Home cracking damage during re-stumping denied under gradual deterioration and faulty workmanship exclusions
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim
Determination
Case No: 370418 Determination Page 1 of 9
Case number : 370418 3 February 2015
1 Overview
1.1 Dispute
The Applicant lodged a claim under her Home Insurance Policy with the Financial
Services Provider (FSP), after the walls of her home sustained cracking damage
while the home were being re-stumped in November 2013.
The FSP denied the claim on the basis that the damage was not caused by the
restumping but was pre-existing and/or was caused by factors which are excluded
from cover under the policy (such as wear and tear, gradual deterioration and
faulty design or workmanship).
1.2 Issues and key findings
Is the FSP liable for the damage to the Applicant’s home ?
The available information (including the engineers’ reports) establishes that, on
the balance of probabilities, the proximate cause of the cracking damage to the
Applicant’s home was the gradual deterioration of the original foundation
materials and the inappropriate use of stumps to support the internal brick walls.
Damage caused in this manner is excluded under the policy.
Section 46 of the Insurance Contracts Act 1984 (the Act) does not assist the
Applicant, as the application of the policy exclusions relied on by the FSP does
not depend on the issues with the foundations having been present before the
policy was taken out.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is not liable for the damage to the Applicant’s home.
Case No: 370418 Determination Page 2 of 9
2 Reasons for Determination
2.1 Is the FSP liable for the damage to the Applicant’s home ?
Application of policy depends on cause of damage
The Applicant’s policy provides cover for accidental damage to her property,
subject to the conditions and exclusions set out in the policy. In this context, the
courts have interpreted “accidental” to mean “unintended and unexpected.”
The policy contains exclusions for damage caused by:
inherent defects, structural defects, faulty workmanship or faulty design
wear, tear, rust corrosion, depreciation or gradual deterioration
the removal or weakening of supports or foundations for the purpose of
alterations, additions, renovations or repair.
The policy also excludes liability for damage intentionally caused by the Applicant
or a person acting with her consent.
The Applicant says that the damage to her property occurred accidentally as a
result of the re-stumping carried out by her builder in November 2013.
However, the FSP says that the bulk of the damage existed prior to the
restumping and was caused by the gradual deterioration of the original foundation
materials, together with the inappropriate use of stumps to support the internal
brick walls. To the extent that the re-stumping in November 2013 triggered further
cracking damage, the FSP says that this was caused by the pre-existing condition
of the foundations.
Accordingly, it is necessary to determine the proximate cause of the cracking
damage to the Applicant’s property (that is, the real, effective or predominant
cause). As the FSP is seeking to rely on a policy exclusion to deny the Applicant ’ s
claim, it bears the onus of establishing that, on the balance of probabilities, the
relevant exclusion applies.
Re-stumping of the home was not the proximate cause of the damage
Having carefully reviewed the available information (including the engineers’
reports obtained by both parties), the Panel is satisfied that the proximate cause
of the cracking damage to the Applicant’s home was the deteriorated and
inadequate condition of the foundations of the internal brick walls, and not the
restumping in November 2013.
The FSP’s engineer (M) concluded that the damage to the internal brick wall in
the front room was caused by the severe deterioration of the siltstone foundations
due to long term weathering. M considered that the damage to the remaining
internal brick walls was caused by the inappropriate use of concrete stumps as
foundations to support those walls, together with the severe deterioration of the
brick sub-walls under the walls. M noted that the use of inappropriate stumps
predated the re-stumping in November 2013, but the re-stumping in November
2013 had been carried out on the same basis, thereby continuing the existing
problem.
Case No: 370418 Determination Page 3 of 9
M’s report includes a number of photographs which clearly show the extent of the
deterioration of the siltstone foundations and brick sub-walls under the various
internal brick walls. These photographs also show significant holes which had
been punched through the siltstone foundations, apparently for the purposes of
ducted heating.
The Applicant’s engineer (S) agreed with the FSP’s engineer (M) that the siltstone
foundation of the wall in the front room had almost completely eroded, with
significant signs of failure and large areas completely removed. S also agreed that
the use of stumps as foundations for internal brick walls did not conform to
applicable building standards.
In his report, S concluded that, because major cracking damage became
apparent during the re-stumping process, the re-stumping was necessarily the
cause of the damage.
However, the pre-purchase building report obtained by the Applicant in February
2013 suggests that some damage had already occurred at that time. The report
refers to the floor levels in the house being inconsistent and cracking damage
being apparent to the top of the walls and the render. It appears that the
contractor who prepared the report did not inspect the sub-floor area and
therefore may not have appreciated the extent of the damage to the foundations
at the time.
Further, the fact that major cracking may only have become apparent during the
re-stumping process does not of itself mean that the re-stumping was the
proximate cause of the damage.
The Panel accepts the views expressed by the FSP’s engineer (M) that, had the
foundations of the internal brick walls been adequate, then damage would not
have occurred during the re-stumping in November 2013.
The Applicant’s engineer (S) has suggested that that the major cracking damage
occurred when one of the stumps under the external timber clad walls lifted during
the re-stumping process. However, M has confirmed that this would not have
resulted in damage to the internal brick walls had the existing foundations been
adequate, having regard to the nature of the connections between the internal
and external walls.
Factors which caused damage are excluded under the policy
The Applicant’s policy excludes damage caused by inherent defects, structural
defects, faulty workmanship or faulty design, as well as from wear, tear, or
gradual deterioration.
For the reasons outlined above, the Panel is satisfied that the proximate cause of
the damage to the Applicant’s policy was the gradual deterioration of the existing
foundation materials and the inappropriate use of stumps to support the internal
brick walls (being faulty design or workmanship). Damage caused in this manner
is excluded under the policy.
Accordingly, under the terms of the policy, the FSP is not liable for the Applicant’s
claim.
Case No: 370418 Determination Page 4 of 9
Section 46 of the Act does not apply
The Applicant says that section 46 of the Act operates to prevent the FSP from
denying her claim.
Section 46 of the Act prevents an insurer from relying on a policy exclusion which
operates by reference to a defect in a thing which existed before the policy was
taken out, in circumstances where the insured was not aware (and a reasonable
person in the circumstances could not be expected to have been aware) of the
defect at the time the policy was taken out.
However, the courts have confirmed that section 46 of the Act only applies where
the exclusion relied on by the insurer operates by reference to the time at which
the relevant defect arose.
The exclusions relied upon by the FSP in the present case apply to damage
which was caused by faulty design and workmanship and/or gradual deterioration,
irrespective of when these issues arose. As these exclusions do not expressly
refer to the relevant defect having been present before the policy was taken out,
section 46 of the Act does not operate to assist the Applicant.
Case No: 370418 Determination Page 5 of 9
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised a number of issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
3.2 Other amounts sought by the Applicant
The Applicant seeks reimbursement of lawyers ’ and engineer’s fees incurred for
the purposes of this dispute. She also seeks compensation for financial and non-
financial losses, including temporary accommodation costs , travel costs to inspect
the property and income lost as a result of taking unpaid leave.
The Panel notes that the Applicant has lodged a separate dispute with FOS in
relation to the FSP’s cancellation of her policy in July 2014. While the issues in
relation to the cancellation have been resolved by negotiation, the Applicant also
sought compensation for financial losses incurred as a result and it has been
agreed that the Applicant’s claim in this regard will be considered in conjunction
with the current dispute. Accordingly, th e Panel has had regard to the Applicant’s
submissions in this respect.
Based on the available information, the Panel does not consider that the
circumstances justify the award of compensation. As outlined above, the Panel
has determined that, under the terms of the policy, the FSP was entitled to deny
the Applicant’s claim. F urther, FOS will not generally award compensation for lost
income and time spent pursuing a dispute.
3.3 Section 46 of the Insurance Contract Act 1984
Section 46 Pre-existing defect or imperfection
46 (1) This section applies where a claim under a contract of insurance (other than a
contract of insurance that is included in a class of contracts declared by the
Case No: 370418 Determination Page 6 of 9
regulations to be a class of contracts in relation to which this section does not
apply) is made in respect of a loss that occurred as a result, in whole or in part,
of a defect or imperfection in a thing.
46(2) Where, at the time when the contract was entered into, the insured was not
aware of, and a reasonable person in the circumstances could not be expected
to have been aware of, the defect or imperfection, the insurer may not rely on a
provision included in the contract that has the effect of limiting or excluding the
insurer's liability under the contract by reference to the condition, at a time before
the contract was entered into, of the thing.
Relevant case law
Greg Nelson v The Hollard Insurance Company Pty Ltd [2010] NSWSC 199
3.4 Reports
Re port Key points
Applicant’s
p re - purchase
report (A)
February 2013
The b uilding had been re - stumped 8 to 10 years earlier . The floor
l evels we re inconsistent and advice should be sought about
appropriate repacking of the stumps.
Cracking to the top walls and the rendering was common and was
the result of either the building moving or a failure to repair damage
caused by the earlier re - stumping.
Ap plicant’s
engineer (S)
Report - 9
December 2013
The Applicant had advised that a large crack opened up in one of
the walls during the re - stumping . This w all was founded on an
extremely eroded sandstone footin g, with large signs of failure and
large areas c ompletely removed .
The majority of the other internal brick walls appeared to be showing
signs of failure. One wall was founded on brick footing s which
showed significant signs of failure, with the brickwork having fallen
away from the underside of the wall . The o ther walls founded on
hardwood stumps and bearers showed minor cracking. The footing
system for these walls was inadequate .
The d amage to the walls was initially caused by re - stumping.
However, the footing systems did not comply with current bui lding
standards and were structurally inadequate .
It was p ossible that the c racking was pre - existing and had only been
exacerbated by the re - stumping.
FSP’s engineer
(M)
Report -
17 February
2014
During the re - stumping of the Applicant’s property, the re - stumper
(D) told the Applicant that h e had damaged one of the walls.
The re - stumper obtained advice from a master builder, who
confirmed that it was safe to proceed with underpinning the
remaining section of the property as the re - stumping of the area
nea r the damaged wall had been completed .
The i nternal brick walls have a variety of supports, including new
concrete stumps, brick sub - walls that are badly deteriorated and
weathered siltstone foundations.
The u se of stumps to support brickwork is tota lly in adequate and
Case No: 370418 Determination Page 7 of 9
Re port Key points
contravenes the Australian Building Code. The variable movement
between stumps is too great to adequately support such a rigid
structure. Several building professionals involved in this process
have been negligent in allowing it to occur.
The pre - purchase inspection report did not comment on the
foundations or noted that the internal walls are brick, despite s ub -
floor access being available (based on Google streetscape images) .
The re - stumping of the internal brick walls in November 2013 was
c ontrary to building regulations and allowed the existing inadequate
support of the internal brick walls to continue.
The wall supporte d by weathered siltstone wa s in danger of collapse
and required t emp orary support or immediate demolition .
The re - stumping which occurred next to this wall wa s not the exact
cause of the damage. The weathered silts tone foundations of the
wall had worn away to the point where the wall wa s supported on
very small remaining pinnacles, which were in danger of immin ent
collapse . The pinnacle at the end of the external timber framed wall
ha d given way causing excessive settlement of the brick wall and
resultant cracking .
There was s erious cracking in all of the solid brick internal walls ,
particularly those supported by stumps. According to the Applicant,
many of these cracks were pre - existing but seem to have become
worse.
It was d ifficult to believe that the house had been built with brick
walls supported on stumps – it is possible that the stumps had been
installed to replace deteriorated brick strip footings when the house
was re - stumped 8 to 10 years previously (as noted in the pre -
purchase inspection report).
The damage to the internal brick wall in the front room was caused
by the severe deterio ration of siltsto ne foundation due to long term
weathering.
The cracking to the other brick wall s was the result of using stumps
as foundations contrary to the Building Code and the severe
deterioration of the remaining brick sub - wall foundations .
All of the foundations f or the internal walls are structurally
inadequate.
FSP’s engineer
(M)
Addendum – 19
February 2014
The Applicant’s re - stumper had confirmed that the house had under
floor ducted heating which was removed prior to stumping. Large
holes were punched through the sub walls made from siltstone and
the brickwork sup porting the brick walls to take the ducts.
The new concrete stumps installed by the re - stumper replaced
existing stumps. Stumps had also been put in to support the walls
where the heating ducts went through.
FSP’s engineer
(M)
Supplementary
r eport s - 6 May
2014
The proximate causes of the damage are as set out in the earlier
report. The re - stumping did not cause the damage.
Additional information had been received confirming that the holes
under the sub - floor were for ducting purposes .
The photographs provided by the Applicant show the lower section
Case No: 370418 Determination Page 8 of 9
Re port Key points
of the walls near the floor, whereas the Applicant had advised there
was pre - existing damage above the door openings and near the
ceiling.
Applicant’s
e ngineer (S)
Report - 3 July
2014
During the re - stumping process in November 2013, one of the
st umps under the external timber walls was lifted , which resulted in
significant cracking to the adjacent internal brick wall.
Other internal walls had also experienced significant cracking during
the re - stumping .
The footing systems for all of the internal brick walls are inadequate.
One wall is founded on a sandstone footing , which is s h owing
severe signs of deterioration. A nother wall is founded on a brick
foundation which is also showing significant signs of deterioration .
Other walls are founded on stumps and bearers, which is not a
sui table footing system for brick walls and does not comply with
current standards .
He agrees with M that the siltstone foot ing of the wall in the front
room had substantially deteriorated but does not agree that this was
the direct cause of the recent cracking damage. The damage
occurred when the external wall was being lifted as part of the re -
stumping.
The footing s of the o ther walls were inadequate. However, the
significant cracks now present occurred during the re - stumping
process.
Accordingly, it is obvious that the re - stumping was the cause of the
cracking damage.
FSP’s engineer
(M)
Further report -
18 July 2014
(in response to
report from
Applicant’s
engineer (S))
S’s report states that the cracking to the wall in the front room
occurred when one of the stumps under the external timber clad wall
lifted during the re - stumping process.
The internal brick walls and the external timber framed walls are
most likely connected by brick ties (connecting the brickwork to the
timber frame) and possibly a steel faring angle between the
plasterboard lining of the external wall and the hard plaster of the
internal wall.
Connection s of this type are unlik ely to transfer loads applied by the
jacking force on the external wall to cause cracking of the internal
wall to the extent observed.
In any event, the re - stumpers had advised that minimal jacking was
carried out due to the nature of the foundations . It would be usual
practice not to jack beside walls that have strip foundations.
The nature of the crack in the wall in the front room is consistent
with a failure of the foundations under the internal wall and
settlement.
The Ap plicant advised there was significant cracking to the internal
walls prior to the re - stumping .
The r e - stumping process usually come s with a proviso that internal
damage is to be expected .
Had the foundation s under the internal wall been structurally
adequa te the wall would not have cracked .
Case No: 370418 Determination Page 9 of 9
Re port Key points
It is not necessarily the case that the cracking to the other internal
walls occurred during re - stumping, given the Applicant had advised
of pre - existing cracking to these walls.
While some cracking did occur during the re - stumping process, the
proximate cause of this damage was the inadequate foundations
under the internal walls. If the foundations been structurally
adequate and the internal brick walls did not need to be re - stumped
then this damage would not have occur red (assuming the re -
stumping was carried out correctly).
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.