Determination 368735

Mould remediation claim refused (building and contents)

FirmFinancial Firm (Unknown - Insurer)
Decided2015-05-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$186,000
SourceAFCA PDF

Summary

After a kitchen fire, the Applicant sought about $186,000 for mould remediation to her home and contents. AFCA found the mould was not caused by the fire, so it is not covered, but ordered the FSP to fund temporary accommodation and the remaining repairs.

The mould exclusion applies unless the mould results from an event the FSP covers, and the evidence did not establish a causal link to the fire.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - Home Contents - FSP Decision - Claim Amount - Service - Service Quality Determination Case No: 368735 Determination Page 1 of 10 Case number : 368735 4 May 2015 1 Overview 1.1 Dispute The Applicant lodged a claim under her home insurance policy with the Financial Services Provider (FSP) after her home and contents were damaged by fire in November 2013. The FSP accepted the claim and made arrangements to repair the building and indemnify the Applicant for the damage to her contents by way of replacement and/or cash settlement. The FSP acknowledges that some of the building repairs remain to be completed and is willing to arrange the repairs or cash settle the Applicant for the cost of doing so. However, the Applicant says that further, more extensive building works are required (at an estimated cost of $95,000) in order to address mould issues which have developed as a result of the fire. She also seeks cover for mould remediation of contents items, at an estimated cost of $91,000. 1.2 Issues and key findings Is the FSP liable for mould remediation? Th e Applicant’s policy excludes liability for damage caused by mould, unless the mould results from an earlier event for which the FSP is liable. There is insufficient information available to establish a causal link between the events associated with the fire and the mould growth in the rear bathroom and laundry area of the Applicant’s property. Accordingly, the FSP is not liable for mould remediation of the Applicant’s house and contents. 1.3 Determination This Determination is substantially in favour of the FSP. The FSP is not liable for remediating the mould damage to the Applicant’s property. The FSP and the Applicant should co-operate to finalise settlement of the remaining issues relating to the claim, on the basis set out in section 2.2 below. Case No: 368735 Determination Page 2 of 10 2 Reasons for Determination 2.1 Is the FSP liable for mould remediation? FSP’s liability depends on cause of mould damage The Applicant’s policy provides cover for accidental damage to the property (being damage from an incident that the Applicant did not intend to happen), subject to the exclusions set out in the policy. Airborne mould samples taken from the property establish that a very high concentration of mould is present. The building biologist (BW) appointed by the FSP confirmed that the types of mould present in the samples represent a health hazard and recommended that the property be vacated. The policy contains a general exclusion for damage caused by, arising from or involving mould. However, in the Panel’s view, this exclusion does not apply to mould caused by an event which is otherwise covered under the policy. The Applicant says the mould damage to her house and contents has occurred since the fire, due to the large amounts of water used by the fire brigade to extinguish the fire, as well as the FSP’s delay in replacing roof tiles damaged as a result of the fire, which has allowed water to enter the roof cavity. However, the FSP disputes that the mould at the App licant’s property has been caused by the fire or the subsequent delay in repairs. The FSP says that any mould at the property is due to factors which are not related to the fire, such as poor ventilation of the bathroom and laundry areas and gradual deterioration of the roof. Accordingly, in order to determine the FSP’s liability for mould remediation, it is necessary to identify the proximate cause of mould growth at the Applicant’s property (that is, the real, effective or dominant cause). There is conflicting information about the amount of water present As outlined above, the Applicant says that mould growth at her property has occurred due to the effects of water used to fight the fire and the FSP’s delay in carrying out roof repairs. The initial dama ge which gave rise to the Applicant’s claim occurred when an electric heater mounted on the outside wall of the kitchen pantry caught fire in November 2013. The Applicant says that:  the fire brigade sprayed large amounts of water throughout the house while fighting the fire and poured water directly into the roof cavity in order to extinguish a secondary fire in the air conditioning unit; and  firemen broke a number of roof tiles while walking on the roof, allowing more water to enter the roof cavity during subsequent rainfall events. Case No: 368735 Determination Page 3 of 10 The Applicant says that, when she and her son returned to the property in April 2014 following the initial building repairs, ongoing dampness was evident in a number of rooms, water poured from the ceilings “like it was raining inside” and items became wet when placed on the floors. She says that water continued to drip from the ceilings until the FSP authorised the roof repairs in November 2014. The Applicant has provided photographs showing water damage (swelling) of the kitchen cupboards and shelving and an isolated area of mould on a single window frame. She has also provided a sound recording taken during a period of heavy rainfall, which she says reflects water entering the roof cavity and hitting the ceilings. However, the Applicant has not provided any photographs which support her description of the extent of water present at the property between April 2014 and November 2014. A report and detailed scope of works prepared by the FSP’s assessor (CL) shortly after the fire indicates that the fire damage was limited to the kitchen area, with smoke damage extending to the walls and ceiling of surrounding rooms, as well as the roof mounted air conditioner. While the assessment report and scope of works do not specifically refer to water damage, the FSP’s contractors subsequently identified water damage to the kitchen cupboards and shelving. However, the photographs included in the assessor’s report suggest that the internal water damage did not extend beyond the kitchen area. None of the FSP’s contractors who attended the property between the date of the fire and the roof repairs in November 2014 reported excessive moisture at the property. These included the building biologist (BW) and a mould remediation specialist (RX) who each carried out a thorough inspection of the surface areas. Moisture readings of building materials taken by BW and RX did not reveal any undue levels of moisture in the ceiling space, at the base of the walls or in the kitchen/dining area near where the fire occurred. BW also confirmed that the carpets in the bedrooms and storeroom did not appear to be wet and there was no apparent water or mould damage to the underside of boxes placed on the carpets. The FSP’s builder (MBG) inspected the roof cavity in September 2014, prior to carrying out the repair of the cracked roof tiles. MBG reported that his visual inspection failed to identify an obvious moisture or water damage and there was no evidence of recent water entry in the roof cavity. The photographs included in MBG’s report show that the roof frame and the insulation appear dry and dusty. Mould was identified in the bathroom at the Applicant’s property As noted above, the FSP engaged a building biologist (BW) to report on the level of mould exposure at the Applicant’s property and provide recommendations in relation to any remediation works required. BW attended the property in October 2014 (eleven months after the fire) and took samples from eight different areas. Laboratory testing of these samples showed: Case No: 368735 Determination Page 4 of 10  very high concentrations of airborne mould in the bathroom and the lounge room;  high concentrations in the kitchen/dining room, master bedroom and front bedroom; and  elevated levels in the remaining two bedrooms. A comparative air sample taken from outside the house showed levels of mould almost double that of the samples taken from inside the house. However, despite this, BW expressed concern that there may be hidden mould present within the house, on the basis that there was some difference between types of mould particles detected in the indoor air samples and those found in the outdoor air samples, which was suggestive of indoor mould proliferation. BW also took surface mould samples from eight different areas of the property, including:  the ceiling space timber over the master bedroom, hall and front bedroom;  the water damaged backing paper from ceiling cladding over master bedroom/hallway area;  water affected blown in ceiling insulation from above master bedroom/hallway area; and  the shower recess wall in the rear bathroom. All of the samples taken showed low to normal levels of mould, other than the sample taken from the bathroom shower recess wall. This sample contained fungal hyphae, indicating recent active mould growth cons tituting a potential health hazard. The findings of the building biologist are consistent with the health issues reported by the Applicant and her son, which doctors have confirmed are consistent with exposure to house mould. While BW recommended extensive invasive investigations to determine whether there was any hidden mould at the Applicant’s property, she was unable to confirm the presence of mould other than on the bathroom shower recess wall. BW noted dark mould growth on the wall and cornice above the shower recess in the rear bathroom (where the surface sample was taken) and light mould growth on the cornice above the door, in the rear toilet and in the rear entry foyer area. However, BW’s visual inspection did not reveal any visible mould growth o r water damage in the bedrooms, in the area of the wall cavity which was accessible through a hole cut in the base of the hallway wall or in the area of the ceiling cavity which was accessible through a hole in the ceiling. While BW identified signs of past dampness in the timber roof frame, the insulation and the paper coating on the top of the ceiling cladding, she did not identify any fuzzy mould proliferation. BW subsequently confirmed in an email to the FSP that, in recommending further invasive investigations, she had taken a precautionary approach based on factors including:  her understanding that all of the floor and wall bases had been extensively affected by water at the time of the fire; Case No: 368735 Determination Page 5 of 10  her assumption that no water or mould remediation had been carried out following the fire; and  the health issues reported by the Applicant. As outlined above, it is not entirely clear to what extent the property was affected by water following the fire. Further, the claim records indicate that the initial make safe works (and subsequent building repairs) included chemical sponging and cleaning. The mould remediation specialist (RX) who inspected the property in November 2014 confirmed that there was visible mould on the wall next to the laundry at the rear of the house, but did not observe any other signs of mould growth. In addition to carrying out moisture readings on building materials, RX used a borescope to inspect the wall cavity (through the hole in the wall) and a thermal camera to identify areas of water entry which may have contributed to mould growth. The thermal images in RX’s report showed thermal activity in the bathroom, which RX noted was possibly contributing to mould growth. Based on the results from the mould samples taken by BW, RX concluded that the mould in the bathroom was responsible for the airborne mould found in samples taken throughout the property. The thermal images taken by RX confirm that the areas around the perimeter of the house also showed signs of water entry, which RX concluded had occurred over a prolonged period of time due to maintenance issues such as leaves and other debris blocking the gutters. However, no active mould growth was identified in these areas. In the Panel’s view, had the property experienced mould problems due to ongoing moisture in the roof cavity or building materials as a result of events associated with the fire, it is likely that surface sampling of the roof and ceiling area carried out by BW eleven months after the fire would have revealed active mould growth. Further, it is likely that moisture testing of the building materials would have revealed abnormal results. Based on the available information (including the testing carried out at the property), the Panel is satisfied that the only area of the property in which mould has been identified is in the vicinity of the rear bathroom. Available information does not establish link between mould and fire The Panel has carefully reviewed the mould remediation reports provided by BW and RX, together with the roofing reports provided by the FSP’s builders (JL, who inspected the roof in July 2014) and MNG (who re -inspected the roof in September 2014). Having done so, the Panel is not satisfied that there is sufficient information available to establish a causal link between the events associated with the fire and the mould growth in the bathroom and laundry areas . While the building biologist (BW) identified mould growth at the property, she did not express a concluded view as to what caused the mould. In her report, BW commented that continuing dampness of the ceilings and walls (due to the fire- Case No: 368735 Determination Page 6 of 10 related events) may contrib ute to mould proliferation. However, BW’s tests of the building materials did not reveal elevated moisture levels. In a subsequent email to RX, BW clarified that there may be other causes of mould growth at the Applicant’s property, particularly if the pro perty had ongoing maintenance issues. The Panel notes that the bathroom area where mould was identified is not located directly adjacent to the kitchen where the fire occurred, but is separated by at least one other room. Accordingly, this area would be unlikely to be the most severely affected by water used by the fire brigade to extinguish the fire. The surface mould identified in BW’s sampling was found on the wall of the shower recess, in an area which would commonly be susceptible to mould as a result of ordinary usage. RX considered that the mould in the bathroom area pre-existed the fire and was primarily due to a lack of adequate ventilation through the bathroom and laundry area. The Applicant says that the bathroom is well ventilated by two external windows and an exhaust vent. However, based on the photograph of the mould included in RX’ s report, it appears to be located close to the wall near the shower in an area which would not naturally be well ventilated. The Panel has considered whether the cracked roofing tiles have contributed to the mould issues at the Applicant’s property. The FSP accepted liability for the replacement of sixty or so cracked roofing tiles at the Applicant’s property, despite there being limited information to establis h that the tiles had been damaged by firemen walking on the roof. The FSP’s builder (JL) who inspected the roof in July 2014 reported that a number of the terracotta roofing tiles were mismatched and showed evidence of past repairs using a cement based product. JL noted that the sixty broken tiles were not located in one area and therefore appeared to have been caused by multiple, ongoing issues. JL also noted the presence of a large quantity of needle leaf type debris, which he considered was likely to impede the free flow of rainwater off the tiles during adverse weather. Given the condition of the Applicant’s roof, JL concluded that it was not possible to determine to what extent any of the damage to the tiles had been caused by firemen walking on the roof at the time of the fire in November 2013. JL’s report includes a number of good quality, detailed photographs which, in the Panel’s view suggest that the roof was subject to ongoing maintenance issues. The tiles showing evidence of past temporary repairs are randomly distributed across the roof, including in areas where are less likely to be subject to foot traffic. Case No: 368735 Determination Page 7 of 10 FSP is not liable for mould remediation As outlined above, the Applicant’s policy excludes liability for damage caused by mould, unless the mould results from an earlier event for which the FSP is liable. For the reasons outlined above, the Panel is satisfied that the mould issues identified at the Applicant’s property were not caused by the fire (or associated events) in November 2013, but by ongoing maintenance issues at the property. Accordingly, the FSP is not liable for mould remediation of the Applicant’s home and contents. 2.2 How should the other outstanding issues be resolved ? Parties should work co-operatively to resolve remaining issues During the course of this dispute, the Applicant has raised a number of discrete issues in relation to various aspects of her claim, including the building repairs which remain to be completed and the settlement arrangements for contents damaged in the fire. By way of letters, emails and telephone discussions, the FOS Case Manager has sought to clarify with the Applicant and the FSP the key issues which remain outstanding, and to clarify the actions being taken by the parties to address these issues. Based on the content of these discussions, the Panel is satisfied that the parties are taking appropriate action to progress these issues. The Panel would encourage the parties to work co-operatively to ensure that any outstanding issues in relation to the claim are finalised promptly, in accordance with the principles outlined below. FSP is liable for remaining building repairs During the course of this dispute, the FSP has offered to authorise for its builder (P) to complete the outstanding building repairs, based on a scope of works prepared in mid-2014. This scope of works outlined the further rectification repairs required after the initial builder (RI) ceased work in or around June 2014. Alternatively, the FSP has offered to cash settle the Applicant for cost of the remaining repairs, based on an up to date quote provided by its builder (P). The Panel considers that the approach proposed by the FSP is appropriate to resolve the Applicant’s claim for repair of the damage resulting from the fire. To the extent that the remaining repairs have not yet been completed, the Panel considers that the FSP should fund the cost of temporary acco mmodation for the Applicant and her son until such time as the repairs are completed. In the event that the Applicant is cash settled for the repairs, the cash settlement should be increased by the cost of temporary accommodation for the time required to c omplete the repairs (based on the estimate provided by the FSP’s builder (P)). The Panel notes that the Applicant has previously expressed concern about potential liability for amounts paid by the initial builder (RI) for various kitchen Case No: 368735 Determination Page 8 of 10 fittings installed at the Applicant’s property as part of the building repairs . The FSP has previously confirmed to FOS that it will arrange for RI to be paid for these items. Accordingly, the FSP should arrange payment, to the extent it has not already done so. Parties should work together to finalise contents settlement The FSP has cash settled the Applicant for some of her contents items damaged in the fire. The Panel understand that the parties are continuing to work together to finalise the details of the settlement for the remaining contents items. During the course of the claim, issues arose in relation to the appropriate settlement method for refrigerators and a freezer damage during the fire, which resulted in the Applicant being provided with a refrigerator which did not fit through the door of her house. The FSP subsequently offered the Applicant a smaller refrigerator but she did not take up this offer and the large refrigerator remained on the verandah of her house. The Applicant says that the refrigerator has now sustained damage due to the malicious acts of third parties after being left uncovered by the FSP’s contractors. The FSP has offered to consider the Applicant’s claim for damage to the refrigerator, subject to her lodging a separate claim for malicious damage. The Panel is not aware of whether any such claim has been lodged to date. Payment of compensation is not justified in the circumstances It is clear that the Applicant’s claim has taken an extended period of time to resolve and a number of issues have arisen during the claim process. While such issues are not uncommon in the context of a claim for building and contents damage by fire, in the present case these problems have been exacerbated by communication difficulties between the parties. Having carefully reviewed the claim history, the Panel is satisfied that the FSP is not solely responsible for the delays in resolving the Applicant’s claim. At various stages, the Applicant expressly asked the FSP to hold off on settling certain aspects of the claim (such as the contents settlement) until other, unrelated issues had been resolved. The Panel’s detailed review of the claim history confirms that the FSP’s representatives have made various errors during the course of the claim (for example, not sourcing an appropriate replacement computer when required by the Applicant for work purposes). The Panel accepts that such matters have exacerbated the stress and inconvenience experienced by the Applicant during the claim process. However, the Panel considers that the FSP has generally acted reasonably in seeking to resolve the Applicant’s claim. The FSP agreed to allow RI to conduct the initial repairs in accordance with the Applicant’s wishes (and after the Applicant directly authorised him to do so), even though RI did not provide the most competitive quote and the FSP had concerns Case No: 368735 Determination Page 9 of 10 about his ability to complete the works to an appropriate standard. The FSP subsequently agreed to fund the costs of rectification repairs when the works undertaken by RI proved inadequate. The Panel notes that the FSP has funded the costs of temporary accommodation for the Applicant and her son for extended periods during the claim process, including the period of approximately nine months which it has taken to resolve the issues about mould at the property. In these circumstances, and in light of the Panel findings that the FSP is not liable for mould remediation, the Panel does not consider that an award of compensation is justified in the circumstances. Case No: 368735 Determination Page 10 of 10 3 Supporting information 3.1 Panel approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.