Partial denial of cyclone storm damage claim for investment property and cash settlement amount
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim
Amount
Determination
Case No: 365246 Determination Page 1 of 8
Case number : 365246 1 6 February 201 5
1 Overview
1.1 Dispute
The Applicants held an investor home insurance policy with the Financial Services
Provider (FSP) which provided cover for their rental property.
The Applicants lodged a claim under the policy for damage to the property
following Cyclone Yasi in February 2011. The FSP accepted liability for some of
the damage claimed, but denied cover for the remaining damage on the basis that
it had not been caused by the cyclone.
The Applicants say that the disputed items of damage were caused by the
cyclone. They also seek benefits for loss of rent due to their tenant vacating the
property after the cyclone.
1.2 Issues and key findings
Is the FSP liable for the disputed items of damage?
The available information establishes that the FSP is liable for the repair of some
of the disputed items of damage. However, the FSP is not liable for all of the
disputed damage, some of which pre-existed the cyclone and/or was caused by
factors which are excluded under the policy (such as gradual deterioration,
corrosion and lack of maintenance).
Are the Applicants entitled to any other amounts?
The Applicants are not entitled to payment for loss of rent as they have not
established that their tenants vacated the property due to the damage caused by
the cyclone and/or the delay in completing the repairs.
The Applicants are not entitled to reimbursement of fees incurred in appointing a
builder to project manage their claim. However, they are entitled to
reimbursement of 50% of their engineer’s fees, as the engineer’s report has been
of some assistance in determining the extent of the cyclone-related damage.
1.3 Determination
This Determination is partly in favour of the Applicants.
The FSP is to increase the cash settlement offered to the Applicants by an
additional amount of $13,018 . The FSP is not required to pay interest on this
amount.
Case No: 365246 Determination Page 2 of 8
2 Reasons for Determination
2.1 Is the FSP liable for the disputed items of property damage?
Policy provides cover for storm subject to various exclusions
The Applicants ’ policy provides cover for loss or damage caused by the events
listed in the policy (including the insured event of storm), subject to the conditions
and exclusions set out in the policy.
The policy contains general exclusions for damage caused by:
wear, tear, rust, fading, gradual deterioration, mould, rising damp, mildew,
action of light, atmospheric or c limatic conditions, corrosion or rot (unless
covered under the insured event of storm);
a defect, structural fault or design fault that the insured knew about and did
not fix before the damage occurred; and
the insured’s failure to take reasonable care of the property and to keep the
property in good condition and reasonably maintained and to fix faults and
defects as soon as becoming aware of them.
The FSP accepted that the Applicants’ property was damaged by the cyclone in
February 2011 and offered to cash settle the Applicants for a total of $19,207.39.
However, the Applicants say that the cash settlement does not cover all of the
damage to the property caused by the cyclone. In particular, they say that the
cyclone caused significant damage to the roof, which has continued to leak during
subsequent periods of heavy rainfall.
The FSP says that the disputed items of damage claimed by the Applicants were
not caused by the cyclone, but were either pre-existing and/or caused by factors
which are excluded under the policy.
It is an accepted principle of general insurance law that an insured bears the onus
of establishing that, on the balance of probabilities, they have suffered a loss
caused by a risk insured under the policy. This is known as a prima facie claim. If
the insured is able to establish a prima facie claim, the onus then shifts to the
insurer to show that, on the balance of probabilities, the loss falls within an
exclusion clause under the policy or that it is otherwise entitled to deny liability.
Disputed damage includes a number of separate items
The additional damage to the property which the Applicants say was caused by
the cyclone comprises several separate items of damage.
The parties have provided extensive information (including numerous consultants’
reports, scopes of work and photographs) in relation to the cause of damage in
each case. The Panel has carefully reviewed this information for the purpose of
determining whether the FSP is liable for each disputed item.
Case No: 365246 Determination Page 3 of 8
FSP is liable for damage to front door lead light panels
The photographs included in the reports provided by the various consultants
confirm that the lead light panels in the front door have small holes and cracking
damage. It appears that this damage has occurred in more than one area.
The FSP’s assessor who attended the prop erty in June 2012 reported that the
Applicants’ tenant (GN) had advised him that the damage to the leadlight panels
occurred during windy conditions in January 2012. Accordingly, the FSP says that
the damage was not caused by the cyclone.
However, it is clear from photographs taken by the assessor (KP) who attended
the property in April 2011 that at least some of the damage to the leadlight panels
was already apparent at that time.
Having reviewed the photographs of the damage, the Panel is satisfied that it is
consistent with having been caused by the impact of flying debris during storm
conditions. This has been confirmed by the FSP’s engineer (N).
While it is possible that some of the damage may have occurred during a
separate storm event (as advised by the Applicants’ tenant) , the Panel considers
that the FSP should cash settle the Applicants for all of the damage, in the
interests of finalising the current dispute.
FSP is liable for damage to laundry (other than timber doorframe)
The Applicants seek cover for damage to the external laundry door, as well as
resulting internal damage to the laundry cabinets caused by water being blown
underneath the door.
The FSP says that the damage to the laundry door pre -existed the cyclone and
was due to gradual deterioration and a lack of maintenance over the life of the
house. The FSP’s consultants advised that the bottom of the door had rotted and
the absence of a weather strip had allowed water to enter the laundry during
periods of heavy rainfall. They noted that the damage to the laundry door was
identified in the pre-purchase inspection reports obtained by the Applicants in
October 2006.
The Applicants dispute the findings of the FSP’s consultants. They say that the
laundry door was replaced in 2007 and have provided photographs confirming
that the replacement door had a weather strip installed. The Applicants have also
advised that the door was sealed with three coats of a clear finish paint product
during maintenance repairs carried out in January 2011.
Given the nature of the damage and based on the information provided by the
parties, the Panel is not satisfied that the FSP has established that the damage to
the laundry door and the resulting internal damage was caused by gradual
deterioration, rather than the cyclone in February 2011. The Panel considers that
the Applicants have established that the laundry door was replaced in 2007 and
therefore the reliance by the FSP’s consultants on the pre -purchase inspection
Case No: 365246 Determination Page 4 of 8
report (and references to long-term deterioration over the life of the home) are not
appropriate.
In these circumstances, the Panel considers that the FSP is liable to cash settle
the Applicants for the damage to the laundry door and the resulting water damage
to the laundry cabinets.
However, the Panel notes that the pre-purchase inspection report refers to timber
damage to the laundry door frame, which does not appear to have been replaced
when the door itself was replaced. Accordingly, the FSP is not liable for this
damage.
FSP has cash settled Applicants for damage to garage roller door
In their submissions to FOS, the Applicants have referred to damage to the
garage roller door.
The FSP advised in its Notice of Response that the Applicants had been cash
settled for the damage to the roller door. In their letter to FOS dated 16
September 2014, the Applicants confirmed that they have accepted this cash
settlement. Accordingly, the FSP has no further liability in this regard.
Cyclone caused limited damage to roof
The Applicants say that the roof of the property was lifted due to the effects of
strong winds experienced during the cyclone. They say that, as a result, the roof
has leaked continuously in various areas since, causing further water damage
and mould growth. The Applicants deny that there were any significant issues with
the roof prior to the cyclone.
The FSP says that the cyclone caused minimal (if any) damage to the roof. The
FSP says that the issues with the roof pre -existed the cyclone and were caused
by factors including the poor workmanship in the construction of the roof and/or
poor ongoing maintenance.
The FSP accepted liability for the internal water damage to the property caused
by water entry during the cyclone and offered to cash settle the Applicants for
$12,414,60 for the cost of internal repairs, based on a quotation provided by its
builder (TS). The quote provided by TS included an allowance for the repair,
replacement and re-screwing of lifted or split battens and the replacement of
approximately 10 square metres of roof sheeting.
The Panel has been provided with multiple reports from numerous consultants
who were engaged to assess the extent of damage to the roof and/or determine
the cause of the damage. These consultants include three engineers (two
engaged by the FSP (N and J) and one engaged by the Applicants) and at least
three builders. Each party has also obtained statements in support of its position
from roof sheeting manufacturers and/or distributors.
The reports provided reflect vastly differing opinions as to the extent of the
damage to the roof caused by the cyclone. The views expressed range from the
Case No: 365246 Determination Page 5 of 8
cyclone having caused little (or no) damage to it having caused extensive damage
necessitating the complete replacement of the roof. There is a divergence of
views even between the FSP’s own contractors.
Having carefully reviewed all of the available information (including the numerous
photographs of the roof as at various dates), the Panel is satisfied that the bulk of
the issues with the roof were caused by factors which were unrelated to the
cyclone (such as gradual deterioration, corrosion and lack of maintenance).
The various consultants have confirmed that the property would be particularl y
susceptible to the corrosive effects of the salt laden atmosphere over a relatively
short period of time, given its beachfront position. The available information
establishes that leaks and other maintenance issues were apparent in various
areas of the property prior to the cyclone.
In determining the cause of damage to the roof, the Panel has found the
comprehensive and detailed reports provided by the FSP’s second engineer (J)
particularly persuasive. In his reports, J provides a logical and reasonable
alternative explanation for the problems with the roof in each of the various areas
where water entry has occurred, which are unrelated to the cyclone.
However, the Panel accepts that a number of the consultants who examined the
roof identified some degree of batten lift, although their estimates as to the extent
of the damage varied considerably, from 1% of the total roof area (as estimated
by J, to 50% or more (as estimated by the Applicants’ engineer (C)).
On balance, the Panel is satisfied that the cyclone did pressurise the roof cavity to
some extent, causing damage in the form of batten lifting and/or splitting. Further,
the Panel accepts that some of the roof sheets may require replacement, either to
allow repairs to the underlying structure or as a result of misalignment of the roof
sheets themselves.
While the Panel does not accept that the damage caused by the cyclone was so
extensive as to require the complete replacement of the roof, it is satisfied that the
damage is likely to have been more extensive than allowed for under the cash
settlement offered to date, w hich was based on TS’s quotation. Accordingly, the
Panel considers that the amount of the cash settlement should be increased to
allow for additional repairs to the roof.
Cash settlement should be increased to allow for additional damage
As outlined above, the Panel has determined that some of the disputed damage
was caused by the storm. Accordingly, the FSP is liable for the costs of repairing
this additional damage.
Given the time which has passed since the damage occurred, and in the interests
of achieving finality, the Panel considers that the FSP should be required to
increase the cash settlement offered by an additional amount of $12,000.
In determining this amount, the Panel has had regard to the various estimates
obtained by both parties during the claim process and has also taken into account
Case No: 365246 Determination Page 6 of 8
the delays and inconvenience experienced by the Applicants during the course of
the claim. Accordingly, the FSP is not required to pay interest on the increased
settlement amount.
2.2 Are the Applicants entitled to any other amounts?
Applicants are not entitled to payment for loss of rent
The Applicants’ policy provides cover for loss of rent, in circumstances where the
property is unable to be lived in due to damage caused by an insured event.
The Applicants say that their tenants vacated the property in December 2012 due
to concerns about ongoing leaks, water damage and mould growth.
The Panel notes that the tenants did not vacate the property until more than
eighteen months after the cyclone. In these circumstances, the Panel is not
satisfied that the cyclone damage (and/or the delay in repairs) was the cause of
the tenants ’ departure.
In this respect, the Panel notes that both the existing tenant at the time of the
cyclone and a previous tenant had identified water entry issues with the property
which pre-existed the damage caused by the cyclone.
Further, the Applicants were offered a cash settlement of $12,414.60 for the
internal repairs in December 2011. It was open to them to use these funds to
address issues such as mould growth at the property, in order to minimise the risk
that their tenants would vacate.
In these circumstances, the Panel is not satisfied that the Applicants have
established a claim for loss of rent under the policy .
Applicants are entitled to partial reimbursement of engineer’s fees
Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a
financial services provider to contribute to professional costs incurred by an
applicant in the course of their dispute. A financial services provider will generally
not be required to contribute more than $3,000 unless exceptional circumstances
apply.
The Applicants seek reimbursement of professional fees totalling $6,437 incurred
during the course of the dispute. These fees are made up of fees and expenses
paid to a builder (A) engaged by the Applicants to project manage their claim
($4,402) and fees of $2,035 paid to the Applicants’ engineer (C) to report on the
cause of the disputed items of damage.
While it was open to the Applicants to outsource the management of their claim to
a third party, in the circumstances the Panel does not consider that the FSP
should be required to reimburse them for the costs incurred in doing so. The
Panel does not accept that the involvem ent of the Applicants’ builder (A) has
contributed in any significant respect to the resolution of their claim.
However, even though the Panel has not accepted the views expressed by the
Applicants’ engineer (C) in their entirety, the Panel does consider that C’s reports
Case No: 365246 Determination Page 7 of 8
(and the photographs included therein) have been of some assistance in
identifying the extent of the cyclone damage to the roof.
In the circumstances, the Panel considers that the FSP should be required to
reimburse the Applicants for 50% of C’s fees (being $1,018).
Case No: 365246 Determination Page 8 of 8
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous FOS decisions.
The parties have made extensive submissions and provided voluminous
materials. All material information which has been relied on for the purposes of
this Determination has been exchanged between the parties, and each party has
had the opportunity to address any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised a number of issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those items which remain in dispute and those issues which it considers directly
relevant to the outcome.
The Panel notes that the policyholder is the corporate trustee of a family trust,
which has been represented by its directors for the purpose of this dispute. For
reasons of brevity and simplicity, in this Determination the corporate trustee and
its directors have been referred to collectively as the Applicants.