Home / Financial Firm (Unknown - Insurer) / Determination 368735
Determination 368735
Mould remediation claim refused (building and contents)
Summary
After a kitchen fire, the Applicant sought about $186,000 for mould remediation to her home and contents. AFCA found the mould was not caused by the fire, so it is not covered, but ordered the FSP to fund temporary accommodation and the remaining repairs.
The mould exclusion applies unless the mould results from an event the FSP covers, and the evidence did not establish a causal link to the fire.
Issues
- Claim denial primary · not upheld“The FSP is not liable for mould remediation of the home and contents, as the mould was not caused by the fire or associated events.”
- Poor claim handling secondary · upheld“The Panel's review confirms the FSP's representatives made various errors during the claim, though the FSP generally acted reasonably.”
Subjects and remedies
home or building damagepay claim
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - Home Contents - FSP
Decision - Claim Amount - Service - Service Quality
Determination
Case No: 368735 Determination Page 1 of 10
Case number : 368735 4 May 2015
1 Overview
1.1 Dispute
The Applicant lodged a claim under her home insurance policy with the Financial
Services Provider (FSP) after her home and contents were damaged by fire in
November 2013. The FSP accepted the claim and made arrangements to repair
the building and indemnify the Applicant for the damage to her contents by way of
replacement and/or cash settlement.
The FSP acknowledges that some of the building repairs remain to be completed
and is willing to arrange the repairs or cash settle the Applicant for the cost of
doing so. However, the Applicant says that further, more extensive building works
are required (at an estimated cost of $95,000) in order to address mould issues
which have developed as a result of the fire. She also seeks cover for mould
remediation of contents items, at an estimated cost of $91,000.
1.2 Issues and key findings
Is the FSP liable for mould remediation?
Th e Applicant’s policy excludes liability for damage caused by mould, unless the
mould results from an earlier event for which the FSP is liable.
There is insufficient information available to establish a causal link between the
events associated with the fire and the mould growth in the rear bathroom and
laundry area of the Applicant’s property. Accordingly, the FSP is not liable for
mould remediation of the Applicant’s house and contents.
1.3 Determination
This Determination is substantially in favour of the FSP.
The FSP is not liable for remediating the mould damage to the Applicant’s
property. The FSP and the Applicant should co-operate to finalise settlement of
the remaining issues relating to the claim, on the basis set out in section 2.2
below.
Case No: 368735 Determination Page 2 of 10
2 Reasons for Determination
2.1 Is the FSP liable for mould remediation?
FSP’s liability depends on cause of mould damage
The Applicant’s policy provides cover for accidental damage to the property
(being damage from an incident that the Applicant did not intend to happen),
subject to the exclusions set out in the policy.
Airborne mould samples taken from the property establish that a very high
concentration of mould is present. The building biologist (BW) appointed by the
FSP confirmed that the types of mould present in the samples represent a health
hazard and recommended that the property be vacated.
The policy contains a general exclusion for damage caused by, arising from or
involving mould. However, in the Panel’s view, this exclusion does not apply to
mould caused by an event which is otherwise covered under the policy.
The Applicant says the mould damage to her house and contents has occurred
since the fire, due to the large amounts of water used by the fire brigade to
extinguish the fire, as well as the FSP’s delay in replacing roof tiles damaged as a
result of the fire, which has allowed water to enter the roof cavity.
However, the FSP disputes that the mould at the App licant’s property has been
caused by the fire or the subsequent delay in repairs. The FSP says that any
mould at the property is due to factors which are not related to the fire, such as
poor ventilation of the bathroom and laundry areas and gradual deterioration of
the roof.
Accordingly, in order to determine the FSP’s liability for mould remediation, it is
necessary to identify the proximate cause of mould growth at the Applicant’s
property (that is, the real, effective or dominant cause).
There is conflicting information about the amount of water present
As outlined above, the Applicant says that mould growth at her property has
occurred due to the effects of water used to fight the fire and the FSP’s delay in
carrying out roof repairs.
The initial dama ge which gave rise to the Applicant’s claim occurred when an
electric heater mounted on the outside wall of the kitchen pantry caught fire in
November 2013.
The Applicant says that:
the fire brigade sprayed large amounts of water throughout the house while
fighting the fire and poured water directly into the roof cavity in order to
extinguish a secondary fire in the air conditioning unit; and
firemen broke a number of roof tiles while walking on the roof, allowing more
water to enter the roof cavity during subsequent rainfall events.
Case No: 368735 Determination Page 3 of 10
The Applicant says that, when she and her son returned to the property in April
2014 following the initial building repairs, ongoing dampness was evident in a
number of rooms, water poured from the ceilings “like it was raining inside” and
items became wet when placed on the floors. She says that water continued to
drip from the ceilings until the FSP authorised the roof repairs in November 2014.
The Applicant has provided photographs showing water damage (swelling) of the
kitchen cupboards and shelving and an isolated area of mould on a single window
frame. She has also provided a sound recording taken during a period of heavy
rainfall, which she says reflects water entering the roof cavity and hitting the
ceilings.
However, the Applicant has not provided any photographs which support her
description of the extent of water present at the property between April 2014 and
November 2014.
A report and detailed scope of works prepared by the FSP’s assessor (CL) shortly
after the fire indicates that the fire damage was limited to the kitchen area, with
smoke damage extending to the walls and ceiling of surrounding rooms, as well
as the roof mounted air conditioner.
While the assessment report and scope of works do not specifically refer to water
damage, the FSP’s contractors subsequently identified water damage to the
kitchen cupboards and shelving. However, the photographs included in the
assessor’s report suggest that the internal water damage did not extend beyond
the kitchen area.
None of the FSP’s contractors who attended the property between the date of the
fire and the roof repairs in November 2014 reported excessive moisture at the
property. These included the building biologist (BW) and a mould remediation
specialist (RX) who each carried out a thorough inspection of the surface areas.
Moisture readings of building materials taken by BW and RX did not reveal any
undue levels of moisture in the ceiling space, at the base of the walls or in the
kitchen/dining area near where the fire occurred. BW also confirmed that the
carpets in the bedrooms and storeroom did not appear to be wet and there was
no apparent water or mould damage to the underside of boxes placed on the
carpets.
The FSP’s builder (MBG) inspected the roof cavity in September 2014, prior to
carrying out the repair of the cracked roof tiles. MBG reported that his visual
inspection failed to identify an obvious moisture or water damage and there was
no evidence of recent water entry in the roof cavity. The photographs included in
MBG’s report show that the roof frame and the insulation appear dry and dusty.
Mould was identified in the bathroom at the Applicant’s property
As noted above, the FSP engaged a building biologist (BW) to report on the level
of mould exposure at the Applicant’s property and provide recommendations in
relation to any remediation works required.
BW attended the property in October 2014 (eleven months after the fire) and took
samples from eight different areas. Laboratory testing of these samples showed:
Case No: 368735 Determination Page 4 of 10
very high concentrations of airborne mould in the bathroom and the lounge
room;
high concentrations in the kitchen/dining room, master bedroom and front
bedroom; and
elevated levels in the remaining two bedrooms.
A comparative air sample taken from outside the house showed levels of mould
almost double that of the samples taken from inside the house. However, despite
this, BW expressed concern that there may be hidden mould present within the
house, on the basis that there was some difference between types of mould
particles detected in the indoor air samples and those found in the outdoor air
samples, which was suggestive of indoor mould proliferation.
BW also took surface mould samples from eight different areas of the property,
including:
the ceiling space timber over the master bedroom, hall and front bedroom;
the water damaged backing paper from ceiling cladding over master
bedroom/hallway area;
water affected blown in ceiling insulation from above master bedroom/hallway
area; and
the shower recess wall in the rear bathroom.
All of the samples taken showed low to normal levels of mould, other than the
sample taken from the bathroom shower recess wall. This sample contained
fungal hyphae, indicating recent active mould growth cons tituting a potential
health hazard.
The findings of the building biologist are consistent with the health issues reported
by the Applicant and her son, which doctors have confirmed are consistent with
exposure to house mould.
While BW recommended extensive invasive investigations to determine whether
there was any hidden mould at the Applicant’s property, she was unable to
confirm the presence of mould other than on the bathroom shower recess wall.
BW noted dark mould growth on the wall and cornice above the shower recess in
the rear bathroom (where the surface sample was taken) and light mould growth
on the cornice above the door, in the rear toilet and in the rear entry foyer area.
However, BW’s visual inspection did not reveal any visible mould growth o r water
damage in the bedrooms, in the area of the wall cavity which was accessible
through a hole cut in the base of the hallway wall or in the area of the ceiling
cavity which was accessible through a hole in the ceiling. While BW identified
signs of past dampness in the timber roof frame, the insulation and the paper
coating on the top of the ceiling cladding, she did not identify any fuzzy mould
proliferation.
BW subsequently confirmed in an email to the FSP that, in recommending further
invasive investigations, she had taken a precautionary approach based on factors
including:
her understanding that all of the floor and wall bases had been extensively
affected by water at the time of the fire;
Case No: 368735 Determination Page 5 of 10
her assumption that no water or mould remediation had been carried out
following the fire; and
the health issues reported by the Applicant.
As outlined above, it is not entirely clear to what extent the property was affected
by water following the fire. Further, the claim records indicate that the initial make
safe works (and subsequent building repairs) included chemical sponging and
cleaning.
The mould remediation specialist (RX) who inspected the property in November
2014 confirmed that there was visible mould on the wall next to the laundry at the
rear of the house, but did not observe any other signs of mould growth. In addition
to carrying out moisture readings on building materials, RX used a borescope to
inspect the wall cavity (through the hole in the wall) and a thermal camera to
identify areas of water entry which may have contributed to mould growth.
The thermal images in RX’s report showed thermal activity in the bathroom, which
RX noted was possibly contributing to mould growth. Based on the results from
the mould samples taken by BW, RX concluded that the mould in the bathroom
was responsible for the airborne mould found in samples taken throughout the
property.
The thermal images taken by RX confirm that the areas around the perimeter of
the house also showed signs of water entry, which RX concluded had occurred
over a prolonged period of time due to maintenance issues such as leaves and
other debris blocking the gutters. However, no active mould growth was identified
in these areas.
In the Panel’s view, had the property experienced mould problems due to ongoing
moisture in the roof cavity or building materials as a result of events associated
with the fire, it is likely that surface sampling of the roof and ceiling area carried
out by BW eleven months after the fire would have revealed active mould growth.
Further, it is likely that moisture testing of the building materials would have
revealed abnormal results.
Based on the available information (including the testing carried out at the
property), the Panel is satisfied that the only area of the property in which mould
has been identified is in the vicinity of the rear bathroom.
Available information does not establish link between mould and fire
The Panel has carefully reviewed the mould remediation reports provided by BW
and RX, together with the roofing reports provided by the FSP’s builders (JL, who
inspected the roof in July 2014) and MNG (who re -inspected the roof in
September 2014).
Having done so, the Panel is not satisfied that there is sufficient information
available to establish a causal link between the events associated with the fire
and the mould growth in the bathroom and laundry areas .
While the building biologist (BW) identified mould growth at the property, she did
not express a concluded view as to what caused the mould. In her report, BW
commented that continuing dampness of the ceilings and walls (due to the fire-
Case No: 368735 Determination Page 6 of 10
related events) may contrib ute to mould proliferation. However, BW’s tests of the
building materials did not reveal elevated moisture levels.
In a subsequent email to RX, BW clarified that there may be other causes of
mould growth at the Applicant’s property, particularly if the pro perty had ongoing
maintenance issues.
The Panel notes that the bathroom area where mould was identified is not located
directly adjacent to the kitchen where the fire occurred, but is separated by at
least one other room. Accordingly, this area would be unlikely to be the most
severely affected by water used by the fire brigade to extinguish the fire.
The surface mould identified in BW’s sampling was found on the wall of the
shower recess, in an area which would commonly be susceptible to mould as a
result of ordinary usage.
RX considered that the mould in the bathroom area pre-existed the fire and was
primarily due to a lack of adequate ventilation through the bathroom and laundry
area. The Applicant says that the bathroom is well ventilated by two external
windows and an exhaust vent. However, based on the photograph of the mould
included in RX’ s report, it appears to be located close to the wall near the shower
in an area which would not naturally be well ventilated.
The Panel has considered whether the cracked roofing tiles have contributed to
the mould issues at the Applicant’s property.
The FSP accepted liability for the replacement of sixty or so cracked roofing tiles
at the Applicant’s property, despite there being limited information to establis h that
the tiles had been damaged by firemen walking on the roof.
The FSP’s builder (JL) who inspected the roof in July 2014 reported that a
number of the terracotta roofing tiles were mismatched and showed evidence of
past repairs using a cement based product. JL noted that the sixty broken tiles
were not located in one area and therefore appeared to have been caused by
multiple, ongoing issues. JL also noted the presence of a large quantity of needle
leaf type debris, which he considered was likely to impede the free flow of
rainwater off the tiles during adverse weather.
Given the condition of the Applicant’s roof, JL concluded that it was not possible
to determine to what extent any of the damage to the tiles had been caused by
firemen walking on the roof at the time of the fire in November 2013.
JL’s report includes a number of good quality, detailed photographs which, in the
Panel’s view suggest that the roof was subject to ongoing maintenance issues.
The tiles showing evidence of past temporary repairs are randomly distributed
across the roof, including in areas where are less likely to be subject to foot traffic.
Case No: 368735 Determination Page 7 of 10
FSP is not liable for mould remediation
As outlined above, the Applicant’s policy excludes liability for damage caused by
mould, unless the mould results from an earlier event for which the FSP is liable.
For the reasons outlined above, the Panel is satisfied that the mould issues
identified at the Applicant’s property were not caused by the fire (or associated
events) in November 2013, but by ongoing maintenance issues at the property.
Accordingly, the FSP is not liable for mould remediation of the Applicant’s home
and contents.
2.2 How should the other outstanding issues be resolved ?
Parties should work co-operatively to resolve remaining issues
During the course of this dispute, the Applicant has raised a number of discrete
issues in relation to various aspects of her claim, including the building repairs
which remain to be completed and the settlement arrangements for contents
damaged in the fire.
By way of letters, emails and telephone discussions, the FOS Case Manager has
sought to clarify with the Applicant and the FSP the key issues which remain
outstanding, and to clarify the actions being taken by the parties to address these
issues.
Based on the content of these discussions, the Panel is satisfied that the parties
are taking appropriate action to progress these issues. The Panel would
encourage the parties to work co-operatively to ensure that any outstanding
issues in relation to the claim are finalised promptly, in accordance with the
principles outlined below.
FSP is liable for remaining building repairs
During the course of this dispute, the FSP has offered to authorise for its builder
(P) to complete the outstanding building repairs, based on a scope of works
prepared in mid-2014. This scope of works outlined the further rectification repairs
required after the initial builder (RI) ceased work in or around June 2014.
Alternatively, the FSP has offered to cash settle the Applicant for cost of the
remaining repairs, based on an up to date quote provided by its builder (P).
The Panel considers that the approach proposed by the FSP is appropriate to
resolve the Applicant’s claim for repair of the damage resulting from the fire.
To the extent that the remaining repairs have not yet been completed, the Panel
considers that the FSP should fund the cost of temporary acco mmodation for the
Applicant and her son until such time as the repairs are completed. In the event
that the Applicant is cash settled for the repairs, the cash settlement should be
increased by the cost of temporary accommodation for the time required to
c omplete the repairs (based on the estimate provided by the FSP’s builder (P)).
The Panel notes that the Applicant has previously expressed concern about
potential liability for amounts paid by the initial builder (RI) for various kitchen
Case No: 368735 Determination Page 8 of 10
fittings installed at the Applicant’s property as part of the building repairs . The
FSP has previously confirmed to FOS that it will arrange for RI to be paid for
these items. Accordingly, the FSP should arrange payment, to the extent it has
not already done so.
Parties should work together to finalise contents settlement
The FSP has cash settled the Applicant for some of her contents items damaged
in the fire. The Panel understand that the parties are continuing to work together
to finalise the details of the settlement for the remaining contents items.
During the course of the claim, issues arose in relation to the appropriate
settlement method for refrigerators and a freezer damage during the fire, which
resulted in the Applicant being provided with a refrigerator which did not fit
through the door of her house.
The FSP subsequently offered the Applicant a smaller refrigerator but she did not
take up this offer and the large refrigerator remained on the verandah of her
house. The Applicant says that the refrigerator has now sustained damage due to
the malicious acts of third parties after being left uncovered by the FSP’s
contractors.
The FSP has offered to consider the Applicant’s claim for damage to the
refrigerator, subject to her lodging a separate claim for malicious damage. The
Panel is not aware of whether any such claim has been lodged to date.
Payment of compensation is not justified in the circumstances
It is clear that the Applicant’s claim has taken an extended period of time to
resolve and a number of issues have arisen during the claim process.
While such issues are not uncommon in the context of a claim for building and
contents damage by fire, in the present case these problems have been
exacerbated by communication difficulties between the parties.
Having carefully reviewed the claim history, the Panel is satisfied that the FSP is
not solely responsible for the delays in resolving the Applicant’s claim. At various
stages, the Applicant expressly asked the FSP to hold off on settling certain
aspects of the claim (such as the contents settlement) until other, unrelated
issues had been resolved.
The Panel’s detailed review of the claim history confirms that the FSP’s
representatives have made various errors during the course of the claim (for
example, not sourcing an appropriate replacement computer when required by
the Applicant for work purposes). The Panel accepts that such matters have
exacerbated the stress and inconvenience experienced by the Applicant during
the claim process.
However, the Panel considers that the FSP has generally acted reasonably in
seeking to resolve the Applicant’s claim.
The FSP agreed to allow RI to conduct the initial repairs in accordance with the
Applicant’s wishes (and after the Applicant directly authorised him to do so), even
though RI did not provide the most competitive quote and the FSP had concerns
Case No: 368735 Determination Page 9 of 10
about his ability to complete the works to an appropriate standard. The FSP
subsequently agreed to fund the costs of rectification repairs when the works
undertaken by RI proved inadequate.
The Panel notes that the FSP has funded the costs of temporary accommodation
for the Applicant and her son for extended periods during the claim process,
including the period of approximately nine months which it has taken to resolve
the issues about mould at the property.
In these circumstances, and in light of the Panel findings that the FSP is not liable
for mould remediation, the Panel does not consider that an award of
compensation is justified in the circumstances.
Case No: 368735 Determination Page 10 of 10
3 Supporting information
3.1 Panel approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised numerous issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.