Text of the determination
Determination
General Insurance - Small Business/Farm Insurance - Commercial Property - Service –
Service Quality - Delay in Claim Handling
Determination
Case No: 370013 Determination Page 1 of 8
Case number : 370013 6 February 2015
1 Overview
1.1 Dispute
The Applicants lodged a claim under their farm insurance policy with the Financial
Services Provider (FSP) after their farm was inundated by stormwater run-off in
March 2012.
The FSP accepted the claim and arranged for repairs to be undertaken. However,
the Applicants say that certain aspects of the repairs require rectification and the
repairs do not address all of the damage to their property caused by stormwater
run-off. The Applicants also seek benefits for loss of rent while the damage to
farm 515 remained unrepaired.
1.2 Issues and key findings
Has the FSP satisfied its obligations under the policy?
The available information establishes that the FSP is liable for the repair and/or
rectification of some of the disputed items of damage. However, the FSP is not
liable for all of the disputed damage, some of which was caused by factors which
are excluded under the policy.
Are the Applicants entitled to payments for loss of rent?
The Applicants are not entitled to payments for loss of rent as farm 515 was not
uninhabitable due to the damage which remained unrepaired. Further, the
available information does not establish the Applic ants’ intention to tenant the
property.
1.3 Determination
This Determination is partly in favour of the Applicants.
The FSP is required to, at the Applicants’ election, repair the additional damage to
the property for which the Panel has determined it is liable (as set out in section 2
below) or cash settle the Applicants for the reasonable costs of the repairs (in
accordance with section 2.2 below).
The FSP is also required to assess its liability for the damage to farm 515 caused
by the leaking sewerage pipe identified by the Applicants’ engineer (AC).
The FSP is not required to compensate the Applicants for loss of rent.
Case No: 370013 Determination Page 2 of 8
2 Reasons for Determination
2.1 Has the FSP satisfied its obligations under the policy?
Issues in dispute concern a number of separate items
The Applicants’ policy provides cover for the following buildings which are located
on three separate farm properties:
the Applicants’ main residence located on farm 2542;
a cottage located on farm 515; and
a further residence and drying shed located on farm 528.
When the Applicants lodged their dispute with FOS, they raised a number of
specific concerns about the poor quality of some aspects of the repairs to each of
these buildings carried out by the FSP. They also identified additional damage
which they said was caused by the stormwater inundation but was not included in
the s cope of works prepared by the FSP’s building consultant (S).
During the course of the dispute, the FSP agreed to accept liability for the repair
or rectification of a number of the additional items identified by the Applicants (as
set out in section 3.2 below). Accordingly, these items are no longer in dispute
and therefore will not be dealt with in this Determination.
The Panel notes that, at the Applicants’ reques t, the FSP has agreed to cash
settle them for the cost of the additional repairs and rectification works required,
based on reasonable quotations to be provided by a repairer acceptable to the
Applicants. The Panel considers that this is appropriate. However, it is open to the
Applicants to request that the FSP arrange for the additional repairs and
rectification works to be carried out by its own contractors.
In the event that any dispute arises about the amount of the cash settlement or
the quality of the additional works, it remains open to the Applicants to seek the
assistance of FOS in resolving such a dispute.
In addition to the items of damage for which the FSP has accepted liability, a
number of other items remain in dispute. The parties have provided extensive
information (including numerous consultants’ reports, scopes of work and
photographs) in relation to these items. The Panel has carefully reviewed this
information, for the purpose of determining whether the FSP is liable for each
disputed item.
FSP is liable for some of the disputed damage at farm 2542
Based on the available information, the Panel is satisfied that the FSP is liable for
the repair and/or rectification of the following disputed items at farm 2542.
Item Panel comments
Shower in main
bathroom
The report prepared by the Applicant’s engineer (AC) states
that the shower had been repaired but the grade towards the
floor waste was not sufficient and the sealing of the tiles had
been compromised.
Case No: 370013 Determination Page 3 of 8
Item Panel comments
The FSP’s engineer (XP) did not dispute that the grade in the
shower was insufficient but considered that the FSP was not
liable for rectifying this as the repairs had been carried out
prior to the stormwater inundation in March 2012 and were
therefore unrelated.
However, the availab le information establishes that the repairs
to the shower were carried out by the FSP’s builder (CP) as
part of the claim - related repairs .
These repairs were not included in the original scope of works
prepared by the FSP’s building consultant (S), who
co nsidered that the damage to this area predated the
stormwater inundation.
However, while undertaking the claim - related repairs, the
FSP’s builder (CP) discovered that the floor in the shower
alcove had heaved around the central drain, compromising
the wate rproof membrane. Accordingly, t he FSP’ s loss
adjuster (CL) approved the replacement of the floor and
bottom row of wall tiles and the re - waterproofing of the shower
recess.
Given that the repairs were carried out by the FSP’s
contractor, the FSP is liable for any deficiencies in the repairs.
The FSP’s engineer has suggested that the insufficient grade
may be due to the manner of construction involving a flat floor
platform and has suggested that lack of sufficient grade does
not necessarily cause any probl ems.
However, given that AC has identified that the insufficient
grade has compromised the sealing of the tiles , it is
approp r iate that the FSP be required to address this issue.
The Panel notes that the FSP has agreed to do this in respect
of the repairs to the shower in the ensuite bathroom (see
below).
The FSP is also liable for rectifying the minor issues with the
shower repairs identified by XP in his report dated 3 July 2013
(to the extent these have not been addressed already).
Shower in e nsuite
bathroom
The FSP accepts that the floor tiles in the shower have been
disturbed as a result of movement of the shower base. Based
on the findings of its engineer (XP), the FSP says that this
damage was due to the failure of the wet area seal at the
junction of the shower screen with the wall , and not by the
stormwater inundation in March 2012 .
However, the FSP has accepted liability for the damage to the
floor tiles on the basis that the policy provides cover for
resulting damage caused by water es caping from a shower
wall (although not for the repair of the underlying damage to
the shower itself).
The FSP has also agreed to ensure that the grade in the
shower is adequate following the repairs (thereby addressing
the concerns of the Applicant’s engi neer (AC) in this regard).
The available information establishes that the leaking shower
Case No: 370013 Determination Page 4 of 8
Item Panel comments
wall also caused damage to the carpet and flooring in the
vicinity. Under the terms of the policy, the FSP is also liable
for repairing this damage.
FSP is not liable for the remaining items of disputed damage at farm 2542
However, the Panel considers that the FSP is not liable for the repair and/or
rectification of the remaining disputed items at farm 2542 (being the sinking of the
laundry steps and the movement of the front verandah).
The Applicants say that this damage was caused by the stormwater which
inundated their property in March 2012.
However, based on the engineers’ reports, the Panel considers that the bulk of
this damage was caused by factors which are unrelated to the storm.
The FSP’s engineer (XP) considered that the movement damage to the steps and
verandah pre-existed the stormwater inundation and was caused by the manner
of construction (including the use of uncompacted fill material underneath the
steps).
The Applicants’ engineer (AC) concluded that while this damage may have been
exacerbated by the stormwater inundation, it was usual given the manner of
construction and location of the property and therefore primarily attributable to
those factors. AC did not include the repair of this damage in his scope of works
for the repair of additional claim-related damage.
Accordingly, the FSP is not liable for the repair the damage to the steps and
verandah, as it was caused primarily by factors which are excluded under the
policy.
FSP is liable for the rectification of the downpipe at farm 528
The FSP arranged for the replacement of the existing guttering in the garage at
farm 528 as part of the claim-related repairs. A downpipe nozzle was installed at
one end of the new guttering to allow overflow.
The available information establishes that the downpipe was installed incorrectly
and needs to be repositioned so that it is at least three metres from the footings of
the building.
Neither the scope of works prepared by the FSP’s building consultant (S) nor the
quotation provided by the FSP’s builder (CP) specifically refers to the installation
of the downpipe. It is possible that this was not part of the necessary claim-related
repairs and was installed to better enable the guttering to cope with extreme
rainfall events.
However, in the absence of any information which indicates that the Applicants
undertook this aspect of the works privately, the Panel considers it more likely that
the downpipe was installed to effectively reinstate the guttering system as part of
the claim-related repairs.
Case No: 370013 Determination Page 5 of 8
On this basis, the FSP is liable for the cost of repositioning the downpipe.
FSP is required to reassess some of the disputed damage at farm 515
The claim- related repairs carried out by the FSP’s builder (CP) included the
packing and re-levelling of the stumps along the front of the cottage and under the
kitchen lounge area. These repairs were undertaken based on the findings of the
FSP’s building consultant (S) that the floor in this area was no longer level, most
likely due to the external walls having settled due to the presence of moisture.
The FSP also arranged for the repair of various cracks in the kitchen/dining and
lounge room areas.
However, the Applicants say that further works need to be undertaken to resolve
the issues with the foundations and prevent further cracking damage.
The report prepared by the Applicant’s engineer (AC) in July 2014 (after the re-
levelling works had been completed) identifies significant continuing damage
present in the central part of the house , including a notable rise in the floor level
due to the stumps no longer being in contact with the floor bearers. AC also
identified a high point in the main bathroom.
In his report, AC concludes that a large proportion of the damage and the
resulting floor unevenness was caused by a significant leak from the bathroom
sewerage to the septic tank adjacent to the bathroom, which pre-dated the
rainwater inundation in March 2012. He notes that the damage has been
exacerbated by the stormwater inundation, which resulted in significant swelling
toward the outside of the house, from which the centre was largely protected.
The Applicants say that the leak could not have caused the issues with the floor
levels observed, as the house had been unoccupied for the previous two years.
However, the Panel notes that AC does not express any view as to when the
damage occurred (other than indicating that it pre-dated the stormwater
inundation event).
The leak from the sewerage pipes had not previously been identified by th e FSP’s
contractors but is not disputed by the FSP’s engineer (XP), who also accepts
AC’s conclusion that this leak had a major effect on the building. However, XP
disputes AC’s finding that the stormwater inundation exacerbated the existing
issues.
The Pa nel considers that, as identified by XP, AC’s conclusions about the effects
of the inundation are inconsistent with the available information regarding the floor
levels. If, as AC stated, the primary effects of the inundation were at the perimeter
of the house, then the lounge room floor (which is at the centre of the house)
would be expected to have dropped, whereas the experts’ reports consistently
identify a “peak” in the lounge room floor.
However, XP’s report primarily focuses on whether the ongoing m ovement and
cracking damage to the house is related to the stormwater inundation. It is not
apparent to the Panel whether the FSP has separately assessed its liability for
this damage on the basis that it was primarily due to the effects of the leaking
sewerage pipe (as appears to have been accepted by both AC and XP).
Case No: 370013 Determination Page 6 of 8
Accordingly, the FSP is required to assess its liability for the cracking and
movement damage on this basis.
In his report, the Applicants’ engineer (AC) states that the continuing effects of the
leak from the sewerage pipe has compromised the effectiveness of the re-
levelling works undertaken by the FSP’s builder. While there is insufficient
information available to the Panel to determine this, it is a matter which should be
considered by the FSP in the course of assessing its liability for the damage
caused by the leaking pipe.
FSP is liable for the damage to the laundry tiles at farm 515
The parties’ engineers have provided conflicting views as to the cause of the
dislodged laundry tiles at farm 515.
The FSP’s engineer (XP) considers that this damage was not caused by the
stormwater inundation but was due to general wear and tear and the long-term
failure of the tile adhesive.
The Applicants’ engineer (AC) noted that the FSP had accepted liability for
damage to the plasterboard near the shower and the damage to the tiles was
consistent with this damage.
In the circumstances, the Panel considers that the FSP should be liable for the
repair of this damage. The Panel is satisfied that the Applicants have established
a prima facie case that this damage was caused by the inundation. The available
information is not sufficient to establish that a relevant exclusion applies, bearing
in mind that the FSP bears the onus in this regard.
2.2 How should the claim be settled?
FSP is to undertake necessary repairs or cash settle Applicants
Given that the FSP has elected to repair the Applicants’ property, it would
generally be liable for completing the repairs to an adequate standard. This
includes undertaking any rectification works required.
However, in the present case, the Applicants ha ve indicated that, at least for
some of the outstanding items, they would prefer to be cash settled for the cost of
the repairs.
Accordingly, the FSP is required to, at the Applicants’ election, repair the
additional damage to the property for which the Pa nel has determined it is liable
(as set out in section 2.1 above) or cash settle the Applicants for the reasonable
costs of doing so, based on quotes to be obtained by the FSP from repairers who
are acceptable to the Applicants.
The Panel considers that the FSP has acted reasonably in attempting to resolve
the concerns raised by the Applicants, including by paying the fees of the
engineer appointed by the Applicants (at a cost of $4,048). In these
circumstances, the Panel considers that it is not appropriate to require the FSP to
pay interest on any cash settlement.
Case No: 370013 Determination Page 7 of 8
2.3 Are the Applicants entitled to payments for loss of rent?
Applicants are not entitled to payments for loss of rent
The Applicants acknowledge that, under the terms of the policy, they do not have
cover for loss of rent. However, the policy effectively provides cover for temporary
accommodation costs (calculated by reference to the notional rent) where the
property is unable to be lived in following an insured event. Alternatively, the
Applicants say that they should be entitled to payment for loss of rent as
compensation for losses incurred due to the FSP’s delay in satisfactorily resolving
their claim.
The Applicants say that they have been unable to re -tenant the property due to
the FSP having failed to repair all of the damage caused by the stormwater
inundation to an adequate standard. As outlined above, the outstanding damage
primarily relates to the movement damage in the central rooms of the property,
which the Applicants’ engineer (AC) has advised requires repairs which would be
disruptive to a prospective tenant.
The Panel notes that the extent to which the FSP is liable for this damage
depends on the outcome of the further assessment which is the FSP is required
to undertake, in accordance with section 2.1 above.
Having said that, even if the FSP is found to be liable for this damage, the
Applicants are only entitled to rental benefits to the extent that the relevant
damage has rendered the property unliveable. The Panel does not accept that is
the case. The property remained secure and fit for habitation, and there is no
suggestion that any contaminants or safety hazards were present.
Accordingly the Panel considers that the property remained habitable and
therefore the Applicants have no entitlement to loss of rent benefits under the
policy.
For similar reasons, the Panel considers that it is not appropriate to award
compensation for financial losses incurred as a result of the Applicants’ inability to
rent the property. The Panel notes that the Applicants have confirmed that, at the
time of the stormwater inundation, the property had not been lived in for two
years, and the Applicants have not provided any independent information
confirming their intention to tenant the property at that time.
Case No: 370013 Determination Page 8 of 8
3 Supporting information
3.1 Panel approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised numerous issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
3.2 Additional items for which the FSP has accepted liability
During the course of this dispute, the FSP has accepted liability for the following
additional items identified by the Applicants:
rectification of faulty plasterwork at farm 515;
mould removal and remediation in the sunroom at farm 515;
repair of the additional cracks in the hallway at farm 515;
re-sanding and re-polishing of the timber floors at farm 2542;
removing and reinstating the skirting boards in the hallway at farm 2452
damaged by the leaking shower in the en suite;
re-grouting of the laundry waste at farm 2542;
repair of the garage floor concrete slab and planing and adjustment of the
garage door at farm 528; and
replacement of the stained insulation and cladding of the prune drying shed at
farm 528.