Determination 369823

Declined building damage claim from leaking sewerage pipe, relying on subsidence, settling, design and deterioration exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2014-12-03
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$143,470
Non-financial loss—
Amount claimed$143,470
SourceAFCA PDF

Summary

A body corporate for commercial units claimed for building damage it attributed to leaking sewerage pipes, and the FSP denied the claim under exclusions. AFCA found the FSP had not established the exclusions and ordered it to cash settle $143,470 without interest.

Having established a prima facie claim, the insured was entitled to indemnity because the FSP failed to prove on the balance of probabilities that the damage fell within an exclusion.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of Claim - Exclusion/Condition Determination Case No: 369823 Determination Page 1 of 11 Case number : 369823 2 6 November 2014 1 Overview 1.1 Dispute The Applicant (a body corporate for a complex of commercial units) lodged a claim under its commercial strata insurance policy with the Financial Services Provider (FSP) for damage to four of the units, which the Applicant believed had been caused by leaking sewerage pipes. The FSP denied the claim on the basis that the damage was not caused by the leaking pipes but by matters which are excluded under the policy, such as soil movement, tree roots and/or faulty design and workmanship. 1.2 Issue and key findings Is the FSP liable for the damage to the building? The Applicant has established a prima facie claim under the policy, given the broad cover for accidental damage provided. Accordingly, the onus rests with the FSP to establish that, on the balance of probabilities, the claimed damage was caused by one or more matters which are excluded under the policy. The available information (including the respective engineers’ reports) is not sufficient to establish that, on the balance of probabilities, the cracking a nd movement damage was caused by one or more matters which are excluded under the policy, rather than by the effect of the leaking pipe. 1.3 Determination This Determination is in favour of the Applicant. The FSP is required to cash settle the Applicant for $143,470, being the cost of underpinning works required to repair the movement damage to the building, in accordance with a quote provided by the Applicant’s underpinning contractor (R) . Given the currency of the quote, the FSP is not required to pay interest on this amount. Case No: 369823 Determination Page 2 of 11 2 Reasons for Determination 2.1 Is the FSP liable for the damage to the building? Policy provides cover unless FSP can show an exclusion applies The Applicant’s policy provides cover for “ damage ” to the insured building, subject to the conditions and exclusions set out in the policy. “Damage” is defined in the policy to mean “ physical loss, damage or destruction by any cause not otherwise excluded” . The policy contains general exclusions for damage caused by or as a consequence of:  erosion, subsidence, or any other movement of earth unless it happens immediately following and as a result of water leaking or escaping from pipes or other fixed plumbing apparatus  n ormal settling, seepage, shrinkage or expansion in buildings or foundations  dampness, variations in temperature, inherent vices or latent defects  errors or omissions in designs, plans or specifications , faulty materials or faulty workmanship  gradual deterioration or developing flaws  tree roots. It is an accepted principle of general insurance law that an insured bears the onus of establishing that, on the balance of probabilities, they have suffered a loss caused by a risk insured under the policy. This is known as a prima facie claim. If the insured is able to establish a prima facie claim, the onus then shifts to the insurer to show that, on the balance of probabilities, the loss falls within an exclusion clause under the policy or that it is otherwise entitled to deny liability. The engineers’ reports obtained by both parties establish that the building has suffered movement and cracking damage (although the extent of this damage is disputed). In these circumstances, the Panel is satisfied that the Applicant has established a prima facie claim, given the broad cover for accidental damage provided under the policy. Accordingly, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion to deny the Applicant’s claim. In order to do so, the FSP must show that the proximate cause (that is, the real, effective or predominant cause) of the cracking and movement damage to the building is an event referred to in one of the exclusions listed above. Available information does not establish movement damage was caused by consolidation The FSP acknowledges that the Applicant’s plumber (TG) identified two breaks in the sewerage pipe running under the slab of the units at the rear of the building, approximately 2 metres from the rear retaining wall. However, the FSP disputes that the broken pipe was the proximate cause of the cracking and movement damage. Case No: 369823 Determination Page 3 of 11 The FSP relies on a report provided by its engineer (M) in support of its position that:  the broken pipe (and subsequent movement damage) was caused by the consolidation (downward movement) of the material used to backfill the 2.8 metre retaining wall at the rear of the property, which occurred gradually over an extended period of time  the cracking damage was unrelated to the broken pipe and was caused by one or a combination of factors excluded under the policy, including naturally occurring building movement, poor building design and construction techniques and the loads imposed by heavy machinery used by tenants of the units. The Applicant has provided a report by its engineer (B) which was prepared before the claim was lodged. In his report, B concludes that the main cause of the movement and cracking damage to the building was the leaking pipes, which resulted in settlement of the soil towards the rear half of the units. B has provided a subsequent report in which he strongly disputes the findings of the FSP’s engineer (M). Having reviewed the reports provided, the Panel is not satisfied tha t the available information is sufficient to establish that, on the balance of probabilities, the consolidation of the backfill material was the proximate cause of the broken pipe and the movement damage. The Panel notes that, other than the presence of the backfill material itself, there is little (if any) objective evidence which suggests that this material has consolidated gradually over time, causing damage to the pipes and the building. The FSP’s engineer (M) has suggested that the consolidation proce ss has been occurring since the building was built approximately thirty years earlier. However, if this is the case, it is not clear why it is only recently that more significant damage has become apparent. Further, in these circumstances, it would be expected that the damage would be relatively consistent across the areas in which the backfill material is present (being the entire rear section of the building, including units 7 and 8), rather than at the rear of units 9 to 12 only. By contrast, the report s provided by the Applicant’s engineer (B) demonstrate a clear link between the location of the broken sections of the sewerage pipe and the areas in which the movement damage was observed. The level surveys carried out by B in September 2013 show that settlement was most apparent in the rear half of units 9 and 10 and was also evident to the rear of unit 11, whereas there was no settlement to units 7 and 8. The report prepared by the Applicant’s plumber (TG) confirms that the leaks in the pipe occurred under the slab of unit 9 and unit 11, allowing effluent from all four of the damaged units to discharge directly into the ground and causing the material around the pipe to subside. In these circumstances, the Panel is not satisfied that the FSP has established that, on the balance of probabilities, the movement damage and broken pipe was Case No: 369823 Determination Page 4 of 11 caused by consolidation of the backfill material, such that it is entitled to rely on the policy exclusions for normal settling, subsidence and earth movement. Available information does not establish cracking damage was caused by excluded factors The FSP relies on M’s report in support of its position that the cracking damage t o the walls of the building was caused by various factors which are excluded under the policy, including:  naturally occurring building movement (due to environmental conditions, such as temperature, moisture, wind and the presence of trees)  poor building design and construction techniques , including the use of unreinforced block masonry walls over 2.4 metres high and the inappropriate placement of control joints  the loads imposed by heavy machinery used by tenants of the units. However, the Applicant’s engineer (B) disputes M’s findings. B notes that the nature and location of the severe wall cracking was not random in nature but generally coincided with the areas where the level surveys confirmed that settlement had occurred. While B agreed with M that the construction of the block masonry walls was prone to cracking, he considered that this had no o verall bearing on where the damage had occurred . He also disagreed with M’s view that the design of the wall control joints was “highly irregular” and “non - compliant”, noting that this issue was more appropriately classified as a “poor building detail”, of the type common in every structure. The FSP says that the Applicant’s engineer (B) acknowledged that the cracking damage was caused by a number of factors, including naturally occurring movement as a result of inadequate drainage, naturally occurring climatic variations and the presence of trees. However, the Panel is satisfied that B clearly identified the leaking pipe as the main cause of the cracking damage to the four units which is the subject of the current claim. While B’s report refers to the effec ts of various other factors, this is largely in the context of the possible contribution of such factors to ongoing movement damage at the property, and the improvements which could be made in order to minimise such damage in the future. In these circumstances, the Panel is not satisfied that the FSP has established that, on the balance of probabilities, the cracking damage to the four units was caused by the various factors referred to by the FSP, which are excluded under the policy. Damage occurred “immediately following” leaking pipe The FSP says that, even if the proximate cause of the claimed damage was the leaking pipe, the damage would not be subject to cover because, under the terms of the policy, such damage is only covered where it occurs “immediately following” the escape of liquid from the pipe. The Panel does not agree that this is the effect of the policy wording. Case No: 369823 Determination Page 5 of 11 The general policy exclusion for erosion, subsidence or any other earth movement provides that the resulting damage will not be covered unless it happens “immediately following and as a result of” the escape of liquid from a pipe. However, the exclusion does not require that the escape itself occur suddenly, as contended by the FSP. In circumstances where it appears that the pipe may have been leaking over an extended period of time, the Panel is satisfied that any particular aspect of the cracking and movement damage should be treated as having occurred “immediately following” the escape of water from the pipe, given that this has been an ongoing process which has resulted in further incremental damage over time. The Panel is also satisfied that the policy exclusion for “gradual deterioration” is not applicable in the present case. In the Panel’s view, this exclusion is intended to apply to damage caused by gradual deterioration in the course of ordinary use (such as, for example, deterioration due to the effect of usual weather events). However, it does not apply to further damage which occurs over time, where such damage merely represents the ongoing effects of a separate and identifiable proximate cause which is subject to cover under the policy. Applicant did not unreasonably delay claim lodgement The FSP says that it has been prejudiced by the Applicant’s delay in lodging the claim and its failure to take steps to mitigate its loss, after it first became aware of the damage. Under the terms of the policy, the Applicant is required to lodge a claim as soon as possible after suffering a loss and to take all reasonable steps to minimise the loss and prevent any further damage. The FSP says that the Applicant was aware of the cracking damage approximately three to four years before the claim was lodged, based on information provided by the owner of unit 9 (MP) to its assessor in January 2014. The assessor’s report states that MP advised him that the damage had not been notified to the FSP at this time because it was not considered to be serious. However, MP has subsequently clarified that, although he did notice some minor cracking to his unit four years ago, at the time he attributed this to naturally occurring settlement, as is typical of buildings in the area . MP confirms that it was not until August 2013 that he was aware of any significant worsening of the cracking damage to his unit. The Panel notes that the FSP’s engineer (M) has confirmed that it is not possible to determine exactly when the break in the pipe occurred and that there would have been limited evidence of the problem, other than visible seepage through the retaining wall. However, M noted that the retaining wall is only accessible through a locked gate and is not regularly visited, which meant that the broken pipe may have remained undetected for several years. Accordingly, it is likely that (through no fault of its own) the Applicant remained unaware of the existence of the broken pipe for a significant period. In these circumstances, there was no reason for the Applicant (or the unit owners) to believe that the damage had been caused by a leaking pipe (which is subject to Case No: 369823 Determination Page 6 of 11 cover under the policy), rather than by naturally occurring earth movement (which is not subject to cover). T he Panel notes that the Applicant’s engineer (B) does not dispute that the building is subject to some naturally occurring earth movement, as a result of changes in climatic conditions, although he considers that the nature and extent of the current damage is materially different, due to the effects of the leaking pipe. In these circumstances, it is also possible that at least some of the damage identified by MP approximately three to four years ago was attributable to naturally occurring earth movement, rather than the effects of the leaking pipe. As the FSP’s e ngineer has noted, it is not possible to confirm when the leaking pipe began to have an impact. The Panel is satisfied that, after the significance of the damage was first identified in or around August 2013, the Applicant acted reasonably promptly to appoint an engineer to inspect the damage and a plumber to investigate the underlying cause, before proceeding to lodge a claim. In the circumstances, the Panel is satisfied that the Applicant has complied with its obligations under the policy, and therefore the FSP is not entitled to reduce its liability for the claim due to any delay in claim lodgement or failure to mitigate the loss. FSP is required to cash settle Applicant for underpinning costs For the reasons outlined above, the Panel considers that the FSP is not entitled to rely on any of the policy exclusions referred to, in order to deny the Applicant’s claim. Accordingly, the FSP is liable to indemnify the Applicant for the damage to the building. The Applicant has provided a copy of a quote for $143,470 from an underpinning contractor (R) for works required to rectify the foundations of the building, in accordance with the report provided by the Applicant’s engineer (B). The FSP has not commented on the adequacy of this quote. The Panel notes that it is possible that R’s quote includes the repair of some non - claim related (or pre-existing) movement damage. On the other hand, the Applicant has restricted the scope of the dispute to the amount of R’s quote, even though this arguably excludes some damage which would be subject to cover under the policy (for example, damage to the brickwork and internal walls). Given the above, and in the interests of finality, the Panel considers that it is fair in all the circumstances that the FSP be required to cash settle the Applicant for the amount of R’s quote. Given the currency of the quote, the Panel considers that the FSP should not be required to pay interest on the settlement amount. Case No: 369823 Determination Page 7 of 11 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. The Applicant has been represented by its broker for the purposes of this dispute. The Panel has also been provided with submissions from the owners of the affected units. Any submissions made by the Applicant’s broker and the unit owners have been treated as having been made by the Applicant itself, for the purposes of this Determination. 3.2 Terms of policy Subject Terms Cover provided We will indemnify you for Damage to Property Insured, whilst at the Situation … Damage … means physical loss, damage or destruction by any cause not otherwise excluded. Property exclusions This section does not cover loss or damage …Caused by, or as a consequence of:  Erosion, subsidence, landslide, collapse or any other movement of earth unless it happens immediately following and is as a result of … water leaking or escaping from pipes, gutters, drainpipes or other fixed plumbing apparatus .  … dampness, variations in t emperature, evaporation, disease, inherent vice or l atent defect, structural defect …  Wear and tear, fading, scratching or marring, gradual deterioration, developing flaws, normal upkeeping or making good.  Error or omission in design, plan or specification , or failure of design . Case No: 369823 Determination Page 8 of 11 Subject Terms  Normal settling, seep age, shrinkage or expansion in b uildings or foundations, walls, pavements, roads, and other structural improvements, creeping, heaving, vibration.  Tree roots.  Faulty materials or faulty workmanship . Delay in lo dging claim What you must do when you make a claim You must make your claim as soon as possible after you suffer a loss. If you do not make it within 30 days, we may reduce what we pay you to take account of any disadvantage we suffer by the delay. You mus t also … 1. Take all reasonable steps to minimise the loss, damage or liability and to prevent any further loss, damage or liability. 3.3 Reports Record Key points Applicant’s engineer (B) Report - 10 Sep tember 2013  The cracking damage and footin g system movement was found in u nits 9, 10, 11 and 12 which were on the rear right hand side of the building (as viewed from the street). The property slopes from the street towards the rear.  There was s evere (Category 3) cracking and gaps along the block work with in the units and obvious c urvature of the floor slabs towards the rear half of the units . There was also significant cracking and rotation of the external walls.  The tenant of u nit 9 had advised that voids were apparent under the floor slab towards the rea r of the unit during recent modifications.  Water was visibly seeping through the walls at specific locations just below the floor of the units, along the rear wall. The gro und in this area was wet and spongy with water visible in pools close to the wall.  Geotechnical tests confirmed that the soils at the site were m oderately reactive clay soil s . U n - compacted fill material was also present . It is likely that this fill was compacted during the development process, however there is no record of this.  Some t rees and shrubs were noted growing within their mature height near to the building.  Obvious plumbing leaks were occurring towards the rear half of the units (at least). He recommended that a plumbing test be carried out to confirm this.  A brick course leve l survey identified falls of up to 42 millimetres within the units towards the rear of the building (towards the likely leaking pipes).  Some articulation joints were noted in the brickwork around the building.  The movement damage was r elated to the leaking pipes causing voids and settlement towards rear half of units, in combination with naturally occurring volumetric changes in the moderately reactive clay soils. The effects of the leaking pipes were in addition to the Case No: 369823 Determination Page 9 of 11 Record Key points naturally occurring change s and required specific attention. Applicant’s plumber (TG) Report - 28 Nov ember 2013  There were two major broken sections in the PVC sewerage drain that ran approximately two metres adjacent to the block retaining wall . These breaks were under the slab of units 9 and 11, and were allowing effluent from all four units to discharge into the ground.  In addition, the drain did not have adequate fall in some section s and was holding water up to 75% of its capacity . There were sections of backfill under all un its.  The m aterial around the drain had subsided as a result . FSP’s assessor (C) Reports – 22 January 2014  He was advised by the owner of Unit 9 that the current matter was known to them three to four years ago, but had not been notified to the FSP becaus e it was considered not to be serious. However, as the matter now required action, a claim had been lodged. FSP’s engineer ( M ) Report - 4 March 2014  The owner of unit 9 had advised that he first noticed cracking in the walls about two years ago but believ es that the cracking had gotten worse. When the owner excavated the slab to install drainage for a new shower, he noticed that there was a significant void under the slab of the unit.  There were signs of previous repairs to movement damage in u nits 9, 10 a nd 11.  The fact that the control joints in the units remained intact without excessive cracking indicated that there had been no recent movement in the concrete slab or block walls. The misali gnment of the control joint in u nit 9 was highly irregular. The curvature of the concrete slab was negligible.  The rear wall of the units was constructed on top of a 2.8 metre high masonry block retaining wall founded on the flood plain of [L] Creek.  There was clear evidence of minor seepage coming from behind the ret aining wall, although the current seepage appeared to be concentrated in the bottom 1 metre of the retaining wall (that is approximately 2 metres below the concrete slab). The seepage has caused the erosion of the cement paste from the masonry blocks, whic h would have taken many years.  There are fig trees growing off the masonry block walls, the roots of which may affect the structural integrity of the retaining wall if they are left to grow.  The retaining wall was found to be not vertical. Ground anchors had been installed to assist in supporting this retaining wall.  The photograph of the broken pipe provided by the Applicant’s plumber indicated an absence of voids or erosion of the surrounding ground. The presence of fine tree roots indicated that the pip e had been broken for a significant period of time. The evidence of the current and past locations of seepage from the retaining wall supports this view.  It is not possible to determine exactly when the break in the pipe occurred. The only evidence would be the visible seepage (and the smell). The retaining wall is accessed through a locked gate and not regularly visited – accordingly, the broken pipe may have remained undetected for several years.  Some of the statements in the report of the Applicant’s en gineer Case No: 369823 Determination Page 10 of 11 Record Key points (B) are not supported by his inspection. In particular, the large differences identified by B’s blockwork course level survey were not supported with consequent cracking in the block walls normally associated with substantial footing movements. Thes e differences may be attributed to poor site controls during construction rather than footing movements.  The results of the soil tests referred to by B were not relevant to the material used as backfill behind the retaining wall.  The vast majority of the m ovement cracking was Category 1 or Category 2. The Category 3 cracks were not caused by wall movement but most likely by insufficient clearances around roof purlins and the use of unreinforced block walls over 2.4 metres high.  The d amage to the sewer was c aused by the consolidation (downward movement) over time of the backfill material used to backfill the retaining wall. The sinking of the surrounding soil caused the pipe to break. T he consolidation was a very gradual process which had been occurring over many years since the initial construction of the building.  The consolidation is a building defect because if the backfill material had been compacted correctly (or if “cohesionless” material had been used), the consolidation would most probably not have oc curred.  The p eriodic floodwaters from the nearby creek would submerge the bottom part of the retaining wall , saturating the backfill material , which would also contribute to consolidation.  The other issues with the pipe identified by the Applicant’s plumb er confirmed that there had been prior excessive movement of the ground supporting the pipe (as the council approval would not been obtained if these issues had been present at construction).  The description of the void under the slab provided by the owner of Unit 9 also suggests that there has been prior excessive movement.  The cracking damage to the building has been caused by one or a combination of building movements (from temperature, moisture or wind loads) , poor building practices (including the use of unreinforced masonry walls), poor construction techniques (including in relation to control joints) and applied loads of machinery and material storage in the units. This damage is not related to the breaks in the pipe. Applicant’s engineer (B) Response to M’s report - 5 May 2014 (prepared at FSP’s request)  The level survey he carried out in September 2013 confirm ed that movement in the form of settlement was occurring around the rear of the units (particularly to the rear half of units 9 & 10, b ut also to the rear of unit 11 to a lesser extent). There was no settlement to units 7 and 8. M did not appear to have undertaken a level survey of either the floors or the walls.  This settlement coincided with the location of the plumbing leak s . If general consolidation had occurred (as per M’s report ) , he would have expected the settlement to be more uniform .  He agrees with M that the construction of the block masonry dividing walls is prone to cracking however this had no overall bearing on w here the movement had occurred and what caused the movement. The movement revealed by the floor level surveys Case No: 369823 Determination Page 11 of 11 Record Key points was unrelated to the wall materials used.  The design of the wall control joints noted by M could be described as “poor building details” of the ty pe common in every structure, but did not cause by the movement damage in the current case .  The nature and location of the severe wall cracking was not random in nature but generally coincided with the areas where the level surveys confirmed that settlemen t had occurred.  In relation to M’s comments about the absence of voids or erosion in the ground around the broken pipe , the plumber (TG) had noted subsidence in his report. In any event, plumbing leaks can cause settlement by way of a number of mechanisms (including consolidation, settlement and erosion). In this case, clear downward movement was evident.  M’s comments about the absence of voids also appear to be inconsistent with his later comments about the fact that the concrete slab was unsupported due t o the voids caused by consolidation .  He confirms that both the movement and cracking damage coincide very well with the plumbing leaks identified and that those plumbing leaks reflect the main cause of the damage towards the rear half of the units.  If cons olidation were the main cause, this would be expected to be uniform across the areas where the backfill material was used in construction, which is not the case. 3.4 Email from owner of Unit 9 (MP) dated 18 June 2014 “ Following our telephone conversation I wish to clarify my discussion with the Insurance Assessor, in August 2013, relating to the cracking in the building at [the property]. I would like to make it clear that although Unit 9 (the unit that my wife and I own) did have some minor cracking that I noticed approximately 4 years ago, I had put this down to settlement of the now 30 year old building. As most buildings on the Gold Coast have some settlement cracking I did not take much notice of it at the time. At no time prior to August 2013 was I aware of any problem as such, or that any progression of the cracking was taking place because the unit is tenanted and I generally have no need to carry out inspections …”

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.