Home / Financial Firm (Unknown - Insurer) / Determination 365246

Determination 365246

Partial denial of cyclone storm damage claim for investment property and cash settlement amount

FirmFinancial Firm (Unknown - Insurer)
Decided2015-02-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$13,018
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A family trust investor disputed the FSP's cash settlement for cyclone damage to its rental property and claimed loss of rent and project management costs. AFCA found some disputed damage storm-related and ordered an additional $13,018 (including 50% of engineer fees), but rejected loss of rent and builder costs and ordered no interest.

Under the storm cover, the insured must show a prima facie loss from the insured event and the insurer must then prove an exclusion, so storm-related items are payable while gradual deterioration and lack of maintenance are excluded.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount Determination Case No: 365246 Determination Page 1 of 8 Case number : 365246 1 6 February 201 5 1 Overview 1.1 Dispute The Applicants held an investor home insurance policy with the Financial Services Provider (FSP) which provided cover for their rental property. The Applicants lodged a claim under the policy for damage to the property following Cyclone Yasi in February 2011. The FSP accepted liability for some of the damage claimed, but denied cover for the remaining damage on the basis that it had not been caused by the cyclone. The Applicants say that the disputed items of damage were caused by the cyclone. They also seek benefits for loss of rent due to their tenant vacating the property after the cyclone. 1.2 Issues and key findings Is the FSP liable for the disputed items of damage? The available information establishes that the FSP is liable for the repair of some of the disputed items of damage. However, the FSP is not liable for all of the disputed damage, some of which pre-existed the cyclone and/or was caused by factors which are excluded under the policy (such as gradual deterioration, corrosion and lack of maintenance). Are the Applicants entitled to any other amounts? The Applicants are not entitled to payment for loss of rent as they have not established that their tenants vacated the property due to the damage caused by the cyclone and/or the delay in completing the repairs. The Applicants are not entitled to reimbursement of fees incurred in appointing a builder to project manage their claim. However, they are entitled to reimbursement of 50% of their engineer’s fees, as the engineer’s report has been of some assistance in determining the extent of the cyclone-related damage. 1.3 Determination This Determination is partly in favour of the Applicants. The FSP is to increase the cash settlement offered to the Applicants by an additional amount of $13,018 . The FSP is not required to pay interest on this amount. Case No: 365246 Determination Page 2 of 8 2 Reasons for Determination 2.1 Is the FSP liable for the disputed items of property damage? Policy provides cover for storm subject to various exclusions The Applicants ’ policy provides cover for loss or damage caused by the events listed in the policy (including the insured event of storm), subject to the conditions and exclusions set out in the policy. The policy contains general exclusions for damage caused by:  wear, tear, rust, fading, gradual deterioration, mould, rising damp, mildew, action of light, atmospheric or c limatic conditions, corrosion or rot (unless covered under the insured event of storm);  a defect, structural fault or design fault that the insured knew about and did not fix before the damage occurred; and  the insured’s failure to take reasonable care of the property and to keep the property in good condition and reasonably maintained and to fix faults and defects as soon as becoming aware of them. The FSP accepted that the Applicants’ property was damaged by the cyclone in February 2011 and offered to cash settle the Applicants for a total of $19,207.39. However, the Applicants say that the cash settlement does not cover all of the damage to the property caused by the cyclone. In particular, they say that the cyclone caused significant damage to the roof, which has continued to leak during subsequent periods of heavy rainfall. The FSP says that the disputed items of damage claimed by the Applicants were not caused by the cyclone, but were either pre-existing and/or caused by factors which are excluded under the policy. It is an accepted principle of general insurance law that an insured bears the onus of establishing that, on the balance of probabilities, they have suffered a loss caused by a risk insured under the policy. This is known as a prima facie claim. If the insured is able to establish a prima facie claim, the onus then shifts to the insurer to show that, on the balance of probabilities, the loss falls within an exclusion clause under the policy or that it is otherwise entitled to deny liability. Disputed damage includes a number of separate items The additional damage to the property which the Applicants say was caused by the cyclone comprises several separate items of damage. The parties have provided extensive information (including numerous consultants’ reports, scopes of work and photographs) in relation to the cause of damage in each case. The Panel has carefully reviewed this information for the purpose of determining whether the FSP is liable for each disputed item. Case No: 365246 Determination Page 3 of 8 FSP is liable for damage to front door lead light panels The photographs included in the reports provided by the various consultants confirm that the lead light panels in the front door have small holes and cracking damage. It appears that this damage has occurred in more than one area. The FSP’s assessor who attended the prop erty in June 2012 reported that the Applicants’ tenant (GN) had advised him that the damage to the leadlight panels occurred during windy conditions in January 2012. Accordingly, the FSP says that the damage was not caused by the cyclone. However, it is clear from photographs taken by the assessor (KP) who attended the property in April 2011 that at least some of the damage to the leadlight panels was already apparent at that time. Having reviewed the photographs of the damage, the Panel is satisfied that it is consistent with having been caused by the impact of flying debris during storm conditions. This has been confirmed by the FSP’s engineer (N). While it is possible that some of the damage may have occurred during a separate storm event (as advised by the Applicants’ tenant) , the Panel considers that the FSP should cash settle the Applicants for all of the damage, in the interests of finalising the current dispute. FSP is liable for damage to laundry (other than timber doorframe) The Applicants seek cover for damage to the external laundry door, as well as resulting internal damage to the laundry cabinets caused by water being blown underneath the door. The FSP says that the damage to the laundry door pre -existed the cyclone and was due to gradual deterioration and a lack of maintenance over the life of the house. The FSP’s consultants advised that the bottom of the door had rotted and the absence of a weather strip had allowed water to enter the laundry during periods of heavy rainfall. They noted that the damage to the laundry door was identified in the pre-purchase inspection reports obtained by the Applicants in October 2006. The Applicants dispute the findings of the FSP’s consultants. They say that the laundry door was replaced in 2007 and have provided photographs confirming that the replacement door had a weather strip installed. The Applicants have also advised that the door was sealed with three coats of a clear finish paint product during maintenance repairs carried out in January 2011. Given the nature of the damage and based on the information provided by the parties, the Panel is not satisfied that the FSP has established that the damage to the laundry door and the resulting internal damage was caused by gradual deterioration, rather than the cyclone in February 2011. The Panel considers that the Applicants have established that the laundry door was replaced in 2007 and therefore the reliance by the FSP’s consultants on the pre -purchase inspection Case No: 365246 Determination Page 4 of 8 report (and references to long-term deterioration over the life of the home) are not appropriate. In these circumstances, the Panel considers that the FSP is liable to cash settle the Applicants for the damage to the laundry door and the resulting water damage to the laundry cabinets. However, the Panel notes that the pre-purchase inspection report refers to timber damage to the laundry door frame, which does not appear to have been replaced when the door itself was replaced. Accordingly, the FSP is not liable for this damage. FSP has cash settled Applicants for damage to garage roller door In their submissions to FOS, the Applicants have referred to damage to the garage roller door. The FSP advised in its Notice of Response that the Applicants had been cash settled for the damage to the roller door. In their letter to FOS dated 16 September 2014, the Applicants confirmed that they have accepted this cash settlement. Accordingly, the FSP has no further liability in this regard. Cyclone caused limited damage to roof The Applicants say that the roof of the property was lifted due to the effects of strong winds experienced during the cyclone. They say that, as a result, the roof has leaked continuously in various areas since, causing further water damage and mould growth. The Applicants deny that there were any significant issues with the roof prior to the cyclone. The FSP says that the cyclone caused minimal (if any) damage to the roof. The FSP says that the issues with the roof pre -existed the cyclone and were caused by factors including the poor workmanship in the construction of the roof and/or poor ongoing maintenance. The FSP accepted liability for the internal water damage to the property caused by water entry during the cyclone and offered to cash settle the Applicants for $12,414,60 for the cost of internal repairs, based on a quotation provided by its builder (TS). The quote provided by TS included an allowance for the repair, replacement and re-screwing of lifted or split battens and the replacement of approximately 10 square metres of roof sheeting. The Panel has been provided with multiple reports from numerous consultants who were engaged to assess the extent of damage to the roof and/or determine the cause of the damage. These consultants include three engineers (two engaged by the FSP (N and J) and one engaged by the Applicants) and at least three builders. Each party has also obtained statements in support of its position from roof sheeting manufacturers and/or distributors. The reports provided reflect vastly differing opinions as to the extent of the damage to the roof caused by the cyclone. The views expressed range from the Case No: 365246 Determination Page 5 of 8 cyclone having caused little (or no) damage to it having caused extensive damage necessitating the complete replacement of the roof. There is a divergence of views even between the FSP’s own contractors. Having carefully reviewed all of the available information (including the numerous photographs of the roof as at various dates), the Panel is satisfied that the bulk of the issues with the roof were caused by factors which were unrelated to the cyclone (such as gradual deterioration, corrosion and lack of maintenance). The various consultants have confirmed that the property would be particularl y susceptible to the corrosive effects of the salt laden atmosphere over a relatively short period of time, given its beachfront position. The available information establishes that leaks and other maintenance issues were apparent in various areas of the property prior to the cyclone. In determining the cause of damage to the roof, the Panel has found the comprehensive and detailed reports provided by the FSP’s second engineer (J) particularly persuasive. In his reports, J provides a logical and reasonable alternative explanation for the problems with the roof in each of the various areas where water entry has occurred, which are unrelated to the cyclone. However, the Panel accepts that a number of the consultants who examined the roof identified some degree of batten lift, although their estimates as to the extent of the damage varied considerably, from 1% of the total roof area (as estimated by J, to 50% or more (as estimated by the Applicants’ engineer (C)). On balance, the Panel is satisfied that the cyclone did pressurise the roof cavity to some extent, causing damage in the form of batten lifting and/or splitting. Further, the Panel accepts that some of the roof sheets may require replacement, either to allow repairs to the underlying structure or as a result of misalignment of the roof sheets themselves. While the Panel does not accept that the damage caused by the cyclone was so extensive as to require the complete replacement of the roof, it is satisfied that the damage is likely to have been more extensive than allowed for under the cash settlement offered to date, w hich was based on TS’s quotation. Accordingly, the Panel considers that the amount of the cash settlement should be increased to allow for additional repairs to the roof. Cash settlement should be increased to allow for additional damage As outlined above, the Panel has determined that some of the disputed damage was caused by the storm. Accordingly, the FSP is liable for the costs of repairing this additional damage. Given the time which has passed since the damage occurred, and in the interests of achieving finality, the Panel considers that the FSP should be required to increase the cash settlement offered by an additional amount of $12,000. In determining this amount, the Panel has had regard to the various estimates obtained by both parties during the claim process and has also taken into account Case No: 365246 Determination Page 6 of 8 the delays and inconvenience experienced by the Applicants during the course of the claim. Accordingly, the FSP is not required to pay interest on the increased settlement amount. 2.2 Are the Applicants entitled to any other amounts? Applicants are not entitled to payment for loss of rent The Applicants’ policy provides cover for loss of rent, in circumstances where the property is unable to be lived in due to damage caused by an insured event. The Applicants say that their tenants vacated the property in December 2012 due to concerns about ongoing leaks, water damage and mould growth. The Panel notes that the tenants did not vacate the property until more than eighteen months after the cyclone. In these circumstances, the Panel is not satisfied that the cyclone damage (and/or the delay in repairs) was the cause of the tenants ’ departure. In this respect, the Panel notes that both the existing tenant at the time of the cyclone and a previous tenant had identified water entry issues with the property which pre-existed the damage caused by the cyclone. Further, the Applicants were offered a cash settlement of $12,414.60 for the internal repairs in December 2011. It was open to them to use these funds to address issues such as mould growth at the property, in order to minimise the risk that their tenants would vacate. In these circumstances, the Panel is not satisfied that the Applicants have established a claim for loss of rent under the policy . Applicants are entitled to partial reimbursement of engineer’s fees Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a financial services provider to contribute to professional costs incurred by an applicant in the course of their dispute. A financial services provider will generally not be required to contribute more than $3,000 unless exceptional circumstances apply. The Applicants seek reimbursement of professional fees totalling $6,437 incurred during the course of the dispute. These fees are made up of fees and expenses paid to a builder (A) engaged by the Applicants to project manage their claim ($4,402) and fees of $2,035 paid to the Applicants’ engineer (C) to report on the cause of the disputed items of damage. While it was open to the Applicants to outsource the management of their claim to a third party, in the circumstances the Panel does not consider that the FSP should be required to reimburse them for the costs incurred in doing so. The Panel does not accept that the involvem ent of the Applicants’ builder (A) has contributed in any significant respect to the resolution of their claim. However, even though the Panel has not accepted the views expressed by the Applicants’ engineer (C) in their entirety, the Panel does consider that C’s reports Case No: 365246 Determination Page 7 of 8 (and the photographs included therein) have been of some assistance in identifying the extent of the cyclone damage to the roof. In the circumstances, the Panel considers that the FSP should be required to reimburse the Applicants for 50% of C’s fees (being $1,018). Case No: 365246 Determination Page 8 of 8 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. The parties have made extensive submissions and provided voluminous materials. All material information which has been relied on for the purposes of this Determination has been exchanged between the parties, and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this Determination the Panel has restricted its commentary to those items which remain in dispute and those issues which it considers directly relevant to the outcome. The Panel notes that the policyholder is the corporate trustee of a family trust, which has been represented by its directors for the purpose of this dispute. For reasons of brevity and simplicity, in this Determination the corporate trustee and its directors have been referred to collectively as the Applicants.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.