Determination 366314

Claim denial for building damage attributed to differential earth movement

FirmFinancial Firm (Unknown - Insurer)
Decided2015-04-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The FSP accepted damage to one bedroom from a leaking pipe but denied the remaining building damage, including stump replacement, as caused by differential earth movement. AFCA found in favour of the Applicants, required the FSP to cover the claim under the policy, and ordered interest on any cash settlement from denial.

Water usage data and the restumper's evidence outweighed the FSP engineer's report, so the loss was caused by water escaping from the leaking pipe, which the policy covers.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount Determination Case No: 366314 Determination Page 1 of 3 Case number : 366314 7 April 2015 1 Overview 1.1 Dispute The Applicants lodged a claim under their home insurance policy for damage to the building caused by a leaking water pipe. The Financial Services Provider (FSP) accepted tha t the damage to bedroom 1 was due to the escape of water and as such, covered by the policy. The FSP rejected the claim for the remaining damage including the replacement of the stumps, on the basis that the damage was due to differential earth movement and not from a leaking pipe. The Applicants asserted that the water escaping from the leaking pipe has caused the damage. 1.2 Issues and key findings Was the damage caused by water escaping from the leaking pipe? The damage was caused by the water escaping from the leaking pipe. 1.3 Determination This Determination is in favour of the Applicant. The FSP is required to cover the Applicants ’ claim, in accordance with the terms and conditions of the policy. The FSP is required to pay interest on any cash settlement, in accordance with the Insurance Contracts Act 1984 (the Act), from the date of denial of the claim, until the date of the cash settlement. Case No: 366314 Determination Page 2 of 3 2 Reasons for Determination This Determination has been the subject of a Recommendation, issued by the Service on 21 January 2015. It was the Case Manager’s Recommendation that the FSP was entitled to deny a substantial amount of the Applicants’ claim as the loss and damage was not caused by water escaping from a leaking pipe. The Applicants have disputed the Recommendation and have provided further submissions including copies of their water accounts and an additional report. The FSP have not provided any further submissions or responded to the Applicants’ additional material and I presume that the FSP seek to rely upon a ll of the material and submissions they have previously provided. I have carefully considered all of the material provided by both parties, before and after the Recommendation, whilst making this Determination. 2.1 Was the damage caused by water escaping from the leaking pipe? The parties do not dispute that water has leaked from a pipe at the Applicants’ home. Nor do the parties dispute that in circumstances where loss and damage occurs as a result of water escaping from the leaking pipe, the loss and damage is covered under the terms and conditions of the policy. Indeed, the FSP accepted the Applicants’ claim insofar as the damage to bedroom 1 was concerned. Both the Applicants and the FSP have provided reports from specialist engineers. The Case Manager, within the Recommendation, has provided a summary of some of the aspects of those competing reports. After having considered all of the material presented to him, the Case Manager reached the conclusion that he preferred the report of the FSP’s engineer , to the report of the Applicants’ engineer. In this regard I consider it fair to say that the Case Manager did not regard the Applicants’ engineer as wrong, but rather the Case Manager preferred the conclusions of the FSP’s engineer. In all decision making, it is a matter of assessing the evidence which is presented and giving weight to the competing evidence on the basis of the strength of that evidence and its relationship to the other evidence presented. Within the Case Manager’s Recommendation, he makes it cl ear that he is not persuaded by the evidence presented by the Applicants in relation to the water usage at the property. However, subsequent to the Recommendation, the Applicants have provided copies of their water usage accounts, for what the water provider refers to as quarter 3, being the period from early December to early March in the relevant years. Case No: 366314 Determination Page 3 of 3 I note from the information subsequently provided by the Applicants, that in quarter 3 for 2010/2011, the water usage was 139kl. In quarter 3 for 2011/2012, the water usage was 158kl and in quarter 3 for 2012/2013 (the relevant quarter), the water usage was 283kl. This means that the water usage increased by approximately 80% from 2011/2012 to 2012/2013 and by over 100% from quarter 3 , 2010/2011 to quarter 3, 2012/2013. I am satisfied that this is a significant increase and in the absence of a satisfactory alternative explanation for the significant increase, it represents a large amount of water escaping from the leaking pipe. In addition, there is no alternative explanation as to where the water would have run, other than under the house and through the stumps. The evidence regarding water usage should be considered in light of the further report presented by a Master Re – Blocker, who had completed the restumping of the Applicants’ home in August 2012. The report confirms that the person who completed the restumping, attended at the Applicants’ requests in February 2013 and noted the amount of water subbing up through the remaining red gum stumps. The restumper was in no doubt that the burst pipe and subsequent water leak had caused significant damage and movement to the property. In my view, the additional report is persuasive given the local experience held by the restumper. The local experience can be combined with the fact that the restumper had completed the restumping of a number of the stumps, only six months earlier and would have been intimately aware of the condition of the home at that time. This restumper would have been in a position to compare the position of the home against when he completed the restumping. In this regard, I note that the FSP has not responded to the additional material provided by the Applicants. Having considered all of the evidence, I am persuaded that the cause of the loss and damage throughout the home was the water escaping from the leaking pipe. In those circumstances, the FSP is required to meet the Applicants’ claim under the terms and conditions of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.