Storm damage claim for rear building mouldings denied under deterioration exclusion
Summary
The applicant's claim for storm-damaged rear building mouldings was partly denied by the FSP under a deterioration exclusion. AFCA found the rear mouldings claim must be accepted with interest, but upheld the FSP's refusal of adhesive costs and front mouldings.
The gradual deterioration exclusion does not apply where the insured did not know of and could not have known about the deterioration.
Subjects and remedies
natural disasterpay claimpay interest
Text of the determination
Determination
General Insurance - Small Business/Farm Insurance - Commercial Property - FSP
Decision - Denial of claim-Exclusion/ condition
Determination
Case No: 369423 Determination Page 1 of 5
Case number : 369423 17 March 2015
1 Overview
1.1 Dispute
On 10 March 2014 the Applicant lodged a claim under her Business Insurance
Policy for damage to her investment property. The Applicant claims that severe
storms caused moulding trim to fall from the building.
The Financial Services Provider (FSP) paid for make safe repairs (removal of all
the rear mouldings) but denied that part of the claim for rectification of the
damage. The FSP maintained the moulding fell due to gradual deterioration of the
adhesive, which is excluded under the policy.
1.2 Issues and key findings
Is the FSP entitled to deny the claim?
The FSP is not entitled to deny the claim because:
The Applicant has established a prima facie claim in that the damage to the
rear mouldings occurred as a result of a storm which is an insured event
under the policy.
While gradual deterioration of the adhesive may have contributed to the
damage, the Applicant was not aware of it and as such the exclusion does not
apply.
The FSP may deny the claim in respect of securing the mouldings to the front of
the property as the Applicant has not established they were damaged by the
storm.
1.3 Determination
This Determination is in favour of the Applicant.
The FSP must accept the claim in respect of the rear mouldings in accordance
with the terms and conditions of the policy. If the FSP elects to cash settle the
claim, interest is payable on the settlement sum from 18 July 2014 to the date
payment is paid.
For the sake of clarity, the FSP is not required to cover the cost of adhesive
materials.
Case No: 369423 Determination Page 2 of 5
2 Reasons for Determination
2.1 The FOS Approach
I have decided this case on its merits, doing what is fair in all the circumstances
and having regard to the relevant law, good industry practice, codes of practice
and previous FOS decisions. I have taken into account all the material submitted
by the parties.
I am satisfied that the documentation I have relied on has been provided to both
parties and each party has had the opportunity to address any issues raised by
the other.
This dispute has proceeded straight to Determination. No Recommendation was
issued.
2.2 Is the FSP entitled to deny the claim?
The Applicant has established a prima facie claim
It is not in dispute that during a heavy storm some of the polystyrene decorative
mouldings attached to the upper rear of the Applicant’s building collapsed.
Emergency services attending the site required the Applicant to make the site
safe including removal of the remaining mouldings at the rear of the building. The
front mouldings remain.
The policy covers loss or damage caused by storm, wind and rainwater.
I accept the Applicant has established a prima facie claim.
The onus therefore shifts to the FSP to establish that it is entitled to deny the
claim.
Gradual deterioration contributed to the damage, but is not excluded
The FSP seeks to rely on an exclusion in the policy for loss or damage caused by
gradual deterioration (unless the Applicant can show she did not know about the
deterioration).
The policy also notes the Applicant cannot claim for repairing the deterioration.
In support of this the FSP refers to a report prepared by its engineer (M). M
reported the moulding detachment likely occurred as a result of gradual adhesion
loss and deterioration between the mould and parapet wall. The heavy rainfall and
wind triggered the mould detachment as a result of water being entrapped
between the mould and the parapet wall.
I accept that gradual deterioration contributed to the damage.
Case No: 369423 Determination Page 3 of 5
However, there is no evidence that the Applicant knew or was capable of knowing
of the deterioration and the FSP made no submissions in this regard.
M’s report suggests the adhesive for the moulding was applied correctly.
Based on observations by the loss assessor and M, the building was well
maintained with the remaining mouldings in fair condition.
The building comprised of two stories having masonry walls. The damaged
moulding was fixed to the rear of the building above the parapet being at about
roof level.
I conclude the Applicant would not have been aware of any gradual deterioration
of the adhesive material. As such, the exclusion does not apply.
The FSP is therefore not entitled to deny the claim.
Repair of deterioration excluded
The policy states the Applicant is not covered for repair of the deterioration. In this
matter the deterioration was limited to the adhesive material used to secure the
moulding to the wall face that fell off during the storm.
Included in the scope of works for rectification of the damage is an item for the
supply of polyurethane sealant for the adhesion of mouldings to the wall surface.
In accordance with the policy terms, the FSP is not responsible for the cost of that
item.
I note that M considered the quote supplied by the Applicant to be fair and
reasonable.
Applicant has not established damage to front mouldings
M states additional fixings should be administered to the existing moulds to
prevent any future detachment. The Applicant also seeks these costs.
However, the Applicant has not established that the front mouldings were
damaged by the storm.
The FSP is therefore entitled to deny this aspect of the Applicant’s claim.
Case No: 369423 Determination Page 4 of 5
3 Supporting information
3.1 Relevant policy terms
“This policy section covers loss or damage to buildings, business contents,
specified items or stock at the situation caused by the events listed below in the ‘we
cover’ column.
...
4. Storm or wind
This is limited to:
a. storm;
b. wind;
c. rainwater;
...
Policy section exclusions
This policy section (including the extra covers, additional benefits and optional
insurance) does
not insure:
1. ...
2. Maintenance or defects
loss or damage caused by or arising out of:
...
d. developing flaws, gradual deterioration, normal upkeep of property insured, or
existing defects or lack of maintenance to property insured, unless you can
show you did not know about the deterioration, defect or lack of maintenance.
You cannot claim for repairing the deterioration or defect or the maintenance.
3.2 Expert reports
Record Key points
FSP’s loss assessor
3 June 2014
The building appears to be well maintained .
FSP’s Engineer (M)
16 June 2014
Applicant’s agent indicated a section of moulding at the
rear of the building during the course of high wind and rain
detached and collapsed onto the road way below.
The moulding s appeared to have been directly fixed with
dobs of epoxy adhesive to the masonry wall. This is
consistent with technical specifications.
The remaining mouldings fixed to the building’s rear and
front façade appeared to be in fair condition witho ut cause
for immediate collapse, although this assessment was
done from street level. M was unable to access the roof
and observe from there.
The cause of moulding detachment to the rear of the
building has likely occurred as the result of gradual
adhesion loss and deterioration between the mould and
parapet wall over an extended period of time post initial
moulding installation.
Case No: 369423 Determination Page 5 of 5
Record Key points
Notwithstanding the above, the claimed heavy rainfall and
wind event has been the triggering cause in the mould
detachment failure by water entrapment between the
mould itself and parapet wall.
Given the detachment of the recent mouldings,
administering of additional fixings to the existing moulds
should be completed to ensure that no future detachment
ca n occur.
FSP’s loss assessor
20 June 2014
Assuming the moulds are securely f ixed, it would not be
possible for w ind alo ne to dislodge the mouldings.
Whilst it could be argued that the insured was unlikely to be
aware of the potential problem with the mouldings, to
accept the claim would be in effect repairing the defect ie.
the failed adhesive and not addressing any storm made
damage.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.