Home / Financial Firm (Unknown - Insurer) / Determination 370631

Determination 370631

Defective hail roof repairs, further storm damage and cash settlement of repair costs

FirmFinancial Firm (Unknown - Insurer)
Decided2015-05-26
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant
Amount awarded$119,089
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The business's hail-damaged commercial property was poorly re-roofed by the FSP's contractor, which led to further storm damage. AFCA ordered cash settlement of $111,658.46 for repairs, $4,430.60 expert report costs, $3,000 loss of rent and $1,500 non-financial loss, and refused legal fees.

Once the insurer elects to repair, it must ensure its contractor's work meets the required standard and make good any damage the contractor causes.

Issues

Subjects and remedies

home or building damagenatural disastersmall businesspay claimpay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Small Business - Commercial Property - Service - Delay in Claim Handling Determination Case No: 370631 Determination Page 1 of 10 Case number : 370631 4 May 2015 1 Overview 1.1 Dispute The Applicant lodged a claim under its business insurance policy with the Financial Services Provider (FSP) for damage to its tenanted commercial property caused by a hail storm in November 2013. The FSP accepted the claim and arranged for the repair of the building , including the replacement of the roof. While the roofing works were being undertaken, the building suffered further damage during a storm in March 2014. The FSP and the Applicant have been unable to agree on the extent of the FSP’s liability for further repairs to the property. The Applicant also seeks compensation for various financial and non-financial losses suffered during the claim process. 1.2 Issues and key findings Is the FSP liable for further repairs to the property? The initial roofing works carried out by the FSP’s roofing contractor (JL) were inadequate and the FSP is liable for the cost of redoing these works. The FSP is also liable for the cost of repairing the outstanding damage caused by the hail storm in November 2013 and the storm in March 2014. Is the Applicant entitled to compensation or reimbursement of costs? The Applicant is entitled to compensation for loss of rent and non-financial loss, as a result of the manner in which the FSP handled the claim. It is also entitled to reimbursement of professional costs (other than legal fees). 1.3 Determination This Determination is substantially in favour of the Applicant. The FSP is required to pay the Applicant the amount of $111,658.46 in settlement of its liability for the cost of further repairs to the property, in accordance with section 2.1 below. The FSP is to pay the Applicant an additional amount of $8,930.60 as reimbursement of professional costs and compensation for financial and non- financial loss. Case No: 370631 Determination Page 2 of 10 2 Reasons for Determination 2.1 Is the FSP liable for further repairs to the property? FSP is liable for hail damage in November 2013 and storm damage in March 2014 As outlined above, the FSP accepted the Applicant’s claim for damage to the roofs of the property (and resulting internal water damage) caused by the hail storm in November 2013. The FSP arranged for its builder (JL) to conduct the necessary repairs based on a scope of work and quotation prepared shortly after the hail storm. To the extent that aspects of these repairs have not yet been completed and/or the repairs carried out to date are inadequate, the FSP remains liable for these repairs. The FSP has also acknowledged that the additional water damage to the property which occurred as a result of the storm in March 2014 was due to the failure of JL to properly secure the building prior to the storm. Once the FSP elects to repair the damage to the insured property, it is responsible for appointing a suitably qualified contractor and ensuring that the repairs are carried out to an appropriate standard. If further damage to the property occurs as a result of the contractor’s actions, then the FSP is responsible for making good this damage. The FSP and the Applicant have been unable to agree on the extent of the FSP’s liability for damage arising from both the hail storm in November 2013 and the storm in March 2014. The key items in dispute are:  whether the FSP can attempt to rectify the roofing repairs carried out by JL or is required to replace the roofs in their entirety;  whether the FSP is liable for all of the costs required to restore electricity to the property, including the repair and replacement of the existing cabling. Both the Applicant and the FSP have proposed that the claim be cash settled. The Panel agrees that this is appropriate, given the breakdown in the relationship between the parties and the fact that the Applicant has entered into a contract of sale for the property. Initial roof repairs were inadequate and should be redone After assessing the Applicant’s claim, the FSP accepted that the roofs of the main building and the outbuilding at the property had been damaged by hail and needed to be replaced. The roofing works were carried out by the FSP’s contractor (JL) in March / April 2014. During the course of the roofing works, the Applicant expressed concern about the quality of the works and the working practices employed by JL. He also disputed JL’s position that the roof repairs to the outbuilding could not be completed due to extensive pre-existing damage. Case No: 370631 Determination Page 3 of 10 In response to the Applicant’s concerns, the FSP engaged a building consultant (MS) to review the roofing works, to the extent completed at the time. In his report, MS concluded that the replacement roof to the main building installed by JL was not compliant with applicable building standards and displayed a “considerable number of obvious workmanship defects”. He identified a number of specific issues with the installation of the new roof, including excessive scratches and denting to the roof sheeting, over-tightening of roofing screws, excessive screw holes, over-reliance on silicone sealants and non-weatherproof sections of the roof flashing. The Applicant says that the FSP should be required to replace the roof in its entirety. However, the FSP disputes that this is necessary and says that a further inspection should be arranged to determine the extent of the repairs required in order to address the i ssues with JL’s original works, and ensure that the benefit of the manufacturer’s warranty remains available . The available information indicates that the Applicant first complained in writing about the quality of the roofing works on 30 April 2014, at which time he provided a detailed description of his concerns. D uring MS’s site visit on 30 May 2014, the JL representative present confirmed that she also had concerns about the quality of the works. Having reviewed the available information, the Panel is satisfied that the initial roofing repairs carried out by JL were clearly inadequate. MS identified defects in numerous areas of the roof, which he considered would be highly likely to void the manufacturer’s warranty . Under the terms of the policy, once the FSP had accepted liability for hail damage to the roofs of his property, the Applicant was entitled to have the roofs repaired (or replaced) to a condition equivalent to that when new. Given the nature and extent of the defects identified by MS, the Panel considers that it is appropriate that the FSP be liable for the cost of redoing the roofing works undertaken by JL in their entirety. Both parties have provided estimates of the costs involved in redoing the roofing works completed by JL to date (being the replacement of the roof of the main building). Having carefully reviewed the information provided, the Panel is satisfied that the estimate of $35,359.20 (excluding GST) provided by the FSP’s building consultant (MS) represents the fair and reasonable cost of undertaking the necessary works. The Panel notes that MS prepared its estimate based on an inspection of the property and a review of the initial scope of works followin g the hail storm. MS’s estimate includes an itemised cost breakdown setting out the specific works involved. Case No: 370631 Determination Page 4 of 10 FSP is liable for repairing water damage to electrical infrastructure For the reasons outlined above, the FSP is liable for the additional damage to the property which occurred in March 2014 due to JL’s failure to take appropriate action to protect the property against ad verse weather during the roofing works. In his report, the FSP’s building consultant (MS) confirmed that damage to the electrical infrastructure of the property occurred when water entered the switchboard during the storm in March 2014. MS confirmed that water entered due to the incomplete roof repairs, rather than by way of the external conduit (as initially suggested by JL). The electrical assessor (AC) appointed by the FSP to inspect the damage noted that the electrical infrastructure at the property was aged, incorrectly installed and in poor condition. AC confirmed that the raft of circuit failures and non-compliant electrical works observed pre-existed the hail storm in November 2013. However, AC noted that, under applicable law, it may not be possible to repair the damage to the electrical infrastructure caused by the water entry in March 2014 and reconnect the power to all parts of the property, without undertaking major works to ensure compliance with applicable standards. The electrical assessor (AC) obtained a quote from an electrician (P) for a total of $62,871 (excluding GST) to undertake the necessary works. However, the nature of P’s quote is not entirely clear, as the total amount of the quote includes both the repair and replacement of the sw itchboard and cabling, whereas AC’s report indicates P had provided costings for repair and replacement on an alternative basis (as would appear more logical). The FSP accepts that it is liable for the repairs to the switchboard (at a quoted cost of $8,208) but says that it is not responsible for any additional repairs to the electrical infrastructure at the property. In support of its position, the FSP refers to a provision of the Applicant’s policy which states that the FSP is not liable for any costs that would have been incurred in order to comply with the requirements of a lawful authority that applied to the property prior to the relevant damage. However, the Panel does not accept that this provision applies in the present case. The FSP’s liability for the water damage to the electrical infrastructure arose as a result of the actions of the FSP’s contractor (for which the FSP is responsible) rather than as the result of an event insured against under the policy. Accordingly, the FSP’s obligation to reme dy the damage is not subject to the relevant policy limitations. The Applicant says that the tenant at the property had not experienced any problems with the electricity prior to the storm in March 2014. The Applicant has provided a copy of an email from the electricity provider which confirms that a visual safety inspection took place on 25 May 2010 before the electricity was connected when the tenant moved into the property. On this basis, the Panel accepts that, while the electrical infrastructure at the property may have been aged and non-compliant, the requirement to undertake Case No: 370631 Determination Page 5 of 10 repairs has arisen solely as a result of the water damage which occurred in March 2014. Accordingly, the Panel considers that the FSP should be liable for the costs of reinstating the electricity supply to the property. However, the Panel does not consider that the FSP should be liable for the full costs of replacing the switchboard and the cabling, given the pre-existing issues with the electrical infrastructure at the property. To require the FSP to do so would result in the Applicant receiving a windfall benefit. The report by the FSP’s electrical assessor (AC) states that the minimum cost of reconnecting the power to the property in a manner which complies with applicable standards is $26,928 (excluding GST) (comprising $8,208 for the repair of the switchboard and $18,720 for the restoration and testing of the cabling). Given the uncertainties identified by AC in relation to the electrical works, the Panel considers it appropriate to allow an additional buffer, in the event that the minimum amounts quoted are insufficient to fund the necessary works. On this basis, the Panel considers that the FSP should cash settle the Applicant for a total of $30,000 in respect of the electrical works. FSP is liable for repair of outstanding damage to buildings It appears that the FSP’s contractors did not complete the repair of the internal water damage caused by the hail storm in November 2013, due to the issues which arose in relation to the roof repairs. Further, the FSP’s contractors did not complete the replacement of the roof on the outbuilding, due to concerns about the pre-existing condition of the roof framework (which MS subsequently confirmed were largely unjustified). Accordingly, the FSP remains liable for repairing this damage. The itemised scope of works provided by MS in September 2014 estimates that the cost of completing these additional works (and restoring the property to its pre-loss condition) is $36,299.26 (excluding GST). In determining the appropriate amount of the cash settlement, the Panel has had regards to the report provided by the Applicant’s quantity surveyor (LC), which provides an alternative estimate of the total costs of completing the additional works. Having reviewed LC’s estimate, the Panel considers that it is not materially dissimilar to the itemised cost breakdown provided by MS, once the Panel’s approach to liability for the electrical works is taken into account. Further, the Panel notes that the fact that the building will be sold prior to the repairs being undertaken means that certain allowances included in LC’s estimate may no longer be required. However, the Panel accepts that an allowance should be made for the following additional items i dentified by LC, which were not included in MS’s scope of works:  the potential requirement for removal of internal asbestos (which is expressly excluded from MS’s scope of works); Case No: 370631 Determination Page 6 of 10  the replacement of missing light fittings (which the FSP’s electrical assessor (AC) confirmed had been removed from the property); and  the restoration of the toilet area in the outbuilding (which LC confirmed had sustained damage due to this building have been left without a serviceable roof for an extended period of time). Having regard to the available information, the Panel considers that the cash settlement amount for the outstanding works should be increased by an additional amount of $10,000 to allow for these items. FSP should cash settle Applicant for total cost of repairs For the reasons outlined above, the Panel considers that the FSP should cash settle the Applicant for a total of $111,658.46 (excluding GST), comprising:  the cost of replacing the roof of the main building ($35,359.20);  repairing the damage to the electrical infrastructure ($30,000); and  carrying out the outstanding repairs required as a result of the hail storm in November 2013 and the further storm in March 2014 ($46,299.26). The Applicant’s entitlement to GST in respect of these amounts is to be determined in accordance with the terms of the policy. The Panel is satisfied that the estimates on which the cash settlement amount has been determined are reasonably current. Accordingly, the FSP is not required to pay interest on the cash settlement amo unt. 2.2 Is the Applicant entitled to compensation or reimbursement of costs? Applicant is entitled to reimbursement of certain professional costs The Applicant seeks reimbursement for the costs of engaging experts to provide the reports and advice set out below:  electrical inspection report ($200);  pest inspection report ($187);  building inspection report ($440);  engineer ’s attendance at an on-site meeting ($853.60); and  quantity surveyor report ($2,750). Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a financial services provider to contribute to legal or other professional costs incurred by an applicant in the course of their dispute. A financial services provider will generally not be required to contribute more than $3,000 unless exceptional circumstances apply. In the present case, the Panel accepts that it was reasonably necessary for the Applicant to obtain the reports referred to above. The electrical, pest and building reports were obtained to rebut views expressed by the FSP’s contractors which were later found to be incorrect (for example, the cause of water damage to the switchboard and the presence of live termites at the property). Case No: 370631 Determination Page 7 of 10 It was reasonable for the Applicant to seek the assistance of an engineer for the purposes of the site meeting to attempt to resolve the dispute in relation to the extent of further work required. By relying on the engineer’s verbal advice, the Applicant negated the need to obtain a formal report (thereby reducing costs). While the FSP has criticised the form in which the quantity surveyor (LC) provided his report, the Panel has found the cost estimates in the report of assistance in determining the appropriate settlement amount. Given the range of issues which it was necessary for the Applicant to address during the course of this dispute, the Panel considers that the total costs of $4,430.60 incurred by the Applicant in obtaining expert reports are not unreasonable. On this basis, the Panel considers that the FSP should be required to reimburse the Applicant for the total costs of $4,430.60, to the extent it has not already done so. Applicant is not entitled to reimbursement of legal fees The Applicant seeks reimbursement of legal fees totalling approximately $42,500 for legal advice obtained during the course of this dispute. The legal advice obtained by the Applicant (that is, the corporate trustee as policyholder) was provided by its sole director, acting through a law firm in which he was a principal. FOS provides a service that is free for applicants and it is generally unnecessary for either party to seek professional representation. If an applicant chooses to be represented, they will u sually have to cover their representative’s fees themselves. In the present case, the Applicant (through its sole director) had sufficient legal expertise to pursue its claim without requiring additional assistance. Accordingly, the Panel considers that it was unnecessary for the Applicant to engage an external adviser. Accordingly, the Panel does not consider that the FSP should be required to reimburse the Applicant for legal fees incurred. Applicant is entitled to compensation for non-financial loss Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. In the present case, the Panel is satisfied that the Applicant has suffered extended delays and inconvenience as a result of the manner in which the FSP has handled his claim. In particular, the Panel notes that: Case No: 370631 Determination Page 8 of 10  the FSP did not act promptly to address the Applicant’s concerns about the roofing repairs, in circumstances where the FSP’s building consultant (MS) has since confirmed that the roofing repairs were defective;  poor planning by the roofing contractor led to additional damage to the Applicant’s property during the storm in March 2014;  the FSP and its contractors initially (and incorrectly) denied responsibility for the additional damage on the basis it was caused by factors unrelated to the roofing repairs;  the FSP’s contractor failed to adequately address asbestos -related issues at the property; and  the FSP’s contractor ceased work on the outbuilding on the basis that there was serious pre-existing structural damage and an active termite infestation, both of which were later found to be false. However, the Panel considers that once the FSP accepted that its contractor had caused the additional damage, it acted appropriately to assess its liability for the outstanding repairs. In the circumstances, it was reasonable for the FSP to seek further reports from suitably qualified consultants to determine the extent of the additional works required. In the circumstances, the Panel considers that an award of compensation in the amount of $1,500 is appropriate. Applicant is entitled to partial compensation for loss of rent Under paragraph 9.3(a) of the Terms of Reference, FOS may award compensation (capped at $3,000) for consequential financial loss. While the Applicant’s policy excludes cover for consequential loss, in the Panel’s view this does not necessarily preclude the award of compensation where such loss is caused directly by the actions of the FSP or its contractors, rather than as the result of an event which is insured against under the policy. In the present case, the Applicant says that it has suffered a loss of rent because its tenant (CP) has withheld funds to pay for the hire of a generator to provide power to the property pending the completion of the outstanding repairs. It appears that CP ’s insurer initially paid for the cost of hiring a generator but ceased to do so in or around November 2014. The Applicant has provided a copy of an email from CP dated12 November 2014 confirming his intention to apply rent payments to the cost of the generator (being approximately $1,300 per week). The Applicant has also provided a copy of a rental ledger showing CP in arrears by an amount of $13,568 in March 2015. The FSP says that CP did not fall into arrears until shortly before the date he advised the Applicant that considered rental payments should be applied to the cost of the generator. This supports the Applicant’s position that the rental default was related to the ongoing unrepaired state of the premises. However, based on the available information, the Panel accepts that CP has experienced significant disruption and inconvenience during the course of the claim, which is likely to have contributed to his decision to withhold rent. Case No: 370631 Determination Page 9 of 10 While the FSP is not responsible for all of the delays in resolving the claim, the Panel is satisfied that the FSP’s actions have significantly contribut ed to the delay, for the reasons outlined above. The Panel considers that the breakdown of the relationship between the Applicant and the FSP which has in part delayed the resolution of this dispute was largely driven by the FSP’s failure to respond approp riately to the Applicant’s concerns about the initial roof repairs and to accept responsibility for the additional damage which occurred in March 2014. In these circumstances, the Panel is reasonably satisfied that the Applicant has incurred consequential financial losses exceeding $3,000 due to its tenant’s failure to pay rent. The FSP says that the Applicant should seek to recover for loss of rent under the business interruption section of the policy. It appears that no such claim has been lodged to date. However, in the Panel’s view, the fact that an alternative avenue for recovery may be available does not prevent the award of compensation for loss of rent in the present case. The Panel notes that, in the event that the Applicant lodges a claim for business interruption, his loss would presumably be reduced by the extent of any such award. For the reasons outlined above, the Panel considers that the FSP should pay the Applicant compensation in the amount of $3,000 for loss of rent. As this amount represents compensation for consequential financial loss under the FOS Terms of Reference, it is not subject to the limitations which apply to a claim for business interruption under the terms of the Applicant’s policy. Applicant is not entitled to compensation for future claims by tenant The Applicant has raised concerns about the possibility that the tenant may take legal action in the future, alleging a failure by the Applicant to comply with the terms of the lease due to the condition of the property. There is no information to suggest that any such action has been commenced (or threatened) by the tenant to date. Accordingly, the Applicant is unable to establish any actual loss in this regard. Further, any such loss would constitute consequential financial loss for the purposes of the FOS Terms of Reference. As the Panel has awarded the Applicant the maximum amount of $3,000 available under the Terms of Reference, no additional award would be payable. The Panel does not consider it appropriate to amend the contract of insurance between the parties to ascribe liability to the FSP in the event that the tenant takes legal action (as this would be substantively equivalent to a further award of compensation for non-financial loss). In the event that any such action is taken, it is open to the Applicant to seek to join the FSP (or its contractors) to the relevant proceedings. Case No: 370631 Determination Page 10 of 10 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. The Panel notes that the policyholder is the corporate trustee of a family trust, which has been represented by its sole director for the purpose of this dispute. For reasons of brevity and simplicity, in this Determination the corporate trustee and its director have been referred to collectively as the Applicant.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.