Home / Financial Firm (Unknown - Insurer) / Determination 369529

Determination 369529

Denial of cracking and movement damage to four-year-old home after flood

FirmFinancial Firm (Unknown - Insurer)
Decided2015-05-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for cracking and movement damage to their home after the 2012 floods, and the FSP denied it under soil movement and tree root exclusions. AFCA found flood-caused damage to specific areas was covered and ordered repairs per an engineer's scope, a contribution to engineering costs up to $3,000, and interest.

Once a prima facie claim is established the insurer must prove an exclusion applies, and flood-induced wetting of the ground that caused the damage is a covered cause.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationpay interestrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim Determination Case No: 369529 Determination Page 1 of 11 Case number : 369529 14 April 2015 1 Overview 1.1 Dispute On or about the 13 March 2012, the Applicants lodged a claim on the Financial Services Provider (FSP) for damage to the front veranda of their house that occurred following flood waters inundating their property in February/March 2012. The FSP accepted the claim and cash settled the Applicants for the amount of $3,146. In September 2013, the Applicants lodged a claim on the FSP for cracking and movement damage to their four year old home which they considered was also the result of the 2012 flood waters. The FSP has denied liability for the Applicants‟ claim on the basis of policy exclusions for damage caused by soil movement or settlement or the actions of trees, plants or their roots. 1.2 Issues and key findings Is the FSP liable for the claimed damage to the home? The FSP is liable for some of the claimed damage. The available evidence establishes on the balance of probabilities that some of the cracking damage to some sections of the house was as a result of the 2012 flood event. The Panel is satisfied that the available evidence establishes on the balance of probabilities that the magnitude of the flood allowed abnormal ingress of water to the footing system causing cracking and movement damage to some areas of the house. Even though the water did not inundate the house there was a flow path to saturate the foundation soils. The Panel is also satisfied the preponderance of the expert evidence is that, on the balance of probabilities, the said damage was not caused by trees or their roots. 1.3 Determination The Determination is partly in favour of the Applicants. Within seven days of acceptance of this Determination by the Applicants, the Panel determines that the FSP begin the process to attend to the repair of the insured building in accordance with the scope of works prepared by G under the heading “C. Internal Surfaces”. Case No: 369529 Determination Page 2 of 11 If any part of the Applicants‟ claim is to be cash settled, the FSP is to pay interest, in accordance with the Insurance Contracts Act 1984, from the date of the IDR letter of 23 June 2014 to the date of settlement. The Panel also determines that upon being satisfied of the cost of the reports, the FSP pay the professional costs of the Applicants for the cost of the engineer reports from B and G, such costs not to exceed $3,000. The FSP is to pay interest in accordance with the Insurance Contracts Act 1984 from the date of payment by the Applicants to B and G for their reports until the date of settlement. Case No: 369529 Determination Page 3 of 11 2 Reasons for Determination 2.1 Is the FSP liable for the claimed damage to the home? FSP must establish the damage was caused by an excluded cause It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities tha t an exclusion applies if it seeks to deny or limit its liability for the loss. The Applicants‟ policy is an insured events policy, which provides cover for damage caused by certain events listed in the policy, subject to the conditions and exclusions set out in the policy. The FSP has acknowledged the relevant policy cover and that the Applicants have established a prima facie claim. Once a prima facie claim is established, the onus shifts to the FSP to prove on the balance of probabilities the loss was ca used by the exclusions relied on: „soil movement or settlement‟ and/or the „actions of trees, plants or their roots‟. Was the damage caused by soil movement or settlement? The Applicants contend that the cracking and movement damage to their home occurred as a result of excessive moisture in the foundation soils as a result of the February/March 2012 floods. They have provided a report from a civil engineer, B, who was appointed by the builder of the Applicants‟ house. B was of the opinion that the magnitud e of the flood allowed abnormal ingress of water to the footing system causing the cracking and movement damage. The FSP rejects the proposition that the damage was caused by flood and relies upon a report submitted by a forensic engineer, F, who was of the opinion that the action of tree roots on the west and south sides of the house caused differential footing movement, which in turn caused the damage. The Applicants then engaged a civil engineer, G, to report on the cause of the damage to their house and to also review the reports submitted by B and F. G carried out two comprehensive inspections of the damage to the house and concluded that much of the damages were not flood related except for the damage to the kitchen, family room, meals area, right hand side wall opening to the study and cracking of plaster lining of the bulkhead in the entry area. The flood waters surrounded the Applicants‟ house for a period of between 7 to 10 days. G considered this period of inundation to be of concern. Case No: 369529 Determination Page 4 of 11 F was of the opinion that: „...typically, an isolated heavy precipitation event such as a flood does not increase the foundation soil moisture content to an extent where it causes foundation heave. F‟s opinion is that (relatively impermeable) CLAY foundation soils require large volumes of water accumulating over an extended period before their moisture content increases sufficiently to cause foundation heave.‟ F has not explained what is „an extended period of time‟ before moisture would cause foundation heave. He seems to base his opinion on the basis of “an isola ted heavy precipitation event” and that the floodwater did not inundate the house. B and G concede water did inundate the house but rather there was a flow path to saturate the foundation soils sufficient to cause the damage. G opined that the damage to kitchen and above mentioned areas of the house were movement related and most likely due to excessive wetting of the supporting ground as a result of the prolonged inundation. Further, he considered the localised nature of the damage is most likely the result of service (plumbing) trenches impacted by water as a result of the prolonged inundation from the flood event. This conclusion was supported by B who reported that there was a flow path for flood waters to deliver saturation of the foundation soils. B stated: „The problem with saturation of clay soils is that the resulting boggy suspension can cause a significant reduction in bearing capacity. There is also a flow path under a slab via filled trenches linking plumbing services - in this case the ensuite and kitchen areas are linked to the problem area.‟ Therefore, based upon the available information, the Panel is satisfied that, on the balance of probabilities, the damage to the kitchen, family room, meals area, right hand side wall opening to the study and cracking of plaster lining of the bulkhead in the entry area was caused by the insured event „flood‟ , as outlined in the G and B reports. The FSP did not ask F to review G‟s report but rather relied on an extract from the report to say that it supported its contention that the damage was caused by soil movement which is excluded from cover. However, the Panel does not accept this submission of the FSP, as it considers that the totality of the report from G supports the contention that the proximate cause of the loss was excessive wetting of the ground as a result of the prolonged inundation of water. This cause is covered by the policy. Was the damage caused by trees or their roots? The FSP has also denied liability for the damage on the ground that it was caused by trees or their roots which is also an exclusion of the policy. It has relied upon the findings of the forensic engineer, F, to arrive at this conclusion. F carried out a geotechnical investigation at the subject site on 1 April 2014. However the Panel does not find F‟s opinion compelling as the tests were carried out on 1 April 2014 some two years after the flood event. Further, F does not report on borehole 3 which borehole is closest to the area of damage referred to by G. Moreover, the Case No: 369529 Determination Page 5 of 11 supporting map is not drawn to scale and so the Panel is not certain about exactly where the boreholes were located relative to the insured building. The report may support that the area around the bore 1 and bore 2 are very dry but this is not proximate to the area of the house where G asserts there was the bulk of the flood damage. The mature trees in question are located on the west and south sides of the house and existed when the house was built in 2009. There is no evidence that these trees caused damage to the house during the period 2009 to 2012. It was only after the flood event in February/March 2012 that damage to the house became evident. The damage became progressively worse over subsequent months. B considered that the trees around the perimeter of the site would have enhanced further drying of the foundation soils as a result of the prolonged drought, although in a minor way, as their distance away from the building allowed them only nominal influence. G considered that the trees did not ha ve any relevance to the damage to the house. He stated that they were well clear of the house, well established and pre-existed the house. Accordingly, the Panel finds that the FSP has not established that, on the balance of probabilities, trees or their roots caused the damage to the Applicants ‟ house. Not all the claimed damage was caused by the insured event However the Panel does not accept that all the damage claimed by the Applicants is caused by the insured event. In his comprehensive report G says: “ … The majority of the damages observed throughout the house are minor, i.e. being acceptable and within normal expectations, they are not significant and not flood related. The bathroom damages are not movement related and also not flood related. H owever, the damages in the kitchen, family room and meals area are significant… And due to excessive wetting of the supporting ground as a result of the prolonged inundation.” G has identified the approximate location and extent of the damage caused by the insured event. On page 18 of his report he has identified and described on a floor plan 6 areas of damage. On page 13 under the heading “C. Internal Surfaces”, he has made scope of work recommendations. On the basis of the available information, the Panel determines that the FSP should attend to the repair of the insured building in accordance with the scope of works prepared by G under the heading “C. Internal Surfaces”. If any part of the Applicants‟ claim is to be cash settled, the FSP is to pay intere st, in accordance with the Insurance Contracts Act 1984, from the date of the IDR letter 23 June 2014 to the date of settlement. Case No: 369529 Determination Page 6 of 11 FSP is to pay the cost of the Applicants’ engineers’ reports Paragraph 9.4 of the Terms of Reference allow for FOS to decide that the FSP contribute to the professional costs incurred by an Applicant in the course of a dispute. Unless exceptional circumstances apply, FOS will not require the FSP to contribute more than $3,000 to these costs. In support of their submissions, the Applicants provided two engineer reports. The Panel considers that it is fair in all the circumstances that the FSP should make a contribution to the costs incurred by the Applicants in obtaining these reports. The Panel has taken into account the comple xity of the dispute and the fact that the Applicants incurred these costs in this matter because they required expert assistance in view of the expert assistance provided to the FSP by its engineer, F. On the available information, the Panel is not aware of any exceptional circumstances that exist to exercise discretion to require a contribution from the FSP of over $3,000. Once the Applicants provide the FSP with invoices from their engineers or otherwise provide evidence of the costs of the reports from B and G, the FSP is to pay for the cost of those reports. The FSP is also to pay interest in accordance with the Insurance Contracts Act 1984 from the date the Applicants paid for the reports until date of settlement. Case No: 369529 Determination Page 7 of 11 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. This decision has been made by a Panel. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. 3.2 Extract from policy What we do not cover – general exclusions You are not covered under any section of your policy for damage, loss, cost or legal liability caused by or arising from or involving: …… soil movement or settlement, …… the actions of trees, plants or their roots, ……. 3.3 Expert reports Report Key points FSP’s forensic engineer (F) r eport 6 November 2013  Inspected/photographed the property 24 October 2013.  Viewed Bureau of Meteorology website and noted rain recorded between 28 February and 1 March 2013. Was advised by Applicant resultant flooding did not enter the house but was within 200mm of the house sa v e for the south - west corner  Engineering drawings show the ground floor is supported by a concrete slab o n a grid of concrete beams on concrete piers cast into the natural soil and there is 300 – 600mm of “fill” under the house. Case No: 369529 Determination Page 8 of 11  Site is flat with poor ground surface drainage and there are large trees around the house.  F describes the cracking damage he observ ed during the inspection .  F conducted a levels survey of the ground floor and levels indicate d a pattern of settlement towards the south end of the building in the direction of the row of large trees along the south boundary and towards the west front fac e of the house in the direction of large trees along the west boundary .  The observed distress is generally „cosmetic‟ damage only and no structural damage was observed.  Such a level of damage is not unexpected for structures founded on reactive clay and the site is located on highly reactive clay foundation soil .  This type of soil experiences large volumetric changes with relative changes in moisture content.  Tree roots remove moisture from foundation soil and this moisture loss causes the highly reactive clay soils to shrink resulting in differential footing settlement.  The location and pattern of the internal and external cracks is typical of distress caused by differential foundation movements in reactive soil.  The observed distress has not been caused by the heavy downpour and subsequent flooding event.  Typically, an isolated heavy precipitation event such as flood does not increase the foundation soil moisture content to an extent where it causes foundation heave.  Differential footing movement as a res ult of the long - term drying of the highly reactive clay soil and long - term foundation soil moisture content variation caused the distress.  Consideration of the effect of the trees and groups of trees, in close proximity to the structure, in the design and construction of the footing system may have limited movements and recommended the insured engage a structural engineer to seek advice about the construction of the building. Applicants’ builder’s civil engineer (B) Report 20 Dec 2013  B is a civil engineer who inspected the building 21 November 2013 at the request of the Applicants‟ builder.  B also agreed the soils are within the moderate to highly reactive range but also influenced by the substantial filling soils but potential foundation movements are protected by the raft slab footing system.  B also undertook floor levels and said that the f loor areas of the house south of the family room are outside building tolerances .  B described the cracking damage to the entry, study, master bedroom, passage, laundry, bathroom, meal area and kitchen.  Drainage away from the house is satisfactory under nor mal conditions but the fa ll surfaces around the perimeter of the house are not providing the required protection. Case No: 369529 Determination Page 9 of 11  The house was built around 5 years ago within the latter stages of one of the most sustained drought periods that the region had experienced.  The soils of the site would have been at their driest as a result of the sustained drought conditions.  The trees around the perimeter of the site would have enhanced further drying of the foundation soils albeit in a minor way as their distances away from the building envelope place them at nominal influence.  In these conditions, foundation soils would have already been at the extremity of dryness with negligible potential for further shrinkage.  The flood introduced surface waters lapping around the house at significant levels which meant the dwelling was subject to 2 forms of foundation movement: edge heave and subsidence due to loss of bearing capacity.  The gradual moistening of foundation soils along the east side of the house has caused nominal edge hea ve causing minor damage around the bathroom and laundry.  Subsidence has caused significant damage to the house and following the flood, there was a flow path for flood waters to deliver saturation of the foundation soils.  Interface between concrete work an d excavated soils provided an open medium and gravity allowed water to fill and saturate the areas at depth notably around the bases of supporting piers. Clay soils was saturated and boggy suspension cause significant reduction in bearing capacity.  There i s also a flow path under the slab via filled trenches linking plumbing services – in this case the ensuite and kitchen areas are linked in the problem area.  The sudden saturation due to the flood inundation caused a loss of bearing capacity of the pier sup port to the slab.  This mode of failure corresponds to the Applicants‟ awareness of the damage and its sudden occurrence after the flooding of February 2012.  The magnitude of the flood has allowed abnormal ingress of water to the footing system to cause the recent significant damage as first observed around five months after the flood event.  To rectify the loss of level additional underpinning and jacking of the dwelling will be required and then subsequent repairs and adjustments are recommended to be under taken after this is done .  B also recommended improving the drainage of the open surfaces against the house. FSP’s forensic engineer  As a result of receiving Applicants‟ report s , F carried out a Case No: 369529 Determination Page 10 of 11 (F) Supplementary report 1 May 2014 geotechnical investigation at the site on 1 April 2014 .  The investigation involved drilling for boreholes and collecting soil samples.  The boreholes were on the east and west of the house and two on the southern side of the house between the house and trees.  F conclude d the suction testing indicated that trees are drying the foundation soil towards the south and east ends of the house and this is consistent with the pattern of settlement and location of damage.  F disagrees with B‟s assessment of the soil.  F says that th e footings have not been founded deep enough into the natural clay material.  The floodwater did not inundate the house and therefore is most unlikely to have affected the footing system.  B and F‟s floor level survey both identify a pattern of settlement to wards the south and west of the house where the trees are and the building damage is.  Clay foundation soils require large volumes of water accumulating over an extended period before the moisture content increases sufficiently to cause foundation heave.  A one - off flood event is not expected to result in the saturation of the foundation soils at a depth to cause a bearing failure but the surface water from the flood would have dissipated before reaching the base of the pier footings.  Further, the soil test indicate that even if the foundation soils under the piers had been saturated to some extent, the bearing strength would still be more than adequate to sustain the working stress under the piles hence not resulting in bearing failure.  F maintained its opin ion that the observed damage had not been caused by the flood event. Applicant s’ engineer’s report (G) 15 December 2014  G inspected the property on 1 October and 12 December 2014.  The male Applicant told him about the flood event in early 2012 when the floodwaters surrounded the house to a depth of about 0.5m and stayed there for about a week but w ater did not enter the house.  G read and considered various material s including the reports from F and B and concluded that the report from B was a more inform ed assessment.  He describes three categories of building damage: the first being minor and because of changing ground moisture conditions; the second relates to poor design and construction which would include the broken floor tile in the family room and t he cornice movement around the wall separating the kitchen and family room; the third and most concerning class of damage is that localised and associated with significant building movement observed in the kitchen and meals area. Case No: 369529 Determination Page 11 of 11  G placed limited weight upon the floor levels presented in the previous reports particularly when there is no quote as built information to compare them against.  The property is within an area designated as land subject to inundation .  The foundation design is fit for purpose.  Til es and water related damage in the shower recess are probably construction issues as is the damage described in paragraph G of his report.  He concluded that the source of the water causing the ground to become over wet is the flood event in early 2012 when the house was surrounded by floodwaters. The prolonged duration of the flood event was of concern. An indicator of this kind of damage is radical cracking patterns usually evident in masonry and plaster or lined wall surfaces. The most significant movemen t was seen in the kitchen, family room and meals area.  G acknowledge several potential contributing effects but concluded the trees did not have any relevance to the damages observed as they are well clear of the house, well established and pre - existed th e house.  The majority of damages observed throughout the house are minor and not flood related.  However the damages in the kitchen, family room and meals area are significant, are movement related and most likely due to excessive wetting of the supporting ground as a result of the flood.  The localised nature of the damage led G to the conclusion that the damages are most likely the result of plumbing trenches impacted by water in the flooding event of early 2012.  G made a scope of work recommendation as set out in his report.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.