Home / Financial Firm (Unknown - Insurer) / Determination 362618
Determination 362618
Claim denial for jetty damage not established as caused by an insured impact
Summary
The FSP denied a claim for storm and impact damage to a jetty, relying on the storm exclusion for jetties and finding no proof of impact by a tree. AFCA found in favour of the FSP and it need take no further action.
The Applicants bear the onus of proving an insured impact event, and the evidence did not establish that the jetty damage was caused by impact from a listed item such as a tree.
Issues
- Claim denial primary · not upheld“The Applicants' material does not establish the jetty was damaged by a tree; the storm damage to jetties is excluded from cover.”
- Poor claim handling secondary · not upheld“I am not satisfied that the FSP's claims handling was untimely or prejudicial to the Applicants.”
Subjects and remedies
no remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim
Determination
Case No: 362618 Determination Page 1 of 7
Case number : 362618 14 April 2015
1 Overview
1.1 Dispute
The Applicants suffered damage to their residence, including a jetty, during a
storm. They believe a tree or debris from trees or a large objects impacted the
jetty which now requires extensive repairs.
The Financial Services Provider (FSP) denied the Applicants‟ claim because
storm damage to jetties is excluded from cover and there is no evidence of any
impact damage to the jetty by a tree.
The Applicants are not satisfied with the FSP‟s response. They repaired the
impact damage prior to the FSP assessing the jetty and they have provided other
evidence confirming the cause of the damage.
The Case Manager provided the parties with a Recommendation on the issues in
dispute. The Recommendation was in favour of the FSP.
The FSP accepted the Recommendation but it was not accepted by the Applicant.
In the circumstances, the dispute has been referred to me for Determination.
1.2 Issue and key findings
Is the FSP entitled to deny the Applicants’ claim?
The FSP can deny the Applicants‟ claim for damage to the jetty because:
the policy excludes damage to a jetty caused by storm
the cover for impact damage is limited to certain items as listed in the policy
which items includes trees
there is insufficient evidence to prove, on the balance of probabilities, the jetty
damage was caused by impact by a tree
1.3 Determination
This Determination is in favour of the FSP.
The FSP need take no further action.
Case No: 362618 Determination Page 2 of 7
2 Reasons for Determination
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
Recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
The Applicants‟ son has assisted the Applicants with this dispute. Reference to
the Applicants herein includes a reference to the Applicants‟ son.
No new information provided after the Recommendation
After the Recommendation was rejected, the Applicants made a further
submission. They provided no new material and essentially reiterated their
position.
2.1 Is the FSP entitled to deny the Applicants’ claim for damage to
jetty?
Applicants must prove the damage is caused by an insured event
The Applicants must prove on the balance of probabilities they have suffered a
loss caused by an event to which the policy responds.
Policy excludes cover for damage to a jetty in a Storm event
It is accepted by the parties that are storm event occurred in January 2013 and
that the jetty was damaged in that storm. However although the policy provides
cover for loss and damage caused by storm and flood, damage to a jetty is not
covered under the policy.
The Applicants frame their claim on the basis that they have established that the
jetty was damaged by the insured event of “Impact.”
Impact damage must be caused by one of the items listed in the policy
However in order to establish a loss caused by an event to which the policy
responds the Applicants must establish not only that the damage to the jetty was
caused by impact, but that the impact at the insured address was from one of the
items listed in the relevant part of the policy. The list includes trees, power poles,
TV antennas et cetera.
In support of their submission, the Applicants have provided a number of
photographs and reports. A photograph of the jetty shows a step missing from the
lower part of the jetty. In various correspondence, the Applicants identify that the
floating tree impacted the lower section of the jetty and that the step was
completely destroyed by the impact and the jetty misaligned.
A quote was provided by CP on 28 February 2013. It says:
Case No: 362618 Determination Page 3 of 7
“The recent storm events have caused debris to impact and dislodge the jetty,
causing it to pull away from its foundations …..”
A quote was also provided by PP on 2 May 2013. It says:
“The jetty structure has suffered a profound impact by a large floating object
during this time”.
The female Applicant provided a statutory declaration. She swears that she:
“…saw and removed large palm leaves from palm trees and other plant material
from my jetty that were left over from the impact damage to the jetty in January
2013”
The Applicants engaged the support of S, a civil and structural engineer, who
inspected the jetty on 24 November 2014. As to the cause of damage S says that:
“We understand that debris built up agai nst the jetty causing impact loads during the
flood has caused the front of the structure to move downstream by about 1 metre.
This movement caused the attachment to revetment wall to fail on one side.”
And in a later report S says that the evidence suggests that the damage to the
jetty occurred as a direct consequence of a large heavy floating object impacting
the structure during the January 2013 flood event.
A pplicants’ material does not establish the jetty was damaged by a tree
I accept that there was some damage to the jetty which occurred as a result of
impact damage in the storm but I am not satisfied on the material provided by the
Applicants themselves that they have established that the damage to the jetty was
caused by impact from a tree.
The “debris” or “large floating object” or “”large palm leaves” have not been
identified as a tree. I accept that the female Applicant removed large palm leaves
and other plant material from the jetty and this is consistent with damage from
debris. This does not establish the jetty was damaged by a tree.
As I consider that the Applicants have not established a prima facie claim, I will
not address the exclusions relied on by the FSP as to do so is redundant.
FSP’s claims handling satisfactory
The Applicants compla in that it was unsatisfactory that the FSP‟s assessor
inspected the jetty so long after the event. I have considered the material provided
by the parties and note that it was on 4 March 2013 that the Applicants enquired
about cover for the jetty.
Thereafter the FSP requested quotations and photographs from the Applicants.
However as the material provided was insufficient to make a decision about policy
response, the FSP appointed an assessor who inspected the property 8 July
2013. He found:
Case No: 362618 Determination Page 4 of 7
“… no evidence of any act impact by a vessel or anything indicative of impact. The
insured said he found a timber pallet against the jetty at the time of the flood but
its weight would not cause any damage.”
The claim was denied shortly thereafter.
An engineer was appointed several months later but this was because the
Applicants disputed the FSP‟s denial of the claim. Further, the FSP‟s engineer‟s
opinion has not featured in the reasons for decision in this Determination.
Therefore any delay caused by the engineer inspecting the jetty is irrelevant to the
outcome. Rather, it is my determination that the Applicants‟ material does not
support their contentions that the jetty was damaged when impacted by a tree.
Having considered all the material in context, I am not sat isfied that the FSP‟s
claims handling was untimely or prejudicial to the Applicants.
Case No: 362618 Determination Page 5 of 7
3 Supporting information
3.1 FOS Approach
It is an accepted principle of general insurance law that an insured bears the onus
to establish on the balance of probabilities that they have suffered a loss caused
by an event to which the policy responds. This is known as a prima facie claim.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the
loss.
3.2 Extract from Policy
The PDS provides the following relevant cover and exclusions:
“ 1. Storm and flood
We cover
Loss and damage caused by storm and flood e.g. rain, wind, hail, storm and damage
caused by flooding from rivers, streets and canals.
We do not cover
- …
- wharf, jetty, pontoon or sea wall …
10. Impact
We cover
Impact at the insured address from trees, power poles, TV antennas, communication aerials
or masts, motor vehicles, trailers, wat ercraft, aircraft and s pace debris.
We do not cover loss or dam age:
Failing to establi sh an insured incident
Loss or damage without you being able to reasonably establish an insured incident took
place at a certain time and date.”
3.4 Other relevant material
Date Action
Photograph
undated
Taken of the jetty directly after the impact with the
step missing.
Quote CP
28 February 2013
Replace damaged jetty $12,000.
“The recent storm events have caused debris to
impact and dislodge the jetty, causing it to pull
away from its foundations and the replacement.”
Quote PP
2 May 2013
“The jetty structure has suffered a profound impact
by a large floating object during this time” and
“it has separated from the sea wall by 100 - 150mm
… Support piles leaning … Bearers require
replacement …” $11,990.
Applicants‟ letter 24 March Attached photograph of the jetty “where the impact
Case No: 362618 Determination Page 6 of 7
2014 of the floating tree impacted the lower crate section
and also the step which was completely destroyed
by the impact. In the photo you will see whe re the
step is missing and also the lower section
hanging.”
Photographs shows step missing.
Statutory declaration of female
Applicant
30 April 2014
She swears that she: „saw and removed large palm
leaves from palm trees and other plant material
from my je tty that were left over from the impact
damage to the jetty in January 2013”
Applicants‟ report from
S civil and structural engineer
30 October 2014
S inspected the jetty 24 November 2014
S wrote: “we understand that debris built up
against the jetty causing impact loads during the
flood has caused the front of the structure to move
downstream by about 1 metre. This movement
caused the attachment to revetment wall to fail on
one side.”
Jetty repairs are required to return it to its original
state for t he safety and structural integrity of the
jetty.
Applicants‟ report from
S civil and structural engineer
8 December 2014
Added to the first report by saying: “The impact
point has been determined at the upstream front
side which is 400mm lower than the o verall
platform. This movement caused the attachment to
revetment wall to fail on one side and the step
section to be dislodged. The bolts and fixings to the
structure have remained intact….”
Applicants‟ report from
S civil and structural engineer
27 Jan uary 2015
Added to first and second reports.
Jetty about 40 years old and features a long ramp
leading from the revetment wall to an outer deck
area.
Applicants claim that during the storm event, the
strong fast flowing river waters submerged the jetty
str ucture and the jetty was struck by large floating
object causing the jetty to shift out of alignment and
dislodge the lower step and lower platform.
Once the water receded they noticed the entire
timber structure on top of the piers had shifted
downstream by about 1m and the jetty had pulled
away from the wall.
They noticed large “palm tree branches” wedged in
the lower platform of the jetty directly after the
flooding event.
D amage was the jetty structure had shifted and
was twisted out of line .
P hotographs showed a missing step from upper
deck to lower deck which was dislodged due to the
impact of the large object .
O nce the damage was noticed, the owner
attempted to pull the timber jetty back into
Case No: 362618 Determination Page 7 of 7
alignment with the piers and replace the timber
st ep .
J etty is intact and in sound condition but inspection
of the piers revealed the majority of the piers are
still out of alignment with the jetty structure .
Evidence suggests that the damage to the jetty
occurred as a direct consequence of a large heavy
floating object impacting the structure during the
January 2013 flood event.
Impact point has been determined at the upstream
front side which is 40mm lower than the overall
platform.
Impact has caused the attachment to the wall to fail
on one side and the step section to be dislodged.
Bolts and fixings to the structure remained intact.
FSP‟s assessor report
8 July 2013
28 January 2013 canal flooded and jetty inundated
Timber jetty is supported by fibro columns which
are concrete filled secured to canal be d.
Timber framing in poor condition.
Inspection found no evidence of any impact by a
vessel or anything indicative of impact.
Insured said he found a timber pallet against the
jetty at the time of the flood but its weight would not
cause any damage.
No dam age noted other than wear and tear.
Photographs taken of jetty showing step down to
lower - level; and timber resting on piers;‟
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.