Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
Amount - Service - Service Quality
Determination
Case No: 365637 Determination Page 1 of 24
Case number: 365637 25 February 2015
1 Overview
1.1 Dispute
In March 2012, the Applicants lodged a claim with the Financial Services Provider
(FSP) for water damage sustained to the property because of:
salt water escaping from the neighbour‟s pool
a leaking waste water system at the insured property.
The FSP has accepted partial liability for water damage sustained to the insured
building. However, it refuses to reimburse the Applicants:
to flush out the high salt content from the soil under the property
to reduce free ground water level to below underground brickwork
for remaining repairs to the property
for preventive structural improvements to avoid similar damage in the future.
The Applicants dispute the FSP‟s partial denial of the claim. They want their
property reinstated to its pre-loss condition.
1.2 Issues and key findings
Do the Applicants have a valid claim under the policy?
The Applicants have a valid claim because the insured building was damaged by
water leaking or discharging from a fixed pipe or fixed apparatus, namely:
the neighbour‟s pool
the sewage system at the Applicants‟ property .
Can the FSP partially deny the Applicants’ claim?
The FSP has not established the damage was from the gradual escape of water
or caused by rust and corrosion or by inherent defects. However, the FSP can
partially deny the Applicants‟ claim because the policy does not cover site
rectification or mitigation against future damage that might arise from this event.
What is the extent of the FSP’s liability?
The FSP is obliged to pay the cost of repair for any damage to the insured
building caused by water from the sewage system and the neighbour‟s salt water
pool. This includes any damage, rust and corrosion caused by salt water entering
the building and also includes damage to the structure of the building.
The FSP is also to pay the cost of repair for the damage caused by intrusive
investigations it authorised.
Case No: 365637 Determination Page 2 of 24
The FSP is not liable to the Applicants for:
decontaminating the soil and removal of salt from the soil
reducing free ground water levels below the brickwork of the insured building
the 50% balance of the cost of the replacement of the membrane and damp
course with a new one in the area of the insured building that has been
damaged by the insured event
structural improvements (other than those mandated by any statutory
authority) and any proposed preventive measures to arrest similar issues in
the future.
Is the FSP liable for the cost of alternative accommodation during repairs?
The FSP is to pay for alternative accommodation whilst repairs covered under the
policy are conducted.
Can the FSP reuse the damaged fittings?
The FSP should assess the condition of the fittings kept in storage. If damaged,
the FSP should pay for replacement of these items.
Are the Applicants entitled to compensation?
The Applicants are entitled to an award of compensation of $2,000 because the
FSP has taken too long to resolve the issues surrounding this claim and, in the
process, has left the Applicants stressed and physically inconvenienced.
1.3 Determination
This Determination is partially in favour of the Applicants.
In an effort to bring this dispute to finality, the Panel is directing the FSP to cash
settle the Applicants‟ claim. The extent of its liability and the mechanism for
settlement are set out in full in paragraph 2.6 of this Determination.
Should the Applicants accept this Determination, within 14 days of acceptance,
the FSP is to engage its engineer to prepare a Scope of Works for the insured
loss as set out in paragraph 2.6 of this Determination.
Within 7 days of receipt of the Scope of Works, the FSP is to engage a builder to
provide a costing for the Scope of Works for the insured loss as set out in
paragraph 2.6 of this Determination.
Within 14 days of the parties agreeing the Scope of Works and the costing of the
Scope of Works, the FSP is to cash settle the Applicants the agreed sum.
At the same time, the FSP is to pay the Applicants $2,000 for non-financial loss.
Case No: 365637 Determination Page 3 of 24
2 Reasons for Determination
2.1 Do the Applicants have a valid claim under the policy?
Damage to the property was caused by escape of salt/sewage water
The Applicants are first required to show, on the balance of probabilities, they
have suffered a loss caused by an insured risk. This is called a prima facie claim.
Once the Applicants have shown a prima facie claim exists under the policy, the
FSP is then required to show, on the balance of probabilities, the loss falls within
an exclusion clause of the policy or is otherwise not covered.
The Applicants claim their property sustained damage as a result of water leaking
or discharging from a sewage system and/or the neighbour‟s pool.
The policy covers loss or damage which results directly from the bursting, leaking,
discharging or overflowing of fixed apparatus and fixed pipes.
The FSP accepted the claim for damage caused by the leaking sewerage system.
The FSP commenced repairs but halted those repairs once the damage was
more extensive than it first envisaged.
The expert evidence eliminated the Applicants‟ pool as a source of the leak.
The FSP says it is not obl iged to cover damage caused by the neighbour‟s pool. It
says this water first contaminated the soil and then the Applicants‟ property was
damaged by the contaminated soil, not the water.
The Panel is satisfied that the preponderance of the expert evidence is that the
proximate cause of any saltwater damage to the Applicants‟ insured building was
the neighbour‟s leaking pool. This water subsequently travelled through the soil
and reached the Applicants‟ insured building.
Therefore, the Panel is satisfied that the Applicants have established their loss
was caused by an insured event and have a prima facie claim under the policy.
2.2 Can the FSP deny the Applicants’ claim?
The FSP is now required to show it is entitled to refuse payment of the claim
because the loss was caused by causes excluded under the policy. It can also
endeavour to show the policy does not extend cover to some of the items claimed
by the Applicants.
FSP has not established the damage was from the gradual escape of water
The policy excludes cover for loss or damage caused as a result of the gradual
escape of liquid over a period of time. However, the following conditions must be
met:
the Applicants, or a reasonable person in the circumstances, could be
expected to have been aware of such gradual escape of liquid
the loss was due to lack of maintenance, wear and tear, or neglect.
Case No: 365637 Determination Page 4 of 24
The FSP has not proven the Applicants were aware of and neglected any gradual
escape of water from any source.
The Applicants notified the FSP of the issues as soon as they realised the
damage to their property could be from their neighbour‟s leaking pool.
The FSP has also not shown the damage to the insured building was from the
Applicants‟ lack of maintenance, wear and tear or neglect. The expert evidence is
that the primary cause of the loss was the result of water leaking or discharging
from the neighbour‟s pool. The Applicants did not have any control over the
maintenance issues relating to the neighbour‟s pool.
There is also no evidence the issue with the sewage system was due to lack of
maintenance, wear and tear or neglect.
FSP has not established the damage was caused by rust and corrosion or
by inherent defects
The policy excludes cover for loss or damage caused by rust and corrosion.
However, in the Applicants‟ case, the damage was not caused by rust or
corrosion.
The event of water discharging or leaking from the fixed apparatus or the fixed
pipe was not caused by rust or corrosion.
There is no evidence to indicate the water leaking from the neighbour‟s pool
entered the property because of rust and corrosion at the Applicants‟ insured
building.
Geotechnical expert JK concluded the damp-proofing at the insured building may
have been inadequate. However, he was satisfied the problem was exacerbated
by the neighb our‟s leaking pool.
The FSP‟s appointed structural engineer (M) suggests the high salt content pool
water could have damaged the waterproofing membranes and dampcourses
installed at the insured building. This in turn may have allowed the salt water to
seep into and/or enter the insured building.
The rust and corrosion was actually the resultant effects of the high salt content
water entering the insured building after being discharged from the neighbour‟s
pool.
Based on the evidence presented by the parties, the FSP has not established the
damage to the Applicants‟ insured building was caused by rust and corrosion,
neglect of maintenance or any inherent defect in the insured property.
The FSP therefore cannot deny any part of the Applicants‟ claim on these
grounds.
2.3 What is the extent of the FSP’s liability?
FSP is liable for damage to the insured building caused by water from the
sewage system and neighbour’s pool
Case No: 365637 Determination Page 5 of 24
M suggested it was likely, if the pool and the sewer leak had not occurred, the
current insured building damage would not have occurred. He concluded the
proximate cause of the recent damage was the two leaks.
The policy covers water damage sustained to the insured building. The policy
definition of a building is:
““building” or “buildings” both mean the fully enclosed building or buildings at your risk
address, primarily used as a place of residence.”
Damage to the soil and water levels is not covered
The policy does not state the soil at the property would be considered as part of
the insured building. As such, the FSP does not have to pay for flushing the high
salt from the soil or any other treatment of the soil.
For the same reasons, the FSP does not have to pay for reducing the free ground
water levels below the underground brickworks of the ins ured building.
These issues will remain the Applicants‟ responsibility. The FSP must pay the cost
of repair that relates to the damage sustained to the insured building as a result of
the water discharging from the sewage system and from the neighbour‟s p ool.
Dampcourse not inadequate until the insured event
As detailed above, it was possible the high salt content in the water which entered
the property may have damaged the dampcourse and membrane of the insured
building.
M indicates the existing dampcourse appears to have been sufficient to prevent
water entry throughout the life of the insured building to date. He also indicates
the dampcourse may not have been adequate to manage the amount of
contaminated water that resulted from the insured event.
The FSP has raised concerns in relation to the increase in salinity even after the
sources of water leaks were attended to. M has indicated it was possible there
may be a very large reservoir of pool salt in the ground resulting from the water
discharged from the neighbour‟s pool or some other unknown source. The FSP
has been unable to identify any alternative source other than that in respect of
which the Applicants have claimed.
Fair that 50% of the cost to repair the dampcourse and membrane of the
insured building be paid by each party
Based on the evidence and considering all of the above, it is fair in the
circumstances for the FSP to pay for water/salt water damage sustained to the
insured building including the dampcourse and membrane. This will also include
repair or replacement of internal damage, salt laden brick works and the
waterproof membrane and dampcourse. However the proposed solution in
respect of the replacement of the dampcourse and membrane involves a degree
of betterment. The Panel considers it is fair in all the circumstances that the
Applicants should contribute 50% to the cost of that portion of the work – that is
50% of the cost of a new dampcourse and membrane in the area of the insured
building that has been damaged by the insured event. The Panel considers that
the presence of salt in the building, as a direct result of the insured event, is likely
Case No: 365637 Determination Page 6 of 24
to continue to cause rising damp and thus brings at least some of the cost of that
work within the scope of the Applicants‟ claim.
FSP is to repair damage caused by its intrusive investigations
The Applicants say the FSP failed to repair the damage caused to various
sections of the insured building from intrusive investigations organised by the
experts under its authority.
The FSP does not dispute this.
The Applicants are also unhappy with the repair method chosen by the FSP in
relation to the slabs, namely, the use of dowel joining instead of continuous slabs.
They contend membranes beneath the slabs have been destroyed leaving the
slabs more vulnerable to salt attacks.
The FSP‟s engineer should assess this issue and propose a suitable repair
method; upon which the FSP should base its offer of cash settlement for that
component of the claim.
FSP does not have to pay for retaining wall/barrier
The Applicants have suggested the FSP should pay for a retaining wall, and/or a
barrier between the neighbour and their insured properties, to prevent similar
damage in the future.
These are structural improvements to the property for the purpose of mitigating
future damage and must remain the Applicants‟ r esponsibility.
However, as far as any insured loss is concerned – as delineated in this
determination- if structural improvements to the insured building are necessary to
meet the requirements of any statutory authority, the FSP is required to pay the
cost of such improvements in accordance with the cover provided under
Additional Benefit 20 of the policy.
2.4 Should the FSP pay for alternative accommodation during
repairs?
The policy covers alternative accommodation to a maximum period of 12 months.
The FSP should therefore pay for alternative accommodation for the estimated
period required to repair the property, in accordance with the terms and conditions
of the policy.
2.5 Can the FSP reuse damaged fittings?
The Applicants suggest the FSP has or intends to re use some fittings. They
believe they were damaged whilst in storage during the subject period.
The FSP should assess the condition of these fittings. If they are damaged, the
FSP should pay the cost to replace them.
Case No: 365637 Determination Page 7 of 24
2.6 How is the claim to be settled?
Cash settlement is fair in all the circumstances
The policy sets out how the FSP will settle a buildings claim. At its option it can
repair or pay the reasonable costs of repairs. The FSP has attempted to cash
settle this claim. For the reasons stated the Panel co nsiders the cash settlement
offered is inadequate.
But because the work that needs to be done includes work that it is at the cost of
the Applicants (for example, the 50% contribution to the cost of a new
dampcourse and membrane in that area of the insured building damaged by the
insured event), and because of the length of time the parties have been in
dispute, the Panel considers that it is fair in all the circumstances to bring this
dispute to finality and a cash settlement is the fairest way to achieve this outcome.
The Panel therefore directs the FSP to cash settle the Applicants‟ claim in respect
of the costs for:
all damage caused to the insured building as a result of the water from the
sewage water system and the neighbor‟s pool including internal damage and
salt laden brickworks
damage to the insured building caused by its various intrusive investigations
50% of the costs to replace, as new, the insured building's membrane and
damp course in the area of the building that has been damaged by the insured
event
as far as any insured loss is concerned, if structural improvements are
necessary to meet the requirements of any statutory authority, the FSP is
required to pay the cost of such improvements in accordance with the cover
provided under Additional Benefit 20 of the policy
the estimated cost of alternative accommodation, as fairly established by the
engineer‟s Scope of Works, which will be undertaken pursuant to this
Determination.
The FSP must also assess the condition of the fittings and, if they are not suitable
for reuse, the FSP is to pay for the cost of their replacement.
The FSP is not obliged to pay all of the Applicants’ claim
The FSP is not obliged to pay for:
the costs associated with flushing the soil
reducing free groundwater levels below the underground brick work of the
insured building
save for its 50% contribution to the new damp course and membrane in the
area that has been damaged by the insured event, any structural
improvements or work to prevent similar damage in future .
S cope of W orks to be prepared
At the FSP‟s cost, the FSP‟s engineers are to prepare and cost a Scope of Works
on which the cash settlement will be based. The Scope of Works is to address all
of the damage to the insured building, as at the date of this determination, arising
Case No: 365637 Determination Page 8 of 24
from this event and to which the policy responds. If during the process of repair,
additional damage is discovered not considered in the Scope of Works, the
Applicants can refer it back to the FSP and the FSP can cash settle the repair of
any additional unknown damage to the insured building caused by the salt
brought into the soil from the escaping pool water. The Panel is concerned to
bring finality to this dispute. Thus it considers it fair that the FSP will not be liable
for the cost of any additional unknown damage unless the FSP is advised of that
damage within nine months of the date of payment of the cash settlement by the
FSP, pursuant to this Determination.
The Scope of Works is to be based on the repair solution discussed in the
engineer‟s report dated 15 July 2014, under the heading “The option to stop the
saltwater wicking into the building”.
The Panel recognises that the installation of a new dampcourse and membrane in
the area of the building damaged by the insured event, as proposed by the FSP‟s
engineer, involves some degree of mitigation against future loss and some degree
of betterment. However, the presence of salt in the building, as a direct result of
the insured event, is likely to continue to cause rising damp and thus brings at
least some of the cost of that work within the scope of the Applicants‟ claim. The
Panel has determined that it is fair in all the circumstances that the Applicants
should contribute fifty percent of the cost of materials and labour involved in the
installation of the new dampcourse and membrane in the area of the building
damaged by the insured event. The shared costs determined in respect of the
new dampcourse and membrane should not include the cost of removal of the salt
damaged walls, which work would have been required in any case and which
work is 100% to the cost of the FSP.
In order to determine the amount of the cash settlement, the FSP is, at its o wn
cost, also to engage an appropriately qualified builder to provide a costing for the
Scope of Works, such costing to be prepared on an arms‟ length basis and
without taking into account any insurer discounts or rebates.
The FSP‟s engineers or its builder are to determine the reasonable length of time
for the insured work to be completed in a normal commercial environment and the
FSP is to pay the cost of alternative accommodation for that period in accordance
with the terms of the policy. This assessed s um is to be included in the cash
settlement.
The Panel considers that it is not appropriate to require the FSP to pay interest on
the cash settlement amount, given that this amount will be determined based on
costings prepared using current market rates.
Under the Financial Ombudsman Service Terms of Reference, the maximum
amount that can be awarded as a result of this dispute is $280,000. Despite the
sum insured, t he FSP‟s liability to pay the Applicants as a result of this
Determination is limited to that amount.
It remains necessary for the amount of the cash settlement to be agreed, based
on the Scope of W orks to be prepared by the FSP‟s engineers and builder. The
Panel encourages the parties to this dispute to resolve any issues that might arise
during that process. However, the parties can return to the Service if they are
Case No: 365637 Determination Page 9 of 24
unable to resolve any issues arising from the Scope of Works and/or the costing
of that work.
2.7 Are the Applicants entitled for compensation?
Compensation is awarded in certain circumstances
The Terms of Reference allows the Service to direct that the FSP compensate an
Applicant for non-financial loss where there is an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with the
Applic ant‟s expectation of enjoyment or peace of mind.
The maximum amount of compensation for non-financial loss is $3,000.
The material shows the dispute has been ongoing for many years. Further there
has been many attendances by experts and intrusive investigative work done to
the insured building. The Applicants say their health has deteriorated since the
commencement of this claim and that their living conditions have been intolerable.
The photographs provided support the latter contention.
$2,000 compensation is fair in all circumstances
The Panel recognises that this has been a complex claim. H owever the FSP‟s
long running investigations of the various aspects of this claim appear to have
taken little account of the physical inconvenience and stress being experienced by
the Applicants. The FSP ultimately took some steps towards rectifying this
s ituation but should have been more aware of the Applicants‟ circumstances and
could have acted more quickly to ease those circumstances.
The Panel considers it is fair in all the circumstances that the FSP pay $2,000
compensation to the Applicants as it is satisfied that there has been an unusual
degree of physical inconvenience and time taken to resolve the situation together
with interference with the Applicants‟ expectation of enjoyment and peace of
mind.
Case No: 365637 Determination Page 10 of 24
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference.
This decision has been made by a Panel. The Panel consists of an Ombudsman
and two representatives with consumer and insurance experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised a number of issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
3.2 Product Disclosure Statement
“ Page 4
Our agreement with you
We will insure you for:
• loss or damage caused by one or more of the insured events, and
• the other benefits,
as set out in this policy occurring during the period of insurance
Page 5
Words with special meanings
“ building ” or “buildings ” both mean the fully enclosed building or buildings at your risk address, primarily
used as a place of residence.
Page 8
If you have buildings cover
What are buildings
If you have selected buildings cover, the term “buildings” also includes:
…
4 Building materials located at the risk address whic h are to be fitted to the buildings up to a
total amount of $1,000, but not sand, soil or gravel ofor any gas or electrical appliance.
Page 9
Type s of loss or damage your buildings are covered for
We will cover your buildings against loss or damage caus ed by one or more of the insured
events occurring during the period of insurance. We will also cover you for the other
Case No: 365637 Determination Page 11 of 24
benefits listed below. Details of the terms, conditions and exclusions which specifically
relate to each insured event and other benefits are provided on the pages indicat ed.
Insured events
11 Water or other liquid damage
Page 10
How we will settle your buildings claim
1. At our option we will:
a. repair or rebuild the damage part of your building to the same condition as when it
was new; or
b. pay you the reasonable cost of repairing or rebuilding any damage part of your
building to the same condition as when it was new; or
c. pay you up to the amount of the sum insured
...
Insured Events we will pay
Page 22
11. Water or other liquid damage
(Applicable whether you have buildings and/or
contents cover)
We will pay for loss or damage which results
directly from the bursting, leaking, discharging or
overflowing of:
• fixed apparatus,
…
• fixed tanks,
• fixed pipes,
…
If you have buildings cover and we have agreed to
pay a claim for water or other liquid damage, we
will also pay the reasonable cost of locating the
source of the damage.
We will not pay:
a. for loss or damage caused as a result of the
gradual escape of liquid over a period of time:
• where you or a reasonable person in the
circumstances could be expected to have
been aware of such gradual escape of liquid,
• due to lack of maintenance, wear and tear,
or neglect, or
• from a shower base, shower recess, shower
alcove or the walls surrounding the shower;
b. for the cost of repair or replacement of the
defective part or parts of the fixed apparatus,
dishwashers, washing machines, fixed tanks,
fixed pipes, waterbeds, aquariums or
installations whic h caused the loss or damage;
c. for the cost of repair or replacement of any
broken main or pipe; or
d. for loss or damage caused by rust, corrosion,
algae, mould or mildew.
Case No: 365637 Determination Page 12 of 24
Page 23
Other benefits we will provide
“ 1. Additional cost of temporary accommodation
(Applicable only when you have contents cover)
“additional costs” mean those rental and ot her
related costs which you have to incur at the
location of your temporary accommodation which
are in addition to the costs you would have had to
incur if you continued to live at your risk address.
If you normally live in the buildings, the amount
we will pay will be based on the buildings‟ rent able
value.
We will reimburse the additional costs you have to
pay for temporary accommodation where:
• the buildings you live in are damaged by an
insured event to such an extent that you cannot
live in them, and
• you temporarily take accommodation at another
address.
We will pay for temporary accommodation for:
• the period which we agree is reasonably
• necessary, or
• 12 mont hs,
whichever period of time is the lesser.
20 Removal of debris, profe ssional fees and extra costs
…
When the buildings have been destroyed or damaged by an insured event and we
have agreed to pay your claim, we will also pay the reasonable and necessary costs
of:
…
c. meeting the requirements of any statutory authority.
Page 43
Parts A and B
When we will not pay a claim under your policy
1. This policy does not cover loss, liability, injury or damage:
f. Wear and tear
arising out of depreciation, gradual deterioration, wear and tear;
g. Inherent Defects
caused directly or indirectly through inherent defects, faulty design, structural
defects or poor workmanship.
...”
3.3 Chronology and experts ’ findings
Date /Expert Event Findings
2002
5 May 2008
Applicant bought house .
i nsurance commenced
i nsurance schedule shows the policy was renewed 5 May
2011
b uildings insured $367,512 and contents sum insured
Case No: 365637 Determination Page 13 of 24
$81,033
b uilding sum insured increased at renewal 5 May 2012 to
$393,237 and contents cover increased to $85,084
2008/9 commenced bathroom renovation - large hole found in slab
concrete completely perished
s altwater pool installed by professionals
door frames commenced to rust
2012 neighbor said he was experiencing problems following the
leak from his 25 - year - old of fiberglass pool
skimmer box under ground level saltwater had leached into
the ground over a considerable period of time
damage to his house included brickwork on concre te
pathway eastern side of his house/the western side of
Applicant‟s house
Claim form n eighbor has an in ground salty water pool which has been
leaking for a while now and the water is getting into our
property
d ate of incident 20 March 2012
damage des cribed as lower - level bathroom floor: walls steel
frames rusting; doorframes rusting
FSP letter
27 March 2012
a sked Applicant to get letter from neighbor accepting liability
for damage
Assessor report
4 April 2012
G is adjuster
Applicant told him about 18 months ago updated downstairs
bathroom and laundry
both rooms are partially below ground level - drainage had
been installed outside the downstairs rooms to keep out any
seepage
o nce work completed Applicant noticed rust and cor rosion
forming on metal jams fitted to laundry and bathroom doors
e ngaged plumber who found n o leaks .
Applicant became aware of neighbor‟s problem with
damaged brickwork and discovered same damage to the
brick wall in his garage
neighbor‟s saltwater pool leaking
neighbor made a claim against his insurance (N) and told not
to make any admissions
adjuster noted possible corrosion, brickwork garage, metal
door jam in bathroom, rust stains in laundry and gym room
building consultant to be engaged to confirm ca use of
damage and provide advice on how to remedy damage
took photographs which show the proximity of the pool and
rust stains on door jams and brickwork
Assessor report
29 April 2012
A adjuster
engaged B of E to advise
B needed access to the neighbor‟s pool and samples taken
of the salt water from the pool
noted irrespective of source of water adequate drainage and
waterproofing should have been installed behind the lower -
level wall of the premises when renovations done 18 months
prior
as rust noted 18 m onths ago issue pre - existed the
completion of the renovations
Case No: 365637 Determination Page 14 of 24
Report by building
consultant E
23 May 2012
l ooked at pool next door but couldn‟t advise as to whether it
was the cause of damage
i nspected ground floor laundry. Found no evidence of water
dama ge to tiles but minor rust staining on tiles. No damage
in ground level bathroom. Gym room minor evidence of rust
on tiles. Garage a single course of brickwork severely
deteriorated noted. Same deterioration to next - door neighbor
brickwork
a highly salt la den and corrosive moisture transfer is
occurring beneath the dwelling of the insured‟s premise
predominantly to the western elevation
w ater transfer is occurring beneath the external concrete
path level which was noted to be approximately 600mm
above the i nternal floor level
w ithout extensive testing including removing sections of the
external path, geotechnical testing of the foundation material
directly adjacent to the dwelling, the exact source of the
wat er ingress cannot be determined
g enerally however it would appear the rusting within the
metal jambs to the laundry and bathroom at ground floor
level is occurring as a result of highly corrosive and salt
laden moisture being drawn from below the floor slab via
capillary action into the brickwork to wh ich the door jambs
are attached
a remedial works summary was presented 28 September
2012 for work done to garage, bathroom, gym, laundry
t ender from A 28 September 2012 to do work. Take 5 weeks.
3 items to cost $17,248 - $22,176 and $8,470.
A and N quote 12 October 2012 cost $30, 690
A and N recommended by E on 16 October 2012 as most
competitive
p hotographs attached to tender show damaged floor
v ariation of $700 on 16 November 2012
f ourth variation in the amount of $4,128.30 for professional
safe removalist and rendering of walls in laundry and
bathroom
FSP file note
25 July 201 2
adjuster asked to proceed with the testing of the drainage
and sewer system to the insured premises
took moisture readings in garage, laundry, bathroom shower
c oncluded: The ref lux valve was not functioning correctly and
in turn caused the upstream pipe to hold water.
t his build - up was seeping out at the point of dislodgement
between the cast iron reflux and the PVC sewer pipe and
then disbursed out under the slab
AN believed the steel jambs were rusting as a result of water
tracking under the slab from the reflux valve
FSP email
21 September 2012
FSP emailed adjuster after receiving the report from AN that
it will accept the resulting water damage to the property only
Email loss adjuster a rranged E to organize site meeting w ith Applicant to
prepare final S cope of W orks for reinstatement of the
resultant damage and rectification of cause of damage
any repairs involving remedy will be at Applicant‟s own
expense
Email fro m loss Applicant requested repairs be put on hold because of
Case No: 365637 Determination Page 15 of 24
adjuster to FSP
17 December 2012
Christmas
repairs rescheduled late January 2013
AN
8 January 2013
AN submitted variation to rectify water damage $2,105.40
Loss assessor‟s
report
1 February 2013
w ork resumed 22 January 2013
w hen some of the wall and floor tiles were removed, damage
to timber panels were found to be in an extremely
deteriorated state enough so they were crumbling at the
edges when touched . As such, resultant damage repairs
cannot proceed as there is still water/moisture evident within
walls and beneath the flooring
n oted that timber panels will now require replacement and
the builder will submit a variation along with supporting
photog raphs for review and validation
a s there was evidence that the cause of damage had not yet
been resolved, agreed for the builder to appoint a plumber to
conduct further tests t o find any other possible leaks
p lumber engaged - no leaking pipes
o nce all the wall and floor tiles were stripped away, the
builder did a moisture test to the outside wall which read 80
to 90 per cent. It is saturated and confirms that there is still
water ingress continuing to cause damage at the risk
premises
d iscussions were held with [E]. It was decided that water/soil
tests should now be carried out underneath the home to try
and find the cause of damage. Samples from under the
bathroom and la undry will be taken for testing
builder instructed to test insured‟s pool
19/20 January 2013 Applicant said water came from
neighbor‟s pool into driveway
furniture removed and stored off - site
Soil analyst G‟s
reports dated
19 February 2013 &
27 February 2013
19 February 2013 - Soil sample taken below the concrete
slab of laundry and bathroom re vealed very elevated
heterotrophic plate counts. The results suggest that the
water ingress beneath the concre te slab is from a sewage
source
26 February 2013 – G understood the pipe for sewerage was
predominantly used for the disposal of laundry water
Soil sample taken below the concrete slab of laundry did not
identify any indicators of the presence of post laundry water.
Report Assessor C
14 March 2013
l ab results inconclusive
s uggested geotechnical engineer be engaged
19 April 2013 AN submitted account for $21,743.25
Report from
Geotechnical expert
JK
22 April 2013
i nspected and photographed the house 8 April 2013
house built 30 to 40 years ago by owner builder
insured lived in property for several years
insured refurbished the ba throom and laundry facilities – only
internal refurbishment
noted lower level of house has been cut into hillside. A two
car garage has been incorporated into the lower ground floor
at south west. Laundry, bathroom, gym located at the lower
level North Wes t
eastern portion of the lower ground level comprises a self -
contained flat
Case No: 365637 Determination Page 16 of 24
in ground pool in back yard
c onventional residence at first floor level
i n ground pool located along the northern end of the west
boundary
(see map) and described the site description and the
damage
a hole excavated by [G] within laundry revealed that the
concrete slab had been provided with a damp - proof
membrane and overlay a clay soil down to at least .5m
b rick wall from the western extern al wall revealed damp -
proof course just above the internal garage floor level
t he external surface increased in height to a maximum of
approximately 2 m above the internal floor level of the gym
and the rockery against the southern external wall of the fla t
was higher than the internal floor level
a ny habitable room below the ground should have significant
damp proofing – full “tanking” not warranted
i n the absence of leaking plumbing and given that the ground
water level was observed to be at least .5m bel ow slab level,
the source of damp would be due to moisture being drawn
up by capillary action into the brickwork
h ad adequate damp - proofing been provided particularly
given that the lower ground floor is essentially an in ground
structure, then moisture wo uld not have been drawn up into
the brick work by capillary action
membrane and damp - proof course were inadequate or were
inadequately installed
t he level of groundwater as observed in the borehole is
shallower than would be expected suggesting that possi bly a
source of water such as a leaking pool or external plumbing
is occurring. We note that the shallow groundwater level is
exacerbating the problem but not in our opinion the cause of
the problem.
l eaks repaired by plumber
n eed to investigate to identi fy the source including drilling of
bore holes in the north - west portion of the house towards the
pool in the rear yard and the pool in the neighbor‟s property
– cost $4,000
r e adequacy of damp proofing, destructive testing of floor
etc. required (need sco pe of works from suitably qualified
building consultant)
Emails
April 201 3
the structural engineer P of M has spoken to a chemist
„chemist concludes it is likely it is salt pool water and the pool
is still leaking
JK report
30 April 2013
“Subsurface investigation carried out 7 May 2013 including the
drilling of three boreholes and the borehole within the laundry
was deepened
soil samples were taken and tested
6.1 Geotechnical Evaluation
The damp problems have been noted and reported in areas
which are lower than the external ground levels. Also, the level of
groundwater, as observed in the borehole at JK4, is shallower
than would be expected. In view of the above and in the absence
of leaking plumbing, we agree that damp in the building is due to
Case No: 365637 Determination Page 17 of 24
moist ure being drawn up by capillary action into the brickwork.
The chemical testing has suggested that the groundwater
contains potable water possibly from a source such as a leaking
pool or external plumbing. We understand both upslope pools
(i.e. on the subj ect site and on the neighbouring property to the
west) are saltwater pools, but in any event, the salinity of the soil
from JK3 indicates that the subsoils themselves are generally
saline as is typical for Western Sydney. Therefore, in the
absence of leaki ng plumbing, the upslope pools remain the only
alternative sources.
We cannot be definitive on which of the two pools is leaking,
except that the neighbouring pool has been reported to have
been associated with previous leaking.
We would expect that any ha bitable room would be provided with
adequate damp - proofing.
Whilst we acknowledge that full „tanking‟ may not be warranted in
such circumstances, treatment to the extent that damp is
excluded should have been provided, in accordance with
Clauses F2.2.2 and F2.2.3 of the BCA. Had adequate damp -
proofing been provided, particularly given that the lower ground
floor is essentially an inground structure, then moisture would not
have been drawn up into the brickwork by capillary action.
We thus believe that the p roblem is the result of inadequate
damp - proofing and has been exacerbated by the shallow
groundwater, possibly the result of the leaking neighbouring
pool.”
Retro fitting damp proofing is difficult to achieve so consider
install a cut off drain along the n orthern and western elevations
of the laundry bathroom gym
However the clay subsoils will continue to draw up moisture from
larger depth and as the area is naturally saline corrosion may
continue but at a reduced rate
Whatever option adopted should still c onfirm the source of the
water and eliminate it .”
C report
24 May 2013
A and N have charged $44,121.95 to date
C report
4 June 2013
damp proofing issue not covered
investigation into the pool leak is a cost for the insured or the
neighbouring property owner to remedy as this is another
cause of the water ingress problem not covered by the policy
damage repairs held in abeyance until the leaking pool and
damp proofin g addressed
suggested cash settlement as expensive to rectify causes
asked A and N to provide a breakdown of repair costs
Email C to FSP
11 July 2013
Applicant has report from JK.
Engineer met with Applicant yesterday .
Email from Applicant
to C
24 July 2013
contests the offer for resultant damages to the property
c ontests work done by AN
c ontends engineer said there was presence of salt beneath
the slab
t he bore down to the bedrock in the laundry has significantly
affected the building‟s ability to stem the capillary action as the
Case No: 365637 Determination Page 18 of 24
membrane has been pierced and breached. Ditto Gym/ family
room
s ays resultant damage is significant and that water is trapped
b eneath the slab and as the water can‟t escape
offer $19,078.76 rejected as deficient
s labs will need to be removed to assist in drying beneath
p roposes all slabs are removed, contaminated soils removed
here and on the western and northern external side of premise
repairs and inside the garage
Email FSP to
investigator
8 August 2013
appoint a structural engineer to inspect and confirm the exact
cause of the damage, provide scope of work, comment on
damaged concrete slab (appoint concrete expert if neces sary)
S L water testing
21 August 2013
water from borehole in l aundry obtained by owner
f ree chlorine levels at upper limit of what is ideal in a
pool
Report from Engineer
P of M
5 September 2013
i nvestigated, described site and photographed it
p hotographs show proximity of neighbour ‟ s, corrosion to a
rear door frame, rising damp damage to the walls, the hole in
the bathroom slab, the damage to the steps externally, the
investigation hole in the laundry
n oted evidence of rising damp at the lower f loor level mainly
in the north - west quadrant of the house attenuating to the
south and noted:
insured bought house 2002
building report at that time showed isolated rising damp
issues
4/5 years ago renovated bathroom noted a hole in the
bathroom floor slab at the north - west corner which was
repaired no corrosion is seen
five years ago saw rusting on metal door frames
rust came through within six months
four years ago nails started ru sting in garage
salt deposit on wall
brickwork in garage perishing
2012 neighbour told him issues with pool. Neighbour ‟ s
external walls also had salt damage
made the claim
p roblem continue to worsen
s ewer reflux fixed
h ouse is problematic as built parti ally underground
w alls and floors should be water proofed and internal walls
damp proofed
h ard to do in this house as masonry walls with infill slabs is
prone to water ingress
t he presence, or otherwise, of damp proof coursing to the
external and internal walls and waterproofing to the external
walls is not known at this stage but it is essentially moot in the
context of the history - where for the bulk of the house‟s life we
know of no significant issues arising. – pro blems first noticed 5
years ago
s ewer leak repaired and yet still excessive water in the soil
no known leak from insured‟s pool so likely the water comes
from the neighbour‟s pool
Case No: 365637 Determination Page 19 of 24
d iscussed various reports from JK and said that given that it
is essentially known that there was a significant le ak from the
neighbour‟s pool, and no known leak from the insured‟s pool,
then it is very likely that water came from the neighbour‟s
pool.
s o, synthesising the verbal, physical and reported evidence,
it appears likely that the house‟s waterproofing was
ade quate or close to adequate to resist natural water ingress
over most of the house‟s life. Then, around five years ago (or
somewhat earlier), the pool to the north - west and the sewer
to the west started leaking.
t he building‟s waterproofing was incapable of adequately
resisting the unusual amount of water that now impinged
upon the building. Further it seems from the recent testing
that this water is very salty. So, not only is water present
where it may not once have been, but it is now highly
corrosive to the door frame, concrete and any other ferrous
metal products in the house.
s o, based on the available evidence, we believe it likely that
if the pool and the sewer leak had not occurred then the
current building damage would not have occurred. Therefore
we conclude that the proximate cause of the recent damage
is the two leaks.
t he nature and extent of damage underground is not known
so rec ommended more investigation via excavation
t here is some chance, that it can never be proved or
disproved at this late date, that the leaking pool uphill of the
sewer caused that leaking sewer by causing the clay soil in
the area to expand and damage the pipe
i n regards to the insured‟s concerns tha t there is the
potential for hidden damage or future damage to the house
footings; we believe that this potential does exist. Concrete
that is capable of resisting very saline environment must be
of the highest quality. House footings are essentially never
explicitly built to this quality (unless the potential for salt
attack is know n at the time of construction)
t he salt may have also damaged the brickwork or the
underground damp pro of coursing and/or the concrete
c oncerned pool may still be leaking. Need to do tests. This
won‟t be quick
i n our opinion it is likely that the rate of natural salt removal
due to ground water flushing will be low given the relatively
impermeable nature of the soil. We suspect that the salt will
remain for decades at elevated le vels in the soil and this may
present an ongoing problem to the building
l ong - term solution; ensure all leaks are stopped and
excavate the soil down to bedrock level (may require
underpinning) ensure salty water is drained, reconstruct the
walls, bring in new clean fill, reconstruct floor slabs , leave the
external soil level
c onclusion both the leaking sewer and leaking saltwater pool
caused large amounts of salty water to contact the building
over the last few years, building‟s waterproofing was
adequate: but not adequate to resist the abnormal imposition
of the leaking pool a nd leaking sewer; the nature and extent
of damage underground is not known and too early to
Case No: 365637 Determination Page 20 of 24
formulate a scope of works
d estructive investigation recommended
l ikely subsoil under and around the house would have to be
removed
s oil around the perimeter needs to be lowered
C report
11 September 2013
d amage is caused by sewer leak and the leak from the pool
s ewer leak rectified
r elevance of damp proofing discussed and cost to
investigate it
Emails
28 October 2013 &
6 November 2013
engineering adjuster from C advised FSP AB have
completed the excavation of four separate pits to assess
subsurface damage
P of M structural engineer to ascertain extent of repairs
required
awaiting results of soil and water sampling to give an
indication of level of salts pre sent and scope of works
required
M report
20 November 13
t est pits in garage, bathroom etc.
s oil was uncontaminated but ground water was
contaminated with salts
salt still in the ground water – must keep this away from a
building
testing also showed the presence of fluoride in the water
which is an indicator of tap water
this suggests that pool water is still in the soil along with the
dissolved salts
recommended pumping of the pits and get benchmark soil
water te sting away from the leak too
AT soil t est summary says soil is not contaminated
See quotes from A and N 28 June 2013 and AB to the
Applicant 24 October 2013
C report
3 December 2013
new adjuster is an engineer
m et on - site 11 October 2013 with the Applicant, the engineer
P of M, and P from AB
d iscussed the water testing and summarised that the water
would be classed as effluent and significant concentration
salts were present in the water the water should be kept
away from any structure
waterproofing was typical for homes constructed fully a bove
ground
insured intends to reduce the external ground level to below
the lower floor level
agrees current damage to brickwork and concrete is a result
of the increased salt within the sub groundwater
concluded minimal probability of undiscovered damag e
underneath the building
pool water is still in the soil along with the dissolved salts
recommended to remove the existing water beneath the soil
the water from the neighbour ‟ s pool should be fixed as soon
as possible
salt may be removed from groundwater with the continual
flushing of rain – there is potential for flushing of the soil
recommended pumping and another round of testing in a
month
Case No: 365637 Determination Page 21 of 24
if salt attack is diminished then ground works can take place
Email FSP to C
10 December 2013
proceed with remed ial works to confirm water causes no
longer occurring
accept the cost of these works
repairs to any damage caused by testing and resulting
damage work already accepted and agreed with AN
defects with building design will need to be rectified and not
covered by the policy
M report
23 December 20 13
Scope of works for reduction groundwater contamination
described
t est pits shown in laundry, bathroom, rumpus room and
garage
t o take water samples and test for contamination
Pump and submit results to en gineer P of M
Water testing by AT
29 January 2014
“Analysis of the average test properties of samples taken 29th
January 2014 indicates there has not been a significant change
in water properties since the previous samples taken October
2013. Conductivi ty, total dissolved solids, sodium and chloride
levels are elevated well above drinking water limits in the range
more typical of effluent or wastewater. These levels are
indicators that there is a significant amount of cations and
anions, typically descri bed as salts dissolved in the water. The
salt level would be described as medium level concentration, well
below the typical values found in seawater.”
Report C
7 February 2014
remedial works are ongoing
that is removing contaminated groundwater from the soil and
taking water samples and testing
automatic pumps are installed within four separate pits
mechanism allows for continual flushing of subsoil water with
the goal of minimising and removing high pH water
Report C
10 March 2014
t est results consistent with concentrations typical of pool
water and validates the source to be the neighbour ‟ s
swimming pool
the neighbour has now repaired the pool
will be verified by next sample
Water testing by AT
18 March 2014
“Analysis of the average test prop erties of samples taken 18th
March 2014 indicates there has been a slight increase in levels
since January 2014.
C onductivity, total dissolved solids, sodium and chloride levels
have increased indicating a higher concentration of salts present
t he salt level would be described as medium level concentration,
well below the typical values found in seawater.”
Water testing by AT
undated report
“The levels of electrical conductivity, total dissolved solids,
hardness, sodium and chloride have not decreased appreciably
from October 2013 to March 2014. The values remain well above
limits published by Sydney Water as fit for human consumption.
Untreated, the water is not safe to drink. …
W ater is not naturally occurring run - off … I n summary, this water
looks cle ar and clean, has no appreciable odour, yet has high
sodium chloride. This would be more typical of a salt treated pool
water. The salt is at the concentration level required to prevent
algae and bacteria growth. T here appears to be no loss in salt
concent ration over time, suggesting a direct source with little
diluting or flushing out of the contaminating sodium chloride
Case No: 365637 Determination Page 22 of 24
before entering the property. Therefore to lower the
concentration the salt source would have to be eliminated.”
Email C to FSP
24 April 2014
C talked to the chemist. He said the levels of contaminants
appear to be unnaturally high. He believed, as do I based on
the observed movement of water in the test pits, that if the
source had been removed then we would have seen a
diminution of cont amination by now. However, the
concentrations are fairly static. He is of the opinion that
evidence suggests that the neighbour‟s salt water pool is still
leaking .
Report C
14 May 2014
site meeting held 9 May 2014
liaised with neighbour‟s insurer who deni ed liability but
reviewed damage at insured‟s property on 9 May 2014
insurers‟ assessor said neighbour ‟ s pool was not leaking
C wanted to inspect the pool
insured to be indemnified for costs arising from temporary
accommodation but did not want to upset tenant residing in
basement
concerned laundry was unsafe - C recommended reinstalling
lighting within the laundry and basement area and removing
trip hazards
advised insurance doesn‟t cover a subsoil water proof barrier
maintain reserve $95,000 for reinsta tement of basement
floor once source of water identified and isolated
wanted to engage pool leak specialist - noted pool in good
condition
L pool leak detection
11 June 2014
no leaks were detected conducting all possible tests to both
pools
pool assessor noted previous repairs to the neighbour ‟ s pool
return line a location of a previous leak. The neighbour said
this happened prior to them taking occupancy
C report
13 June 2014
b ecause most of the lower ground for floor is under the
external groun d level there will always be positive pressure
of subsoil water and holes or breaks within damp proofing
proofing will result in water continuously entering the house -
noting flaking of wall paint in the flat tenanted to an elderly
couple
Applicant insist s neighbour told him the pool was leaking and
concrete has been cut in the area of repairs
n eighbour‟s insurer closing file as no leak identified and
repairs to pool had been completed prior to their client taking
occupancy
Email C to FSP
3 July 2014
en gaged AB to install lighting in the laundry and remove soil
taken from pits in the basement floor but AB was told by
insured not to proceed as insured would do it himself
Letter EI to P of M
4 July 2014
p rovided proposal to assist in management and remedi ation
of existing salt damage to the property
M report
15 July 2014 “ Conclusions
In response to your question:
As we know, even if salt concentrations were reduced to
acceptable limits, the Insured would still be experiencing rising
damp issues. This was evident in the tenanted flat area where
paint was flaking off the wall?
Case No: 365637 Determination Page 23 of 24
Does this mean there is a failure in th e property's water
proofing? If there was adequate water proofing of the property,
we would not expect such water ingress.
Is there any way to verify the adequacy of the property's water
proofing?
In our opinion:
1) On account of the above - ground construct ion being used
below - ground some water ingress was close to inevitable.
2) It would be a mischaracterisation to say that the
waterproofing had “failed”. It was simply never conceived
properly to reliably exclude all water. What is clear is that
the waterproo fing was not entirely satisfactory for the
environment and this particular construction.
3) However, it transpired that prior to the pool leak the
waterproofing was adequate, or largely adequate, to resist
the ambient moisture environments that it had been
s ubject to over most of its life.
In response to your question:
If the source has been isolated, the quickest way to reduce salt
concentrations would be some sort of pumping/flushing system
i.e. pump out saline water and replenish with potable water, do
y ou agree?
In our opinion:
4) It had been anticipated that a resolution the neighbour‟s
pool leaks would have led to a current reduction in the salt
concentrations under the building.
5) However, somewhat counter - intuitively, the salt levels
have remained esse ntially constant over an extended
period whilst it has recently been determined that there are
no current pool leaks.
6) Given we know there has been some natural flushing, this
means that either:
a) There is a very large reservoir of pool salt in the
ground from the earlier pool leak. In this case then
“some sort of pumping/flushing system i.e. pump out
saline water and replenish with potable water” may
take a long and indeterminate time to resolve th e
problem.
OR
b) There is a natural or some other unidentified source of
salt.
7) Given the recent revelations that there has been no pool
leak for a few years, we have a residual doubt as to
whether the source of the salt is the pool.
8) We have a proposal fro m a specialist to review the current
testing results and provide their considered opinion.
9) In this document we have discussed various alternative
solutions and believe that we have designed a viable
solution to exclude salt from the internals of the build ing.
This approach has the benefit of a relatively speedy
resolution of the situation.
10) Draft details have been presented earlier in this report. We
can incorporate these into a scope of works and
Case No: 365637 Determination Page 24 of 24
associated drawings if required.
11) As discussed in previous reports and again in this report,
on account of the essentially “normal” above - ground
construction which has been used below - ground some
water ingress (as differentiated from the salt ingress) was
close to inevitable.
12) At our last inspection, some water in gress was noted in the
granny flat and this is consistent with this issue of original
building construction.
13) So, we believe that there is an imperative to improve the
building‟s overall waterproofing, so as to reduce the
chances of general building dampne ss, by lowering the
external ground level to below lower floor level. ”
C report
23 July 2014
a ddressed adequacy of existing damp proofing and
exclusion in the policy which excludes damage caused by
faulty design
a qualified building consultant would need to review the
relevant building standard and provide a determination as to
whether the building contains inherent defects in accordance
with its damp breach proofing
h owever says the ability of the water to enter t he property is
a result of inadequate DPC further the building‟s construction
was susceptible to water ingress because an entire floor was
located beneath the ground
d iscussed options for reinstatement of insured‟s property
noting there is still an unknown quantity of salt water beneath
the house despite the neighbour‟s pool leak being fixed
coupled with the natural flushing of subsoil water. Recent
water testing showed increase in salt concentrations - need
further investigation from specialist geotechnica l engineer
(proposal from environmental investigations attached)
d oes not recommend pursuing reducing free groundwater
levels to below underground brickwork by pump out pits
d iscussed the method of under setting recommended in
which sections of the base of the wall progressively rebuilt in
new materials together with a new DPC
s alt laden bricks would need to be replaced in their entirety
i nstall new DPC on the surface of the existing slab or wall be
removed out footings and repla ce with new brickwork and a
DPC
i nstallation of new DPC would not be covered by the policy
as the wording stipulates reinstatement to the s ame
condition prior to the loss
FSP‟s liability limited to replacement of brickwork and
reinstatement of internal fit out with insured liable fo r the new
DPC.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.