Denial of cracking and structural damage to home caused by leaking sewer pipe and storm water

FirmFinancial Firm (Unknown - Insurer)
Decided2014-11-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The owner's home suffered structural cracking after a storm and a leaking sewer pipe, and the FSP denied the building damage as subsidence or flood. AFCA found the broken pipe was the proximate cause, the exclusions did not apply, and ordered the claim settled under the policy with interest from 24 December 2010.

The proximate cause of the damage was the leaking pipe, which is an insured event, and the subsidence and flood exclusions do not apply to it.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion/ condition Determination Case No: 363275 Determination Page 1 of 10 Case number : 363275 5 November 2014 1 Overview 1.1 Dispute The Applicant lodged a claim under her farm insurance policy with the Financial Services Provider (FSP) after her home suffered cracking and structural damage on or around 2 March 2010. The Applicant initially attributed the damage to the effects of a severe storm, but later identified the cause as being water leaking from a broken sewer pipe discovered by her plumber in September 2010. The FSP accepted the Applicant’s claim for water damage to her home caused by the storm. However, it denied the Applicant’s claim for cracking and structural damage on the basis that this damage was caused by flood and/or earth movement. 1.2 Issues and key findings Is the FSP liable for the damage to the Applicant’s house ? The available information establishes that the cracking and movement damage to the Applicant’s house was caused by earth movement resulting from the effects of water leaking from the broken pipe, exacerbated by water ponding around the house after the storm. Damage caused in this manner is covered under the policy. The exclusion for earth movement does not apply as this was not the proximate cause of the damage. The FSP has not provided any information to establish that the damage was caused by a “flood” as defined in the policy. 1.3 Determination This Determination is in favour of the Applicant. The FSP is to settle the Applicant’s claim for the cracking and movement damage to her home in accordance with the terms of the policy. If the Applicant’s claim is cash settled, the FSP is to pay interest on the settlement amount at the rate determined in accordance with section 57 of the Insurance Contracts Act 1984 (the Act) from 24 December 2010 until the payment date. Case No: 363275 Determination Page 2 of 10 2 Reasons for Determination 2.1 Is the FSP liable for the building damage? Application of policy depends on cause of damage The Applicant’s policy provides cover for damage caused by certain events listed in the policy, including storm and rainwater run-off, flash flood and water discharging or overflowing at the property. The policy also provides cover for accidental damage, which occurs in any circumstances not covered under one of the listed events. The policy contains general exclusions for damage caused by or as a result of erosion, subsidence or any other earth movement, except where the damage is caused by the insured events of flash flood or water discharging or overflowing. Damage caused by flood is not covered under the policy, as the Applicant had elected not to take out the optional flood cover available. The Applicant says that the cracking and movement damage to her house was caused by water escaping from a broken sewerage pipe under the concrete slab in the bathroom, which washed the soil away from underneath the slab, creating a large void which caused the slab to subside. The FSP acknowledges the broken sewerage pipe, but disputes that this caused the cracking damage to the Applicant’s home. The FSP says that the damage occurred after the foundation soils became saturated following heavy rain, which significantly reduced their bearing capacity and caused the slab to subside. The FSP says that the damage to the sewerage pipe occurred as a result of the slab subsiding. Accordingly, it is necessary to determine the proximate cause of the cracking and movement damage to the Applicant’s house (that is, the real, effective or predominant cause). Building damage was caused by effects of broken pipe and pooling water The Panel has been provided with a number of reports from various builders and engineers engaged by the parties to determine the cause of the damage to the Applicant’s house. These reports are inconsistent in a number of key respects. Having reviewed the reports provided, the Panel is satisfied that:  as a result of heavy rainfall during the storm on 2 March 2010, the Applicant’s house was surrounded by water which pooled around the perimeter but did not enter the house itself. The Applicant evacuated the house during the storm and therefore is unable to confirm how long the inundation lasted. Various estimates have been provided, ranging from a couple of hours to several days;  major cracking damage to the house became apparent immediately after the severe storm in early March 2010. This damage was localised to the north- west corner of the house where the concrete slab had subsided. While there Case No: 363275 Determination Page 3 of 10 were signs that the house had previously experienced movement damage, the nature and extent of the prior damage was significantly less severe than the damage which occurred in March 2010; and  in September 2010, the Applicant’s plumber discovered a cracked and leaking sewerage pipe located under the concrete slab of the en suite bathroom in the north west corner of the house. Soil tests carried out at the property identified that the foundation soils were a fine to medium grained sand and therefore would not experience significant volumetric changes under ordinary weather conditions. The FSP’s geotechnical engineer (AG) confirmed that rainwater would typically drain away fairly quickly from the foundation soils. However, if they did become saturated, then their bearing capacity would be significantly reduced. Accordingly, it appears likely that the cracking and movement damage which is the subject of the Applicant’s claim occurred as the result of a specific event, rather than due to an ongoing pattern of earth movement. Based on the available information, the Panel is satisfied that the leaking sewerage pipe identified by the Applicant’s plumber was the proximate cause of the subsidence of the concrete slab at the north-west corner of the house which caused the resulting damage. In this respect, the Panel notes that:  the broken pipe is located in the corner of the house where the localised damage occurred;  the photographs of the broken pipe taken by the Applicant’s builder in September 2010 suggest that soil has been washed into the broken section of the pipe and a void had developed under the slab;  the builder’s photographs show that the broken pipe remained encased in the concrete slab. Accordingly, the crack in the pipe is more likely to have existed before the subsidence (rather than having been caused by the slab subsiding) and may have existed for some time; and  the FSP’s geotechnical engineer (AG) stated that water usually only ponds on the surface of sandy soils when the soil has already become saturated. This suggests that the soil may have already been partially saturated prior to the storm event. However, the Panel acknowledges that the pooling of water around the edge of the building during and following the storm may have contributed to the damage. Both the FSP’s geotechnical engineer (AG) and consult ing engineer (L) noted that there was a depression in the ground along the front of the northern wall which allowed water to collect. This may have resulted in more water pooling in this area following the storm than in other areas around the building which (together with the effects of the broken pipe) caused the slab to subside in the north-west corner only. Exclusions referred to by FSP do not apply As outlined above, the Applicant’s policy provides cover where the proximate cause of the damage is a leaking pipe, storm/rainwater run-off or flash flood, but does not provide cover for damage caused by subsidence or flood. Case No: 363275 Determination Page 4 of 10 In the present case, the exclusion for subsidence, erosion or other earth movement does not apply as the subsidence of the slab occurred as a result of the broken pipe, exacerbated by the pooling of water following the storm. Accordingly, the subsidence of the slab (or the erosion of the soil underneath the slab) was not the proximate or underlying cause of the damage. The FSP has sugge sted that the pooling of water around the Applicant’s property constitutes a “flood” (which is not covered under the policy), as opposed to a “flash flood” (which is covered). However the FSP has not provided any hydrological information to show that the pooling was caused by water escaping or being released from the normal confines of a river or other natural watercourse, as is required to satisfy the policy definition of “flood”. The Panel notes that the available meteorological information shows that the significant rainfall during the storm occurred within a 24 hour period between 2 March 2010 and 3 March 2010. Accordingly, to the extent that the pooling of water around the Applicant’s property caused or contributed to the damage, the Panel consider s that this is more properly categorised as “storm and rainwater run- off” or “flash flood” as defined in the policy. For the reasons outlined above, the Panel considers that neither of the exclusions referred to by the FSP can be relied on in the present case. Accordingly, the FSP is liable for the Applicant’s claim. Case No: 363275 Determination Page 5 of 10 3 Supporting information 3.1 Approach taken by Panel This dispute has not been the subject of a FOS Recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for Determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed all of the material provided by the parties, i ncluding the various consultants ’ reports obtained. However, for the purposes of this Determination, the Panel has limited its commentary to the matters which it considers directly relevant to the outcome. 3.2 Terms of policy Subject Terms Insured event - leaking of water INSURED EVENTS Bursting, leaking, discharging of water or liquids at the insured address from:  pipes and taps …  drainage and sewerage systems NOT INSURED Repair or replacement of the tank, pipe or container that water or liquid escaped from … Loss or damage:  caused by flood … Insured event – storm and rainwater run - off INSURED EVENTS Storm and rainwater run - off NOT INSURED Loss or damage caused by or because of: …  flood but we will cover - flash flood (Insured Event 6(b)) - flood damage if you are covered for flood damage under (Option 3) Insured event – “flash flood” INSURED EVENTS Flash flood … NOT INSURED Loss or damage caused by or because of: … Case No: 363275 Determination Page 6 of 10 Subject Terms  flood, if the rain that caused the flooding fell more than 24 hours before the flood occurred “Flash flood” - f lood or a combination of flood mixed with rainwater run - off, caused by rain falling in the 24 hours immediately before the Home or Contents are damaged by the flash flood. It does not mean water from the sea. Exclusion for subsidence We do NOT cover loss or damage … caused by or as a result of erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement but we will cover …  Bursting, leaking, discharging or overflowing (Insured Event 7)  Flash flood (insured event 6(b))  Flood (if you have chosen and are covered by Option 3) Definition of “flood” The covering of normally dry land by water escaping, overflowing or being released from the normal confines of a:  river, creek or any other natural watercourse whether or not it has been altered or modifi ed … A “flood” is not water from: …  a burst or leaking pipe or water tank 3.3 Reports Record Key points FSP’s builder (D) Report - 23 April 2010  The building was approximately 30 years old and built on a concrete slab.  The Applicant had advised that the building had been surrounded by approximatel y 100mm of floodwater which had subsided after about five hours .  The building displayed severe structural failure throughout, with major failure in one corner. The failure was due to the construction methods used .  T he failure was not due to a single event but existed prior to the storm. There was evidence of previous repairs . FSP’s engineer (L) Report - 1 July 2010  The house is in a very flat area and is not raised above the surrounding land. This would result i n water ponding around the house after rain.  T he recent high rainfall had softened the foundation material resulting in subsidence of the slab and footings that ini tiated the cracking damage to the building.  Subsidence was restricted to the damaged area with the remainder appearing sound and unaffected. There was evidence of previous cracking damage but not to the extent currently observed.  As the soils were not reactive, the subsidence of the perimeter footing was due to the loss of load bearing capacity when the supporting soils were saturated by the Case No: 363275 Determination Page 7 of 10 Record Key points recent rainfall event.  The subsidence had broken or blocked the pipe draining the vanity and shower . Applicant’s engineer (B) Report - 10 September 2010  The wall damage (crack ing) is due to soil movement which was caused by leaking pipes .  The repairs carried out to address movement damage caused by a leaking drainage pipe six years earlier were still intact. Applicant’s plumber (PS) Report - 20 September 2010  He had dug down beside the house to gain acce ss under the slab . T he damage to the slab was caused by a broken pipe under the slab beneath the bathroom . FSP’s engineer (L) Report - 1 November 2010  The suggestion by the Applicant’s engineer (B) that the damage was due to leaking pipes was not supported .  He would expect the service pipes to have sheared or failed due to the building movement. S oil experts (SQ) (jointly appointed) Report - 15 July 2011  T he foundation soils were classified as “S” (slightly reactive) and therefore would exper ience only slight ground movement from changes in moisture conditions. Applicant’s engineer (B) Report - September 2011  Design details for the co ncrete slab and footing system we re unknown, however, the building wa s generally stable.  There were no control joints in the masonry walling and no steel reinforcement or core filling was apparent in the cracked sections of the walls. This form of construction was not unusual in the region.  The foundation soils were slightly reactive and would lose strength if soaked.  The recent floodwater did not enter the building but only enveloped the who le of the building perimeter (and the inundation was not prolonged).  If the foundation soils had been soaked by floodwaters, the damage would be more generally distribu ted rather than localised.  The period of inundation was unlikely to have been long enough for sufficient moisture to penetrate the soil below the external wall footings so as to affect those footings.  The leaking sewerage pipe was approximately six metres from the damaged area and therefore was also unlikely to have caused the damage. [ Note: B later retracted this opinion ]  While it was difficult to be certain, the pattern of damage was consistent with e xcessive wind forces acting on the building frame at the affected corner. [ Note: B later retracted this opinion ] FSP’s engineer (L) Report - 12 December 2011  He agreed with the findings of the FSP’s geotechnical engineer (AG) that the cause of the cracki ng damage wa s a lack of soil bearing capacity in the saturated state, which was a matter that should have been dealt with in the design stage for the building.  The effect of soil saturation is critical for the building and Case No: 363275 Determination Page 8 of 10 Record Key points therefore the site should have be en classified as a problem site. FSP’s geotechnical engineer (AG) Report - 28 November 2011  Anecdotal evidence suggested that the area was flooded for several months, and water was ponded to a depth of about 150 millimetres in a depression along the north ern side of the house for some time.  Water will normally only pond on the surface of sandy soil s when the soil has become saturated .  There had been minor cracking only prior to the flood in March 2010, which was probably associated with prior flood events.  Tests found the soil to be a fine to medium - grained sand with low plasticity silty grains. Soils of this type are very susceptible to failure on saturation, which significantly reduces the bearing capacity. In this case, it appeared that the allowa ble bearing capacity of the soil had been exceeded by the floods.  Given the high permeability of the soil, rainwater would typically drain fairly quickly before the soil could become saturated. Therefore, it is unlikely that normal rain events, garden wate ring or leaking pipes etc. would saturate the soils to a degree that the be aring capacity would be reduced. This would require a large flood event where there was so much water that it could not quickly drain away . FSP’s engineer (L) Report s - 1 February 2012 and 6 February 2012  T he damage to the building is not cons istent with wind loading damage .  In relation to why the damage had occurred primarily in one area of the building, he notes that there was evidence of previous settlement and repairs to damaged walls and slabs at many different places around the house.  There is evidence that settlement has not occurred in one event but has been ongoing over many years.  The damage may have been localised in the north - west corner because there was a depression in front of the northern wall where water can collect. The Applicant reported ankle deep ponding in this area after returning to the house a week after the flood. Applicant’s builder (RH) Statement - 17 September 2012  Most of the damage was to the northern wall. The rest of the building showed small cracks consistent with ongoing marginal settlement only.  The subsidence in the northern corner was most pronounced over a distance of 2.5 to 3 metres.  The pipe had broken on the lower side of the elbow and an am ount of dir t was present in the pipe , which led directly to the septic system.  If the footing had crushed the pipe (as claimed by the FSP’s engineer (L)), the slab should have separated from the footing. However, the vertical part of the PVC pipe was firml y encased in the concrete slab, meaning the footing, slab and pipe elbow had moved as one.  There was no pressure on the pipe from the footings and Case No: 363275 Determination Page 9 of 10 Record Key points no damage or indentations were visible to the pipe except near the elbow where it had cracked.  Anecdotal ev idence suggested that a number of floods had previously inundated the region with apparently no major damage to the building.  After excavating the site and seeing the damage firsthand, he was sure that the damage had been caused by water from the cracked p ipe saturating the soils under the slab . Applicant’s engineer (B) Letter – 13 March 2014  It was quite probable that leakage from the broken pipe had caused the damage to the building. Applicant’s engineer (NM) Report - 27 June 2014  He has carried out a desktop review of the various reports regarding the cause of the cracking damage.  The assumption made by the FSP’s engineer (L) and geotechnical expert (AG) that the house was on a strip footing was incorrect. The photographs provided by the Applicant’s bu ilder (RH) established that the slab was a raft slab.  He modelled the maximum bearing pressure of the raft slab and found that the bearing pressure of the slab in saturated soil conditions was significantly less than that determined by AG which showed tha t the foundations had sufficient bearing capacity even in a saturated state.  Based on this, he concluded that the subsidence was not caused by the flood in 2010 but by the undermining of the slab by the broken sewer pipe . FSP’s engineer (L) Report s – 25 A ugust 2014  NM’s conclusion that the damage was not caused by settlement is inconsistent with his conclusion that it was caused by a broken pipe.  The building information does not establish that the slab fits the requirements for a stiffened raft slab that would provide load distribution.  The settlement has occurred due to bearing failure (saturation of soils) and densification of the sand as the water dissipates .  A broken pipe does not divert all the flow into the soils – rather , very little water is lost a nd in silty sandy soils , this water would flow vertically from the break, not laterally . Further the Applicant had advised that the en suite bathroom was rarely used.  The extent of settlement damage was not consistent with a leaking pipe. It is simply not possible given the soil profile for a leaking sewer pipe to sufficiently saturate the soil in the damaged corner of the building. Displacement associated with pipe leaks first shows as light cracking but bearing is still maintained. It is progressive, and there are enough warning signs to act before it reaches the stage observed in the Applicant’s house.  He believes that the water ponded for a long time adjacent to the building around the damaged area and the highly permeable founding soils resulted in the saturation of the corner of the building. Case No: 363275 Determination Page 10 of 10 Record Key points  The pipe was sitting in loose backfill and it is likely that it cracked because it had no support and hung from the slab below the shower recess, as the soils dried out . Applicant’s engineer (NM) Report - 15 Sept ember 2014  The damage was not due to the flood because the bearing pressure was low and therefore the saturation of the soil would not have resulted in settlement.  Settlement occurred due to the large void under the slab created by the water from the broken sewer pipe washing away the soil under the slab  T he foundations and slab met the standards applicable at the time of construction. His analysis of bearing pressure was based on the actual (not assumed) construction methods.  The evidence establishes that ponding of water did not occur for a long period of time, but for a few hours only.  The Applicant has confirmed that the en suite bathroom was in use prior to the loss.  In September 2010 the plumber (PS) excavated down the s ide of the building and found a large void area underneath the slab and further excavation found the broken pipe under the slab. It was these excavation works which were the cause for the loose soil under the bathroom identified by L (who assumed they were associated with previous settlement issues) .  T he pipe was broken well before the 2010 damage occurred and caused a large amount of silt and sand to be washed out from under the slab leaving a large void under the slab.