Home / Financial Firm (Unknown - Insurer) / Determination 365637

Determination 365637

Partial denial of water and salt damage building claim

FirmFinancial Firm (Unknown - Insurer)
Decided2015-03-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

Homeowners claimed for salt and sewage water damage to their building caused by a neighbour's leaking pool and a sewer leak; the FSP accepted partial liability but refused several heads of cost. AFCA directed a cash settlement of the building damage, with the Applicants bearing 50% of a new damp course and membrane, plus $2,000 non-financial loss.

The policy covers water damage to the insured building from leaking fixed pipes, the FSP could not rely on the gradual escape, rust or inherent defect exclusions, and soil treatment and structural improvements fall outside the policy.

Issues

Subjects and remedies

home or building damagepay claimpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount - Service - Service Quality Determination Case No: 365637 Determination Page 1 of 24 Case number: 365637 25 February 2015 1 Overview 1.1 Dispute In March 2012, the Applicants lodged a claim with the Financial Services Provider (FSP) for water damage sustained to the property because of:  salt water escaping from the neighbour‟s pool  a leaking waste water system at the insured property. The FSP has accepted partial liability for water damage sustained to the insured building. However, it refuses to reimburse the Applicants:  to flush out the high salt content from the soil under the property  to reduce free ground water level to below underground brickwork  for remaining repairs to the property  for preventive structural improvements to avoid similar damage in the future. The Applicants dispute the FSP‟s partial denial of the claim. They want their property reinstated to its pre-loss condition. 1.2 Issues and key findings Do the Applicants have a valid claim under the policy? The Applicants have a valid claim because the insured building was damaged by water leaking or discharging from a fixed pipe or fixed apparatus, namely:  the neighbour‟s pool  the sewage system at the Applicants‟ property . Can the FSP partially deny the Applicants’ claim? The FSP has not established the damage was from the gradual escape of water or caused by rust and corrosion or by inherent defects. However, the FSP can partially deny the Applicants‟ claim because the policy does not cover site rectification or mitigation against future damage that might arise from this event. What is the extent of the FSP’s liability? The FSP is obliged to pay the cost of repair for any damage to the insured building caused by water from the sewage system and the neighbour‟s salt water pool. This includes any damage, rust and corrosion caused by salt water entering the building and also includes damage to the structure of the building. The FSP is also to pay the cost of repair for the damage caused by intrusive investigations it authorised. Case No: 365637 Determination Page 2 of 24 The FSP is not liable to the Applicants for:  decontaminating the soil and removal of salt from the soil  reducing free ground water levels below the brickwork of the insured building  the 50% balance of the cost of the replacement of the membrane and damp course with a new one in the area of the insured building that has been damaged by the insured event  structural improvements (other than those mandated by any statutory authority) and any proposed preventive measures to arrest similar issues in the future. Is the FSP liable for the cost of alternative accommodation during repairs? The FSP is to pay for alternative accommodation whilst repairs covered under the policy are conducted. Can the FSP reuse the damaged fittings? The FSP should assess the condition of the fittings kept in storage. If damaged, the FSP should pay for replacement of these items. Are the Applicants entitled to compensation? The Applicants are entitled to an award of compensation of $2,000 because the FSP has taken too long to resolve the issues surrounding this claim and, in the process, has left the Applicants stressed and physically inconvenienced. 1.3 Determination This Determination is partially in favour of the Applicants. In an effort to bring this dispute to finality, the Panel is directing the FSP to cash settle the Applicants‟ claim. The extent of its liability and the mechanism for settlement are set out in full in paragraph 2.6 of this Determination. Should the Applicants accept this Determination, within 14 days of acceptance, the FSP is to engage its engineer to prepare a Scope of Works for the insured loss as set out in paragraph 2.6 of this Determination. Within 7 days of receipt of the Scope of Works, the FSP is to engage a builder to provide a costing for the Scope of Works for the insured loss as set out in paragraph 2.6 of this Determination. Within 14 days of the parties agreeing the Scope of Works and the costing of the Scope of Works, the FSP is to cash settle the Applicants the agreed sum. At the same time, the FSP is to pay the Applicants $2,000 for non-financial loss. Case No: 365637 Determination Page 3 of 24 2 Reasons for Determination 2.1 Do the Applicants have a valid claim under the policy? Damage to the property was caused by escape of salt/sewage water The Applicants are first required to show, on the balance of probabilities, they have suffered a loss caused by an insured risk. This is called a prima facie claim. Once the Applicants have shown a prima facie claim exists under the policy, the FSP is then required to show, on the balance of probabilities, the loss falls within an exclusion clause of the policy or is otherwise not covered. The Applicants claim their property sustained damage as a result of water leaking or discharging from a sewage system and/or the neighbour‟s pool. The policy covers loss or damage which results directly from the bursting, leaking, discharging or overflowing of fixed apparatus and fixed pipes. The FSP accepted the claim for damage caused by the leaking sewerage system. The FSP commenced repairs but halted those repairs once the damage was more extensive than it first envisaged. The expert evidence eliminated the Applicants‟ pool as a source of the leak. The FSP says it is not obl iged to cover damage caused by the neighbour‟s pool. It says this water first contaminated the soil and then the Applicants‟ property was damaged by the contaminated soil, not the water. The Panel is satisfied that the preponderance of the expert evidence is that the proximate cause of any saltwater damage to the Applicants‟ insured building was the neighbour‟s leaking pool. This water subsequently travelled through the soil and reached the Applicants‟ insured building. Therefore, the Panel is satisfied that the Applicants have established their loss was caused by an insured event and have a prima facie claim under the policy. 2.2 Can the FSP deny the Applicants’ claim? The FSP is now required to show it is entitled to refuse payment of the claim because the loss was caused by causes excluded under the policy. It can also endeavour to show the policy does not extend cover to some of the items claimed by the Applicants. FSP has not established the damage was from the gradual escape of water The policy excludes cover for loss or damage caused as a result of the gradual escape of liquid over a period of time. However, the following conditions must be met:  the Applicants, or a reasonable person in the circumstances, could be expected to have been aware of such gradual escape of liquid  the loss was due to lack of maintenance, wear and tear, or neglect. Case No: 365637 Determination Page 4 of 24 The FSP has not proven the Applicants were aware of and neglected any gradual escape of water from any source. The Applicants notified the FSP of the issues as soon as they realised the damage to their property could be from their neighbour‟s leaking pool. The FSP has also not shown the damage to the insured building was from the Applicants‟ lack of maintenance, wear and tear or neglect. The expert evidence is that the primary cause of the loss was the result of water leaking or discharging from the neighbour‟s pool. The Applicants did not have any control over the maintenance issues relating to the neighbour‟s pool. There is also no evidence the issue with the sewage system was due to lack of maintenance, wear and tear or neglect. FSP has not established the damage was caused by rust and corrosion or by inherent defects The policy excludes cover for loss or damage caused by rust and corrosion. However, in the Applicants‟ case, the damage was not caused by rust or corrosion. The event of water discharging or leaking from the fixed apparatus or the fixed pipe was not caused by rust or corrosion. There is no evidence to indicate the water leaking from the neighbour‟s pool entered the property because of rust and corrosion at the Applicants‟ insured building. Geotechnical expert JK concluded the damp-proofing at the insured building may have been inadequate. However, he was satisfied the problem was exacerbated by the neighb our‟s leaking pool. The FSP‟s appointed structural engineer (M) suggests the high salt content pool water could have damaged the waterproofing membranes and dampcourses installed at the insured building. This in turn may have allowed the salt water to seep into and/or enter the insured building. The rust and corrosion was actually the resultant effects of the high salt content water entering the insured building after being discharged from the neighbour‟s pool. Based on the evidence presented by the parties, the FSP has not established the damage to the Applicants‟ insured building was caused by rust and corrosion, neglect of maintenance or any inherent defect in the insured property. The FSP therefore cannot deny any part of the Applicants‟ claim on these grounds. 2.3 What is the extent of the FSP’s liability? FSP is liable for damage to the insured building caused by water from the sewage system and neighbour’s pool Case No: 365637 Determination Page 5 of 24 M suggested it was likely, if the pool and the sewer leak had not occurred, the current insured building damage would not have occurred. He concluded the proximate cause of the recent damage was the two leaks. The policy covers water damage sustained to the insured building. The policy definition of a building is: ““building” or “buildings” both mean the fully enclosed building or buildings at your risk address, primarily used as a place of residence.” Damage to the soil and water levels is not covered The policy does not state the soil at the property would be considered as part of the insured building. As such, the FSP does not have to pay for flushing the high salt from the soil or any other treatment of the soil. For the same reasons, the FSP does not have to pay for reducing the free ground water levels below the underground brickworks of the ins ured building. These issues will remain the Applicants‟ responsibility. The FSP must pay the cost of repair that relates to the damage sustained to the insured building as a result of the water discharging from the sewage system and from the neighbour‟s p ool. Dampcourse not inadequate until the insured event As detailed above, it was possible the high salt content in the water which entered the property may have damaged the dampcourse and membrane of the insured building. M indicates the existing dampcourse appears to have been sufficient to prevent water entry throughout the life of the insured building to date. He also indicates the dampcourse may not have been adequate to manage the amount of contaminated water that resulted from the insured event. The FSP has raised concerns in relation to the increase in salinity even after the sources of water leaks were attended to. M has indicated it was possible there may be a very large reservoir of pool salt in the ground resulting from the water discharged from the neighbour‟s pool or some other unknown source. The FSP has been unable to identify any alternative source other than that in respect of which the Applicants have claimed. Fair that 50% of the cost to repair the dampcourse and membrane of the insured building be paid by each party Based on the evidence and considering all of the above, it is fair in the circumstances for the FSP to pay for water/salt water damage sustained to the insured building including the dampcourse and membrane. This will also include repair or replacement of internal damage, salt laden brick works and the waterproof membrane and dampcourse. However the proposed solution in respect of the replacement of the dampcourse and membrane involves a degree of betterment. The Panel considers it is fair in all the circumstances that the Applicants should contribute 50% to the cost of that portion of the work – that is 50% of the cost of a new dampcourse and membrane in the area of the insured building that has been damaged by the insured event. The Panel considers that the presence of salt in the building, as a direct result of the insured event, is likely Case No: 365637 Determination Page 6 of 24 to continue to cause rising damp and thus brings at least some of the cost of that work within the scope of the Applicants‟ claim. FSP is to repair damage caused by its intrusive investigations The Applicants say the FSP failed to repair the damage caused to various sections of the insured building from intrusive investigations organised by the experts under its authority. The FSP does not dispute this. The Applicants are also unhappy with the repair method chosen by the FSP in relation to the slabs, namely, the use of dowel joining instead of continuous slabs. They contend membranes beneath the slabs have been destroyed leaving the slabs more vulnerable to salt attacks. The FSP‟s engineer should assess this issue and propose a suitable repair method; upon which the FSP should base its offer of cash settlement for that component of the claim. FSP does not have to pay for retaining wall/barrier The Applicants have suggested the FSP should pay for a retaining wall, and/or a barrier between the neighbour and their insured properties, to prevent similar damage in the future. These are structural improvements to the property for the purpose of mitigating future damage and must remain the Applicants‟ r esponsibility. However, as far as any insured loss is concerned – as delineated in this determination- if structural improvements to the insured building are necessary to meet the requirements of any statutory authority, the FSP is required to pay the cost of such improvements in accordance with the cover provided under Additional Benefit 20 of the policy. 2.4 Should the FSP pay for alternative accommodation during repairs? The policy covers alternative accommodation to a maximum period of 12 months. The FSP should therefore pay for alternative accommodation for the estimated period required to repair the property, in accordance with the terms and conditions of the policy. 2.5 Can the FSP reuse damaged fittings? The Applicants suggest the FSP has or intends to re use some fittings. They believe they were damaged whilst in storage during the subject period. The FSP should assess the condition of these fittings. If they are damaged, the FSP should pay the cost to replace them. Case No: 365637 Determination Page 7 of 24 2.6 How is the claim to be settled? Cash settlement is fair in all the circumstances The policy sets out how the FSP will settle a buildings claim. At its option it can repair or pay the reasonable costs of repairs. The FSP has attempted to cash settle this claim. For the reasons stated the Panel co nsiders the cash settlement offered is inadequate. But because the work that needs to be done includes work that it is at the cost of the Applicants (for example, the 50% contribution to the cost of a new dampcourse and membrane in that area of the insured building damaged by the insured event), and because of the length of time the parties have been in dispute, the Panel considers that it is fair in all the circumstances to bring this dispute to finality and a cash settlement is the fairest way to achieve this outcome. The Panel therefore directs the FSP to cash settle the Applicants‟ claim in respect of the costs for:  all damage caused to the insured building as a result of the water from the sewage water system and the neighbor‟s pool including internal damage and salt laden brickworks  damage to the insured building caused by its various intrusive investigations  50% of the costs to replace, as new, the insured building's membrane and damp course in the area of the building that has been damaged by the insured event  as far as any insured loss is concerned, if structural improvements are necessary to meet the requirements of any statutory authority, the FSP is required to pay the cost of such improvements in accordance with the cover provided under Additional Benefit 20 of the policy  the estimated cost of alternative accommodation, as fairly established by the engineer‟s Scope of Works, which will be undertaken pursuant to this Determination. The FSP must also assess the condition of the fittings and, if they are not suitable for reuse, the FSP is to pay for the cost of their replacement. The FSP is not obliged to pay all of the Applicants’ claim The FSP is not obliged to pay for:  the costs associated with flushing the soil  reducing free groundwater levels below the underground brick work of the insured building  save for its 50% contribution to the new damp course and membrane in the area that has been damaged by the insured event, any structural improvements or work to prevent similar damage in future . S cope of W orks to be prepared At the FSP‟s cost, the FSP‟s engineers are to prepare and cost a Scope of Works on which the cash settlement will be based. The Scope of Works is to address all of the damage to the insured building, as at the date of this determination, arising Case No: 365637 Determination Page 8 of 24 from this event and to which the policy responds. If during the process of repair, additional damage is discovered not considered in the Scope of Works, the Applicants can refer it back to the FSP and the FSP can cash settle the repair of any additional unknown damage to the insured building caused by the salt brought into the soil from the escaping pool water. The Panel is concerned to bring finality to this dispute. Thus it considers it fair that the FSP will not be liable for the cost of any additional unknown damage unless the FSP is advised of that damage within nine months of the date of payment of the cash settlement by the FSP, pursuant to this Determination. The Scope of Works is to be based on the repair solution discussed in the engineer‟s report dated 15 July 2014, under the heading “The option to stop the saltwater wicking into the building”. The Panel recognises that the installation of a new dampcourse and membrane in the area of the building damaged by the insured event, as proposed by the FSP‟s engineer, involves some degree of mitigation against future loss and some degree of betterment. However, the presence of salt in the building, as a direct result of the insured event, is likely to continue to cause rising damp and thus brings at least some of the cost of that work within the scope of the Applicants‟ claim. The Panel has determined that it is fair in all the circumstances that the Applicants should contribute fifty percent of the cost of materials and labour involved in the installation of the new dampcourse and membrane in the area of the building damaged by the insured event. The shared costs determined in respect of the new dampcourse and membrane should not include the cost of removal of the salt damaged walls, which work would have been required in any case and which work is 100% to the cost of the FSP. In order to determine the amount of the cash settlement, the FSP is, at its o wn cost, also to engage an appropriately qualified builder to provide a costing for the Scope of Works, such costing to be prepared on an arms‟ length basis and without taking into account any insurer discounts or rebates. The FSP‟s engineers or its builder are to determine the reasonable length of time for the insured work to be completed in a normal commercial environment and the FSP is to pay the cost of alternative accommodation for that period in accordance with the terms of the policy. This assessed s um is to be included in the cash settlement. The Panel considers that it is not appropriate to require the FSP to pay interest on the cash settlement amount, given that this amount will be determined based on costings prepared using current market rates. Under the Financial Ombudsman Service Terms of Reference, the maximum amount that can be awarded as a result of this dispute is $280,000. Despite the sum insured, t he FSP‟s liability to pay the Applicants as a result of this Determination is limited to that amount. It remains necessary for the amount of the cash settlement to be agreed, based on the Scope of W orks to be prepared by the FSP‟s engineers and builder. The Panel encourages the parties to this dispute to resolve any issues that might arise during that process. However, the parties can return to the Service if they are Case No: 365637 Determination Page 9 of 24 unable to resolve any issues arising from the Scope of Works and/or the costing of that work. 2.7 Are the Applicants entitled for compensation? Compensation is awarded in certain circumstances The Terms of Reference allows the Service to direct that the FSP compensate an Applicant for non-financial loss where there is an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applic ant‟s expectation of enjoyment or peace of mind. The maximum amount of compensation for non-financial loss is $3,000. The material shows the dispute has been ongoing for many years. Further there has been many attendances by experts and intrusive investigative work done to the insured building. The Applicants say their health has deteriorated since the commencement of this claim and that their living conditions have been intolerable. The photographs provided support the latter contention. $2,000 compensation is fair in all circumstances The Panel recognises that this has been a complex claim. H owever the FSP‟s long running investigations of the various aspects of this claim appear to have taken little account of the physical inconvenience and stress being experienced by the Applicants. The FSP ultimately took some steps towards rectifying this s ituation but should have been more aware of the Applicants‟ circumstances and could have acted more quickly to ease those circumstances. The Panel considers it is fair in all the circumstances that the FSP pay $2,000 compensation to the Applicants as it is satisfied that there has been an unusual degree of physical inconvenience and time taken to resolve the situation together with interference with the Applicants‟ expectation of enjoyment and peace of mind. Case No: 365637 Determination Page 10 of 24 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. This decision has been made by a Panel. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. 3.2 Product Disclosure Statement “ Page 4 Our agreement with you We will insure you for: • loss or damage caused by one or more of the insured events, and • the other benefits, as set out in this policy occurring during the period of insurance Page 5 Words with special meanings “ building ” or “buildings ” both mean the fully enclosed building or buildings at your risk address, primarily used as a place of residence. Page 8 If you have buildings cover What are buildings If you have selected buildings cover, the term “buildings” also includes: … 4 Building materials located at the risk address whic h are to be fitted to the buildings up to a total amount of $1,000, but not sand, soil or gravel ofor any gas or electrical appliance. Page 9 Type s of loss or damage your buildings are covered for We will cover your buildings against loss or damage caus ed by one or more of the insured events occurring during the period of insurance. We will also cover you for the other Case No: 365637 Determination Page 11 of 24 benefits listed below. Details of the terms, conditions and exclusions which specifically relate to each insured event and other benefits are provided on the pages indicat ed. Insured events 11 Water or other liquid damage Page 10 How we will settle your buildings claim 1. At our option we will: a. repair or rebuild the damage part of your building to the same condition as when it was new; or b. pay you the reasonable cost of repairing or rebuilding any damage part of your building to the same condition as when it was new; or c. pay you up to the amount of the sum insured ... Insured Events we will pay Page 22 11. Water or other liquid damage (Applicable whether you have buildings and/or contents cover) We will pay for loss or damage which results directly from the bursting, leaking, discharging or overflowing of: • fixed apparatus, … • fixed tanks, • fixed pipes, … If you have buildings cover and we have agreed to pay a claim for water or other liquid damage, we will also pay the reasonable cost of locating the source of the damage. We will not pay: a. for loss or damage caused as a result of the gradual escape of liquid over a period of time: • where you or a reasonable person in the circumstances could be expected to have been aware of such gradual escape of liquid, • due to lack of maintenance, wear and tear, or neglect, or • from a shower base, shower recess, shower alcove or the walls surrounding the shower; b. for the cost of repair or replacement of the defective part or parts of the fixed apparatus, dishwashers, washing machines, fixed tanks, fixed pipes, waterbeds, aquariums or installations whic h caused the loss or damage; c. for the cost of repair or replacement of any broken main or pipe; or d. for loss or damage caused by rust, corrosion, algae, mould or mildew. Case No: 365637 Determination Page 12 of 24 Page 23 Other benefits we will provide “ 1. Additional cost of temporary accommodation (Applicable only when you have contents cover) “additional costs” mean those rental and ot her related costs which you have to incur at the location of your temporary accommodation which are in addition to the costs you would have had to incur if you continued to live at your risk address. If you normally live in the buildings, the amount we will pay will be based on the buildings‟ rent able value. We will reimburse the additional costs you have to pay for temporary accommodation where: • the buildings you live in are damaged by an insured event to such an extent that you cannot live in them, and • you temporarily take accommodation at another address. We will pay for temporary accommodation for: • the period which we agree is reasonably • necessary, or • 12 mont hs, whichever period of time is the lesser. 20 Removal of debris, profe ssional fees and extra costs … When the buildings have been destroyed or damaged by an insured event and we have agreed to pay your claim, we will also pay the reasonable and necessary costs of: … c. meeting the requirements of any statutory authority. Page 43 Parts A and B When we will not pay a claim under your policy 1. This policy does not cover loss, liability, injury or damage: f. Wear and tear arising out of depreciation, gradual deterioration, wear and tear; g. Inherent Defects caused directly or indirectly through inherent defects, faulty design, structural defects or poor workmanship. ...” 3.3 Chronology and experts ’ findings Date /Expert Event Findings 2002 5 May 2008  Applicant bought house .  i nsurance commenced  i nsurance schedule shows the policy was renewed 5 May 2011  b uildings insured $367,512 and contents sum insured Case No: 365637 Determination Page 13 of 24 $81,033  b uilding sum insured increased at renewal 5 May 2012 to $393,237 and contents cover increased to $85,084 2008/9  commenced bathroom renovation - large hole found in slab  concrete completely perished  s altwater pool installed by professionals  door frames commenced to rust 2012  neighbor said he was experiencing problems following the leak from his 25 - year - old of fiberglass pool  skimmer box under ground level saltwater had leached into the ground over a considerable period of time  damage to his house included brickwork on concre te pathway eastern side of his house/the western side of Applicant‟s house Claim form  n eighbor has an in ground salty water pool which has been leaking for a while now and the water is getting into our property  d ate of incident 20 March 2012  damage des cribed as lower - level bathroom floor: walls steel frames rusting; doorframes rusting FSP letter 27 March 2012  a sked Applicant to get letter from neighbor accepting liability for damage Assessor report 4 April 2012  G is adjuster  Applicant told him about 18 months ago updated downstairs bathroom and laundry  both rooms are partially below ground level - drainage had been installed outside the downstairs rooms to keep out any seepage  o nce work completed Applicant noticed rust and cor rosion forming on metal jams fitted to laundry and bathroom doors  e ngaged plumber who found n o leaks .  Applicant became aware of neighbor‟s problem with damaged brickwork and discovered same damage to the brick wall in his garage  neighbor‟s saltwater pool leaking  neighbor made a claim against his insurance (N) and told not to make any admissions  adjuster noted possible corrosion, brickwork garage, metal door jam in bathroom, rust stains in laundry and gym room  building consultant to be engaged to confirm ca use of damage and provide advice on how to remedy damage  took photographs which show the proximity of the pool and rust stains on door jams and brickwork Assessor report 29 April 2012  A adjuster  engaged B of E to advise  B needed access to the neighbor‟s pool and samples taken of the salt water from the pool  noted irrespective of source of water adequate drainage and waterproofing should have been installed behind the lower - level wall of the premises when renovations done 18 months prior  as rust noted 18 m onths ago issue pre - existed the completion of the renovations Case No: 365637 Determination Page 14 of 24 Report by building consultant E 23 May 2012  l ooked at pool next door but couldn‟t advise as to whether it was the cause of damage  i nspected ground floor laundry. Found no evidence of water dama ge to tiles but minor rust staining on tiles. No damage in ground level bathroom. Gym room minor evidence of rust on tiles. Garage a single course of brickwork severely deteriorated noted. Same deterioration to next - door neighbor brickwork  a highly salt la den and corrosive moisture transfer is occurring beneath the dwelling of the insured‟s premise predominantly to the western elevation  w ater transfer is occurring beneath the external concrete path level which was noted to be approximately 600mm above the i nternal floor level  w ithout extensive testing including removing sections of the external path, geotechnical testing of the foundation material directly adjacent to the dwelling, the exact source of the wat er ingress cannot be determined  g enerally however it would appear the rusting within the metal jambs to the laundry and bathroom at ground floor level is occurring as a result of highly corrosive and salt laden moisture being drawn from below the floor slab via capillary action into the brickwork to wh ich the door jambs are attached  a remedial works summary was presented 28 September 2012 for work done to garage, bathroom, gym, laundry  t ender from A 28 September 2012 to do work. Take 5 weeks. 3 items to cost $17,248 - $22,176 and $8,470.  A and N quote 12 October 2012 cost $30, 690  A and N recommended by E on 16 October 2012 as most competitive  p hotographs attached to tender show damaged floor  v ariation of $700 on 16 November 2012  f ourth variation in the amount of $4,128.30 for professional safe removalist and rendering of walls in laundry and bathroom FSP file note 25 July 201 2  adjuster asked to proceed with the testing of the drainage and sewer system to the insured premises  took moisture readings in garage, laundry, bathroom shower  c oncluded: The ref lux valve was not functioning correctly and in turn caused the upstream pipe to hold water.  t his build - up was seeping out at the point of dislodgement between the cast iron reflux and the PVC sewer pipe and then disbursed out under the slab  AN believed the steel jambs were rusting as a result of water tracking under the slab from the reflux valve FSP email 21 September 2012  FSP emailed adjuster after receiving the report from AN that it will accept the resulting water damage to the property only Email loss adjuster  a rranged E to organize site meeting w ith Applicant to prepare final S cope of W orks for reinstatement of the resultant damage and rectification of cause of damage  any repairs involving remedy will be at Applicant‟s own expense Email fro m loss  Applicant requested repairs be put on hold because of Case No: 365637 Determination Page 15 of 24 adjuster to FSP 17 December 2012 Christmas  repairs rescheduled late January 2013 AN 8 January 2013  AN submitted variation to rectify water damage $2,105.40 Loss assessor‟s report 1 February 2013  w ork resumed 22 January 2013  w hen some of the wall and floor tiles were removed, damage to timber panels were found to be in an extremely deteriorated state enough so they were crumbling at the edges when touched . As such, resultant damage repairs cannot proceed as there is still water/moisture evident within walls and beneath the flooring  n oted that timber panels will now require replacement and the builder will submit a variation along with supporting photog raphs for review and validation  a s there was evidence that the cause of damage had not yet been resolved, agreed for the builder to appoint a plumber to conduct further tests t o find any other possible leaks  p lumber engaged - no leaking pipes  o nce all the wall and floor tiles were stripped away, the builder did a moisture test to the outside wall which read 80 to 90 per cent. It is saturated and confirms that there is still water ingress continuing to cause damage at the risk premises  d iscussions were held with [E]. It was decided that water/soil tests should now be carried out underneath the home to try and find the cause of damage. Samples from under the bathroom and la undry will be taken for testing  builder instructed to test insured‟s pool  19/20 January 2013 Applicant said water came from neighbor‟s pool into driveway  furniture removed and stored off - site Soil analyst G‟s reports dated 19 February 2013 & 27 February 2013  19 February 2013 - Soil sample taken below the concrete slab of laundry and bathroom re vealed very elevated heterotrophic plate counts. The results suggest that the water ingress beneath the concre te slab is from a sewage source  26 February 2013 – G understood the pipe for sewerage was predominantly used for the disposal of laundry water  Soil sample taken below the concrete slab of laundry did not identify any indicators of the presence of post laundry water. Report Assessor C 14 March 2013  l ab results inconclusive  s uggested geotechnical engineer be engaged  19 April 2013 AN submitted account for $21,743.25 Report from Geotechnical expert JK 22 April 2013  i nspected and photographed the house 8 April 2013  house built 30 to 40 years ago by owner builder  insured lived in property for several years  insured refurbished the ba throom and laundry facilities – only internal refurbishment  noted lower level of house has been cut into hillside. A two car garage has been incorporated into the lower ground floor at south west. Laundry, bathroom, gym located at the lower level North Wes t  eastern portion of the lower ground level comprises a self - contained flat Case No: 365637 Determination Page 16 of 24  in ground pool in back yard  c onventional residence at first floor level  i n ground pool located along the northern end of the west boundary  (see map) and described the site description and the damage  a hole excavated by [G] within laundry revealed that the concrete slab had been provided with a damp - proof membrane and overlay a clay soil down to at least .5m  b rick wall from the western extern al wall revealed damp - proof course just above the internal garage floor level  t he external surface increased in height to a maximum of approximately 2 m above the internal floor level of the gym and the rockery against the southern external wall of the fla t was higher than the internal floor level  a ny habitable room below the ground should have significant damp proofing – full “tanking” not warranted  i n the absence of leaking plumbing and given that the ground water level was observed to be at least .5m bel ow slab level, the source of damp would be due to moisture being drawn up by capillary action into the brickwork  h ad adequate damp - proofing been provided particularly given that the lower ground floor is essentially an in ground structure, then moisture wo uld not have been drawn up into the brick work by capillary action  membrane and damp - proof course were inadequate or were inadequately installed  t he level of groundwater as observed in the borehole is shallower than would be expected suggesting that possi bly a source of water such as a leaking pool or external plumbing is occurring. We note that the shallow groundwater level is exacerbating the problem but not in our opinion the cause of the problem.  l eaks repaired by plumber  n eed to investigate to identi fy the source including drilling of bore holes in the north - west portion of the house towards the pool in the rear yard and the pool in the neighbor‟s property – cost $4,000  r e adequacy of damp proofing, destructive testing of floor etc. required (need sco pe of works from suitably qualified building consultant) Emails April 201 3  the structural engineer P of M has spoken to a chemist  „chemist concludes it is likely it is salt pool water and the pool is still leaking JK report 30 April 2013 “Subsurface investigation carried out 7 May 2013 including the drilling of three boreholes and the borehole within the laundry was deepened soil samples were taken and tested 6.1 Geotechnical Evaluation The damp problems have been noted and reported in areas which are lower than the external ground levels. Also, the level of groundwater, as observed in the borehole at JK4, is shallower than would be expected. In view of the above and in the absence of leaking plumbing, we agree that damp in the building is due to Case No: 365637 Determination Page 17 of 24 moist ure being drawn up by capillary action into the brickwork. The chemical testing has suggested that the groundwater contains potable water possibly from a source such as a leaking pool or external plumbing. We understand both upslope pools (i.e. on the subj ect site and on the neighbouring property to the west) are saltwater pools, but in any event, the salinity of the soil from JK3 indicates that the subsoils themselves are generally saline as is typical for Western Sydney. Therefore, in the absence of leaki ng plumbing, the upslope pools remain the only alternative sources. We cannot be definitive on which of the two pools is leaking, except that the neighbouring pool has been reported to have been associated with previous leaking. We would expect that any ha bitable room would be provided with adequate damp - proofing. Whilst we acknowledge that full „tanking‟ may not be warranted in such circumstances, treatment to the extent that damp is excluded should have been provided, in accordance with Clauses F2.2.2 and F2.2.3 of the BCA. Had adequate damp - proofing been provided, particularly given that the lower ground floor is essentially an inground structure, then moisture would not have been drawn up into the brickwork by capillary action. We thus believe that the p roblem is the result of inadequate damp - proofing and has been exacerbated by the shallow groundwater, possibly the result of the leaking neighbouring pool.” Retro fitting damp proofing is difficult to achieve so consider install a cut off drain along the n orthern and western elevations of the laundry bathroom gym However the clay subsoils will continue to draw up moisture from larger depth and as the area is naturally saline corrosion may continue but at a reduced rate Whatever option adopted should still c onfirm the source of the water and eliminate it .” C report 24 May 2013 A and N have charged $44,121.95 to date C report 4 June 2013  damp proofing issue not covered  investigation into the pool leak is a cost for the insured or the neighbouring property owner to remedy as this is another cause of the water ingress problem not covered by the policy  damage repairs held in abeyance until the leaking pool and damp proofin g addressed  suggested cash settlement as expensive to rectify causes  asked A and N to provide a breakdown of repair costs Email C to FSP 11 July 2013  Applicant has report from JK.  Engineer met with Applicant yesterday . Email from Applicant to C 24 July 2013  contests the offer for resultant damages to the property  c ontests work done by AN  c ontends engineer said there was presence of salt beneath the slab  t he bore down to the bedrock in the laundry has significantly affected the building‟s ability to stem the capillary action as the Case No: 365637 Determination Page 18 of 24 membrane has been pierced and breached. Ditto Gym/ family room  s ays resultant damage is significant and that water is trapped b eneath the slab and as the water can‟t escape  offer $19,078.76 rejected as deficient  s labs will need to be removed to assist in drying beneath  p roposes all slabs are removed, contaminated soils removed here and on the western and northern external side of premise repairs and inside the garage Email FSP to investigator 8 August 2013  appoint a structural engineer to inspect and confirm the exact cause of the damage, provide scope of work, comment on damaged concrete slab (appoint concrete expert if neces sary) S L water testing 21 August 2013  water from borehole in l aundry obtained by owner  f ree chlorine levels at upper limit of what is ideal in a pool Report from Engineer P of M 5 September 2013  i nvestigated, described site and photographed it  p hotographs show proximity of neighbour ‟ s, corrosion to a rear door frame, rising damp damage to the walls, the hole in the bathroom slab, the damage to the steps externally, the investigation hole in the laundry  n oted evidence of rising damp at the lower f loor level mainly in the north - west quadrant of the house attenuating to the south and noted:  insured bought house 2002  building report at that time showed isolated rising damp issues  4/5 years ago renovated bathroom noted a hole in the bathroom floor slab at the north - west corner which was repaired no corrosion is seen  five years ago saw rusting on metal door frames  rust came through within six months  four years ago nails started ru sting in garage  salt deposit on wall  brickwork in garage perishing  2012 neighbour told him issues with pool. Neighbour ‟ s external walls also had salt damage  made the claim  p roblem continue to worsen  s ewer reflux fixed  h ouse is problematic as built parti ally underground  w alls and floors should be water proofed and internal walls damp proofed  h ard to do in this house as masonry walls with infill slabs is prone to water ingress  t he presence, or otherwise, of damp proof coursing to the external and internal walls and waterproofing to the external walls is not known at this stage but it is essentially moot in the context of the history - where for the bulk of the house‟s life we know of no significant issues arising. – pro blems first noticed 5 years ago  s ewer leak repaired and yet still excessive water in the soil no known leak from insured‟s pool so likely the water comes from the neighbour‟s pool Case No: 365637 Determination Page 19 of 24  d iscussed various reports from JK and said that given that it is essentially known that there was a significant le ak from the neighbour‟s pool, and no known leak from the insured‟s pool, then it is very likely that water came from the neighbour‟s pool.  s o, synthesising the verbal, physical and reported evidence, it appears likely that the house‟s waterproofing was ade quate or close to adequate to resist natural water ingress over most of the house‟s life. Then, around five years ago (or somewhat earlier), the pool to the north - west and the sewer to the west started leaking.  t he building‟s waterproofing was incapable of adequately resisting the unusual amount of water that now impinged upon the building. Further it seems from the recent testing that this water is very salty. So, not only is water present where it may not once have been, but it is now highly corrosive to the door frame, concrete and any other ferrous metal products in the house.  s o, based on the available evidence, we believe it likely that if the pool and the sewer leak had not occurred then the current building damage would not have occurred. Therefore we conclude that the proximate cause of the recent damage is the two leaks.  t he nature and extent of damage underground is not known so rec ommended more investigation via excavation  t here is some chance, that it can never be proved or disproved at this late date, that the leaking pool uphill of the sewer caused that leaking sewer by causing the clay soil in the area to expand and damage the pipe  i n regards to the insured‟s concerns tha t there is the potential for hidden damage or future damage to the house footings; we believe that this potential does exist. Concrete that is capable of resisting very saline environment must be of the highest quality. House footings are essentially never explicitly built to this quality (unless the potential for salt attack is know n at the time of construction)  t he salt may have also damaged the brickwork or the underground damp pro of coursing and/or the concrete  c oncerned pool may still be leaking. Need to do tests. This won‟t be quick  i n our opinion it is likely that the rate of natural salt removal due to ground water flushing will be low given the relatively impermeable nature of the soil. We suspect that the salt will remain for decades at elevated le vels in the soil and this may present an ongoing problem to the building  l ong - term solution; ensure all leaks are stopped and excavate the soil down to bedrock level (may require underpinning) ensure salty water is drained, reconstruct the walls, bring in new clean fill, reconstruct floor slabs , leave the external soil level  c onclusion both the leaking sewer and leaking saltwater pool caused large amounts of salty water to contact the building over the last few years, building‟s waterproofing was adequate: but not adequate to resist the abnormal imposition of the leaking pool a nd leaking sewer; the nature and extent of damage underground is not known and too early to Case No: 365637 Determination Page 20 of 24 formulate a scope of works  d estructive investigation recommended  l ikely subsoil under and around the house would have to be removed  s oil around the perimeter needs to be lowered C report 11 September 2013  d amage is caused by sewer leak and the leak from the pool  s ewer leak rectified  r elevance of damp proofing discussed and cost to investigate it Emails 28 October 2013 & 6 November 2013  engineering adjuster from C advised FSP AB have completed the excavation of four separate pits to assess subsurface damage  P of M structural engineer to ascertain extent of repairs required  awaiting results of soil and water sampling to give an indication of level of salts pre sent and scope of works required M report 20 November 13  t est pits in garage, bathroom etc.  s oil was uncontaminated but ground water was contaminated with salts  salt still in the ground water – must keep this away from a building  testing also showed the presence of fluoride in the water which is an indicator of tap water  this suggests that pool water is still in the soil along with the dissolved salts  recommended pumping of the pits and get benchmark soil water te sting away from the leak too  AT soil t est summary says soil is not contaminated  See quotes from A and N 28 June 2013 and AB to the Applicant 24 October 2013 C report 3 December 2013  new adjuster is an engineer  m et on - site 11 October 2013 with the Applicant, the engineer P of M, and P from AB  d iscussed the water testing and summarised that the water would be classed as effluent and significant concentration salts were present in the water the water should be kept away from any structure  waterproofing was typical for homes constructed fully a bove ground  insured intends to reduce the external ground level to below the lower floor level  agrees current damage to brickwork and concrete is a result of the increased salt within the sub groundwater  concluded minimal probability of undiscovered damag e underneath the building  pool water is still in the soil along with the dissolved salts  recommended to remove the existing water beneath the soil  the water from the neighbour ‟ s pool should be fixed as soon as possible  salt may be removed from groundwater with the continual flushing of rain – there is potential for flushing of the soil  recommended pumping and another round of testing in a month Case No: 365637 Determination Page 21 of 24  if salt attack is diminished then ground works can take place Email FSP to C 10 December 2013  proceed with remed ial works to confirm water causes no longer occurring  accept the cost of these works  repairs to any damage caused by testing and resulting damage work already accepted and agreed with AN  defects with building design will need to be rectified and not covered by the policy M report 23 December 20 13  Scope of works for reduction groundwater contamination described  t est pits shown in laundry, bathroom, rumpus room and garage  t o take water samples and test for contamination  Pump and submit results to en gineer P of M Water testing by AT 29 January 2014 “Analysis of the average test properties of samples taken 29th January 2014 indicates there has not been a significant change in water properties since the previous samples taken October 2013. Conductivi ty, total dissolved solids, sodium and chloride levels are elevated well above drinking water limits in the range more typical of effluent or wastewater. These levels are indicators that there is a significant amount of cations and anions, typically descri bed as salts dissolved in the water. The salt level would be described as medium level concentration, well below the typical values found in seawater.” Report C 7 February 2014  remedial works are ongoing  that is removing contaminated groundwater from the soil and taking water samples and testing  automatic pumps are installed within four separate pits mechanism allows for continual flushing of subsoil water with the goal of minimising and removing high pH water Report C 10 March 2014  t est results consistent with concentrations typical of pool water and validates the source to be the neighbour ‟ s swimming pool  the neighbour has now repaired the pool  will be verified by next sample Water testing by AT 18 March 2014 “Analysis of the average test prop erties of samples taken 18th March 2014 indicates there has been a slight increase in levels since January 2014. C onductivity, total dissolved solids, sodium and chloride levels have increased indicating a higher concentration of salts present t he salt level would be described as medium level concentration, well below the typical values found in seawater.” Water testing by AT undated report “The levels of electrical conductivity, total dissolved solids, hardness, sodium and chloride have not decreased appreciably from October 2013 to March 2014. The values remain well above limits published by Sydney Water as fit for human consumption. Untreated, the water is not safe to drink. … W ater is not naturally occurring run - off … I n summary, this water looks cle ar and clean, has no appreciable odour, yet has high sodium chloride. This would be more typical of a salt treated pool water. The salt is at the concentration level required to prevent algae and bacteria growth. T here appears to be no loss in salt concent ration over time, suggesting a direct source with little diluting or flushing out of the contaminating sodium chloride Case No: 365637 Determination Page 22 of 24 before entering the property. Therefore to lower the concentration the salt source would have to be eliminated.” Email C to FSP 24 April 2014  C talked to the chemist. He said the levels of contaminants appear to be unnaturally high. He believed, as do I based on the observed movement of water in the test pits, that if the source had been removed then we would have seen a diminution of cont amination by now. However, the concentrations are fairly static. He is of the opinion that evidence suggests that the neighbour‟s salt water pool is still leaking . Report C 14 May 2014  site meeting held 9 May 2014  liaised with neighbour‟s insurer who deni ed liability but reviewed damage at insured‟s property on 9 May 2014  insurers‟ assessor said neighbour ‟ s pool was not leaking  C wanted to inspect the pool  insured to be indemnified for costs arising from temporary accommodation but did not want to upset tenant residing in basement  concerned laundry was unsafe - C recommended reinstalling lighting within the laundry and basement area and removing trip hazards  advised insurance doesn‟t cover a subsoil water proof barrier  maintain reserve $95,000 for reinsta tement of basement floor once source of water identified and isolated  wanted to engage pool leak specialist - noted pool in good condition L pool leak detection 11 June 2014  no leaks were detected conducting all possible tests to both pools  pool assessor noted previous repairs to the neighbour ‟ s pool return line a location of a previous leak. The neighbour said this happened prior to them taking occupancy C report 13 June 2014  b ecause most of the lower ground for floor is under the external groun d level there will always be positive pressure of subsoil water and holes or breaks within damp proofing proofing will result in water continuously entering the house - noting flaking of wall paint in the flat tenanted to an elderly couple  Applicant insist s neighbour told him the pool was leaking and concrete has been cut in the area of repairs  n eighbour‟s insurer closing file as no leak identified and repairs to pool had been completed prior to their client taking occupancy Email C to FSP 3 July 2014  en gaged AB to install lighting in the laundry and remove soil taken from pits in the basement floor but AB was told by insured not to proceed as insured would do it himself Letter EI to P of M 4 July 2014  p rovided proposal to assist in management and remedi ation of existing salt damage to the property M report 15 July 2014 “ Conclusions In response to your question: As we know, even if salt concentrations were reduced to acceptable limits, the Insured would still be experiencing rising damp issues. This was evident in the tenanted flat area where paint was flaking off the wall? Case No: 365637 Determination Page 23 of 24 Does this mean there is a failure in th e property's water proofing? If there was adequate water proofing of the property, we would not expect such water ingress. Is there any way to verify the adequacy of the property's water proofing? In our opinion: 1) On account of the above - ground construct ion being used below - ground some water ingress was close to inevitable. 2) It would be a mischaracterisation to say that the waterproofing had “failed”. It was simply never conceived properly to reliably exclude all water. What is clear is that the waterproo fing was not entirely satisfactory for the environment and this particular construction. 3) However, it transpired that prior to the pool leak the waterproofing was adequate, or largely adequate, to resist the ambient moisture environments that it had been s ubject to over most of its life. In response to your question: If the source has been isolated, the quickest way to reduce salt concentrations would be some sort of pumping/flushing system i.e. pump out saline water and replenish with potable water, do y ou agree? In our opinion: 4) It had been anticipated that a resolution the neighbour‟s pool leaks would have led to a current reduction in the salt concentrations under the building. 5) However, somewhat counter - intuitively, the salt levels have remained esse ntially constant over an extended period whilst it has recently been determined that there are no current pool leaks. 6) Given we know there has been some natural flushing, this means that either: a) There is a very large reservoir of pool salt in the ground from the earlier pool leak. In this case then “some sort of pumping/flushing system i.e. pump out saline water and replenish with potable water” may take a long and indeterminate time to resolve th e problem. OR b) There is a natural or some other unidentified source of salt. 7) Given the recent revelations that there has been no pool leak for a few years, we have a residual doubt as to whether the source of the salt is the pool. 8) We have a proposal fro m a specialist to review the current testing results and provide their considered opinion. 9) In this document we have discussed various alternative solutions and believe that we have designed a viable solution to exclude salt from the internals of the build ing. This approach has the benefit of a relatively speedy resolution of the situation. 10) Draft details have been presented earlier in this report. We can incorporate these into a scope of works and Case No: 365637 Determination Page 24 of 24 associated drawings if required. 11) As discussed in previous reports and again in this report, on account of the essentially “normal” above - ground construction which has been used below - ground some water ingress (as differentiated from the salt ingress) was close to inevitable. 12) At our last inspection, some water in gress was noted in the granny flat and this is consistent with this issue of original building construction. 13) So, we believe that there is an imperative to improve the building‟s overall waterproofing, so as to reduce the chances of general building dampne ss, by lowering the external ground level to below lower floor level. ” C report 23 July 2014  a ddressed adequacy of existing damp proofing and exclusion in the policy which excludes damage caused by faulty design  a qualified building consultant would need to review the relevant building standard and provide a determination as to whether the building contains inherent defects in accordance with its damp breach proofing  h owever says the ability of the water to enter t he property is a result of inadequate DPC further the building‟s construction was susceptible to water ingress because an entire floor was located beneath the ground  d iscussed options for reinstatement of insured‟s property noting there is still an unknown quantity of salt water beneath the house despite the neighbour‟s pool leak being fixed coupled with the natural flushing of subsoil water. Recent water testing showed increase in salt concentrations - need further investigation from specialist geotechnica l engineer (proposal from environmental investigations attached)  d oes not recommend pursuing reducing free groundwater levels to below underground brickwork by pump out pits  d iscussed the method of under setting recommended in which sections of the base of the wall progressively rebuilt in new materials together with a new DPC  s alt laden bricks would need to be replaced in their entirety  i nstall new DPC on the surface of the existing slab or wall be removed out footings and repla ce with new brickwork and a DPC  i nstallation of new DPC would not be covered by the policy as the wording stipulates reinstatement to the s ame condition prior to the loss  FSP‟s liability limited to replacement of brickwork and reinstatement of internal fit out with insured liable fo r the new DPC.