Home / Financial Firm (Unknown - Insurer) / Determination 369789
Determination 369789
Claim Amount
Summary
The insured's storm claim for roof ridge pointing and a driveway replacement was cash settled by the FSP at $4,167.01 net of excess, which he rejected. AFCA found the ridge pointing failure was wear and tear or workmanship, the driveway needed only repair, and the offer fair, so it determined in favour of the FSP.
The policy excludes wear, tear, deterioration and poor workmanship, and the expert evidence shows the ridge damage was not storm-related, so the offer adequately covers storm damage.
Issues
- Claim amount dispute primary · not upheld
“The offer of $4,167.01 is fair in all the circumstances; the FSP is entitled to cash settle the claim for $4,167.01 net of excess.”
- Claim denial secondary · not upheld
“The FSP is not liable to meet the cost of repointing the ridge lines or replacing the driveway.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
Amount
Determination
Case No: 369789 Determination Page 1 of 2
Case number : 369789 20 January 2015
1 Overview
1.1 Dispute
This dispute follows a claim for storm related damage on 25 June 2014. The
Financial Service Provider (FSP) accepted liability for storm related damage but
has declined liability for repair to the entire ridge pointing or replacement of the
driveway.
The Applicant has rejected the over to cash settle the claim for $4,167.01 and
seeks $3,520 to repair the ridging and replacement of the driveway.
The Case Manager provided the parties with a Recommendation on the issues in
dispute. The Recommendation was in favour of the FSP. A copy of the
Recommendation is attached to this Determination.
1.2 Issues and Key findings
Were the findings of the Recommendation correct?
The findings contained in the Recommendation were correct and are adopted in
this Determination . Further submissions provided after the Recommendation have
been considered.
Is the FSP’s offer of settlement reasonable in the circumst ances?
The FSP’s offer of settlement is reasonable in the circumstances because:
the policy excludes liability for wear and tear, rust and deterioration as well as
poor or faulty design, materials, plan or workmanship
the evidence establishes on the balance of probabilities the damage to the
ridging was due to wear and tear, deterioration
there is no evidence the driveway needs to be replaced
there is no evidence of additional storm related damage to the driveway.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is entitled to cash settle the Applicant ’ s claim for $4,167.01 net of
excess in accordance with the terms of the policy.
The FSP is not liable to meet the cost of repointing the ridge lines or replacing
the driveway.
Case No: 369789 Determination Page 2 of 2
2 Reasons for Determination
2.1 Were the findings in the Recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
Recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that the Case M anager’s Recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs
of the Terms of Reference and any relevant law.
The Applicant in rejecting the Recommendation has not offered any additional
information to support his claim. The Applicant maintains that the damage to t he
roof now requires urgent rectification and there is further damage to the driveway.
2.2 Is the FSP’s offer of settlement reasonable ?
The offer of settlement is reasonable in the circumstances
The policy is an insured events policy covering various events subject to
limitations and exclusions.
Whilst the policy covers storm damage, it specifically excludes damage due to
wear and tear, rust, corrosion and deterioration.
There is no dispute the property suffered some storm related damage to the roof
and driveway during the storm in June 2014. The FSP accepted liability for this
damage and attended to the make safe repairs.
The FSP’s roofing contractor identified the flexible pointing compound over the
ridging showed signs of degradation and was debonding. He considered this a
wear and tear, deterioration or poor workmanship issue.
Although the Applicant has provided a quotation for repairs from JR, I note JR
concedes the ridging was not damaged in the storm.
As for the driveway the FSP has provided a quotation to cover the repairs to the
chips and to repaint and reseal. There is no evidence the driveway needs to be
replaced or that it has sustained further storm related damage.
Having considered the information exchanged, I am satisfied the FSP is entitled to
rely on the terms of the policy to limit its liability for the roof repairs and repair of
the driveway. I am satisfied the offer of $4 ,167.01 is fair in all the circumstances.
Recommendation
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
amount
Recommendation
Case No: 369789 Recommendation Page 1 of 5
Case number: 369789 12 November 2014
1 Overview
1.1 Dispute
The Financial Services Provider (FSP) accepted the Applicant’s claim for storm
damage to his roof and driveway, but the Applicant was dissatisfied with the
FSP’s cash settlement offer of $4,167.01 net of excess.
The Applicant seeks the cost he incurred in repairing all the roof damage in the
amount of $3,520, plus cost to replace the whole driveway (amount has not been
established).
1.2 Issues and key findings
Can FSP refuse costs of repairing damaged ridge pointing and replacing the
entire driveway?
The FSP can refuse to pay the Applicant the costs of repairing the damaged ridge
pointing on the roof and replacing the entire driveway because the available
evidence shows:
the damage to the ridge line pointing compound was due to general
deterioration and workmanship issues, which are specifically excluded from
cover under the policy
the damage to the driveway does not warrant full replacement of the entire
structure.
Is Applicant entitled to indemnity for additional driveway damage?
The FSP is entitled to an inspection of the additional damage to the driveway
before determining if the policy responds to such damage.
1.3 Recommendation
This Recommendation is in favour of the FSP.
The FSP is not required to:
to meet the cost of repointing all the ridge lines on the roof
to replace the whole driveway.
The FSP is to arrange a further inspection to assess the additional damage to the
driveway.
Case No: 369789 Recommendation Page 2 of 5
2 Reasons for Recommendation
2.1 Can FSP refuse costs of repairing damaged ridge pointing and
replacing the entire driveway?
Policy covers storm damage, but excludes wear, tear and deterioration
The Applicant holds an insured events policy which provides cover for storm
damage, subject to a number of exclusions, including wear, tear and deterioration.
FSP may cash settle claim but amount offered must be adequate
Under the terms of the policy, the FSP has the right to decide how it wishes to
settle the claim. However, if the FSP elects to cash settle the claim, it must ensure
that the amount offered is reasonably adequate to carry out all necessary repairs.
Available expert evidence establishes damage to ridge line pointing
compound is due to general deterioration and workmanship
The Applicant has the onus to establish that the costs of repair he is seeking falls
within terms of the cover provided by the policy. However, apart from a roof repair
invoice the Applicant has not provided any expert evidence to support his claim
that all the roof damage were caused by the June 2014’s storm event.
On the hand, the FSP has provided several expert reports, including images of
the damaged roof. These images indicate the presence of moss on some areas of
the roof and in several other areas the pointing thickness barely covered the edge
of the ridge component. All available evidence points to general deterioration and
poor quality workmanship as being the cause of the damage associated with the
ridge pointing.
In the absence of any other expert evidence to refute the available expert
evidence, it is reasonable to accept the FSP’s experts’ conclusions.
The FSP has offered to cash settle the Applicant $2,265.12 (GST inclusive) for
the roof repairs. The Applicant has provided an invoice for $3,520, but this invoice
also included repair cost for the ridge pointing. In these circumstances, it is fair to
accept that the FSP's proposed settlement appropriately indemnifies the Applicant
for losses associated with the June 2014’s storm event and is consistent with the
terms of the policy.
Damage to driveway does not warrant full replacement of driveway
The FSP’s experts consider the driveway damage can be repaired by filling the
chipped concrete with a concrete resin, followed by repainting and sealing of
approximately 36m2 of the driveway. According to them, this repair method will
retain the integrity of the entire slab and maintain a uniform appearance.
Case No: 369789 Recommendation Page 3 of 5
Photo images provided with the FSP’s expert reports show minor chips in the
concrete driveway and there is no evidence to show that it has suffered any
structural damage. Save for his concerns, the Applicant has not presented any
evidence to demonstrate the repairs contemplated will impact upon the structural
integrity or appearance of the driveway.
In the absence of contrary expert evidence, it would not be reasonable to require
the FSP to pay the cost of replacing the entire driveway. The FSP has offered a
cash settlement of $2551.89 for this portion of the claim. The Applicant has not
obtained an alternative quote and in the lack of any alternative evidence it is
reasonable to accept the quote prepared by the FSP’s builder.
2.2 Is Applicant entitled to indemnity for additional driveway
damage?
FSP arrange a further inspection for the additional damage to driveway
During a telephone conversation with the undersigned on 5 November 2014, the
Applicant advised that another loose tile has fallen on the back section of the
driveway (behind the gate). He confirmed that this damage occurred after the
FSP’s experts’ inspections and therefore has not been included in the claim.
The FSP is entitled to inspect this damage before being required to indemnify the
Applicant. It is recommended that the FSP do this within 7 days of receiving the
Recommendation.
3 Supporting information
3.1 Relevant Policy Provisions
General exclusions
General exclusions apply to all sections of your policy and describe circumstances where
your policy will not provide cover for any loss, damage or liability arising directly or indirectly
from any cause noted below. We will not pay for death, bodily injury to any person, or loss
of or damage to property caused directly or indirectly by:
…
6. wear and tear, rust, corrosion or deterioration;
8. mould, rot, damp or the effects of the climate or weather;
11. poor or faulty design specification, materials, plan or workmanship;
…
What if you need to Claim?
When you claim, it can only relate to one incident and you cannot include multiple incidents
in one. If there is more than one incident, a separate claim will need to be submitted and the
relevant excess/es will apply to each and every claim. If you claim under your policy, we
have the choice to settle your claim in many ways. We will never pay more than the sum
insured shown on your policy schedule, plus the ex tra amounts shown under the Extra
Cover section. We may:
1. settle your buildings claim by:
paying for the reasonable cost of repair or rebuilding the damaged part of your
buildings; or
paying you the reasonable cost of repair or rebuilding the damaged part o f your
buildings; or
Case No: 369789 Recommendation Page 4 of 5
rebuilding the building to its size and quality before the claim;
any combination of the above.
Matching Materials
We will always try to match colours and materials, but where products are unavailable we
will use the closest possible match that is available. Additional costs resulting from the
unavailability of matching materials are not covered. Whether we settle your claim by
replacing, repairing or rebuilding, it will only be for the damaged areas of your premises or
damaged contents.
We will not pay for the costs to replace, repair or rebuild undamaged areas or contents
items that form part of any set. We may agree to pay you what it would cost us to repair,
replace or rebuild the damaged areas or contents and you can pay the balanc e of the cost.
3.2 Key Expert Evidence
Record Key points
FSP’s Assessor (LT)
Report
undated
The insured advised that tiles had slid from the 2nd storey
roof and damaged the concrete driveway below
There are chips in the driveway that have been caused
from tiles falling from the roof
There is no visible damage to the inside of the property
a builder will be engaged to report and quote for installation
of new roof tiles.
FSP’s Roofing
Contractor (ABR)
Report
8 July 2014
The overall condition of the roofing system presents in
satisfactory condition
There are approximately 7 roof tile fractures and 2
dislodged ridge caps identifying as storm associated
damage
The pointing compound shows signs of degradation and
de - bonding from the bedding component. This is du e to a
number of factors:
- application of the flexible pointing compound may have
been applied during too warm a temperature preventing
adhesion to the bedding compound
- it may also be that the pointing compound may have
been applied in too cool a temperatur e also resulting in a
lack of adhesion to the bedding compound or as a result
of application too early if bedding material is wet
- the pointing compound also appears to have been
applied thinly further resulting in accelerated service life
- several areas of pointing deterioration and de - bonding,
the thickness barely covered the edge of the ridge
component and under applied
- the pointing condition to the majority of this roofing
system identifies as either general service
life/workmanship issues that have led t o the acceleration
and premature deteriorated pointing compound.
FSP’s Builder’s (AJG)
Quote
11 July 2014
Roof:
- Supply 2 x ridge caps and install. Re - bed and re - point
approximately 5 x ridge caps to the top ridge to the
Case No: 369789 Recommendation Page 5 of 5
upper level.
- Supply and install total of 10 x roofing tiles to match as
existing profile.
- Remove fractured roofing tile beneath top ridge to
lower level and re - bed and re - point 2 x ridge caps.
- Replace roof tiles as needed. $2059.20
External Front:
- Repair concrete chips to driveway (appro ximately 15
chips)
- Re - paint and re - seal approximately 36m2 of concrete
driveway to best match existing. $2319.90
Total Repair Costs: $4817.01 (includes GST)
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.