Text of the determination
Determination
Credit - Consumer Credit - Home Loans - Instructions - Delay
Credit - Consumer Credit - Home Loans - Privacy & Confidentiality - Unauthorised
information disclosed
Determination
Case No: 367068 Determination Page 1 of 13
Case number : 367068 2 2 May 2015
1 Overview
1.1 Dispute
On 6 June 2013, the Applicants (Mr Applicant and Mrs Applicant) lodged a loan
application with the Financial Services Provider (FSP) to purchase a new
residential property (property 2). The purchase of property 2 was subject to the
sale of their existing residential property (property 1) and simultaneous settlement
was required as surplus funds from the sale of property 1 were required to
complete the purchase of property 2.
The vendors of property 2 did not receive confirmation of unconditional loan
approval from the Applicants before 5.00pm, on 1 July 2013, as required under
the sale contract and so rescinded the contract.
The dispute concerns whether the FSP:
Unreasonably delayed the provision of unconditional loan approval and
Breached the Applicants ’ privacy when it contacted the vendors’ agent of
property 2, on 2 July 2013, to advise that unconditional loan approval had
been provided to the Applicants.
1.2 Issues and key findings
Did the FSP unreasonably delay the provision of unconditional loan
approval?
The FSP did cause unreasonable delay in the provision of unconditional loan
approval to the Applicants. The delay associated with providing unconditional loan
approval was a resu lt of the FSP’s failure to request the necessary income
verification documents from Mrs Applicant in a timely manner. Accordingly, the
Applicants are entitled to compensation for financial losses in the amount of
$4,767.45.
In addition, the Applicants are jointly entitled to compensation for non-financial
loss in an amount of $500.
Did the FSP breach the Applicants’ privacy when it contacted the vendors’
agent and the vendors in relation to the contract of sale for property 2
Case No: 367068 Determination Page 2 of 13
The FSP did breach the Applica nts’ privacy when it contacted the vendors’ and/or
their agent on 2 July 2013, to advise it that the Applicants’ finance had been
unconditionally approved and that settlement of the property could proceed. The
Applicants are each entitled to compensation for non-financial loss in an amount
of $100 due to the undue stress and anxiety suffered as a result of the breach of
their privacy.
1.3 Determination
This Determination is in favour of the Applicants.
If the Applicants accept this Determination within 30 days of its date (and bearing
in mind that the Applicants have now refinanced their loans to another financial
services provider), then the FSP must pay the Applicants an amount of $5,467.45
to their nominated account within 14 days of being notified of the A pplicants’
acceptance of the Determination.
If payment is not made within that time period, the compensation amount will incur
interest at four per cent (4%) per annum.
A summary of how the figure of $5,467.45 is calculated is set out in section 3.4 of
this Determination.
Case No: 367068 Determination Page 3 of 13
2 Reasons for Determination
2.1 Did the FSP unreasonably delay the provision of unconditional
loan approval?
The parties have conflicting positions regarding the provision of
unconditional loan approval
In May 2013, the Applicants approached the FSP for the purpose of discussing a
loan to purchase a new residential property. At that time, the FSP advised the
Applicants that it would consider a loan supporting a purchase price between
$550,000 and $650, 000 . The Applicants purchased proper ty 2 and made a loan
application to the FSP.
Unconditional finance approval was originally due 21 days from the date of the
contract of sale for the purchase of property 2. However this date was extended to
1 July 2013.
The Applicants state that the FSP delayed the provision of unconditional loan
approval such that the 1 July 2013 deadline for settlement was missed. The
Applicants say that supporting documentation or information was provided to
support their loan application as soon as the FSP made the request to the
Applicants. The Applicants state that the initial date for obtaining unconditional
finance approval was extended numerous times to allow the FSP to finalise the
finance for the purchase of property 2. The last extension request resulted in a
finance approval date of 1 July 2013, however the FSP failed to provide
unconditional finance approval before 5.00pm on that date and the vendors
rescinded the contract on 2 July 2013.
The FSP states that the delays associated with the necessary unconditional loan
approval to enable the purchase of property 2 was attributed to the Applicants ’
delay in providing the requested documents to it in a timely manner . It provided
unconditional loan approval on 1 July 2013, however it was unaware of the “cut
off” time of 5.00pm and believed the vendors of property 2 would have accepted
the unconditional approval letter of 1 July 2013. The FSP has not provided any
confirmation in relation to the time it dispatched the unconditional approval letter
to the Applicants’ soli citors.
The FSP says that it did not make extension requests in relation to the
unconditional finance due date. The FSP’s lending manager made requests for
further information in support of the loan application, however any extensions of
the finance due date would have been agreed between the real estate agent, the
Applicants and the vendors.
A timeline of events from 1 June 2013 to the date the FSP provided the
Applicants with unconditional loan approval (relating to the purchase of property
2) has been compiled based on information received from both the Applicants and
the FSP and appears in section 3.2.
Case No: 367068 Determination Page 4 of 13
The FSP failed to request income information from the Applicants in a
timely manner
The FSP states that on 13 June 2013, its credit assessment department sent an
internal email to Mr H requesting confirmation of Mrs Applicant’s income. Based
on the payslips provided, there was insufficient income to support the application
and confirmation was required of the bonus amounts stated because the figures
appeared inconsistent with the hourly rate recorded on the payslip. On 19 June
2013, Mr H contacted the Applicants and requested the relevant income
verification documentation. On 21 June 2013, Mrs Applicant provided her payroll
activity details to the FSP which contained an illegible handwritten statement on it.
On 22 June 2013, the FSP again requested “a letter” from Mrs Applicant’s
employer. The Applicants did not provide the requested documentation until 27
June 2013. Upon its receipt, and on that same day, the FSP processed the
Applicants’ loan application and sent it to the mortgage insurer for approval. The
FSP rejects the Applicants’ position that it contributed to the delays in settlement
for the purchase of property 2.
The Applicants have confirmed they received a telephone call from the FSP on 19
June 2013, in which the FSP sought more information in relation to the bonus
amounts appearing on Mrs Applicant’s pa yslips. This was sent to the FSP on 21
June 2013, however the FSP subsequently contacted the Applicants and advised
that the letter was in a format that was “unreadable”. At that stage, Mrs Applicant
conceded that she did have some difficulty obtaining the necessary confirmation,
but it was ultimately provided to the FSP on 27 June 2013.
T he FSP’s system notes show that on 13 June 2013, its internal credit
assessment team sent an email notification to Mr H, the FSP’s lender (at about
6.43pm) seeking further verification in relation to Mrs Applicant’s income. This
request was not actioned by Mr H until 19 June 2013, some six days after the
internal email request was initially made. The FSP has not explained the reason
for this delay in contacting the Applicants to seek further confirmation of Mrs
Applicant’s income.
In reviewing Mr H’s six day delay in contacting the Applicants to seek the relevant
information relating to Mrs Applicant’s income, I have sought the views of the FOS
Banking Specialist (the specialist). The specialist has extensive industry
experience in the banking and financial services industry, and regularly provides
advice about what constitutes good industry practice in lending and loan
management matters.
The specialist reviewed the FSP’s timeline of events and the corresponding
system notes and has advised that, in her opinion, the FSP’s six day delay in
contacting the Applicants to seek written confirmation from Mrs Applicant’s
employer regarding her income, was not good banking practice in the
circumstances.
The specialist has further advised that, Mr H should have, as matter of good
banking practice, contacted the Applicants within two business days of receiving
the internal credit assessment team’s email querying Mrs Applicant’s income. I
accept the specialist’s advice in this regard.
Case No: 367068 Determination Page 5 of 13
Based on the information provided, the Applicants did not provide the FSP with
the necessary income verification documents (in the legible form) relating to Mrs
Applicant’s employment until 27 June 2013, some eight days after the initial
request was made by the FSP on 19 June 2013. In having regard to this eight day
timeframe and by applying it to the date from which the specialist advised that the
FSP should have contacted Applicants (ie. on 17 June 2013 at the latest), then
the income verification documents would have been provided to the FSP by no
later than 25 June 2013. Given that the FSP completed its assessment and
unconditional approval of the Applicants’ loan application within two business
days, then the FSP would have provided unconditional loan approval by 27 June
2013, a clear four days (or two business days) before the finance due date of 1
July 2013.
I am satisfied that the FSP’s six day delay in contacting the Applicants for the
purpose of obtaining further documentation verifying Mrs Applicant’s income
contributed to their delay in providing the requested information to the FSP, which
ultimately resulted in the FSP’s failure to provide notification of unconditional loan
approval before 5.00pm on 1 July 2013. In this regard, the Applicants have
provided an email notification sent by the FSP to them advising of unconditional
loan approval. The email time stated is 5.11pm.
Given that the FSP breached its obligations to the Applicants in the handling of
their loan application (specifically with regard to the delays concerned with its
requests to the Applicants for income verification from Mrs Applicant’s employer),
I am satisfied that that the Applicants are entitled to compensation in that regard.
The contract of sale for property 1 was required by the FSP
The contract of sale for property 1 was not provided to the FSP until 21 June 2013
and this only occurred when the FSP followed up the Applicants.
The Applicants state that the importance of the provision of the contract of sale for
property 1 to the FSP was at no stage “ clearly explained” to them and that, prior
to 19 June 2013, the FSP had not requested a copy of it.
The FSP states that the Applicants were advised that a simultaneous settlement
would be required in relation to the sale of property 1 and the purchase of
property 2. The FSP says that, on 6 June 2013, it was clearly explained to the
Applicants that for the loan application process to proceed, the FSP would need
an executed contract of sale in relation to property 1.
The executed contract of sale for property 1 enabled the FSP to determine the
surplus sale proceeds (approximately $75,000) and include that amount in the
Applicants’ loan application as a part of its credit risk and servic eability
assessment for the Applicants’ new loan relating to the purchase of pro perty 2.
Accordingly, the executed contract of sale was a necessary part of the loan
application process and should have been provided to the FSP shortly after its
execution.
I accept that, as a part of the loan application process, the FSP would have
required a copy of the relevant contractual instrument that verified and validated
Case No: 367068 Determination Page 6 of 13
the sale price of property 1. Given this, the finance application could not progress
until such time as that contract of sale was provided to the FSP given the
proceeds of that sale needed to be determined and verified as a part of the
application process relating to the purchase of property 2.
The FSP did not request the contract of sale for property 1 until 19 June
2013
The Applicants state that the FSP did not request a copy of the contract of sale for
property 1 until 19 June 2013.
In contrast, Mr H of the FSP states that as early as 6 June 2013, the Applicants
were advised that in order for the “deal to proceed”, the FSP required a contract
of sale for property 1.
In the FS P’s email to the Applicants dated 3 June 2013, there is no request for a
copy of the contract of sale for property 1, despite Mr H’s statement referred to
above. Further the FSP’s system notes relating to the processing of the
Applicants’ loan application do not at any stage refer to a request to the
Applicants for the contract of sale for property 1. The first mention of the contract
of sale for property 1 is in the FSP’s system note dated 21 June 2013 , which
states that it now holds a contract of sale for property 1.
Based on the above, it is more likely than not that the FSP’s request for the
contract of sale for property 1 was not made until about 19 June 2013, which
accords with the Applicants’ version of events and the FSP’s statement about
following up the Applicants.
Despite the above, I am not satisfied that the Applicants were unaware of the
importance attributed to the executed contract of sale for property 1. This is
evident given that the purchase contract for property 2 was conditional on the
Applicants entering into a contract for the sale of property 1, and the sale
proceeds of property 1 were to be used to complete the Applicants’ purchase of
property 2.
It should also be noted that the Applicants were legally represented by the same
firm of solicitors in relation to the sale of property 1 and the purchase of property
2. Given this, the importance of that contract should have been apparent and a
copy of that contract should have been provided to the FSP by their
representative as soon as possible.
The late provision of the contract of sale for property 2 had no bearing on
the failed settlement
Even if I accepted that the Applicants did not appreciate the significance of
providing a copy of the contract of sale for property 1, the delay in its provision to
the FSP on 21 June 2013 had no impact on either of the failed finance due dates
of 22 June 2013 or 1 July 2013. The ultimate delay in settlement was as a result
of issues concerned with the provision of Mrs Applicant’s income verification
document. These issues stemmed from the FSP’s failure to request the
Case No: 367068 Determination Page 7 of 13
documentation in a timely manner in addition to the Applicants failure to provide
the FSP with legible income verification documents.
The Applicants are entitled to some compensation
The Applicants claim that they incurred financial losses totalling $10,036 as a
result of the delay in settlement and finding a new property to purchase. The
Applicants have provided numerous tax invoices, internet banking “pay anybody”
receipts and copies of account statements with various amounts highlighted
relating to storage, removalist fees, postal redirection and telephone provider
costs. The claims for which they have provided documentation are as follows:
D escription of Tax invoice or account statement Amount $
Removalist (paid 12 August 2013 via internet banking) $843.73
Building and Pest Report $545
Ute & driver hire & additional equipment (10 July & 9 August 2013)
30 day storage and care of potted plants and livestock
$480
$145
Storage (paid 5 July 2013) $446.50
Storage (paid 11 July 2013) $27.50
Storage (paid 12 July 2013) $100.20
Kennel (paid 9 July 2013) $242
Removals (paid 17 July 2013) $781.25
Mail redirection (paid 1 August 2013) $19
Telephone provider (paid 4 October 2013 $479.86
Rental Tax invoice dated 1 September 2013 (for the period 11 July
2013 to 5 August 2013)
$2,000
FOS does not compensate Applicants for loss of wages. In addition, the
Applicants are not entitled to compensation for costs they would have incurred in
the normal course of events related to moving house. I do however accept that
the Applicants are entitled to compensation for the building and pest report and
one set of removalist fees they would not have otherwise incurred, in this case the
removalist fees paid on 17 July 2013 in the amount of $781.25.
Taking into account the above, I accept the Applicants are entitled to
compensation for the following expenses incurred as a result of the rescinded
contract of sale relating to the purchase of property 2:
D escription of Tax invoice or account statement Amount $
Building and Pest Report $545
Ute & driver hire & additional equipment (10 July & 9 August 2013)
30 day storage and care of potted plants and livestock
$480
$145
Storage (paid 5 July 2013) $446.50
Case No: 367068 Determination Page 8 of 13
Storage (paid 11 July 2013) $27.50
Storage (paid 12 July 2013) $100.20
Kennel (paid 9 July 2013) $242
Removals (paid 17 July 2013) $781.25
Rental Tax invoice dated 1 September 2013 (for the period 11 July
2013 to 5 August 2013)
$2,000
TOTAL $4,767.4 5
I am satisfied that the Applicants incurred the above mentioned costs as a result
of the FSP’s failure to provide unconditional finance approval by close of business
on 1 July 2013, which resulted in the rescission of the contract for the purchase of
property 2.
The Applicants are entitled to some compensation for non-financial loss
I am satisfied that the Applicants suffered some stress and inconvenience as a
result of the FSP’s f ailure to provide unconditional loan approval by 1 July 2013
which resulted in the rescission of the contract for the purchase of property 2. I
accept that the stress was compounded by the fact that the Applicants’ sale and
settlement of their own property (property 1) was less than two weeks away and
they had to seek temporary accommodation in addition to another residential
home.
I consider that the Applicants are jointly entitled to compensation in the amount of
$500.
2.2 Did the FSP breach the Applicants’ privacy when it contacted the
vendors’ agent and the vendors in relation to the contract of sale
for property 2?
The parties have conflicting positions in relation to the claim
On 2 July 2013 at about 9.00am, the Applicants were informed by the vendors ’
agent for property 2 that given the Applicants’ failure to comply with the
contractual requirements relating to finance approval, the vendors rescinded the
contract. In response, the Applicants instructed their solicitor to contact the
vendors’ solicitor for the purpose of seeking the reinstatement of the contract of
sale as it was, in their view, it was the FSP’s fault that unconditional loan approval
had not been provided by the 5.00pm deadline on 1 July 2013. However, the
vendors declined.
The Applicants say that they contacted FSP staff member, Mr D, on 3 July 2013,
who advised that he had spoken to the vendors’ solicitor on 3 July 2013 in order
to explain to them that the delay was not caused by issues relating to the
Applicants’ finances, but rather d ue to “ banking issues ”. In support of this, the
Applicants say that both Mr D and the vendors’ agent advised the Applicants to
offer a cash incentive to the vendors to rekindle the contract of sale in relation to
property 2 and both referred to an incentive amount of $5,000. By doing so, the
Case No: 367068 Determination Page 9 of 13
Applicants state that Mr D disclosed their financial position to the vendors’
representative and, accordingly, breached their privacy. The Applicants state that
at no stage was permission given to the FSP to speak to th e vendo rs or their
agent .
I n response, the FSP, states that once the Applicants’ loan application was
unconditionally approved, it contacted the vendors’ agent in order to provide it
with the FSP’s confirmation and that settlement could proceed. Mr D of t he FSP
says that at no stage did he discuss personal information relating to the
Applicants’ finances with the vendors’ agent. In addition, Mr D did not
communicate directly with the vendors, rather his communications were limited to
the Applicants or the vendors’ agent.
Another FSP staff member, Mr H, confirms that Mr D called the solicitor and the
vendors’ real etate agent on 2 July 2013, and advised that unconditional finance
approval had been obtained and that settlement could continue. I note that Mr H ’s
statement does not clarify whether Mr D contacted the Applicants’ solicitor or the
vendors’ solicitor. This contradicts Mr D’s statement that his contact was limited to
the Applicants and the vendors’ real estate agent.
The FSP should not have contacted the vendors and/or their agents
Based on the above, it is more likely than not that the FSP’s contact was not
limited to the Applicants and their solicitors, but also included the vendors’ real
estate agent and/or the vendors in addition to the vendors’ solicitor.
I accept that Mr D was attempting to help the Applicants in acting as he did,
however Mr D should not have contacted the vendors’ agent on 2 July 2013,
advising that the loan was unconditionally approved. By doing so, and without the
Applicants’ express permission, Mr D disclosed personal information regarding
the Applicants and breached the Applicants’ privacy.
Although the Applicants have not suffered any financial loss as a result of the
FSP’s conduct in contacting the vendors’ agents, I am s atisfied that the contact
did cause the Applicants additional stress in circumstamces where the Applicants
were obviously stressed and anxious as a result of the vendors’ decision to
rescind the contract of sale for the purchase of property 2.
In the circumstances of this dispute and mindful of awards I have made for
breaches of privacy in other disputes, I consider that each Applicant is entitled to
compensation in the amount of $100 resulting from the FSP’s conduct in
contacting the vendors’ and/or their agents.
Case No: 367068 Determination Page 10 of 13
3 Supporting information
3.1 How we assess disputes
FOS is not a court of law. We do not have the power to take or test evidence on
oath, or to require third parties to give evidence. If we find we need information
from a third party, and that information needs to be tested, we may not be able to
continue considering your dispute.
When we assess disputes, we consider available documents, the recollections of
the parties, and all relevant circumstances. We give more weight to
contemporaneous documentary information.
If there is no relevant documentation, we will decide what is most likely to have
occurred based on the information provided to us. If there are conflicting
recollections and these are evenly weighted, we may find that a claim cannot be
established.
3.2 Timeline of events from June 2013 to the date of unconditional
loan approval
The following timeline of events from 1 June 2013 to the date of unconditional
loan approval has been compiled from information received from both the
Applicants and the FSP. It provides that:
Date Action
1 June 2013 The Applicants enter into a contract of sale for the purchase
of property 2.
3 June 2013 Email from the FSP to the Applicants requesting further
information in order to “move on” the Applicants’ loan
application. The email requested two recent payslips for
each Applicant, 2012 Group Certificates, a copy of the
contract of sale for the purchase of property 2 and “Rem
Serve Details/statement.”
6 June 2013 The Applicants’ new loan application to purchase property 2
is lodged with the FSP’s credit assessment team. The FSP
receives the contract of sale for property 2 and this is
included with the loan application along with other
supporting documentation.
8 June 2013 The FSP ’s credit assessment department issues a n internal
notice to the FSP lender , Mr H, querying whether the “deal”
was ready.
13 June 2013 The Applicants execute the contract of sale to sell property
1.
13 June 2013 The FSP’s system note states that “Deal ready for
validation, funds to com plete calculator uploaded TOC14,
Case No: 367068 Determination Page 11 of 13
Property [1] is currently on the market verified in
realestate.com.au please proceed, Standard Underwriting
EC …”
A further system note on that same day (at about 6.43pm)
states that the FSP is “unable to validate deal … Ha ve sent
email to lender (ie. Mr H) advising [Applicants joint net
earnings] does not service, need to explain the bonus on
Mrs Applicant’s payslips if it is to include this as income….
.”
19 June 2013 The FSP’s system notes state Mr H spoke with Mrs
Appli cant in relation to queries it had regarding the bonus
figures appearing on her payslips.
19 June 2013 The FSP receives the executed Release of Security form
from the Applicants for property 1.
19 June 2013 The Applicants received a telephone call from FSP
requesting a letter from Mrs Applicant’s employer
confirming bonus amounts and that they had yet to receive
the contract of sale in relation to the sale of property 1.
21 June 2013 Letter from Mrs Applicant’s employer sent to the FSP
however Applicant s receive notification from the FSP that
the format of the letter is “unreadable” and request that it be
resubmitted.
21 June 2013 The FSP receives copy of contract of sale for property 1.
22 June 2013 The FSP requests a property valuations in relation t o
property 2.
The FSP speaks to Mrs Applicant again in relation to
confirmation of bonus amounts appearing on her payslips.
The Applicants sought the information from Mrs Applicants’
employer again and, according to the Applicants, it took
four days to o btain. The letter was then hand delivered to
the FSP by Mrs Applicant.
27 June 2013 The FSP’s system notes show it received Mrs Applicant’s
income details from her employer. Further system notes on
that day state that “health industry annualised YTD incom e
is acceptable for servicing.”
27 June 2013 The FSP’s system notes state that the application was sent
to its mortgage insurer for approval. Further system notes
from that same day refer to the application being placed on
the “LMI urgent list”.
28 June 2013 The FSP system notes refer to a follow up by the FSP
which shows the application is still on the “LMI urgent list.
Awaiting decision”.
1 July 2013 (at 11.47am) Housing loan for $608,000 unconditionally approved
1 July 2013 (at 2.06pm) The FSP emails the unconditional loan approval letter to the
relevant FSP lender, Mr H.
Case No: 367068 Determination Page 12 of 13
1 July 2013 (at 3.10pm) The unconditional loan approval letter is printed by Mr D of
the FSP.
1 July 2013 (at 5.11pm) Email from the FSP to the Applicants attaching the letter of
u nconditional loan approval.
3.3 The finance due date was extended from 22 June 2013 to 1 July
2013
The purchase contract for property 2 provided for a finance approval due date of
22 June 2013. However, this date was extended numerous times to allow the FSP
t o “finalise the finance”. The Applicants refer to their solicitor’s daily contact with
the FSP in relation to “extending financial deadlines” up to and including 1 July
2013, but have not provided any documentation (from their solicitor or otherwise)
to support the purported numerous extension requests from the FSP. The
contract of sale for property 2 dated 1 June 2013, provided a finance due date of
21 days from the date of the contract. Accordingly, the finance due date appears
to have been 22 June 2013. The information available shows that the original
finance due date was extended from 22 June 2013 to 1 July 2013.
The FSP states that, on 19 June 2013, Mr H followed up the Applicants in relation
to the provision of the contract of sale for property 1 in addition to seeking further
clarification in relation to Mrs Applicant’s income. Given that the finance approval
relating to the purchase of property 2 was due on 22 June 2013, an extension
was required. The FSP recommended that the Applicants seek an extension to
the original finance due date which was agreed to by the vendors of property 2
until 1 July 2013. I note that the FSP’s system notes do not refer to any requests
for an extension of the finance due date and only refers to a finance due date of 1
July 2013.
I am satisfied that the finance due date stated under the contract of sale for
property 2 was extended on only one occasion (ie. from the original finance due
date of 22 June 2013 to 1 July 2013) and not on multiple occasions as asserted
by the Applicants. Based on all the information, it appears that the extension was
agreed to by the parties, but it has not been established that this was based on
any error or breach of obligation by the FSP.
If Mr H had called the Applicants as early as 17 June 2013 to request income
verification documents from Mrs Applicant’s employer, the FSP would not have
been able to process the Applicants’ loan application to unconditional loan
approval by 22 June 2013 given the original document provided by Mrs Applicant
to the FSP (two days after the initial request was made) was illegible and required
another letter in a readable format.
Based on the information before me, I am satisfied that the original finance due
date of 22 June 2013 was never going to be achievable by the FSP even if the
income verification document was requested as early as 17 June 2013.
Case No: 367068 Determination Page 13 of 13
3.4 Determination remedy
The Determination is in favour of the Applicants.
If the Applicants accept the Determination within 30 days, then the FSP must pay
the Applicants $5,4 67.45 arising from the FSP’ s delay in providing unconditional
loan approval and breaching the Applicants’ privacy . This figure is made up of:
financial losses in the amount of $4,767.45 and
total non-financial loss in the amount of $700 as a result of the stress and
inconvenience.