at all. As the Deed stated, at Clause 9.5(a), that the Applicants are liable for the FSP’s legal costs associated with the Deed, the Applicants are not entitled to a refund of these charges.  Their own legal fees for seeking advice in response to the Deed because the Deed states at Clause 9.5(c) that the Applicants are responsible for their own costs.  The FSP’s costs of preparing the IA report because, as above, the FSP was entitled to appoint and IA and charge the Applicants for those services. 3 Supporting information 3.1 Interactions between the parties about the refinance Date 5 October 2012 The Applicant signed a variation to his facilities in which the FSP provided a $1,000,000 Business Loan to fund extensions to the Hotel Property . The Business Loan had a twelve month term, to expire on 10 October 2013. At the same time, the FSP converted their existing $2,770,000 Commercial Facility into a two year Business Loan, payable in principal and interest instalments. 12 June 2013 The FSP wrote to the Applicants and advised th em that the $1,000,000 Facility was due to expire on 10 October 2013. It advised the Applicants to contact the FSP to review their financial arrangements. 22 August 2013 The Applicants emailed their Relationship Manager (RM 1 ) and told him they had a submi ssion ready to present for a new financial arrangement. They expressed concern about “continuing with our building program despite not having a formal arrangement in place”. 3 September 2013 RM 1 emailed the Applicant and approved a $1 00,000 drawdown. RM 1 said the FSP had received historical accounts from the Applicant’s accountant and was currently progressing on the annual review and application for new funds . 30 September 2013 The Applic ants wrote to RM 1 and asked for an update on the progress of the a pplication. They said the building projects was progressing well and they would be close to completing it on target date of 15 November 2013. The RM responded saying another RM (RM2) had been appointed. I October 2013 The Applicants wrote to RM2 and asked for an update on the statu s of their revised facility. RM2 emailed the Applicants and said that two new RMs, RM3 and RM4, had been appointed to their account and provided contact details for them. The Applicants emailed RM3 and asked for an update on thei r revised finance facility. She responded by saying she would be in Case No: 371632 Determination Page 9 of 10 touch by the end of the week. 4 October 2013 The Applicants wrote to RM3 and said they were anxiously awaiting an update as the 12 June 2013 letter said they only had until 10 October 201 3 to “lock in” their new facility. RM3 responded acknowledging the Applicants had provided their information in August 2013 and there was no delay on their part. She said they would extend the Facility for 30 days to allow time to meet with them and discus s 8 October 2013 RM3 confirmed that the Facility was extended by 30 days and outlined concerns from the Credit department about the building project:  The high gearing of the Motel (LVR concern)  Cost overrun of $700,000  Debt of $200,000 owed by the Applica nts to the builders. RM3 said the FSP wanted to meet and then would re - assess the funding request. She said a temporary overdraft was possible for the debt to the builders but it would need to be repaid in 60 days 9 October 2013 The Applicants wrote to RM 3 and stated, amongst other things, that the build was 90% complete, that they had reduced their debt by $450,000 in the previous three years and would able to reduce it by $200,000 per annum after the build was complete. 11 October 2013 The parties met and RM3 wrote to the Applicant and said the FSP was not in a position to lend to them in either a temporary overdraft or new loan. RM3 said the FSP was considering engaging an independent accountant (IA) to review the status of the build and the business f inancials. Later that day, RM3 wrote to the Applicants requesting their approval for the IA to proceed . 14 October 2013 The Applicants wrote to RM3, saying, in part that they would be willing to add another security to the Facility to reduce the LVR conc ern. They also stated that they do not consent to the IA being appointed as it was redundant, given the build was in its final stage. The FSP responded saying the LVR was too high and they require an IA to confirm completion and review forecasts or the Fac ility will be required to be repaid in full by 10 November 2013 14 October 2013 The Applicants said the FSP could proceeds with the IA 18 October 2013 The IA inspected the Hotel site 4 November 2013 The IA presented his report which said, in brief:  It i s critical for building works to be completed asap  The FSP should monitor the completion of the building works  Cash flow is not likely to be sufficient to result in material debt reduction within term of Facility  Motel is currently very highly geared with minimal improvement in the LVR in 18 months 8 November 2013 The parties met and the FSP told the Applicants it would not be extending the facilities when they expired on 10 November 2013 Case No: 371632 Determination Page 10 of 10 8 November 2013 The interest rate on the $1,000,000 and $2,770,00 Business Loans increased from 6.15% to 10% 11 November 2013 The FSP emailed the Applicants and said it had “decided that it would not extend the facilities post - expiry (which has now eventuated)”. It said, however, that it proposed allowing “a further per iod to 1 March 2014 to achieve the completion of the Project under the auspices of the [IA]” and that it offered a reduced interest rate as opposed to the contracted rate on an interest only”. The proposal was subject to documentation it said was currently being drafted (ie the Deed). 12 December 2013 The parties agreed to a Deed in which the FSP would forbear on enforcement until 28 June 2014 to allow the Applicants to pay the total amount outstanding. The Deed required them to pay contractual interest pl us a step - up margin as follows:  3.85% up to 28 February 2014  4.85% up to 31 March 2014  5.85% up to 30 April 2014  6.85% up to 31 May 2014  7.85% up to 28 June 2014 20 December 2013 The Hotel building works were completed 1 March 2014 The interest rate on both Loans was increased from 10% to 11% 1 April 2014 The interest rate on both Loans was increased from 11 to %12% 1 May 2014 The interest rate on both Loans was increased from 12% to 13% 1 June 2014 The interest rate on both Loans was increased from 1 3% to 14% 1 July 2014 The Applicant’ s refinanced the Loans and they were re paid in full 18 August 2014 The Ap plicants lodged the FOS dispute requesting a refund of:  All i nterest incurred above the Facility agreement of 6.15% be refunded , which they calculated at approximately $88,806.00; and  The additional c osts incurred including those for IA, the FSP’s solicitors and Applicants’ lawyers of $73,262.00. 15 October 2014 The FSP declined to refund claimed losses and said it was a commercial decisio n to decline further funding or renew the current funding.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.