Defective hail roof repairs, further storm damage and cash settlement of repair costs
Text of the determination
Determination
General Insurance - Small Business - Commercial Property - Service - Delay in Claim
Handling
Determination
Case No: 370631 Determination Page 1 of 10
Case number : 370631 4 May 2015
1 Overview
1.1 Dispute
The Applicant lodged a claim under its business insurance policy with the
Financial Services Provider (FSP) for damage to its tenanted commercial property
caused by a hail storm in November 2013.
The FSP accepted the claim and arranged for the repair of the building , including
the replacement of the roof. While the roofing works were being undertaken, the
building suffered further damage during a storm in March 2014.
The FSP and the Applicant have been unable to agree on the extent of the FSP’s
liability for further repairs to the property. The Applicant also seeks compensation
for various financial and non-financial losses suffered during the claim process.
1.2 Issues and key findings
Is the FSP liable for further repairs to the property?
The initial roofing works carried out by the FSP’s roofing contractor (JL) were
inadequate and the FSP is liable for the cost of redoing these works. The FSP is
also liable for the cost of repairing the outstanding damage caused by the hail
storm in November 2013 and the storm in March 2014.
Is the Applicant entitled to compensation or reimbursement of costs?
The Applicant is entitled to compensation for loss of rent and non-financial loss,
as a result of the manner in which the FSP handled the claim. It is also entitled to
reimbursement of professional costs (other than legal fees).
1.3 Determination
This Determination is substantially in favour of the Applicant.
The FSP is required to pay the Applicant the amount of $111,658.46 in settlement
of its liability for the cost of further repairs to the property, in accordance with
section 2.1 below.
The FSP is to pay the Applicant an additional amount of $8,930.60 as
reimbursement of professional costs and compensation for financial and non-
financial loss.
Case No: 370631 Determination Page 2 of 10
2 Reasons for Determination
2.1 Is the FSP liable for further repairs to the property?
FSP is liable for hail damage in November 2013 and storm damage in March
2014
As outlined above, the FSP accepted the Applicant’s claim for damage to the
roofs of the property (and resulting internal water damage) caused by the hail
storm in November 2013.
The FSP arranged for its builder (JL) to conduct the necessary repairs based on a
scope of work and quotation prepared shortly after the hail storm. To the extent
that aspects of these repairs have not yet been completed and/or the repairs
carried out to date are inadequate, the FSP remains liable for these repairs.
The FSP has also acknowledged that the additional water damage to the property
which occurred as a result of the storm in March 2014 was due to the failure of JL
to properly secure the building prior to the storm.
Once the FSP elects to repair the damage to the insured property, it is
responsible for appointing a suitably qualified contractor and ensuring that the
repairs are carried out to an appropriate standard. If further damage to the
property occurs as a result of the contractor’s actions, then the FSP is responsible
for making good this damage.
The FSP and the Applicant have been unable to agree on the extent of the FSP’s
liability for damage arising from both the hail storm in November 2013 and the
storm in March 2014. The key items in dispute are:
whether the FSP can attempt to rectify the roofing repairs carried out by JL or
is required to replace the roofs in their entirety;
whether the FSP is liable for all of the costs required to restore electricity to
the property, including the repair and replacement of the existing cabling.
Both the Applicant and the FSP have proposed that the claim be cash settled.
The Panel agrees that this is appropriate, given the breakdown in the relationship
between the parties and the fact that the Applicant has entered into a contract of
sale for the property.
Initial roof repairs were inadequate and should be redone
After assessing the Applicant’s claim, the FSP accepted that the roofs of the main
building and the outbuilding at the property had been damaged by hail and
needed to be replaced.
The roofing works were carried out by the FSP’s contractor (JL) in March / April
2014. During the course of the roofing works, the Applicant expressed concern
about the quality of the works and the working practices employed by JL. He also
disputed JL’s position that the roof repairs to the outbuilding could not be
completed due to extensive pre-existing damage.
Case No: 370631 Determination Page 3 of 10
In response to the Applicant’s concerns, the FSP engaged a building consultant
(MS) to review the roofing works, to the extent completed at the time.
In his report, MS concluded that the replacement roof to the main building
installed by JL was not compliant with applicable building standards and displayed
a “considerable number of obvious workmanship defects”. He identified a number
of specific issues with the installation of the new roof, including excessive
scratches and denting to the roof sheeting, over-tightening of roofing screws,
excessive screw holes, over-reliance on silicone sealants and non-weatherproof
sections of the roof flashing.
The Applicant says that the FSP should be required to replace the roof in its
entirety. However, the FSP disputes that this is necessary and says that a further
inspection should be arranged to determine the extent of the repairs required in
order to address the i ssues with JL’s original works, and ensure that the benefit of
the manufacturer’s warranty remains available .
The available information indicates that the Applicant first complained in writing
about the quality of the roofing works on 30 April 2014, at which time he provided
a detailed description of his concerns. D uring MS’s site visit on 30 May 2014, the
JL representative present confirmed that she also had concerns about the quality
of the works.
Having reviewed the available information, the Panel is satisfied that the initial
roofing repairs carried out by JL were clearly inadequate. MS identified defects in
numerous areas of the roof, which he considered would be highly likely to void the
manufacturer’s warranty .
Under the terms of the policy, once the FSP had accepted liability for hail damage
to the roofs of his property, the Applicant was entitled to have the roofs repaired
(or replaced) to a condition equivalent to that when new.
Given the nature and extent of the defects identified by MS, the Panel considers
that it is appropriate that the FSP be liable for the cost of redoing the roofing
works undertaken by JL in their entirety.
Both parties have provided estimates of the costs involved in redoing the roofing
works completed by JL to date (being the replacement of the roof of the main
building).
Having carefully reviewed the information provided, the Panel is satisfied that the
estimate of $35,359.20 (excluding GST) provided by the FSP’s building consultant
(MS) represents the fair and reasonable cost of undertaking the necessary works.
The Panel notes that MS prepared its estimate based on an inspection of the
property and a review of the initial scope of works followin g the hail storm. MS’s
estimate includes an itemised cost breakdown setting out the specific works
involved.
Case No: 370631 Determination Page 4 of 10
FSP is liable for repairing water damage to electrical infrastructure
For the reasons outlined above, the FSP is liable for the additional damage to the
property which occurred in March 2014 due to JL’s failure to take appropriate
action to protect the property against ad verse weather during the roofing works.
In his report, the FSP’s building consultant (MS) confirmed that damage to the
electrical infrastructure of the property occurred when water entered the
switchboard during the storm in March 2014. MS confirmed that water entered
due to the incomplete roof repairs, rather than by way of the external conduit (as
initially suggested by JL).
The electrical assessor (AC) appointed by the FSP to inspect the damage noted
that the electrical infrastructure at the property was aged, incorrectly installed and
in poor condition. AC confirmed that the raft of circuit failures and non-compliant
electrical works observed pre-existed the hail storm in November 2013.
However, AC noted that, under applicable law, it may not be possible to repair the
damage to the electrical infrastructure caused by the water entry in March 2014
and reconnect the power to all parts of the property, without undertaking major
works to ensure compliance with applicable standards.
The electrical assessor (AC) obtained a quote from an electrician (P) for a total of
$62,871 (excluding GST) to undertake the necessary works. However, the nature
of P’s quote is not entirely clear, as the total amount of the quote includes both
the repair and replacement of the sw itchboard and cabling, whereas AC’s report
indicates P had provided costings for repair and replacement on an alternative
basis (as would appear more logical).
The FSP accepts that it is liable for the repairs to the switchboard (at a quoted
cost of $8,208) but says that it is not responsible for any additional repairs to the
electrical infrastructure at the property.
In support of its position, the FSP refers to a provision of the Applicant’s policy
which states that the FSP is not liable for any costs that would have been incurred
in order to comply with the requirements of a lawful authority that applied to the
property prior to the relevant damage.
However, the Panel does not accept that this provision applies in the present
case. The FSP’s liability for the water damage to the electrical infrastructure arose
as a result of the actions of the FSP’s contractor (for which the FSP is
responsible) rather than as the result of an event insured against under the policy.
Accordingly, the FSP’s obligation to reme dy the damage is not subject to the
relevant policy limitations.
The Applicant says that the tenant at the property had not experienced any
problems with the electricity prior to the storm in March 2014. The Applicant has
provided a copy of an email from the electricity provider which confirms that a
visual safety inspection took place on 25 May 2010 before the electricity was
connected when the tenant moved into the property.
On this basis, the Panel accepts that, while the electrical infrastructure at the
property may have been aged and non-compliant, the requirement to undertake
Case No: 370631 Determination Page 5 of 10
repairs has arisen solely as a result of the water damage which occurred in March
2014. Accordingly, the Panel considers that the FSP should be liable for the costs
of reinstating the electricity supply to the property.
However, the Panel does not consider that the FSP should be liable for the full
costs of replacing the switchboard and the cabling, given the pre-existing issues
with the electrical infrastructure at the property. To require the FSP to do so would
result in the Applicant receiving a windfall benefit.
The report by the FSP’s electrical assessor (AC) states that the minimum cost of
reconnecting the power to the property in a manner which complies with
applicable standards is $26,928 (excluding GST) (comprising $8,208 for the repair
of the switchboard and $18,720 for the restoration and testing of the cabling).
Given the uncertainties identified by AC in relation to the electrical works, the
Panel considers it appropriate to allow an additional buffer, in the event that the
minimum amounts quoted are insufficient to fund the necessary works.
On this basis, the Panel considers that the FSP should cash settle the Applicant
for a total of $30,000 in respect of the electrical works.
FSP is liable for repair of outstanding damage to buildings
It appears that the FSP’s contractors did not complete the repair of the internal
water damage caused by the hail storm in November 2013, due to the issues
which arose in relation to the roof repairs.
Further, the FSP’s contractors did not complete the replacement of the roof on the
outbuilding, due to concerns about the pre-existing condition of the roof
framework (which MS subsequently confirmed were largely unjustified).
Accordingly, the FSP remains liable for repairing this damage.
The itemised scope of works provided by MS in September 2014 estimates that
the cost of completing these additional works (and restoring the property to its
pre-loss condition) is $36,299.26 (excluding GST).
In determining the appropriate amount of the cash settlement, the Panel has had
regards to the report provided by the Applicant’s quantity surveyor (LC), which
provides an alternative estimate of the total costs of completing the additional
works.
Having reviewed LC’s estimate, the Panel considers that it is not materially
dissimilar to the itemised cost breakdown provided by MS, once the Panel’s
approach to liability for the electrical works is taken into account. Further, the
Panel notes that the fact that the building will be sold prior to the repairs being
undertaken means that certain allowances included in LC’s estimate may no
longer be required.
However, the Panel accepts that an allowance should be made for the following
additional items i dentified by LC, which were not included in MS’s scope of works:
the potential requirement for removal of internal asbestos (which is expressly
excluded from MS’s scope of works);
Case No: 370631 Determination Page 6 of 10
the replacement of missing light fittings (which the FSP’s electrical assessor
(AC) confirmed had been removed from the property); and
the restoration of the toilet area in the outbuilding (which LC confirmed had
sustained damage due to this building have been left without a serviceable
roof for an extended period of time).
Having regard to the available information, the Panel considers that the cash
settlement amount for the outstanding works should be increased by an additional
amount of $10,000 to allow for these items.
FSP should cash settle Applicant for total cost of repairs
For the reasons outlined above, the Panel considers that the FSP should cash
settle the Applicant for a total of $111,658.46 (excluding GST), comprising:
the cost of replacing the roof of the main building ($35,359.20);
repairing the damage to the electrical infrastructure ($30,000); and
carrying out the outstanding repairs required as a result of the hail storm in
November 2013 and the further storm in March 2014 ($46,299.26).
The Applicant’s entitlement to GST in respect of these amounts is to be
determined in accordance with the terms of the policy.
The Panel is satisfied that the estimates on which the cash settlement amount
has been determined are reasonably current. Accordingly, the FSP is not required
to pay interest on the cash settlement amo unt.
2.2 Is the Applicant entitled to compensation or reimbursement of
costs?
Applicant is entitled to reimbursement of certain professional costs
The Applicant seeks reimbursement for the costs of engaging experts to provide
the reports and advice set out below:
electrical inspection report ($200);
pest inspection report ($187);
building inspection report ($440);
engineer ’s attendance at an on-site meeting ($853.60); and
quantity surveyor report ($2,750).
Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a
financial services provider to contribute to legal or other professional costs
incurred by an applicant in the course of their dispute. A financial services
provider will generally not be required to contribute more than $3,000 unless
exceptional circumstances apply.
In the present case, the Panel accepts that it was reasonably necessary for the
Applicant to obtain the reports referred to above.
The electrical, pest and building reports were obtained to rebut views expressed
by the FSP’s contractors which were later found to be incorrect (for example, the
cause of water damage to the switchboard and the presence of live termites at the
property).
Case No: 370631 Determination Page 7 of 10
It was reasonable for the Applicant to seek the assistance of an engineer for the
purposes of the site meeting to attempt to resolve the dispute in relation to the
extent of further work required. By relying on the engineer’s verbal advice, the
Applicant negated the need to obtain a formal report (thereby reducing costs).
While the FSP has criticised the form in which the quantity surveyor (LC) provided
his report, the Panel has found the cost estimates in the report of assistance in
determining the appropriate settlement amount.
Given the range of issues which it was necessary for the Applicant to address
during the course of this dispute, the Panel considers that the total costs of
$4,430.60 incurred by the Applicant in obtaining expert reports are not
unreasonable.
On this basis, the Panel considers that the FSP should be required to reimburse
the Applicant for the total costs of $4,430.60, to the extent it has not already done
so.
Applicant is not entitled to reimbursement of legal fees
The Applicant seeks reimbursement of legal fees totalling approximately $42,500
for legal advice obtained during the course of this dispute.
The legal advice obtained by the Applicant (that is, the corporate trustee as
policyholder) was provided by its sole director, acting through a law firm in which
he was a principal.
FOS provides a service that is free for applicants and it is generally unnecessary
for either party to seek professional representation. If an applicant chooses to be
represented, they will u sually have to cover their representative’s fees
themselves.
In the present case, the Applicant (through its sole director) had sufficient legal
expertise to pursue its claim without requiring additional assistance. Accordingly,
the Panel considers that it was unnecessary for the Applicant to engage an
external adviser.
Accordingly, the Panel does not consider that the FSP should be required to
reimburse the Applicant for legal fees incurred.
Applicant is entitled to compensation for non-financial loss
Under paragraph 9.3(b) of the Terms of Reference, FOS may award
compensation (capped at $3,000) for non-financial loss where an applicant has
suffered an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with their expectation of enjoyment or peace
of mind.
In the present case, the Panel is satisfied that the Applicant has suffered
extended delays and inconvenience as a result of the manner in which the FSP
has handled his claim. In particular, the Panel notes that:
Case No: 370631 Determination Page 8 of 10
the FSP did not act promptly to address the Applicant’s concerns about the
roofing repairs, in circumstances where the FSP’s building consultant (MS)
has since confirmed that the roofing repairs were defective;
poor planning by the roofing contractor led to additional damage to the
Applicant’s property during the storm in March 2014;
the FSP and its contractors initially (and incorrectly) denied responsibility for
the additional damage on the basis it was caused by factors unrelated to the
roofing repairs;
the FSP’s contractor failed to adequately address asbestos -related issues at
the property; and
the FSP’s contractor ceased work on the outbuilding on the basis that there
was serious pre-existing structural damage and an active termite infestation,
both of which were later found to be false.
However, the Panel considers that once the FSP accepted that its contractor had
caused the additional damage, it acted appropriately to assess its liability for the
outstanding repairs. In the circumstances, it was reasonable for the FSP to seek
further reports from suitably qualified consultants to determine the extent of the
additional works required.
In the circumstances, the Panel considers that an award of compensation in the
amount of $1,500 is appropriate.
Applicant is entitled to partial compensation for loss of rent
Under paragraph 9.3(a) of the Terms of Reference, FOS may award
compensation (capped at $3,000) for consequential financial loss.
While the Applicant’s policy excludes cover for consequential loss, in the Panel’s
view this does not necessarily preclude the award of compensation where such
loss is caused directly by the actions of the FSP or its contractors, rather than as
the result of an event which is insured against under the policy.
In the present case, the Applicant says that it has suffered a loss of rent because
its tenant (CP) has withheld funds to pay for the hire of a generator to provide
power to the property pending the completion of the outstanding repairs.
It appears that CP ’s insurer initially paid for the cost of hiring a generator but
ceased to do so in or around November 2014. The Applicant has provided a copy
of an email from CP dated12 November 2014 confirming his intention to apply
rent payments to the cost of the generator (being approximately $1,300 per
week). The Applicant has also provided a copy of a rental ledger showing CP in
arrears by an amount of $13,568 in March 2015.
The FSP says that CP did not fall into arrears until shortly before the date he
advised the Applicant that considered rental payments should be applied to the
cost of the generator. This supports the Applicant’s position that the rental default
was related to the ongoing unrepaired state of the premises.
However, based on the available information, the Panel accepts that CP has
experienced significant disruption and inconvenience during the course of the
claim, which is likely to have contributed to his decision to withhold rent.
Case No: 370631 Determination Page 9 of 10
While the FSP is not responsible for all of the delays in resolving the claim, the
Panel is satisfied that the FSP’s actions have significantly contribut ed to the
delay, for the reasons outlined above. The Panel considers that the breakdown of
the relationship between the Applicant and the FSP which has in part delayed the
resolution of this dispute was largely driven by the FSP’s failure to respond
approp riately to the Applicant’s concerns about the initial roof repairs and to
accept responsibility for the additional damage which occurred in March 2014.
In these circumstances, the Panel is reasonably satisfied that the Applicant has
incurred consequential financial losses exceeding $3,000 due to its tenant’s
failure to pay rent.
The FSP says that the Applicant should seek to recover for loss of rent under the
business interruption section of the policy. It appears that no such claim has been
lodged to date.
However, in the Panel’s view, the fact that an alternative avenue for recovery may
be available does not prevent the award of compensation for loss of rent in the
present case. The Panel notes that, in the event that the Applicant lodges a claim
for business interruption, his loss would presumably be reduced by the extent of
any such award.
For the reasons outlined above, the Panel considers that the FSP should pay the
Applicant compensation in the amount of $3,000 for loss of rent.
As this amount represents compensation for consequential financial loss under
the FOS Terms of Reference, it is not subject to the limitations which apply to a
claim for business interruption under the terms of the Applicant’s policy.
Applicant is not entitled to compensation for future claims by tenant
The Applicant has raised concerns about the possibility that the tenant may take
legal action in the future, alleging a failure by the Applicant to comply with the
terms of the lease due to the condition of the property.
There is no information to suggest that any such action has been commenced (or
threatened) by the tenant to date. Accordingly, the Applicant is unable to establish
any actual loss in this regard.
Further, any such loss would constitute consequential financial loss for the
purposes of the FOS Terms of Reference. As the Panel has awarded the
Applicant the maximum amount of $3,000 available under the Terms of
Reference, no additional award would be payable.
The Panel does not consider it appropriate to amend the contract of insurance
between the parties to ascribe liability to the FSP in the event that the tenant
takes legal action (as this would be substantively equivalent to a further award of
compensation for non-financial loss). In the event that any such action is taken, it
is open to the Applicant to seek to join the FSP (or its contractors) to the relevant
proceedings.
Case No: 370631 Determination Page 10 of 10
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised numerous issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
The Panel notes that the policyholder is the corporate trustee of a family trust,
which has been represented by its sole director for the purpose of this dispute.
For reasons of brevity and simplicity, in this Determination the corporate trustee
and its director have been referred to collectively as the Applicant.