Determination 370013

Stormwater damage repairs and rectification; loss of rent claim

FirmFinancial Firm (Unknown - Insurer)
Decided2015-02-26
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicants disputed the FSP's stormwater repairs, the scope of damage and loss of rent on their farm properties. AFCA found the FSP liable for some repair items and for reassessing other damage, but not for the steps, verandah or loss of rent.

The FSP bore the onus of proving the exclusion, and the policy did not cover damage caused primarily by pre-existing construction or sewerage defects rather than the storm.

Issues

Subjects and remedies

home or building damagenatural disasterreassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Small Business/Farm Insurance - Commercial Property - Service – Service Quality - Delay in Claim Handling Determination Case No: 370013 Determination Page 1 of 8 Case number : 370013 6 February 2015 1 Overview 1.1 Dispute The Applicants lodged a claim under their farm insurance policy with the Financial Services Provider (FSP) after their farm was inundated by stormwater run-off in March 2012. The FSP accepted the claim and arranged for repairs to be undertaken. However, the Applicants say that certain aspects of the repairs require rectification and the repairs do not address all of the damage to their property caused by stormwater run-off. The Applicants also seek benefits for loss of rent while the damage to farm 515 remained unrepaired. 1.2 Issues and key findings Has the FSP satisfied its obligations under the policy? The available information establishes that the FSP is liable for the repair and/or rectification of some of the disputed items of damage. However, the FSP is not liable for all of the disputed damage, some of which was caused by factors which are excluded under the policy. Are the Applicants entitled to payments for loss of rent? The Applicants are not entitled to payments for loss of rent as farm 515 was not uninhabitable due to the damage which remained unrepaired. Further, the available information does not establish the Applic ants’ intention to tenant the property. 1.3 Determination This Determination is partly in favour of the Applicants. The FSP is required to, at the Applicants’ election, repair the additional damage to the property for which the Panel has determined it is liable (as set out in section 2 below) or cash settle the Applicants for the reasonable costs of the repairs (in accordance with section 2.2 below). The FSP is also required to assess its liability for the damage to farm 515 caused by the leaking sewerage pipe identified by the Applicants’ engineer (AC). The FSP is not required to compensate the Applicants for loss of rent. Case No: 370013 Determination Page 2 of 8 2 Reasons for Determination 2.1 Has the FSP satisfied its obligations under the policy? Issues in dispute concern a number of separate items The Applicants’ policy provides cover for the following buildings which are located on three separate farm properties:  the Applicants’ main residence located on farm 2542;  a cottage located on farm 515; and  a further residence and drying shed located on farm 528. When the Applicants lodged their dispute with FOS, they raised a number of specific concerns about the poor quality of some aspects of the repairs to each of these buildings carried out by the FSP. They also identified additional damage which they said was caused by the stormwater inundation but was not included in the s cope of works prepared by the FSP’s building consultant (S). During the course of the dispute, the FSP agreed to accept liability for the repair or rectification of a number of the additional items identified by the Applicants (as set out in section 3.2 below). Accordingly, these items are no longer in dispute and therefore will not be dealt with in this Determination. The Panel notes that, at the Applicants’ reques t, the FSP has agreed to cash settle them for the cost of the additional repairs and rectification works required, based on reasonable quotations to be provided by a repairer acceptable to the Applicants. The Panel considers that this is appropriate. However, it is open to the Applicants to request that the FSP arrange for the additional repairs and rectification works to be carried out by its own contractors. In the event that any dispute arises about the amount of the cash settlement or the quality of the additional works, it remains open to the Applicants to seek the assistance of FOS in resolving such a dispute. In addition to the items of damage for which the FSP has accepted liability, a number of other items remain in dispute. The parties have provided extensive information (including numerous consultants’ reports, scopes of work and photographs) in relation to these items. The Panel has carefully reviewed this information, for the purpose of determining whether the FSP is liable for each disputed item. FSP is liable for some of the disputed damage at farm 2542 Based on the available information, the Panel is satisfied that the FSP is liable for the repair and/or rectification of the following disputed items at farm 2542. Item Panel comments Shower in main bathroom  The report prepared by the Applicant’s engineer (AC) states that the shower had been repaired but the grade towards the floor waste was not sufficient and the sealing of the tiles had been compromised. Case No: 370013 Determination Page 3 of 8 Item Panel comments  The FSP’s engineer (XP) did not dispute that the grade in the shower was insufficient but considered that the FSP was not liable for rectifying this as the repairs had been carried out prior to the stormwater inundation in March 2012 and were therefore unrelated.  However, the availab le information establishes that the repairs to the shower were carried out by the FSP’s builder (CP) as part of the claim - related repairs .  These repairs were not included in the original scope of works prepared by the FSP’s building consultant (S), who co nsidered that the damage to this area predated the stormwater inundation.  However, while undertaking the claim - related repairs, the FSP’s builder (CP) discovered that the floor in the shower alcove had heaved around the central drain, compromising the wate rproof membrane. Accordingly, t he FSP’ s loss adjuster (CL) approved the replacement of the floor and bottom row of wall tiles and the re - waterproofing of the shower recess.  Given that the repairs were carried out by the FSP’s contractor, the FSP is liable for any deficiencies in the repairs.  The FSP’s engineer has suggested that the insufficient grade may be due to the manner of construction involving a flat floor platform and has suggested that lack of sufficient grade does not necessarily cause any probl ems.  However, given that AC has identified that the insufficient grade has compromised the sealing of the tiles , it is approp r iate that the FSP be required to address this issue. The Panel notes that the FSP has agreed to do this in respect of the repairs to the shower in the ensuite bathroom (see below).  The FSP is also liable for rectifying the minor issues with the shower repairs identified by XP in his report dated 3 July 2013 (to the extent these have not been addressed already). Shower in e nsuite bathroom  The FSP accepts that the floor tiles in the shower have been disturbed as a result of movement of the shower base. Based on the findings of its engineer (XP), the FSP says that this damage was due to the failure of the wet area seal at the junction of the shower screen with the wall , and not by the stormwater inundation in March 2012 .  However, the FSP has accepted liability for the damage to the floor tiles on the basis that the policy provides cover for resulting damage caused by water es caping from a shower wall (although not for the repair of the underlying damage to the shower itself).  The FSP has also agreed to ensure that the grade in the shower is adequate following the repairs (thereby addressing the concerns of the Applicant’s engi neer (AC) in this regard).  The available information establishes that the leaking shower Case No: 370013 Determination Page 4 of 8 Item Panel comments wall also caused damage to the carpet and flooring in the vicinity. Under the terms of the policy, the FSP is also liable for repairing this damage. FSP is not liable for the remaining items of disputed damage at farm 2542 However, the Panel considers that the FSP is not liable for the repair and/or rectification of the remaining disputed items at farm 2542 (being the sinking of the laundry steps and the movement of the front verandah). The Applicants say that this damage was caused by the stormwater which inundated their property in March 2012. However, based on the engineers’ reports, the Panel considers that the bulk of this damage was caused by factors which are unrelated to the storm. The FSP’s engineer (XP) considered that the movement damage to the steps and verandah pre-existed the stormwater inundation and was caused by the manner of construction (including the use of uncompacted fill material underneath the steps). The Applicants’ engineer (AC) concluded that while this damage may have been exacerbated by the stormwater inundation, it was usual given the manner of construction and location of the property and therefore primarily attributable to those factors. AC did not include the repair of this damage in his scope of works for the repair of additional claim-related damage. Accordingly, the FSP is not liable for the repair the damage to the steps and verandah, as it was caused primarily by factors which are excluded under the policy. FSP is liable for the rectification of the downpipe at farm 528 The FSP arranged for the replacement of the existing guttering in the garage at farm 528 as part of the claim-related repairs. A downpipe nozzle was installed at one end of the new guttering to allow overflow. The available information establishes that the downpipe was installed incorrectly and needs to be repositioned so that it is at least three metres from the footings of the building. Neither the scope of works prepared by the FSP’s building consultant (S) nor the quotation provided by the FSP’s builder (CP) specifically refers to the installation of the downpipe. It is possible that this was not part of the necessary claim-related repairs and was installed to better enable the guttering to cope with extreme rainfall events. However, in the absence of any information which indicates that the Applicants undertook this aspect of the works privately, the Panel considers it more likely that the downpipe was installed to effectively reinstate the guttering system as part of the claim-related repairs. Case No: 370013 Determination Page 5 of 8 On this basis, the FSP is liable for the cost of repositioning the downpipe. FSP is required to reassess some of the disputed damage at farm 515 The claim- related repairs carried out by the FSP’s builder (CP) included the packing and re-levelling of the stumps along the front of the cottage and under the kitchen lounge area. These repairs were undertaken based on the findings of the FSP’s building consultant (S) that the floor in this area was no longer level, most likely due to the external walls having settled due to the presence of moisture. The FSP also arranged for the repair of various cracks in the kitchen/dining and lounge room areas. However, the Applicants say that further works need to be undertaken to resolve the issues with the foundations and prevent further cracking damage. The report prepared by the Applicant’s engineer (AC) in July 2014 (after the re- levelling works had been completed) identifies significant continuing damage present in the central part of the house , including a notable rise in the floor level due to the stumps no longer being in contact with the floor bearers. AC also identified a high point in the main bathroom. In his report, AC concludes that a large proportion of the damage and the resulting floor unevenness was caused by a significant leak from the bathroom sewerage to the septic tank adjacent to the bathroom, which pre-dated the rainwater inundation in March 2012. He notes that the damage has been exacerbated by the stormwater inundation, which resulted in significant swelling toward the outside of the house, from which the centre was largely protected. The Applicants say that the leak could not have caused the issues with the floor levels observed, as the house had been unoccupied for the previous two years. However, the Panel notes that AC does not express any view as to when the damage occurred (other than indicating that it pre-dated the stormwater inundation event). The leak from the sewerage pipes had not previously been identified by th e FSP’s contractors but is not disputed by the FSP’s engineer (XP), who also accepts AC’s conclusion that this leak had a major effect on the building. However, XP disputes AC’s finding that the stormwater inundation exacerbated the existing issues. The Pa nel considers that, as identified by XP, AC’s conclusions about the effects of the inundation are inconsistent with the available information regarding the floor levels. If, as AC stated, the primary effects of the inundation were at the perimeter of the house, then the lounge room floor (which is at the centre of the house) would be expected to have dropped, whereas the experts’ reports consistently identify a “peak” in the lounge room floor. However, XP’s report primarily focuses on whether the ongoing m ovement and cracking damage to the house is related to the stormwater inundation. It is not apparent to the Panel whether the FSP has separately assessed its liability for this damage on the basis that it was primarily due to the effects of the leaking sewerage pipe (as appears to have been accepted by both AC and XP). Case No: 370013 Determination Page 6 of 8 Accordingly, the FSP is required to assess its liability for the cracking and movement damage on this basis. In his report, the Applicants’ engineer (AC) states that the continuing effects of the leak from the sewerage pipe has compromised the effectiveness of the re- levelling works undertaken by the FSP’s builder. While there is insufficient information available to the Panel to determine this, it is a matter which should be considered by the FSP in the course of assessing its liability for the damage caused by the leaking pipe. FSP is liable for the damage to the laundry tiles at farm 515 The parties’ engineers have provided conflicting views as to the cause of the dislodged laundry tiles at farm 515. The FSP’s engineer (XP) considers that this damage was not caused by the stormwater inundation but was due to general wear and tear and the long-term failure of the tile adhesive. The Applicants’ engineer (AC) noted that the FSP had accepted liability for damage to the plasterboard near the shower and the damage to the tiles was consistent with this damage. In the circumstances, the Panel considers that the FSP should be liable for the repair of this damage. The Panel is satisfied that the Applicants have established a prima facie case that this damage was caused by the inundation. The available information is not sufficient to establish that a relevant exclusion applies, bearing in mind that the FSP bears the onus in this regard. 2.2 How should the claim be settled? FSP is to undertake necessary repairs or cash settle Applicants Given that the FSP has elected to repair the Applicants’ property, it would generally be liable for completing the repairs to an adequate standard. This includes undertaking any rectification works required. However, in the present case, the Applicants ha ve indicated that, at least for some of the outstanding items, they would prefer to be cash settled for the cost of the repairs. Accordingly, the FSP is required to, at the Applicants’ election, repair the additional damage to the property for which the Pa nel has determined it is liable (as set out in section 2.1 above) or cash settle the Applicants for the reasonable costs of doing so, based on quotes to be obtained by the FSP from repairers who are acceptable to the Applicants. The Panel considers that the FSP has acted reasonably in attempting to resolve the concerns raised by the Applicants, including by paying the fees of the engineer appointed by the Applicants (at a cost of $4,048). In these circumstances, the Panel considers that it is not appropriate to require the FSP to pay interest on any cash settlement. Case No: 370013 Determination Page 7 of 8 2.3 Are the Applicants entitled to payments for loss of rent? Applicants are not entitled to payments for loss of rent The Applicants acknowledge that, under the terms of the policy, they do not have cover for loss of rent. However, the policy effectively provides cover for temporary accommodation costs (calculated by reference to the notional rent) where the property is unable to be lived in following an insured event. Alternatively, the Applicants say that they should be entitled to payment for loss of rent as compensation for losses incurred due to the FSP’s delay in satisfactorily resolving their claim. The Applicants say that they have been unable to re -tenant the property due to the FSP having failed to repair all of the damage caused by the stormwater inundation to an adequate standard. As outlined above, the outstanding damage primarily relates to the movement damage in the central rooms of the property, which the Applicants’ engineer (AC) has advised requires repairs which would be disruptive to a prospective tenant. The Panel notes that the extent to which the FSP is liable for this damage depends on the outcome of the further assessment which is the FSP is required to undertake, in accordance with section 2.1 above. Having said that, even if the FSP is found to be liable for this damage, the Applicants are only entitled to rental benefits to the extent that the relevant damage has rendered the property unliveable. The Panel does not accept that is the case. The property remained secure and fit for habitation, and there is no suggestion that any contaminants or safety hazards were present. Accordingly the Panel considers that the property remained habitable and therefore the Applicants have no entitlement to loss of rent benefits under the policy. For similar reasons, the Panel considers that it is not appropriate to award compensation for financial losses incurred as a result of the Applicants’ inability to rent the property. The Panel notes that the Applicants have confirmed that, at the time of the stormwater inundation, the property had not been lived in for two years, and the Applicants have not provided any independent information confirming their intention to tenant the property at that time. Case No: 370013 Determination Page 8 of 8 3 Supporting information 3.1 Panel approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. 3.2 Additional items for which the FSP has accepted liability During the course of this dispute, the FSP has accepted liability for the following additional items identified by the Applicants:  rectification of faulty plasterwork at farm 515;  mould removal and remediation in the sunroom at farm 515;  repair of the additional cracks in the hallway at farm 515;  re-sanding and re-polishing of the timber floors at farm 2542;  removing and reinstating the skirting boards in the hallway at farm 2452 damaged by the leaking shower in the en suite;  re-grouting of the laundry waste at farm 2542;  repair of the garage floor concrete slab and planing and adjustment of the garage door at farm 528; and  replacement of the stained insulation and cladding of the prune drying shed at farm 528.