Home / Financial Firm (Unknown - Insurer) / Determination 368281
Determination 368281
Water damage claim declined under poor workmanship and gradual deterioration exclusions
Summary
The applicant, an investment property owner, claimed water damage from a bathroom shower base and sought review of the FSP's declinature. AFCA found the damage was caused by poor design and workmanship and gradual deterioration, both excluded under the policy, so the FSP was entitled to decline.
Once the insured establishes a prima facie claim, the insurer bears the onus of proving that an exclusion applies, which expert evidence established here.
Issues
- Claim denial primary · not upheld
“the current damage is the result of a poor design and workmanship in construction and gradual deterioration.”
- Inadequate claim investigation secondary · not upheld
“The opinions of L and M in conjunction with the photographs persuade me, on the balance of probabilities, that the current damage is the result of a poor design.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim - Exclusion/Condition - Service - Delay in Claim Handling
Determination
Case No: 368281 Determination Page 1 of 7
Case number : 368281 13 May 2015
1 Overview
1.1 Dispute
In February 2014, the Applicant lodged a claim with the Financial Services
Provider (FSP) for water damage in the bathroom of his investment property.
The FSP assessed the claim and refused liability on the basis the loss was
caused by construction defects and gradual deterioration.
The Applicant seeks a review of the claim.
1.2 Issues and key findings
Has the Applicant established a prima facie claim?
There has been water damage from the shower base. Accordingly, the Applicant
has established a prima facie claim under the policy.
Is the FSP entitled to decline the claim?
On balance, the loss has been caused by a poor design and construction, leading
to gradual deterioration, which are exclusions under the policy.
Accordingly, the FSP is entitled to decline the claim.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is entitled to decline the claim and need take no further action.
Case No: 368281 Determination Page 2 of 7
2 Reasons for Determination
2.1 Has the Applicant established a prima facie claim?
The policy covers water damage
When an insured makes an insurance claim they bear the legal onus to establish
the loss is a claimable event under the policy. This is known as establishing a
prima facie claim.
The listed event of „Water or Liquid damage‟ in the policy covers loss or damage
cause by water escaping a shower base or shower wall.
In this dispute, water has escaped a shower base and caused damage within the
shower recess area.
Accordingly, the Applicant has established a prima facie claim.
2.2 Is the FSP entitled to decline the claim?
Damage was caused by excluded causes
Once an insured has established a prima facie claim and the insurer seeks to
decline the claim on the basis of a policy exclusion, the legal onus shifts to the
insurer to establish the exclusion applies to the circumstances of the claim.
The policy excludes loss or damage caused by gradual deterioration, structural
defects, and faulty or poor workmanship and design.
The experts appointed by the FSP report that the water had been escaping for
some time and the damage had been occurring since before an inspection report
dated the 4 July 2012 (refer section 3.3).
„L‟ reported that large sections of the shower floor tiles were in very poor condition
and a lot of silicone had been applied to the wall tiles/shower base junction during
previous attempts at repair. This can be seen in the photographs he took when he
inspected the property.
„M‟ reviewed an inspection report from the agent from July 2012 and it stated tiles
were coming loose from the shower at that time. This was rectified in December
2012. M reviewed an invoice for the repairs which showed work done included the
replacement of missing tiles in the shower base, around the shower grate, grout
all tiles that had been replaced and seal the edges with clear silicon.
M reported the 2012 repairs were effectively band aid measures. M also says that
the failure had already occurred and the water was seeping into the area under
the shower whilst the shower was being used by tenants between July and
December 2012.
M further reports the loss has been caused by a combination o f poor construction,
possible general movement as well as the ongoing use of the shower while it was
leaking.
Case No: 368281 Determination Page 3 of 7
The Applicant is a qualified architect. He submits that had the issues been due to
poor design or construction it would have been apparent well before 2012, given
the bathroom was constructed in 1998.
He also says that had the membrane been breached prior to 2012 then the
particle board would have deteriorated by this time and the swelling would have
been evident in 2012 and yet the condition report from the agent makes no
mention of swelling in 2012.
He believes the leak has occurred around the shower drain hole but iterates that
no cause of the leaking has been confirmed. Rather he says the expert reports
from the FSP are not compelling. He says M did not give it definitive reason for
the failure but speculated on five possible causes. He says the membrane has
failed and it is just as likely the damage has been an accident caused by the
tenant such as tripping in the shower or dropping an object on the shower floor.
The material before me indicates that there were loose or missing tiles and
leaking issues in July 2012, April 2013 and February 2014.
The opinions of L and M in conjunction with the photographs persuade me, on the
balance of probabilities, that the current damage is the result of a poor design and
workmanship in construction.
Further, it appears this loss has been an ongoing issue preceding July 2012 and
gradual deterioration has continued to occur despite the Applicant and his agent
authorising repairs. Further, leaking and poor design and construction may take
some years to manifest and cause damage, particularly in areas such as shower
recesses.
I have considered the Applicant‟s submissions; however, there is no evidence that
a single accident by a tenant caused the loss. Nor is it persuasive that the floor
could deteriorate so rapidly from water breaching the floor membrane in the short
time between the claimed date of loss and the first inspection by L only one month
later.
I am persuaded that the large grout area on the shower base floor in conjunction
with poor construction and ongoing leaking once the area had been breached
have caused the failure of the area.
I accept the Applicant and his agent have taken steps to conduct maintenance on
the property since 2012; however, L and M report that this did not address the
underlying issues with the construction.
The opinions of L and M are supported by the fact the tiles continued to fail even
after repairs were done in 2012.
Based on the available material, I am persuaded the FSP has established on the
balance of probabilities the damage is due to poor design and workmanship in
construction and gradual deterioration. Accordingly, it is entitled to refuse the
claim, including the loss of rental payments.
Case No: 368281 Determination Page 4 of 7
3 Supporting information
3.1 FOS approach for this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to an Ombudsman for
Determination, in line with the Operational Guidelines to the FOS Terms of
Reference.
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
I have reviewed and considered all of the material provided by the parties. While
the parties have raised a number of issues in their submissions, for the purposes
of this Determination, I have restricted commentary to those issues that I consider
directly relevant to the outcome only.
3.2 Relevant Policy Terms
The following section of the Product Disclosure Statement (PDS) apply
“When your buildings are protected
The specific events that your buildings will be covered for are listed in the table
below. This cover is subject to the exclusions set out on pages 37 – 38.
…
Water or liquid damage (pages16 - 17)
Loss or damage caused by water or liquid escaping from:
• a fixed pipe or an object attached to a pipe, fixed gutter, fixed tank or a drain
• a bath, basin, sauna, spa, shower base or shower wall, sink, toilet or tiled floor that
has drainage holes
………………
Cost of finding where the water or liquid escape from, including the cost of repairing
any damage that occurs while looking for the cause”
We won‟t cover
………
Cost of repairing the item from which the water or liquid escaped.
“ Exclusions (pages 36 - 37)
Any cover we provide is subject to the following exclusions:
• general exclusions (these apply to b uildings, contents and liability covers)
• buildings and contents cover exclusions
• liability cover exclusions.
Case No: 368281 Determination Page 5 of 7
…
Buildings and contents cover exclusions
We will not cover any loss or damage as a result of, or caused by:
• …
• Erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear
• …
• A defect in an item, structural defects, or faulty or poor workmanship or design
• …”
3.3 Expert Evidence
The following reports were reviewed and considered
Record Key points
FSP’s expert ( L )
Building report
18 March 2014
inspected, photographed and described the bathroom 5
March 2014
there is extensive damage to the timberwork on either side
of the window indicating the shower recess has been
leaking for some time
the shower recess substrate is rotten
Baltic pine boards have rotted at the entry of the shower
recess
chipboard/plywood used for shower base with membrane
applied to it
the shower base is tiled with mosaic tiles with large
sections in a very poor condition to the point that the tiles
had dislodged
the wall tiles appears to be in serviceable condition
there is some concern as to the water proofing where the
wall tiles meet the shower base as there are large amounts
of silicone evident from previous attempts to repair
there is no shower screen
upon lifting the timber slatted frame that was positioned on
the shower base, major damage to the base was observed
pressure tested the water lines and spindles and no leaks
were detected
appears the waterproof membrane has failed allowing
water to make contact with the sheet flooring beneath the
shower base resulting in timber sheet floor rotting causing
the base to collapse in sections
membrane failure has allowed water to make contact with
the Baltic pine floorboards causing them to rot also
at tempts at maintenance have failed resulting in visible
long - term water damage
estimate to repair $6,800
concluded the long - term water damage appears to be the
result of a poorly constructed shower recess
waterproofing membrane has failed allowing water to make
contact with the sheet flooring beneath the shower base,
resulting in timber sheet flooring rotting causing base to
collapse
Case No: 368281 Determination Page 6 of 7
due to the extent of the damage it appears water has been
escaping for some time and no attempt has been made to
rectify the i ssue
long - term problem has also affected pine floorboards
resulting in rotting
FSP ’s expert ( M )
Building report
9 May 2014
M inspected and described bathroom 2 May 2014
photographs are annotated and M notes failure of
substrate supporting the tiles in the shower area, white
silicon around the base of the wall floor junction, tile failure,
Shug window rotted near tile floor junction
Applicant stripped the bathroom a few days later and taken
photos throughout the process
home is over 100 years old with the bathroom conversion
being undertaken around 15 years ago
the insured purchased the property around 3 years ago
a property report from July 2012 makes reference to “tiles
that are coming loose around the shower area and there is
wood rotting in the corner of the shower area”
this indicates water was getting under the tiles, causing
damage to the adhesive, substrate, membrane and floor
system prior to July 2012
it appears the shower had loose tiles between July and
Decemb er 2012
repairs were done in December 2012 and the invoice
states “replace all missing tiles to shower base and around
shower grate” and the tiles were grouted and all edges
were sealed with clear silicon
these are “simply inappropriate repairs consistent with
band aid measures”
the continued use of the shower by the tenants will have
exacerbated the issue
The silicone is white rather than clear as stated on the
invoice. This means there was either a typographical error
or more silicone was applied later
In April 2013, a subsequent inspection report mentioned
there was one tile loose and a note to follow up with
contractor who completed job. Enquires were made with
repairer but the relevant person no longer works for the
company.
the use of timber reveals on the Shug window is defective
building works as it is not suitable for a wet area, although
this is not the cause of the damage
it is likely the damage has been a slow and gradual failure
starting prior to 2012 and continuing and accelerating as
the ten ants used the shower, noting there is only one
shower in the dwelling
the 2012 repairs were only cosmetic
The damage is due to a combination of the following:
loose tiles, and this usually occurs from failed adhesive or
poorly installed adhesive
poorly in stalled grout in the first instance, which falls out
during normal use. It is noted the tiles are small (25mm x
25mm) meaning a large area of the floor is grout. Larger
tiles of 250mm x 250mm will have about 90% less grout
Case No: 368281 Determination Page 7 of 7
flex in the substrate may have loosened the tiles and put
stress on the adhesive junctions
general movement due to changing weather conditions,
such as the 13 year drought that ended in 2010 can also
alter building levels and joins in intersections and walls
the use of a timber slatted frame in the shower recess may
not have helped the performance of the shower area as
this may have placed point loads in or one the same set
positions of tiling each time the shower is used
these factors would have allowed continued and gradual
seepage of water to occur under the tiles causing greater
levels of damage to the adhesive, substrate and floor
system during shower use by tenants
failure of the shower floor area started prior to 4 July 2012
and continued