Text of the determination
Determination
General Insurance - Domestic Insurance - Personal and Domestic Property - Pleasure
Craft - Service - Service Quality
Determination
Case No: 362462 Determination Page 1 of 11
Case number: 362462 2 7 February 2015
1 Overview
1.1 Dispute
The Applicant held a pleasure craft insurance policy with the Financial Services
Provider (FSP). The Applicant lodged a claim for accidental damage to his boat
because of partial water submersion, which occurred on 24 February 2013.
This dispute arises because the Applicant is dissatisfied with the quality of
electrical repairs carried out by the FSP’s repairer (N) and items that have
allegedly gone missing from his boat while it was at N’s yard.
The FSP says N satisfactorily completed the claim related electrical repairs and
the FSP is not responsible for the Applicant’s items.
1.2 Issues and key findings
Are the electrical repairs satisfactory?
The Applicant has not established that the remaining issues with the boat’s
electrics are the result of N’s defective work.
The FSP is therefore not required to undertake any further rectification works.
Is the FSP liable for the Applicant’s missing items?
The FSP is liable for some of the Ap plicant’s missing items because , most likely,
N left the items in an unsecured place at the conclusion of the claimed repairs and
did not advise the Applicant.
1.3 Determination
This Determination is partly in favour of the Applicant.
The FSP must replace or cash settle the Applicant’s esk i, ropes and fire
extinguishers with items that are the same brand and in the same condition as
when the boat first entered N’s yard.
In the event the FSP cash settles the claim, the FSP must pay the Applicant
interest, in accordance with the Insurance Contracts Act 1984, from the date it
denied the claim to the date payment is made.
Case No: 362462 Determination Page 2 of 11
2 Reasons for Determination
2.1 The FOS Approach
I have decided this case on its merits, doing what is fair in all the circumstances
and having regard to the relevant law, good industry practice, codes of practice
and previous FOS decisions. I have taken into account all the material submitted
by the parties.
I am satisfied that the documentation I have relied on has been provided to both
parties and each party has had the opportunity to address any issues raised by
the other.
This dispute has been expedited to a Determination. No Recommendation was
issued.
2.2 Are the electrical repairs satisfactory?
Part of the electrical repairs in dispute are not claim related
The Applicant has previously raised several issues about the quality of repairs to
his boat performed by N. These were not limited to electrical repairs. However, in
his dispute form and during discussion with FOS, the Applicant clarified the only
issues that he wishes to challenge before FOS are the electrical issues raised in
the report obtained for and paid by the Applicant from his repairer (A), that were
claim related.
The Applicant had engaged N to perform additional electrical tasks (such as to the
anchor winch and water tank sender) that were not claim related and therefore do
not form part of this dispute.
To clarify the scope of claim related electrical repairs, the FSP provided a “job
sheet” that outlines the electrical repairs completed for the claim. This has been
used as the basis of the repairs currently in dispute before FOS.
There were also separate submissions from the Applicant about a damaged bow
thruster that occurred when the Applicant first used the boat once the repairs
were completed. The Applicant states the cause of the damage was the fresh
water sender unit, which had been fitted by N. The FSP blames the damage on
an incorrect or loose hose clamp on the water tank filler installed when the boat
was first built. Even if the Applicant is correct that the cause of damage is the
water tank sender, as this did not form part of the claim repairs (as opposed to
private repairs), the damage does not form part of this dispute.
Evidence is insufficient to establish the FSP is liable for further rectification
works
The Applicant alleges N did not carry out adequate repairs and these now require
rectification. The onus is on the Applicant to establish this is the case.
Case No: 362462 Determination Page 3 of 11
Set out in section 3.1 below, is a scope of the electrical works agreed, together
with A’s comments on the repairs and N’s reply. It does not include those items
for which the Applicant privately engaged N.
While N stated that he sought the opinion of third parties in respect to his repairs,
no details of that opinion were provided. I note that the Applicant requested the
FSP to seek an independent opinion, believing that the FSP’s assessor and N
were friends. The FSP did not obtain any independent opinion.
Following N’s reply, t he Applicant was provided an opportunity to obtain a further
expert report, but no such report was forthcoming.
A’s report is descriptive in nature, reporting on the issues with electrical
installations and what repair or replacement action was needed to bring the boat
“back to safe operating standard . ”
A does not explain how the issues he has identified are connected to N’s repairs,
whether it be that the repairs were faulty, or that repairs that should have been
undertaken as part of the agreed scope of works, were not.
While I am satisfied there are issues with the electrics on the Applicant’s vessel,
the Applicant has not provided sufficient evidence to establish that those
problem s are a result of N’s repairs, or from N’s failure to undertake work that was
required and agreed to be done as part of the claim.
The FSP is therefore not liable for any further rectification works to the boat.
2.3 Is the FSP liable for the Applicant’s missing items?
Items missing are those accepted by N
The Applicant has provided a list and supporting documents to identify the items
that allegedly went missing. However, these documents are only replacement
quotations or screen captures of potential replacement items. No other evidence
has been provided (eg, tax invoices, packaging, images) to establish he owned
the items and that they were on the boat.
When queried about this additional information, the Applicant acknowledged he
has no evidence regarding the items he allegedly owned.
N acknowledges having removed some items. As N offered to replace the eski,
ropes and fire extinguishers (as a goodwill gesture as opposed to an
acknowledgement of liability), it is fair to accept these items as the ones that were
removed from the boat by N and subsequently went missing.
The items were initially stored by N
Under the policy, the Applicant has the obligation to take reasonable and
responsible precautions to prevent any further loss or damage to the boat (the
policy definition of which includes equipment and accessories).
The Applicant says N told him it would retrieve his contents and store them in
containers. N says it advised the Applicant before commencing repairs to retrieve
Case No: 362462 Determination Page 4 of 11
his contents from the boat but he never did and so N removed some items. The
FSP says N returned the removed equipment and placed it on the rear deck of the
boat on completion of the repairs.
There is no evidence to support or challenge either version of events. It is also not
clear when the repairs were said to be completed (and the items placed on the
deck). While the FSP relies on the “discharge of liability form” signed by the
Applicant on 15 May 2013 (as well as 26 April 2013 and 24 June 2013), it is clear
the repairs were not completed at this time. N was still to replace the carpet,
polish the floor and detail the boat. This was, sensibly, to be done after the engine
was installed (which the FSP had cash settled separately with the Applicant in
May 2013).
That the Applicant did not raise the issue of the missing items after November
2013 is consistent with his understanding that N was storing them until the boat
was available for use.
I consider the most probable scenario is that the items were returned to the deck
after N had completed all its repairs, including those that were claim related and
outstanding until the engine was installed. At this point they went missing.
I accept that the Applicant has a duty to look after and maintain his boat and its
contents when in the yards. However, there is no evidence to suggest the
Applicant was informed the items had been placed on the deck and were no
longer secure. There was therefore no opportunity for the Applicant to take
reasonable measures to prevent theft.
In these circumstances, it is fair for the FSP to replace or cash settle the eski,
ropes and fire extinguishers of the same brand and in the same condition as
those that went missing.
Case No: 362462 Determination Page 5 of 11
3 Supporting information
3.1 Summary of claim electrical work and standard of repairs
Job sheet 26/2/13 A’ s report N’s comment 26/2/14
Vessel had been immersed
in salt water gaining ingress
to all electrical equipment
and wiring.
Premise of A’s report is
incorrect as wiring was not
immersed in water. In
particular wiring behind the
distribu tion panel was
unaffected and therefore no
work was required in this
area .
Bow thruster – some
corrosion around base.
Unit not working.
Replace
Bow thruster requires
marine connection joints .
Connectors have started to
corrode and fail.
Labour $195 and joint $150
Wiring of thruster is as per
original. Original plugs
/connectors supplied by
manufacturer are not
waterproof.
Other wiring –
4mm x 20 metres
6mm x 20 metres
Split tubing, heart
shrink, cable ties,
fuse holders, fuses.
Test electrical system
All power relays wiring
/ terminals corroded.
Need to be replaced
and cabling 8 mtrs
battery cable. 12
battery lugs. 3 x relays
Under deck switchboard
requires all equipment and
associated wiring identified
and tidied and te rminal
security checked and
replaced with corrosion
present .
Labour $800
Cabin switch board all, 12
DC sub circuits to check and
repairs as there is confusion
as to what circuit is actually
working on house battery or
engine batteries .
Labour $650
This area was largely
untouched except to move
anchor breaker. Wiring is
as was and labelling as per
factory. There was little or
no corrosion. It would be
almost impossible to find no
corrosion on any vessel of
this age.
I agree. The original set up
as per be fore the
immersion is confusing in
the way the vessel ha s
been laid out electrically.
As I’m not sure how engine
was wired up, there is
potential that engine install
may have some bearing on
some issues .
Batteries – replace 4,
plus lugs, terminals
and ca b les. Battery
cable x 8 metres
House batteries require
replace ment 2 x N150.
Labour $190 Materials $700
Battery i solator switch to be
re - wired correctly to isolate
all DC as at present engine
batteries appear to still
energise cabin DC sub
circuits, when 1 shou l d be
These are an exact
replacement of what was
already on the vessel. Both
batteries teste d ok to load
tester. In general, size of
batteries is a matter of –
what will fit, what the owner
wants in reserve capacity,
etc .
Case No: 362462 Determination Page 6 of 11
Job sheet 26/2/13 A’ s report N’s comment 26/2/14
isolated and 2 should be fed
from house batteries. Labour
$550.
Engine kill switch appears to
be wired incorrectly as
although the engines won’t
start with switches active
they won’t stop / kill the
engines while running . This
appear s to feed engine
battery powe r through to DC
board in cabin, that is
usually f ed f rom house
batteries.
Labour $550
If 12v and thruster isolators
off, engine isolators do not
power up DC board. I g ot
engines to run and switch
off. There still is potential
issue with engine wiring
c ompatibility with rest.
Battery charger -
Replace charger in
engine room (not
working) Also replace
cabling
House battery char g ing
circuit requires modification
re present isn’t charging
batteries, charger appears
ok just incorrectly wired.
Labour $400
All tested fine. Voltmeter
showing voltage from
charger.
3.2 Chronology of key events
Date Event
25 Feb 2013 Applicant lodges claim for incident occurred on 24 Feb 2013.
11 Apr 2013 FSP’s loss assessor (C) authorises N to repair the boat following
requests for further info from Applicant.
26 Apr 2013 Applicant signs a release in respect of the engine.
7 May 2013 FSP cash settles Applicant $29,559.76 for engine replacement.
15 May 2013 Applicant signs a further release for the same amount
17 May 2013 N c ompletes repairs, save for carpet, floor polishing and detailing which
awaits completion of the installation of engine and legs.
20 May 2013 Applicant provides list of items for which he says repairs have not been
completed.
22 May 2013 T asks C to atten d to the Applicant’s issues.
24 May 2013 Save for carpet, floor polishing and detailing, FSP considers repairs have
been completed.
24 June
2013
Applicant signs another release, for $1320. It is unclear what this relates
to.
Nov 2013 Applicant installs engine.
10 Dec 2013 Applicant advises N’s repairs are substandard.
Case No: 362462 Determination Page 7 of 11
Date Event
13 Dec 2013 C, N and Applicant inspect boat together.
16 Dec 2013 Applicant summarises repairs outstanding and mentio ns missing items
for first time, requesting their return.
16 Dec 201 3 C tells T that N will complete repairs.
22 Jan 2014 Applicant says:
table is still loose, eski and extinguishers not the correct ones, a list of
unreturned items remain missing
all electrical issues appear fine.
23 Jan 2014 N says:
Applicant was advised to remove all personal items on vessel before
repairs but as this did not occur, N removed some items
as vessel sat around for some time before engine replacement, good
chance items may have been misplaced or removed without consent.
Applicant says N never asked him to remove personal items.
28 Jan 2014 Applicant advises of further issues with electrical repairs and
missing/damaged items.
30 Jan 2014 N satisfied with claim related repairs.
31 Jan 2014 C reports claim related issues were properly repaired but provides no
opinion regarding missing items.
4 Feb 2014 T advises the Applicant:
issue about missing items will need to be dealt with directly with N
new damage is not claim related.
5 Feb 2014 N proposes repairing the bow thruster as a goodwill gesture.
5 Feb 2014 Applicant accepts N’s offer.
10 Feb 2014 Applicant complains about:
boat left in dirty and untidy condition
inflatable mattress which was damaged by oil and water was left in
same state
electrical compartment cover in WC was left off
outstanding electrical issues.
26 Feb 2014 Applicant’s broker (J) forwards A’s report to T. J says N’s electrical work
was substandard and left vessel arguably unsafe and unseaworthy.
26 Feb 2014 One of N’s staff issues a report disputing A’s findings. N had carried out
additional works, not related to the claim on the understanding no furthe r
claim would be made but this agreement was not honoured.
3.3 Key reports
Record Key points
FSP’s loss
assessor (C)
The vessel was in very good condition. It suffered impact damage to
stern drive legs, keel and trim tabs on transom.
Case No: 362462 Determination Page 8 of 11
Record Key points
Report
4 Apr 2013
Port stern drive leg was completely torn off. Starboard stern drive leg
suffered major propeller impact damage.
Starboard propellers show signs of extremely severe impact.
Port external transom plate sustained impact damage, requires
replacement.
Vessel was partially flooded, engines ingested water into the intake
systems. Engine room was about 40 - 50% filled with sea water.
All bilge components which are not e ngine related were submerged,
resulting in a high electrical repair cost as all wiring or electrical parts
subjected to water require replacement.
Starboard engine severely overheated when raw water intake was
obstructed with sand and debris after being be ached.
Minor hull damage to the transom where weight of vessel was placed
on legs, ultimately causing port leg to break off completely.
Aft cabin adjacent to engine room was partially flooded and its carpet
and mattress were soaked with sea water. These re quire
replacement and the room needs drying and detailing.
Cabin sole floor has been flooded and timber requires drying out and
re - varnishing.
A damaged cabin step requires repair.
Vessel will require full interior detail due to salt ingress, moisture
odou r and partial flooding to the aft cabin, floor and furnishings.
Repairing engines is not a viable option. Replacing would cost
$24,000 for both engines, plus $3,550 for labour and $2,509.76 for
removal, stripping and salvage of the damaged engines.
Replace ment electrical items are subject to depreciation, thus C
deducts $1,928.74 from the electrical quotation. Other deductions
have been made for antifoul and prop speed application.
FSP’s
repairer (N)
Email
30 Jan 2014
Filler clamp under the gunwale is loo se, causing water to leak
continually whilst filling the vessel. This is a manufacture deficiency.
Bow thruster has been submerged, damaged and will require new
motor or replacement.
The water and dirt in the rear seat box is the responsibility of the
Applicant. Nothing to do with original damage. It could be that as the
vessel sat on hardstand, during winter it filled with water and dirt.
At the time, the Applicant was waiting for the engines and it was his
responsibility to upkeep and maintain the ves sel.
Unclear how the tears to canopy and clear happened.
Anchor winch should be working fine.
Table is re - screwed, not too much pressure is recommended as it will
otherwise tear from deck.
As to rectification of issues, a quotation will be presented and if
awarded, works will be carried out.
FSP’s loss
assessor (C)
Report
31 Jan 2014
The vessel was found to have some areas of repair which were not
rectified to the Applicant’s approval.
There were some overlooked issues (eg, salt water in a compartment
in t he aft bedroom). N dealt with these issues.
A number of personal items were taken from the vessel while it spent
Case No: 362462 Determination Page 9 of 11
Record Key points
a period of 10 months on hardstand with N.
Claim related repairs were concluded in May. The vessel remained
on hardstand until December, when t he Applicant had engines fitted.
The security of the vessel and its contents usually remains the
owner’s responsibility. Being placed in the care of a repairer does not
exclude an owner of their obligation to care for the vessel. The matter
of missing item s is between the Applicant and N.
The sender unit on the tank wept water but it did not and would not
flood the compartment. There is also no evidence whatsoever that
water from the sender unit ever flooded this compartment.
If the water tank sender were t o leak and the water tank level were to
drop several centimetres, the leak would stop as water is no longer in
contact with the sender seal being mounted in the top of the tank.
It appears the crush made by the hose clamp on the water tank filler
hose when the vessel was originally built was insufficient and has
begun to leak.
The water damaged bow thruster relay unit was responsible for
activating the bow thruster, which once activated would have been
impossible to switch off without disconnecting the powe r.
As to the anchor winch and vessel’s clears, records confirm they
were not part of the claim. This is a warranty issue between the
Applicant and N.
The FSP has no liability in this matter. The claim related repairs have
been properly repaired.
FSP’s
repairer (N)
Email
5 Feb 2014
Water has been and was leaking from filler on the deck, not from the
tank. This has no relevance to works undertaken by N.
Rain and water getting into rear seat has been wiped and cleaned
out. N apologises for this occurring d uring winter.
The [damage to] clears and canopy are wear and tear, not warranty
related or any relation to N’s works.
The vessel sat on hardstand for a long period during severe storms. It
was in the care of the Applicant while he was waiting for new motor s.
The table was again screwed to deck.
A leaking skin fitting has been repaired but it has nothing to do with
N’s works, only done as duty of care. This expense is covered by N
as a goodwill gesture.
The bow thruster needs to be repaired and has nothing t o do with N’s
works. N suggests repairing bow thruster as a good will gesture so it
is operational again.
Applicant’s
repairer (A)
Report
Undated
Electrical inspection shows safety and wiring issues.
The fresh water tank and bow thruster control require marine
standard electrical connection joints as what is in place is non - water
proof connections that have started to corrode and fail.
Fresh water tank level indicator requires repair/replacement.
Anchor winch inoperable, to be repaired and/or reversing contactor
replaced and a main safety breaker installed.
Underdeck switchboard requires all equipment and associated wiring
identified and tidied and terminal security checked and replaced as
Case No: 362462 Determination Page 10 of 11
Record Key points
there is corrosion present.
House batteries require replacement.
House battery charging circuit requires modification as it is not
charging batteries. Charger appears ok but incorrectly wired.
Invertor requires replacement as it is inoperable.
All 12V DC sub - circuits of cabin switchboard need to be checked and
repaired as there is confusion as to what circuit is actually working on
house battery or engine batteries.
Battery isolator switch to be wired correctly to isolate all DC as at
present engine batteries appear to still energise cabin DC sub - circuits
when it should be isolated and fed from house batteries.
Engine kill switches appear to be wired incorrectly and they appear to
feed engine battery power through to DC board in cabin that is
usually fed from house battery.
FSP’s
repairer (N)
Report
26 Feb 2014
Not all e lectrical equipment and associated wiring was immersed in
water. Wiring behind distribution panel was unaffected and therefore
no work was required in this area.
Terminals used in N’s electrical are used in the electrical industry.
There are waterproof con nectors joiners available and N uses these
where there is a strong chance of contact with water or salt spray.
Connectors used on fresh water sender are not waterproof as there is
no expectation of water affecting joining, especially not salt water.
There appears to be no corrosion present on these joints.
The water tank indicator works, there is a momentary switch on
distribution panel that needs to be pressed for gauge to work.
Wiring of the bow thruster is as per original. In fact, N’s repairer does
not recall changing any terminals on boat side of thruster. The
original plugs/connectors supplied by manufacturer are not
waterproof.
Anchor winch operates fine. There is a circuit breaker alongside
ignition keys and dash operated switch to supply power to re mote.
The underdeck switchboard was largely untouched, except to move
the anchor breaker. Wiring is as was and labelling as per factory.
There was little or no corrosion.
The house batteries are an exact replacement of what was already
on vessel. Both batteries tested ok to load tester.
House battery charging tested fine.
The inverter appears to need servicing. This item was not touched
during rewiring as no obvious signs of immersion and water mark in
engine room around 300mm below inverter.
The origin al setup as per before immersion is confusing in the way
the vessel has been laid out electrically. N is not sure how engines
were wired up, there is potential that the engine install may have
some bearing on some issues.
If 12V and thruster isolators are off, engine isolators do not power up
DC board. N got engines to run and switch off. There is still
potentially an issue with engine wiring compatibility with the rest.
Case No: 362462 Determination Page 11 of 11
3.4 Other relevant materials relied upon
Product Disclosure Statement with preparation date 1 April 2011.
Insurance schedule for the period 29 March 2012 to 26 March 2013.
Claim form dated 26 February 2013.
T’s authority for payment of repair signed by Applicant on 15 May 2013.
N’s quotation dated 7 March 2013.
N’s tax invoice dated 16 May 2013 .
N’s job sheet dated 26 February 2013.
Various images of the vessel.
Parties’ submissions.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.