Determination 370582
Service quality
Summary
The FSP accepted that earlier repairs to the insured home were substandard but disputed the scope of rectification, including a kitchen tap. AFCA found the tap works covered, required a fresh quote for a cash settlement and increased non-financial loss compensation to $1,500.
Where the insurer's repairs caused the damage and the insurer's position on scope has shifted, the claim must be settled on a fresh independent quote covering all works, with compensation for unreasonable delay under the Terms of Reference.
Issues
- Repairs or contractors primary · upheld
“The available evidence establishes poor repairs were originally completed by the FSP's consultants under a claim lodged by the Applicant in 2011.”
- Claim amount dispute secondary · upheld
“The FSP's final cash settlement offer does not fulfil its obligations to the Applicant; a fresh independent quote is to be obtained.”
- Delay secondary · upheld
“In acknowledgment of the unreasonable delays and its level of service, the FSP offered $500; AFCA increased compensation to $1,500.”
Subjects and remedies
home or building damagepay non financial lossreassess claim
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - Service - Service quality
Determination
Case No: 370582 Determination Page 1 of 7
Case number : 370582 3 June 2015
1 Overview
1.1 Dispute
The Applicant is seeking cover for rectification works to the insured building
arising from poor repairs previously authorised by the Financial Services Provider
(FSP).
The FSP accepts the Applicant’s position that the repairs completed were not to
an acceptable standard. The parties, however, have been unsuccessful in
reaching an agreement with respect to the scope rectification works required.
The Applicant is seeking cover for all the issues she has identified with the
original repairs authorised by the FSP.
1.2 Issues and key findings
Is the FSP obliged to cover all the damage/items in dispute?
The Applicant has been successful in establishing she is entitled to cover for all
the rectification repairs claimed including the kitchen sink tap (the tap).
Does the FSP ’s final cash settlement offer fulfil its obligations?
The FSP ’s final cash settlement offer does not fulfil its obligations to the Applicant .
The FSP, in consultation with the Applicant, is to arrange a fresh quote from an
independent suitably qualified consultant, including for the additional works in line
with this Determination. The claim is to be settled on the basis of the new quote.
Is the Applicant entitled to compensation?
The FSP is to arrange payment of $1,500 by way compensation to the Applicant
in line with section 9.3 b) of the Financial Ombudsman Service (FOS) Terms of
Reference (ToR).
Case No: 370582 Determination Page 2 of 7
1.3 Determination
This Determination is in favour of the Applicant.
The FSP is to cash settle the claim on the basis of a fresh quote from an
independent suitably qualified consultant acceptable to the parties in line with the
Determination.
The FSP is to arrange payment of $1,500 by way of compensation to the
Applicant in line with section 9.3 b) of the FOS ToR.
Case No: 370582 Determination Page 3 of 7
2 Reasons for Determination
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties. There has been a full exchange
of all documents relied on to make this Determination and each party has had the
opportunity to address any issues raised by the other.
This dispute has not been the subject of a FOS Recommendation. Due to its
nature, it was appropriate to proceed directly to a Determination in line with the
Operational Guidelines to the FOS Terms of Reference.
While the parties have raised a number of issues in their submissions, for the
purposes of this Determination, commentary has been restricted to those issues
considered directly relevant to the outcome only.
2.1 Is the FSP obliged to cover all the damage claimed?
The FSP is to increase the level of cover offered to the Applicant
I have considered the F SP’s opinion that the onus rests with the Applicant to
establish the issue with the tap falls within the scope of the policy.
I am not satisfied this position is accurate and/or reasonable. The available
evidence establishes this issue arises from repairs authorised by the FSP under a
previously accepted claim. Accordingly, as it is neither a new event nor a new
claim; rather, is an issue regarding quality of repairs, the onus does not rest with
the Applicant.
The available evidence establishes poor repairs were originally completed by the
FSP’s consultants “B” under a claim lodged by the Applicant in 2011.
It is not in dispute the FSP has accepted liability for the majority of the issues
raised including flooring, kitchen cabinets, removal and storage of furniture,
cleaning, temporary accommodation, etc. associated with the required
rectification works.
The parties, however, have not been able to agree upon the scope of works to be
authorised by the FSP and/or therefore a final cash settlement amount.
The tap
The available evidence, on balance, establishes there exists issues with the tap
installed in that splashing occurs whilst it is in use. Various consultants appointed
by the FSP as well as the Applicant have inspected the tap and provided their
opinion (expert reports referred to in Section 3 of this Determination).
The claim file notes, and communication between the parties over the course of
the claim show, the FSP has altered its position on a number of occasions in this
regard.
These various position include:
Case No: 370582 Determination Page 4 of 7
the repairs were defective
the Applicant has not established this falls within the scope of the policy
the tap has been installed correctly
the Applicant’s choice of kitchen sinks is to blame.
The fact there does exist a problem of unreasonable splashing whilst the tap is in
use, however, remains constant in all scenarios.
I have considered the FSP’s r eference to the absence of a building standard
regarding installation of taps. It maintains it is at the discretion of the plumber
installing the tap as to where a tap is positioned.
In the absence of such a building standard, it is also a case that the FSP is not in
a position that the tap had been installed in line with any relevant building
standard. There are conflicting expert opinions in respect to the positioning and
installation of the tap from the various consultants appointed to the claim.
As noted above, there is no dispute unreasonable amount of splashing occurs
whilst the tap is in u se. The Applicant’s consultant “E” as well as the FSP’s own
internal assessor place the issue with the tap’s positioning.
The available evidence establishes that despite its efforts, the FSP and its
appointed consultants have not been able to find a replacement tap, standard or
custom made, to resolve the issue.
Accordingly, in the absence of substantiating evidence to the contrary, it is
reasonable to conclude the only option to rectify the issue lies in the tap being re-
positioned, which will also include removal and replacement of the kitchen bench.
2.2 Does the FSP’s final settlement offer fulfil its obligations ?
The Applicant is not obliged to accept the FSP’ s cash settlement offer
The FSP is of the opinion, due to the complications faced and its failure to meet
the Applicant’s expectations , the best option to settle the claim is by way of a cash
settlement to the Applicant on the basis of a quote from J.
The Applicant, arising from her lack of trust in the FSP’s preferred repairs , is also
accepting of the claim being settled by way of a cash settlement. However, the
Applicant, as noted above, was not satisfied with the FSP’s proposed scope of
works.
The Applicant also remains concerned with the FSP’s proposed costing of the
repairs and believes J’s quote would not cover the cost to complete the repairs by
her preferred consultant.
Both parties have obtained quotes, which I note are significantly different in terms
of the cost to complete the works proposed. Having considered both quotes, the
Applicant’s quote from “ CM ” and the FSP’s preferred quote from J, I am not
satisfied either quote is a fair representation of the required scope of works and/or
costings.
Case No: 370582 Determination Page 5 of 7
I am not satisfied the quote from CM is a fair representation of the reasonable
costs to undertake the works. If accepted, this quote would also exceed the FSP’s
obligations under the policy. The FSP is entitled to settle the claim on the basis of
what it would fairly cost the FSP to complete “ al l” the works required.
Accordingly, considering the lack of trust between the parties and what is fair in all
the circumstances, I determine:
The FSP, in consultation with the Applicant, is to arrange a fresh quote from a
suitably qualified independent consultant.
The scope of works is to include the repositioning of the tap and all works
associated with the repositioning.
The scope of works is to include all the outstanding repairs not in dispute
between the parties eg removal and replacement of cabinetry, refitting of the
dishwasher, etc.
In line with the available evidence, the FSP has already accepted the floor repairs
are to be completed by the Applicant’s preferred repairer , for which it will provide
a cash settlement to the Applicant.
The FSP, as per its obligations under the policy, is also obliged to cover/cash
settle the Applicant for the costs associated with the removal and storage of
furniture, temporary accommodation for the Applicant and family, cleaning works,
etc. and which is not in dispute.
2.3 Is the Applicant entitled to compensation?
The FSP is to increase its offer of compensation to the Applicant
FOS’s ToR allows an award of compensation for non-financial loss up to a
maximum sum of $3,000.
Such an award is subject to consideration as to whether there has occurred an
unusual degree or extent of physical inconvenience, time taken to resolve the
situation or interference with the Applicant’s expectation of enjoyment or peace of
mind has occurred.
The evidence supports the above criteria has been met to an extent that it would
be reasonable to require the FSP to financially compensate the Applicant.
The available evidence shows the FSP, in acknowledgment of the unreasonable
delays and its level of service provided, offered to pay the Applicant $500 by way
of compensation. I am not satisfied this amount represents a fair award of
compensation and determine the FSP is to increase this by a further $1,000.
Accordingly, the FSP is to arrange payment of $1,500 by way of compensation to
the Applicant in line with section 9.3 b) of the FOS ToR.
Case No: 370582 Determination Page 6 of 7
3 Supporting information
3.1 Expert evidence
Record Key points
Applicant’s (E’s) expert
Invoice
5 September 2013
attended to report on leaking mixer tap to kitchen sink
found the tap had been installed incorrectly and washer
had split.
FSP’s Assessor Report
8 April 2014
“… IO advised [B] installed the tap incorrectly when
supplying and installing the Caesar stone benchtop. The 2
sinks cut into the benc htop have also been installed to
close to one another. The issue though, is the tap when
turned on sprays water all over the benchtop as the tap
installation is approx. 30mm to far back from the sink . …”
[sic]
Applicant’s (E’s) expert
Report
19 December 2 014
the current sinks are designed to be top mounted sinks
and are installed correctly
when the tap is running no water bouncing out of the sink
on to benchtop
the tap has been mounted too far back from the edge of
the sink restricting water from discharging to the centre of
the sink
advised the Applicant would need to move tap forward
which would reduce splashing on the bench.
FSP ’s (J) expert Report the two sinks used are typically used in an under mount
application and not specifically designe d for top mount
application as is in this case (this has no bearing on issue
at hand)
found that the tap had been installed in a typical fashion
and is located in line with the separation of the two sinks to
the rear
operated the tap and found it has adequ ate coverage of
the sinks and its functionality to be correct
when tap turned on rapidly some minor splashing
occurred, not dissimilar to other sinks when pressure high
J suggested the tap should be operated in a more
controlled manner and noted the square sinks bases were
flat and this was a contributing factor for the splashing
location of the tap was not considered incorrect however it
could possibly be moved forward 10mm but this would not
affect its o peration.
Case No: 370582 Determination Page 7 of 7
3.2 TOR 9.3
9.3 Other compensation
...
b) Subject to paragraph 9.3c) and paragraph 9.7, FOS may decide that the
Financial Services Provider Compensate the Applicant for non-financial loss
but only where:
(i) An unusual degree or extent of physical inconvenience, time taken
to resolve the situation or interference with the Applicant’s
expectation of enjoyment or peace of mind has occurred; or
(ii) In the case of a Dispute pertaining to an individual’s privacy rights –
injury has occurred to the Applicant’s feelings or humiliation has
been suffered by the Applicant.
The maximum amount of compensation for non-financial loss will be $3,000
per claim made in the Dispute.
…