Text of the determination
Determination
General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision -
Denial of Claim
Determination
Case No: 363244 Determination Page 1 of 7
Case number : 363244 29 December 2014
1 Overview
1.1 Dispute
The Applicant is an owners’ corporation which holds a strata insurance policy with
the Financial Services Provider (FSP) for a residential apartment building.
In July 2013, the Applicant lodged a claim for damage to a sewer pipe under the
concrete floor of the ground floor car park.
The FSP denied the claim on the basis that the damage was caused by factors
which are excluded under the policy, namely wear, tear, gradual deterioration,
building movement and/or earth movement.
1.2 Issue and key findings
Can the FSP deny the Applicant’s claim?
The Applicant has established a prima facie claim for accidental damage under
the policy, as the damage to the sewer pipe was unintended and unexpected.
The available information does not establish that, on the balance of probabilities,
the proximate cause of the damage to the sewer pipe was one or more of the
factors relied on by the FSP which are excluded under the policy. Accordingly, the
FSP is liable for the Applicant’s claim.
1.3 Determination
This Determination is in favour of the Applicant.
The FSP is to cash settle the Applicant for the claim in accordance with the terms
of the policy (and subject to the principles set out in section 2.1 below), subject to
the Applicant providing the further information outlined in section 2.1 below.
Case No: 363244 Determination Page 2 of 7
2 Reasons for Determination
2.1 Can the FSP deny the Applicant’s c laim?
Policy provides cover unless FSP can show an exclusion applies
The Applicant’s policy provides cover for accidental loss or damage to the insured
property which occurs during the period of insurance. The courts have defined
“accidental” in this context to mean “unintended and unexpected”.
The cover for accidental damage is subject to exclusions for damage caused by:
wear and tear (which is defined in the policy to mean age, ordinary use or lack
of maintenance)
gradual deterioration
normal settling, shrinkage, heaving or expansion in buildings, foundations or
other structural improvements or
the removal or weakening of, or interference with, the support of land or
buildings, erosion or earth movement (unless the damage is due to bursting or
leaking pipes, in which case cover is provided).
It is an accepted principle of general insurance law that an insured bears the onus
of establishing that, on the balance of probabilities, they have suffered a loss
caused by a risk insured under the policy. This is known as a prima facie claim. If
the insured is able to establish a prima facie claim, the onus then shifts to the
insurer to show that, on the balance of probabilities, the loss falls within an
exclusion clause under the policy or that it is otherwise entitled to deny liability.
The Applicant’s plumber (GM) has provided a report confirming that the sewer
pipe cracked or fractured. The FSP has not disputed that the damage was
sufficient to trigger the accidental damage cover (subject to the application of any
relevant exclusions).
In these circumstances, the Panel is satisfied that the Applicant has established a
prima facie claim under the policy, given the broad cover for accidental damage
provided.
Accordingly, the FSP bears the onus of establishing that, on the balance of
probabilities, it is entitled to rely on a policy exclusion to deny the Applicant’s
claim. In order to do so, the FSP must show that the proximate cause (that is, the
real, effective or predominant cause) of the damage to the sewer pipe was one of
the factors outlined above.
Available information does not establish damage was caused by excluded
factors
The Applicant’s plumber (GM) has provided a written report dated 11 September
2013, in which he concludes that the underlying cause of the damage was the
accidental cracking or fracturing of the sewer pipework. GM states the cracks in
the pipe caused water to leak into the surrounding earth, which led to a
weakening of the soil supporting the pipework, thereby causing it to collapse.
Case No: 363244 Determination Page 3 of 7
The FSP does not dispute that the Applicant’s plumber (GM) identified cracks in
the damaged section of the sewer pipe or that the pipe had collapsed in a number
of places. However, the FSP says that the proximate cause of the damage to the
pipe was movement of the surrounding foundation soils, together with wear and
tear (due to the age of the pipe).
In support of its position, the FSP relies on a report provided by its loss adjuster
(FR) which concluded that the damage to the pipe had occurred as a result of a
cyclical process which had been ongoing for a number of years. FR’s report
stated that it was likely that:
the earth in which the pipework was embedded had moved and subsided over
the years, possibly because the pipework was not originally installed on a
compacted base
this had caused the joins between each section of the pipework to move and
crack, allowing the pipes to leak and
the water leaking from the joins had caused the foundation material to further
consolidate or erode, resulting in further movement and settlement of the
pipework (and creating further leaks).
Accordingly, the critical difference between the opinions expressed by the
Applicant’s plumber (GM) and the FSP’s loss adjuster (FR) is whether the original
event which triggered the subsequent collapse of the pipework was a crack in the
pipe or movement of the surrounding soils (exacerbated by the age of the pipe).
As outlined above, the FSP bears the onus of establishing, on the balance of
probabilities, that the proximate cause of the damage to the pipe was one or more
factors which are excluded under the policy.
Having reviewed the reports provided, the Panel is not satisfied that the available
information is sufficient to establish that a relevant exclusion applies.
The Panel notes that by the time FR attended the Applicant’s property, the
damaged section of pipework had already been replaced and the area re-
concreted. Accordingly, FR was not able to observe either the damage to the pipe
itself or the condition of the surrounding earth.
In these circumstances, FR’s explanation as to the cause of the damage reflects
his assessment of what is most likely to have occurred. In drawing his
conclusions, FR appears to have based significant weight on the absence of any
evidence of an external force affecting the pipe (such as the effect of tree roots or
impact by another object). However, it is clear that FR had limited first-hand
information available on which to base his conclusions.
In his report, FR refers to the possibility that the initial cracks in the pipe had
occurred as a result of inherent defects, but subsequently dismisses this as
speculation. However, it is not clear why this is inherently any more speculative
than FR’s statement that the initial cracks were caused by movement of the pipe,
possibly as a result of it having been installed on a poorly compacted base. There
does not appear to be any independent information available about the manner in
which the pipe was installed.
Case No: 363244 Determination Page 4 of 7
Further, FR’s report does not provide any information about the nature of his
qualifications which may be relevant to identifying the cause of the claimed
damage.
In these ci rcumstances, the Panel considers that, while FR’s report provides one
possible explanation as to how the damage to pipework may have occurred, it
does not establish that, on the balance of probabilities, the claimed damage
actually occurred in this manner.
The Panel notes that, in his report and in subsequent correspondence with the
FSP, FR refers to various conversations with the Applicant’s plumber (GM) in
which he says that GM agreed with his findings that the proximate cause of
damage was earth movement and wear and tear. The FSP says that its
representatives have also spoken directly to GM who has confirmed that he
agreed with the conclusions set out in FR’s report.
However, the Panel does not consider that it is appropriate to rely on the FSP and
FR ’s account of their telephone discussions with GM, in circumstances where GM
has provided a written report which clearly states that the cycle of cracking and
earth movement commenced with the accidental cracking or fracturing of the
sewer pipe. The Panel notes that the fact that GM and FR essentially agreed on
the process by which the damage occurred (while apparently disagreeing on the
initial trigger) raises the real possibility that statements made during such
discussions may be open to misinterpretation.
FSP is required to indemnify Applicant in accordance with policy terms
For the reasons outlined above, the Panel considers that the FSP is not entitled to
rely on any of the policy exclusions referred to, in order to deny the Applicant’s
claim. Accordi ngly, the FSP is liable to indemnify the Applicant in accordance with
the terms of the policy.
The Applicant’s policy provides cover for accidental damage to the insured
building. In the case of a bursting or leaking pipe, the policy also provides for the
payment of reasonable cost incurred in:
locating the source of the escaping liquid
repairing the area of the property damaged by exploratory work
repairing or replacing the defective part of the pipes, to a limit of $1,000 and
rectifying contamination damage to land caused by the escape of liquid, to a
limit of $1,000.
The Applicant has provided an invoice from his plumber (GM) for $16,840 (plus
GST) for works undertaken to replace the sewer pipe. It is clear from GM’s earlier
quotation that these works included the excavation and disposal of the original
pipe and the concrete surrounds, the installation of the pipe and the restoration of
the area to its previous condition.
As the policy limits the available benefit for replacing the pipe itself to $1,000, it is
necessary to identify what proportion of the works performed by GM related to the
replacement of the pipe itself, rather than the repair of the surrounding area
damaged by the exploratory work.
Case No: 363244 Determination Page 5 of 7
Further, it is not clear from the available information whether the Applicant paid
GM any additional amount for the investigations carried out to identify the source
of the problem or whether any costs were incurred in rectifying contamination
damage caused by the burst sewer pipe.
Accordingly, in order to allow the FSP to quantify its liability for the claim, the
Applicant is to provide the FSP with:
an itemised invoice from GM which separately identifies the costs (including
labour and materials) of replacing the damaged section of the pipe and
repairing the area of the property damaged b y exploratory work respectively
and
evidence of any additional costs incurred in identifying the source of the
problem and/or rectifying resulting contamination damage to land at the
property.
Following receipt of the above information, the FSP is to cash settle the Applicant
for the amount payable in accordance with the terms of the policy, plus interest at
the rate calculated in accordance with section 57 of the Insurance Contracts Act
1984 (the Act) for the period from 4 December 2013 until the payment date.
Case No: 363244 Determination Page 6 of 7
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recomme ndation. Due to the
nature of the dispute, it has been referred directly to a Panel for Determination, in
line with the Operational Guidelines to the FOS Terms of Reference. The Panel
consists of an Ombudsman and two representatives with consumer and insurance
experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the
purposes of this Determination and each party has had the opportunity to address
any issues raised by the other.
The Panel has reviewed and considered all of the material provided by the
parties. While the parties have raised a number of issues in their submissions, for
the purposes of this Determination the Panel has restricted its commentary to
those issues which it considers directly relevant to the outcome only.
The Applicant has been represented by its solicitor for the purposes of this
dispute. Any submissions made by the Applicant’s solicitor have been treated as
having been made by the Applicant itself, for the purposes of this Determination.
3.2 Reports
Record Key points
Applicant’s
plumber (GM)
Report – 31 May
2013
His CCTV inspection of the blocked sewer pipe had revealed that
the 150 millimetres diameter earthenware pipe for a length of around
20 metres was severely cracked and had collapsed in sections.
This was creating a restriction on the total volume capacity and
creat ing recurring blockages throughout the apartment complex.
FSP’s loss
adjuster (FR)
Report - 23 August
2013
The 20 metre length of pipework involved was original to the
building. This was confirmed by the Ap plicant’s representative (GB,
a member of the owners ’ corporation) and the plumber engaged by
the Applicant (GM).
While on site, FR did not identify any evidence of subsidence,
impact or tree root invasion. There were no aggressive plants
identified in the nearby vicinity.
GM had advised that , when the area was excavated and exposed,
he did not identify evidence of any external collapse of the driveway,
tree root invasion or any other identifiable external force which could
have caused or contributed to the damage and collapse of the
drainage pipework .
GM believed that the damage was simply a matter of the age of the
pipework and the natural wear, tear and degradation of these
systems. GM had noted that it was possible that the original
construction techniques were not ideal and some cracking may have
occurred at that time becoming worse over the life of the pipework.
FR had discussed with GM the likely sequence of events and
Case No: 363244 Determination Page 7 of 7
Record Key points
agreed with the following analysis.
The ori ginal pipework was possibly not installed onto a compacted
base. In any event , the pipework has moved and subsided over the
years causing cracking and failure to occur.
It is likely the original sections of pipework (usually 1.2 metres in
length) have leaked at the joins causing the fill material to
consolidate or erode therefore a llowing the pipework to move and
settle.
This movement has caused greater openings to occur increasing the
escape of moisture and therefore the localized settlement and
movement. This becomes a continuing cyclic trend until the pipes
crack and break with f oundation materials entering the pipes in
varying degrees.
The only available evidence (including commentary from the GB and
GM ) suggested the original pipework had simply lived its useful life.
The cracking failure and partial collapse of the pipework was due to
long term gradual deterioration, wear and tear.
It was possible that inherent defects in the pipe had contributed
however this was speculation and could not be confirmed.
Applicant’s
plumber (GM)
Report -
11 September 2013
On the balance of probabilities, t he cause of the damage was
initially an accidental cracking or fracturing of the sewer pipework
which caused water to leak into the surrounding earth. This le d to a
weakening of the supporting soil which in turn caused a severe
cracking and collapsing of the pipework which resulted in the water
damage to the property.
FSP’s loss
adjuster (FR)
Email – 3 December
2013
He confirmed the subject matter of his discussions with GM as set
out in his report dated 23 August 2013.
During these discussions, GM had also advised that the pipework
was approximately 40 to 50 years old and cracking, and leaks
frequently occurred due to the age of the building with some
possible exacerbation from soil movement.
The sewer pipe is made up of section of b etween 450 millimetres
and 1.2 metres long, joined at every length with a rubber ring and a
mortar collar. Any earth movement along the length of the pipe will
cause the non elastic facility to move and crack at the joins and this
will in turn allow the pi pes to leak. Leaks will cause localised erosion
and consolidation which in turn will cause further movement and
dislocation of the pipe system. This additional movement will cause
further cr acking and can result in localis ed areas of collapse.
GM removed t he whole of the earthenware pipework. There was no
indication in the work performed by GM, FR’s inspection or the
information provided by the Applicant that the collapsed pipe caused
any resulting damage to the property.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.