Determination 366212

Denial of claim

FirmFinancial Firm (Unknown - Insurer)
Decided2015-03-11
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The owners corporation claimed the cost of replacing four strata balconies after one partially collapsed. The FSP declined because the damage was gradual deterioration and construction defects, and AFCA agreed the policy exclusions applied.

The policy excludes gradual deterioration, wet rot, faulty design and workmanship, and the damage arose from those excluded causes.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim Determination Case No: 366212 Determination Page 1 of 5 Case number : 366212 11 March 2015 1 Overview 1.1 Dispute The Applicant is the Owner’s Corporation, which has a residential strata insurance policy with the Financial Services Provider (FSP). After the partial collapse of unit on e’s balcony, the Applicant lodged a claim on the policy for the cost of replacing the balcony of all four units. The FSP declined the Applicant’s claim because no single event caused the failure of the balconies. The FSP considered the balconies deteriorated over time due to the way they were constructed. 1.2 Issues and key findings Is the FSP entitled to deny the Applicant’s claim ? The FSP is entitled to deny the Applicant’s claim because:  the balconies gradually deteriorated due to water entering through gaps  the balcony of unit one had wet rot  the damage arose from the failure of a waterproofing membrane  the policy excludes gradual deterioration, wet rot and the failure of any item  the FSP is not liable for the damage under the terms of the polic y. 1.3 Determination This Determination is in favour of the FSP. The FSP is not required to pay the Applicant’s claim for the cost of replacing all four balconies in the strata plan. Case No: 366212 Determination Page 2 of 5 2 Reasons for Determination 2.1 Is the FSP entitled to deny the Applicant’s clai m? Applicant must show a claimed loss occurred The policy covers the Applicant for any accidental damage to the properties in the strata plan, subject to exclusions. An accepted principle of insurance law is the Applicant is required to show they suffered a loss covered under the policy. This is called a prima facie claim. Once established, the onus then shifts to the FSP to show the policy excludes the claimed loss or the FSP is entitled to deny the claim. The Applicant and the FSP have to show this based on what was probable. The parties do not dispute the balcony to unit one partially collapsed and there is evidence of damage to the other balconies. The FSP provided a building consultant’s report, which indicated a building construction defect caused th e damage. The Applicant disputes the consultant’s finding and obtained an engineer’s report. Both parties’ engineers considered the structure complied with the relevant building codes. Damage arose from the failure of a waterproofing membrane The information provided shows the cause of damage to the balconies is due to water entering over time because of:  the design of the curved fascia edge of the balconies  the lack of appropriate drainage  the flawed waterproofing membrane  gradual deterioration  wear and tear  the cracks and small gaps, which weakened the structure. The damage included wet rot and possible corrosion. The FSP’s engineer considered the damage did not occur from a single event. The policy excludes gradual deterioration, wet rot and the failure of any item The policy excludes cover for any damage, which arose from or was caused by:  gradual deterioration  wear or tear  wet or dry rot  the failure of or the defect in any item  structural defect  faulty design  faulty workmanship. The information shows the damage occurred over time due to the failure of the waterproofing membrane and the design of the balconies. This means the policy Case No: 366212 Determination Page 3 of 5 does not cover the damage claimed because it arose from the above excluded factors. 3 Supporting information 3.1 Key information  Product disclosure statement.  Certificate of insurance.  Applicant’s claim form.  Applicant’s engineer’s report, 27 March 2014.  FSP’s engineer’s report, 11 July 2014.  Applicant’s statements, various.  Photographs and descriptions of damage. 3.2 Reports of damage Record Key points FSP’s building consultant (M) Report 11 February 2014 Notes from inspection of balcony of unit one:  Grout has bubbled which indicates the water has been trapped in the joints and the grout has failed.  Large crack in one of the joints in the tiling towards the front edge of the balcony.  This allowed water ingress into the sub - floor framing.  Exposed framing had completely rotted away.  Possible failure of the waterproofing (or none applied).  Eaves lining have fallen off.  Method of construction was totally unacceptable and non - compliant.  Recommended residents should not use all balconies.  Evidence of water penetration to unit 2 - 4 balconies. FSP’s building consultant (M) Report 4 March 2014  Provided responses to Applicant’s statements.  Indicated without invasive testing, it was unable to determine the level of defects present. Applicant’s engineer (A ) Report 27 March 2014 Overall:  Observations indicated t he balconies to units 2 - 4 might also be deteriorated.  Balconies were structurally acceptable with standards.  Cause of deterioration is likely to be water ingress at the curved fascia edge causing wet rot.  Recommended all four balconies not be loaded or tra versed until further notice. Balcony of unit one:  Timber elements destroyed by significant rotting. Case No: 366212 Determination Page 4 of 5 Record Key points  Water entry from curved fascia edge.  Silicon sealing was present between tiled balcony and external brick façade, indicating previous water ingress and maintenance.  Ring stains from pot plants show balcony may have been heavily loaded or over - loaded, which caused deflection of timber joists.  Separation between tiles may have exacerbated water ingress.  Hairline cracks in tiles at stress concentration point s.  Vertical separation between sheets observed.  There was a waterproof membrane and mesh. Balcony of unit four:  Inspected the surface.  Water entry point present at curved fascia edge.  Hairline cracks present in tiles at stress concentration points.  Stainin g observed on the vertical surfaces below indicating possible corrosion.  The Applicant should demolish and rebuild the rotted balconies. Applicant’s builder ( DJ ) Quote 28 April 2014  $10,800 (incl GST) to repair each balcony. FSP’s engineer (DB) Report 11 July 2014 Overall:  There is flawed waterproofing membrane and drainage provisions given the extent of damage and wet rot.  The deteriorated condition of the waterproofing membrane occurred over years and is unrelated to a single or defined event.  The con dition of the grouted floor tile joints and escape of efflorescence from the balcony fascia supports this.  The construction of the structure did not influence the cause for the waterproofing membrane to deteriorate.  A combination of factors lead to the wat erproofing membrane failure, including:  the membrane initially applied was poor or defective  inadequate drainage  gradual deterioration, wear and tear of the membrane  temperature changes of the balcony surface  movement within the support joists Balcony of u nit one:  Long - term water/moisture exposure (wet and dry) rotted the timber joists supporting the balcony structure, which compromised completely the integrity of the timber support joists.  The structure is unsafe.  The balcony should be propped and not used. Case No: 366212 Determination Page 5 of 5 Record Key points  The FSP’s building consultant incorrectly determined the details of the balcony construction.  The Applicant’s engineer correctly reported the balconies are compliant with building standards.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.