Home / Financial Firm (Unknown - Insurer) / Determination 371233
Determination 371233
Settlement amount for kitchen floor tiles after accidental damage
Summary
The applicant disputed the FSP's offer to settle his kitchen tile damage claim at $1,609 less a $500 excess and sought full replacement per a quote. AFCA found the FSP could limit cover to the assessed damage because earlier repairs were not shown to be completed.
The policy requires the home to be well maintained and the FSP may reduce cover to what it would have accepted had it known the correct facts about incomplete earlier repairs.
Subjects and remedies
home or building damagepay claim
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Contents - FSP Decision - Claim
Amount
Determination
Case No: 371233 Determination Page 1 of 4
Case number : 371233 2 9 May 2015
1 Overview
1.1 Dispute
This dispute follows a claim lodged by the Applicant with the Financial Services
Provider (FSP) for damage sustained to kitchen floor tiles, when a kitchen
cupboard fell on or about 27 March 2014.
The FSP accepted liability for the damage and sought to settle the claim for
$1,609 less $500 excess. The Applicant disputes the FSP’s offer of settlement
and maintains that he is entitled to have the flooring replaced as pe r the quote
provided.
1.1 Issues and key findings
Is the FSP entitled to limit its liability under the current claim?
The FSP is entitled to limit its liability under the current claim because:
the policy provides cover for accidental damage
the available evidence indicates the Applicant had not replaced the flooring
previously damaged as claimed
in the absence of evidence to establish the previous repairs had been
completed, the FSP is entitled to limit its liability to settle the claim for damage
as assessed in the sum of $1,609 less excess of $500.
1.2 Determination
This Determination is in favour of the FSP.
The FSP is entitled to limit its liability and settle the claim for $1,609 less excess
of $500.
Case No: 371233 Determination Page 2 of 4
2 Reasons for Determination
2.1 Is the FSP entitled to limit its liability under the current claim?
The FSP is entitled to limit its liability under the current claim
The Applicant’s policy was a home and contents policy that provides cover for a
number of specified insured events plus optional accidental damage cover. Under
the terms of the policy, the policy extends to cover accidental loss or damage.
There is no dispute that a number of floor tiles in the kitchen were damaged when
a kitchen cupboard fell on or about 27 March 2014.
The evidence establishes that this was not the first occasion on which the
Applicant had lodged a claim for damaged kitchen tiling.
According to the information exchanged, the Applicant had made two prior claims
as follows:
3 September 2011 - $22,444 cash settlement for tiles in hallway, kitchen and
family room
11 November 2012 - $39,992.11 cash settlement for tiles to kitchen, open
family room, removal of furniture and temporary accommodation.
The Applicant claims that the damaged flooring was repaired on each occasion
and provided a tax invoice dated 20 December 2013 purporting to cover retiling of
91 metres of flooring at a cost of $27,992.86 following the November 2012 claim.
The invoice indicates payment in full.
The FSP had requested documentation from the Applicant to substantiate that the
work was actually performed and completed as claimed.
The Applicant has not been able to provide photographs but confirmed that the
work was completed and provided a statement from CC. CC has not provided any
evidence that it actually purchased the tiles as claimed.
The tax invoice indicates the payment in full. The Applicant has not provided any
bank details or other details to confirm actual payment for the work performed.
The Applicant claims that this was paid from cash held in a safe. No evidence has
been presented to support this.
The FSP arranged for an assessor to attend the Applicant’s property. According
to the assessment report, damage was identified to two floor tiles, a benchtop,
overhead cabinets and its contents. The report did note the quotation provided by
the Applicant appear to be excessive.
The assessor attended the Applicant’s property again on 24 June 2014. During
that assessment, the assessor noted that a floor tile near the sink had been
replaced and there was a cracked tile at the lip of the tiles in the hallway. He
noted this as the same cracked tile that appeared in photos from the Applicant’s
previous claim in 2011. The assessor formed the view that the full floor
replacement as paid for in the previous claim had not been completed despite the
FSP having cash settled these claims.
I note a quotation provided by the Applicant from WBS is dated 2 January 2014
nearly three months prior to the actual claimed incident. The Applicant suggested
Case No: 371233 Determination Page 3 of 4
that this is an error, on behalf of the contractor. There is no evidence from the
contractor to confirm this error.
I am not satisfied the evidence as presented by the Applicant establishes that the
flooring had been replaced as claimed by the Applicant. The evidence provided by
the Applicant and CC is in my view vague. The Applicant has not been able to
establish the actual payment being made nor has CC been able to provide
evidence with respect to the purchase of the relevant tiles. Both the Applicant and
CC have referred to privacy reasons for the difficulty in supplying documentation
however, I do not see how that is relevant the issue of supplying a tax invoice.
I also note the Applicant has provided inconsistent evidence as to who performed
the work. Initially, the Applicant suggested that he performed the work with help
from handymen and sourced tiles from a number of places. He later reported that
CC did the work and paid cash.
Given these inconsistencies and the fact that the FSP’s assessor formed the
opinion that the tiles did not appear to have been replaced, and that the grouting
was old, I am not satisfied the retiling had been completed as claimed.
Relevant Exclusions apply
The FSP has referred to general exclusions contained within the policy including
exclusions relating to the Applicant’s responsibility under the policy.
The policy provides that the home must be well maintained including rectifying
faults or defects in old areas when they need repair.
In the event that the defects or repairs are not completed, the FSP is entitled to
reduce cover to what they would have accepted had they known the correct facts.
Based on the information exchanged, I am satisfied that the Applicant’s flooring
had not been fully retiled following the earlier incidents. I am satisfied that the
evidence establishes that most likely only the individual tiles from the previous
claim had been replaced and not the tiles to the entire kitchen area. In these
circumstances, I am satisfied that the FSP is entitled to limit its liability for the
damage identified by the assessor.
I am satisfied that by providing for the repair of the tiles identified as damaged in
the incident of 27 March 2014 that the FSP would meet its liability under the terms
of the policy to put the Applicant back in the position he would have been in prior
to the loss.
On this basis, I am satisfied the FSP is required to settle the Applicant’s claim for
the sum of $1,609 less the applicable excess of $500.
Case No: 371233 Determination Page 4 of 4
3 Supporting information
3.1 Expert report
The following report was reviewed and considered
Record Key points
FSP’s expert (A)
Assessment
24 June 2014
the floor tile near the sink from a previous claim had been
replaced but the assessor suspects tiles from the bathroom
from a previous claim had been salvaged and put down in
the kitchen
a cracked tile at the lip of the tiles in the hallway appears to
be the same cracked tile in photos from a previous claim,
indicating a full floor replacement was not undertaken w ith
the cash settlement
the condition of the grout throughout the home appears
slightly more worn than in photographs from previous claim
as would be expected of tiles of this age, possibly
suggesting the entire floor has not been replaced.
3.2 Refer to quotation AJG
Record Key points
Quotation AJG $1,609 for repair
Quotation WBS
Dated 2 January 2014
$41,100
Total cost to complete works is $41,100 + GST
Receipt
20 December 2013
Statutory Declaration
AL Carried out works being floor tiling… for an amount of
$27, 993 paid in cash 20 December 2013
Photographs
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.