Determination 366314
Claim denial for building damage attributed to differential earth movement
Summary
The FSP accepted damage to one bedroom from a leaking pipe but denied the remaining building damage, including stump replacement, as caused by differential earth movement. AFCA found in favour of the Applicants, required the FSP to cover the claim under the policy, and ordered interest on any cash settlement from denial.
Water usage data and the restumper's evidence outweighed the FSP engineer's report, so the loss was caused by water escaping from the leaking pipe, which the policy covers.
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
Amount
Determination
Case No: 366314 Determination Page 1 of 3
Case number : 366314 7 April 2015
1 Overview
1.1 Dispute
The Applicants lodged a claim under their home insurance policy for damage to
the building caused by a leaking water pipe.
The Financial Services Provider (FSP) accepted tha t the damage to bedroom 1
was due to the escape of water and as such, covered by the policy.
The FSP rejected the claim for the remaining damage including the replacement
of the stumps, on the basis that the damage was due to differential earth
movement and not from a leaking pipe.
The Applicants asserted that the water escaping from the leaking pipe has caused
the damage.
1.2 Issues and key findings
Was the damage caused by water escaping from the leaking pipe?
The damage was caused by the water escaping from the leaking pipe.
1.3 Determination
This Determination is in favour of the Applicant.
The FSP is required to cover the Applicants ’ claim, in accordance with the terms
and conditions of the policy.
The FSP is required to pay interest on any cash settlement, in accordance with
the Insurance Contracts Act 1984 (the Act), from the date of denial of the claim,
until the date of the cash settlement.
Case No: 366314 Determination Page 2 of 3
2 Reasons for Determination
This Determination has been the subject of a Recommendation, issued by the
Service on 21 January 2015.
It was the Case Manager’s Recommendation that the FSP was entitled to deny a
substantial amount of the Applicants’ claim as the loss and damage was not
caused by water escaping from a leaking pipe.
The Applicants have disputed the Recommendation and have provided further
submissions including copies of their water accounts and an additional report.
The FSP have not provided any further submissions or responded to the
Applicants’ additional material and I presume that the FSP seek to rely upon a ll of
the material and submissions they have previously provided.
I have carefully considered all of the material provided by both parties, before and
after the Recommendation, whilst making this Determination.
2.1 Was the damage caused by water escaping from the leaking
pipe?
The parties do not dispute that water has leaked from a pipe at the Applicants’
home.
Nor do the parties dispute that in circumstances where loss and damage occurs
as a result of water escaping from the leaking pipe, the loss and damage is
covered under the terms and conditions of the policy.
Indeed, the FSP accepted the Applicants’ claim insofar as the damage to
bedroom 1 was concerned.
Both the Applicants and the FSP have provided reports from specialist engineers.
The Case Manager, within the Recommendation, has provided a summary of
some of the aspects of those competing reports.
After having considered all of the material presented to him, the Case Manager
reached the conclusion that he preferred the report of the FSP’s engineer , to the
report of the Applicants’ engineer.
In this regard I consider it fair to say that the Case Manager did not regard the
Applicants’ engineer as wrong, but rather the Case Manager preferred the
conclusions of the FSP’s engineer.
In all decision making, it is a matter of assessing the evidence which is presented
and giving weight to the competing evidence on the basis of the strength of that
evidence and its relationship to the other evidence presented.
Within the Case Manager’s Recommendation, he makes it cl ear that he is not
persuaded by the evidence presented by the Applicants in relation to the water
usage at the property.
However, subsequent to the Recommendation, the Applicants have provided
copies of their water usage accounts, for what the water provider refers to as
quarter 3, being the period from early December to early March in the relevant
years.
Case No: 366314 Determination Page 3 of 3
I note from the information subsequently provided by the Applicants, that in
quarter 3 for 2010/2011, the water usage was 139kl. In quarter 3 for 2011/2012,
the water usage was 158kl and in quarter 3 for 2012/2013 (the relevant quarter),
the water usage was 283kl.
This means that the water usage increased by approximately 80% from
2011/2012 to 2012/2013 and by over 100% from quarter 3 , 2010/2011 to quarter
3, 2012/2013.
I am satisfied that this is a significant increase and in the absence of a satisfactory
alternative explanation for the significant increase, it represents a large amount of
water escaping from the leaking pipe.
In addition, there is no alternative explanation as to where the water would have
run, other than under the house and through the stumps.
The evidence regarding water usage should be considered in light of the further
report presented by a Master Re – Blocker, who had completed the restumping of
the Applicants’ home in August 2012.
The report confirms that the person who completed the restumping, attended at
the Applicants’ requests in February 2013 and noted the amount of water subbing
up through the remaining red gum stumps.
The restumper was in no doubt that the burst pipe and subsequent water leak had
caused significant damage and movement to the property.
In my view, the additional report is persuasive given the local experience held by
the restumper.
The local experience can be combined with the fact that the restumper had
completed the restumping of a number of the stumps, only six months earlier and
would have been intimately aware of the condition of the home at that time. This
restumper would have been in a position to compare the position of the home
against when he completed the restumping.
In this regard, I note that the FSP has not responded to the additional material
provided by the Applicants.
Having considered all of the evidence, I am persuaded that the cause of the loss
and damage throughout the home was the water escaping from the leaking pipe.
In those circumstances, the FSP is required to meet the Applicants’ claim under
the terms and conditions of the policy.