Determination 364525
Delay in claim handling - dispute over extent of damage
Summary
The applicant sought further repairs and compensation for a storm-damaged home after an earlier determination. AFCA ordered the FSP to complete a broader scope of repairs, pay $1,000 for delay and stress, meet temporary accommodation costs, and pay interest on payments, while rejecting some items.
The FSP must cover damage that the evidence shows was caused by the insured event or the repairs, and must act with utmost good faith in resolving the claim.
Issues
- Repairs or contractors primary · upheld
“The FSP is obliged to indemnify the Applicant for further repair work, including the air vent, doors, cornices and wall lining.”
- Claim denial secondary · not upheld
“No evidence the water damaged timber under the bath was not done, so the FSP is not obliged to take it further.”
- Poor claim handling secondary · upheld
“The FSP's handling of this matter has been far less than exemplary.”
- Delay secondary · upheld
“It is simply unacceptable that the FSP took more than three months to attend the further inspection.”
Subjects and remedies
home or building damagepay claimpay compensationpay interestpay non financial lossrepair or rectify
Text of the determination
Addendum
General Insurance - Domestic Insurance - Home Building - Service - Delay in Claim
Handling - Dispute Over Extent of Damage
Determination
Case No: 364525 Determination Page 1 of 8
Case number : 364525 27 August 2014
1 Overview
1.1 Dispute
On 19 December 2013, the Financial Ombudsman Service (FOS) issued a
Determination in favour of the Applicant and against the Financial Services
Provider (FSP). In part the Determination noted that the FSP:
Had an onus to ensure that its experts completed any work conducted at the
property in accordance with the submitted scopes of work
Appoint a “suitably qualified expert to attend at the property and evaluate”
issues identified by the Applicant, noting that there had been two repair
attempts already. The onus remained with the Applicant to establish any
alleged loss
Arrange for an expert to prepare a report in relation to issues noted with the
bathroom
Pay compensation of $1,000.
A dispute has since arisen as to aspects of the Determination and the further
investigations and professional reports commissioned at the property. The FSP
has specifically sought an Addendum Determination to consider these issues.
1.2 Issues and key findings
Did the original Determination adequately address the issues at the home?
There are no reasons to revisit the issues in relation to the settlement of the
evaporative cooler, the removal of the electrical items and/or the
repair/replacement of the shutter blind. These issues were amply resolved in the
Determination issued on 19 December 2013.
Is there any further work required at the home?
Based on the further information submitted, the FSP is obliged to indemnify the
Applicant for additional work at the property for:
Re-painting of the eaves and the air vent, as well as touch ups in all rooms
The rectification/repair of the toilet door and linen closet
The frame inside the bedroom wardrobe, which is damaged and needs to be
attended to
Removal of smoke staining in the dining area
The repair of the kitchen stove tops
Cleaning and re-grouting of the glass bricks in the bathroom area, with a
shower screen also to be supplied and re-fitted
Roof insulation to be properly installed/rectified
Case No: 364525 Determination Page 2 of 8
Solar panels to be re-checked and repaired
The repair or replacement of the telephone jacks (subject to inspection by the
FSP to confirm that they are damaged)
Repair and repainting of the air vent
Repair, relaying or replacement of the flooring in the kitchen, as appropriate to
ensure that it is rectified
Repair or replacement (as appropriate) for the hall and laundry doors and
surrounds
Repair or replacement (as appropriate) for the cornices
Repair or replacement of the wall lining in bedroom 3
Repair of the plaster wall in the toilet from where the light switch was moved.
In addition to the above, the FSP must pay an additional sum of compensation,
being $1,000, for the continued stress and anxiety experienced by the Applicant
through the avoidable and ongoing delays experienced in the resolution of the
claim.
How long should the FSP have to complete the work?
The Service cannot decree a set time for the above work to be completed,
although the FSP should endeavour to ensure its contractors complete this work
as soon as it is possible. The respective parties must remain mindful of their
mutual ongoing duty of utmost good faith.
Temporary Accommodation
The FSP is required to meet the Applicant’s cost of temporary accommodation,
from 09 August 2014 to 05 September 2014, in accordance with the submitted
reservation confirmation and upon the Applicant providing proof of payment.
1.3 Determination
This Addendum Determination is in favour of the Applicant.
The FSP is obliged to resolve the claim as stipulated above. Insofar as it is
required to make any payments to the Applicant (outside of the compensatory
payment for $1,000 and the cost of temporary accommodation), it must include
interest calculated from 28 November 2012 until the date of settlement.
Case No: 364525 Determination Page 3 of 8
2 Reasons for Determination
2.1 Did the original Determination adequately address the issues at
the home?
No grounds to alter the settlement for the evaporative cooler
The FSP has raised issues from the Determination, such as the calculation of the
refund for the evaporative cooler. The original Recommendation and later
Determination relied on figures supplied by the FSP’s solicitor claiming that the
relevant refund figures were “exclusive of GST”. The FSP now claims this was not
the case.
Notwithstanding this, the FSP has provided no explanation why this was not
challenged after the original Recommendation, or provided an invoice or direct
quote to support the allegation. It relies upon a loss adjuster’s report from “CE” , to
contest that the figures were GST-inclusive.
I cannot be satisfied, on balance, that the originally quoted sums were incorrect or
that the original decision on this issue should be changed.
Shutter blind
A dispute over how the shutter blind should be repaired/replaced remains ongoing
since the Determination. This document made it clear that:
“22. Given the evidence, it is appropriate that the FSP ensure that the roller shutter
replacement is of the same original materials as used in other areas of the
home, should this type of unit be available. If that unit is not available, then I
am satisfied the FSP may rely upon the replacement used but in any event the
FSP is still required to ensure that it is working properly.”
Accordingly, it is incumbent upon the FSP to ensure that this item is replaced like
for like, should such an item be available (which the Applicant believes it is).
There was no stipulation for the item to be repaired as a preference. The FSP
must comply with the terms of the Determination.
If the FSP is unable to source an exact replacement for the shutter blind, the
Applicant may provide details where such an item may be sourced (if he has this
information). If the like for like cannot be obtained, then the resolution stipulated
above will stand.
Electrical items
The Applicant says that some electrical items have not been removed and
replaced in the home. This was considered in the FSP’s further deliberations and
the report from “HC”.
This issue was addressed previously in paragraphs 28 -33 of the Determination
and the original evaluation of the relevant items still applies.
Case No: 364525 Determination Page 4 of 8
Determination specified that the FSP must have an expert re-visit the
property
In accordance with the prior Determination, the FSP arranged for consulting
engineer HC to revisit the insured property to review the entirety of the work done
and to evaluate further issues relating to what the FSP will and will not cover for
the Applicant.
HC’s subsequent report was detailed and noted a number of outstanding issues
with the home and some matters that were still to be resolved.
2.2 Is there any further work required at the home?
The extent of cover should be broadened
HC detailed that a number of issues should be covered by the FSP. Based on this
report and other obtained expert evidence, the FSP agreed to (or should agree to)
cover certain items, including the:
Re-painting of the eaves and the air vent, as well as touch ups in all rooms
The issues with the toilet door and linen closet
Frame inside the bedroom wardrobe, which is damaged and needs to be
attended to
Smoke staining in dining area
Kitchen stove top to be repaired
Glass bricks in the bathroom are to be cleaned and re-grouted, with a shower
screen to be supplied and re-fitted
Roof insulation is to be rectified properly
Solar panels to be re-checked and repaired in accordance with the stipulations
from paragraph 39 of the Determination.
Items which the FSP declined to cover or sought further information
The parties remain in dispute over numerous remaining issues in relation to the
home. These remaining issues relate to damage the FSP did not consider was
caused by or related to the insured event or any repair work.
Whilst HC was of the view that some of the damage claimed by the Applicant was
due to differential movement of the footings for the home, there is no persuasive
evidence of this. It is noted that the expert suggested in his initial report that the
home was situated on a slab, when it was clearly built on stumps (which was later
conceded by HC).
I cannot be convinced by HC’s opinion as to possible differential movement being
a factor (not having previously been cited as such), when there is a simpler and
more likely cause for some of the highlighted problems.
The FSP’s handling of this matter has been far less than exemplary and inso far
as there might be some ambiguity about some aspects of the claimed loss, I have
erred in favour of the Applicant.
Case No: 364525 Determination Page 5 of 8
The below table details the relevant items and the consideration of the relevant
evidence in support of same:
Item Issue with damage and determination
Roller shutter FSP does not agree that this needs replacement and
argues it can be repaired. This was determined in
the original dispute and addressed above
Various telephone jacks The FSP requires a proper inspection and agrees to
attend to the work if the jacks are damaged. I am
satisfied that this is a reasonable response
Repair of the air vent Applicant has supplied a photograph to attest to it
not being damage prior to the incident. On balance,
it is more likely than not that it was d amaged during
the repair process and the FSP should cover this
Kitchen flooring The Applicant’s expert, “HA” suggests that there is a
slight movement of the underlay, causing a “sticking”
sound. I do not accept HC’s suggestion of
“differential movement” o f the footings
Scope of works from “BB” confirms that this was part
of the work done so it should be rectified
Hallway and laundry doors HA notes that this has not been installed properly,
whereas HC again contends it was due to differential
movement of the footings. I am of the view that these
should be covered
Plaster cornices The FSP considered that these issues were due to
normal buil ding movement but in the absence of
persuasive evidence, this should be covered
Wall lining in bedroom 3 FSP has agreed to cover if it is verified. I am
satisfied that the HC opinion is verification enough
and it should be covered
Light switch in the toi let moved,
leaving a hole in the plaster wall
FSP says that this was a choice of the Applicant
(which is denied). Even if true, it does not excuse a
poor job and this should be rectified
Roof surface Matter was addressed in paragraph 35 of the
Determinati on – FSP is not required to pressure
clean or re - colour the remaining roof tiles
Water damaged timber under
bath
No evidence to suggest that this work was not done
and in the absence of this, the FSP is not obliged to
take the issue further.
Possibility of further issues
Notwithstanding the breadth of repair issues canvassed through the
Recommendation, Determination and this Addendum, there remains the
Case No: 364525 Determination Page 6 of 8
possibility of hitherto unforseen or unknown damage to the home that the FSP
has not covered to date.
Should any such additional damage or problems emerge, the parties are
reminded of their mutual duty of utmost good faith to ensure that any difficulties
are speedily resolved.
Further compensation
It would appear that there has possibly been some miscommunication between
the FSP and its solicitor through the handling of this matter, which at times has
caused confusion over the resolution of the matter.
This and other difficulties have certainly caused difficulties, stress, anxiety and
discomfort to the Applicant.
I awarded compensation on the previous Determination of $1,000 to the Applicant
for the “serious inconvenience and the... [poor] standard of the initial repairs and
the delays that have resulted”. The effect that this had had on the Applicant
warranted the award of compensation.
These issues have continued to be a problem since the issuing of the original
Determination. There was a significant delay between the FSP being informed of
the acceptance of this Determination on 23 January 2014, which stipulated that a
further inspection was necessary and this inspection being arranged and carried
out by HC on 30 April 2014. It is simply unacceptable that the FSP took more than
three months to attend to this.
It is clear from the Applicant’s submissions that this has been an ongoing source
of frustration and angst for him and I am satisfied than an additional award of
$1,000 compensation is appropriate.
2.3 How long should the FSP have to complete the work?
The Service is unable to impose a timeframe for the repairs
The Applicant has asked the Service to identify a timeframe for the repair of the
home as he remains concerned over the length of time taken by the FSP to attend
to the work.
I agree that the FSP’s handling of the matter has been far less than idea l and it is
understandable that the Applicant has been frustrated by the process. That said, it
is apparent that there is still a considerable amount of work to be done and the
Service is not able to identify or impose a reasonable timeframe for this.
It is incumbent on the FSP to ensure that it attends to the ongoing problems and
the rectification of same as a matter of urgency, so as to avoid further issues and
inconvenience for the Applicant.
Case No: 364525 Determination Page 7 of 8
2.4 Temporary Accommodation
The FSP should meet a limited period of temporary accommodation.
The Applicant says the home is uninhabitable, the FSP does not agree.
Within his email of 6 August 2014, the Applicant explains why he believes the
home is uninhabitable. In my view, items (a) – no shower screen and (d) the toilet
door does not close, as raised by the Applicant, support his contention. This is
particularly so given HC’s report to the effect that these items should be attended
to by the FSP.
In the circumstances, I am satisfied that the Applicant is entitled to a limited period
of temporary accommodation.
The Applicant says he was required to move from his parents’ home on 9 August
2014. The Applicant has provided details of his booking arrangements for the
temporary accommodation. The FSP has not responded to either issue, save for
saying it does not agree to temporary accommodation. As such, I accept the
information provided by the Applicant, in regard to both issues.
In my view, it would only require a limited time for the FSP to attend to items (a)
and (d) as detailed in from the Applicant’s email of 6 August 2014.
Considering all the circumstances of this matter, I am satisfied that it is fair that
the FSP be required to meet the Applicant’s cost of temporary accommodation
from Saturday, 9 August 2014 to Friday, 5 September, 2014, in accordance with
the reservation confirmation dated 8 August, 2014 and upon the Applicant
providing proof of payment.
3 Supporting information
3.1 FOS approach to this dispute
General information
As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the nature and complexity of the matter. This
dispute is an Addendum to the Determination previously issued by the Service on
19 December 2013.
The purpose of this Addendum is not to revisit issues previously considered in the
earlier Recommendation or Determination but to review and determine issues that
have arisen out of the original Determination or that require clarification.
A full exchange of the relevant information has taken place between the
respective parties and each party has had the opportunity of addressing any
issues raised.
Case No: 364525 Determination Page 8 of 8
All of the provided material has been read and considered. The parties have
raised numerous issues in their submissions to the Service. For the purpose of
this Determination, commentary is restricted to only those issues considered
relevant to the outcome.
Duty of utmost good faith
Section 13 of the Insurance Contracts Act 1984 provides that a contract of
insurance is a contract based on the utmost good faith, and there is implied in
each contract, a provision requiring each party to act towards the other party, in
respect of any matter arising under or in relation to it, with the utmost good faith.