Home / Financial Firm (Unknown - Insurer) / Determination 362158
Determination 362158
Quality of fire repairs, temporary accommodation and compensation sought
Summary
The insured claimed that the insurer's builders had not properly completed fire repairs, causing driveway stains, an unlevelled floor and ongoing temporary accommodation and compensation claims. AFCA found the repairs met the policy terms, the stains and floor were not established, and no temporary accommodation or compensation was payable.
The insured bears the onus to prove a covered loss caused by the insurer or its builders, and the evidence did not establish that the roof, driveway, floor or other works were defective or caused by the fire repairs; compensation requires a failing by the FSP under the policy.
Issues
- Repairs or contractors primary · not upheld
“The FSP has completed the repairs to a satisfactory level and in accordance with the policy conditions.”
- Delay secondary · not upheld
“Whilst there have been delays, I note that the delays have occurred for a variety of reasons”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - Service - Service Quality
Determination
Case No: 362158 Determination Page 1 of 8
Case number : 362158 1 8 November 2014
1 Overview
1.1 Dispute
The Applicant has made a claim under his household insurance policy following a
fire at the Applicant’s home in September 2012.
The Financial Services Provider (FSP) accepted the claim and carried out the
repairs.
This dispute relates to whether the repairs have been completed, whether the
FSP has caused additional damage, whether the FSP is required to pay the
Applicant ongoing temporary accommodation costs and whether the FSP is
obliged to pay compensation to the Applicant.
1.2 Issues and key findings
Has the FSP completed the repairs to a satisfactory level and in accordance
with the requirements of the policy conditions?
The FSP has completed the repairs to a satisfactory level and in accordance with
the policy conditions.
Is the Applicant entitled to ongoing temporary accommodation costs?
The Applicant is not entitled to ongoing temporary accommodation costs.
Is the Applicant entitled to compensation?
The Applicant is not entitled to compensation.
1.3 Determination
The Determination is in favour of the FSP.
The FSP has met its obligations in accordance with the requirements of the policy
terms and conditions.
Case No: 362158 Determination Page 2 of 8
2 Reasons for Decision
This Determination has been the subject of a Recommendation issued by the
Service on 7 October 2014. It was the Case Manager’s Recommendation that the
FSP had met its obligations in accordance with its requirements under the policy
and had completed the rectification of the repairs. Further, it was the Case
Manager’s Recommendation that the Applicant was not entitled to ongoing
temporary accommodation or compensation.
The Applicant has provided a further submission as to the circumstances of the
loss and the basis for the rejection of the Recommendation. The FSP has not
provided a further submission but has relied upon the material previously
provided.
In making this Determination, I have decided the matter on its merits and in
regard to the relevant law, good industry practise, codes of prac tise and previous
FOS decisions. I have taken into account all of the material submitted by the
parties both before and after the Recommendation and I am satisfied that the
documentation I have relied upon has been provided to both parties.
2.1 Has the FSP completed the repairs to a satisfactory level and in
accordance with the requirements of the policy conditions?
Damage to the lower roof
The evidence confirms that there was damage to the roof in February 2012, which
pre-dates the fire, the subject matter of this dispute.
The Applicant says that the original damage was fixed and the Applicant
continued living in the home, without water leak, until the subject fire in
September 2012.
The Applicant says that the FSP’s builders “ took access to ” his home for 17
months until February 2014.
The Applicant says that if there was a leak continuing from March 2012 it would
have come to the notice of the builder during the renovation process. If it had
come to the notice of the builder, the Applicant was not advised.
Further, the Applicant says that to the best of his knowledge, there were workers
in the area of the leak, and the leak happened a few days after the work in that
area was performed.
On the other hand, the FSP has produced reports to the effect that the cause of
the leaking roof was incorrect flashing and faulty sarking.
Subsequent reports have confirmed that the rectification of the flashing and faulty
sarking was never completed.
The Applicant argues that the FSP’s builder did not install the down pipes
spreader to Australian standards and that this is the cause of the leaking.
Case No: 362158 Determination Page 3 of 8
However, as detailed within the Case Manager’s Recommendation, the evidence
confirms that the down pipes spreader was present on the lower roof at the time
of the February 2012 event and it was in fact the incorrect flashing and faulty
sarking which was the cause of the leak and not the spreader.
Having considered all of these matters and given that the original problems which
predated the fire (that is the incorrect flashing and fa ulty sarking) were never
rectified, I am satisfied, on the balance of probabilities, that the leaking roof is not
related to the fire, the subject of this dispute and thus the FSP has met its
obligations in respect to the roof.
Oil and other stains to the driveway
The Applicant refers to oil and other stains on the driveway, of which he advised
the FSP, by email of 7 April 2014.
It is settled insurance law that the Applicant carries the initial onus to show that
the loss claimed has arisen from an event covered by the terms of the policy.
I accept that whilst the relevant event covered by the terms of the policy is the fire
of September 2012, the obligations of the FSP extend to rectifying any damage
which is caused by the FSP’s appointed builders during the home repair process.
The difficulty for the Applicant is that the handover of the keys to the home took
place after the completion of the fire damage repairs in February 2014 and even
though the Applicant stood in the driveway, talking with the representative of the
FSP’s builder, at that time, he did not raise the issue of the oil and other stains on
the driveway at that time.
It was only within the Applicant’s email of 7 April 2014 , that the question of stains
to the driveway was raised.
The Applicant says that it was getting dark at the time of the handover and the
Applicant said he did not have the opportunity to go through the external checks
of the house.
In addition, the Applicant says that the driveway was covered with debris after the
fire and that the driveway was the main and only access to the building for the
builders.
Whilst the Applicant confirms that he engaged a tiler and landscape gardener to
attend the property after the handover, he says that the landscaping has not
occurred and it is much more likely that the stains occurred during the 17 months
of repairs to the building, rather than the one day that the tiler was on the
premises after the handover.
Finally, the Applicant says that there are stains along the side of the house.
Notwithsta nding the Applicant’s argument with regard to the stains, it is difficult to
understand why the FSP’s builder did not note the stains at the time of the
handover or why the Applicant waited over a month to advise the FSP of the
stains, after the handover.
Case No: 362158 Determination Page 4 of 8
Whilst the Applicant says that it was getting dark on the evening of the handover
and he did not have a chance to go through the external checks of the house, the
Applicant has suggested that the driveway was covered in debris from the fire and
the builders were present over a 17 month period.
This suggests that the stains occurred during the period immediately after the fire
and during the 17 months of repairs.
It is not unreasonable to assume that the Applicant would have attended at his
home during the repair period and if there were stains on the driveway, he would
have observed the stains during that period.
In those circumstances, it is hard to see why the Applicant waited until 7 April
2014, over a month after the handover, to bring the stains to the attention of the
FSP.
In the circumstances and on the balance of probabilities, I am not satisfied that
the Applicant has met his onus to establish that the stains to the driveway were as
a result of the fire event, or the actio ns of the FSP’s builders when carrying out
repairs.
Floating floor installed without levelling
The Applicant says that the floating floor needs to be removed and reinstalled as
it is not level.
On the other hand, the FSP maintains that the flooring has been checked with a
spirit level in the Applicant’s presence and there were no issues.
The Applicant has provided a report from what he says is a flooring specialist, to
the effect that the floor needs to be removed and reinstalled.
Unfortunately, I have concerns regarding the qualifications of the flooring
specialist engaged by the Applicant.
I note that prior to the preparation of the Recommendation, the flooring specialist
was asked for details of his qualifications. These were not provided.
I note that the FSP wrote directly to the flooring specialist, requesting details of his
qualifications in order to provide the report. A copy o f this request has been
provided to the Applicant and the Applicant was aware that the FSP had
requested these details.
Within the Recommendation, the Case Manager has specifically questioned the
absence of any information regarding the experience and qualifications of the
flooring specialist.
However, within the further submissions from the Applicant, post the
Recommendation, the Applicant has failed to provide the details of the experience
and qualifications of his flooring specialist.
All evidence presented needs to be looked at in terms of what weight or reliance
can be placed upon that evidence.
Case No: 362158 Determination Page 5 of 8
Whilst the opinion of an expert is nothing more than an opinion, it is generally
based upon experience and qualifications, which if demonstrated mean that
weight and reliance can be placed upon that opinion.
The question of the experience and qualifications were specifically raised with the
Applicant regarding the flooring specialist, but the Applicant has not provided
those details.
In the circumstances an d given the FSP’s evidence to the effect that the flooring
was checked with a spirit level in the Applicant’s presence and given the absence
of details regarding the experience and qualifications of the Applicant’s flooring
specialist, I am not satisfied that the Applicant has met his onus to establish that
there is a problem with the flooring which relates to the insured event.
Other Issues
Originally, the Applicant had raised issues regarding the plumbing to the new
fridge, the air conditioning and warranty documents apparently missing in respect
to various electrical and plumbing works.
Within the Recommendation, the Case Manager has rejected the Applicant’s
arguments in respect to these three matters.
Within his further submission, the Applicant has not responded to the
Recommendation in respect to these three matters.
Having viewed the evidence presented, I accept the FSP’s argument to the effect
that the terms and conditions of the policy do not require the FSP to arrange for
the installation of his new refrigerator.
Further, I have noted the report from the air conditioning company to the effect
that the air conditioning unit is working correctly and that any faults had been due
to operator error. There is no evidence to challenge this view and given the
Applicant has not raised the matter again after the Recommendation, I accept the
FSP’s submission to the effect that work in respect to air conditioning has been
completed.
Finally, with regard to the question of the documents for the electrical and
plumbing works, I note that the evidence confirms that these documents were
provided to the Applicant at the first hand over. In the absence of the Applicant
further pursuing this matter, I accept the FSP’s submission that they have
complied with their obligations under the terms and conditions of the policy, in this
regard.
2.2 Has the FSP met its obligations under the terms and conditions
of the policy?
Having considered all of the evidence and the submissions by both parties, I am
satisfied that the FSP has met its obligations under the terms and conditions of
the policy.
Case No: 362158 Determination Page 6 of 8
Temporary accommodation
Given my finding that the FSP has met its obligations under the terms and
conditions of the policy, I am not satisfied that the FSP should be required to pay
any further temporary accommodation.
Compensation
The Terms of Reference of the Service provide that in the circumstances where
there has been an unusual degree or extent of physical inconvenience, time taken
to resolve the situation or interference with the Applican t’s expectation of
enjoyment or peace of mind, the Service may decide that the FSP compensate
the Applicant for non-financial loss.
I am satisfied it is only appropriate to make such a compensation award , where
there is a failing on the part of the FSP in respect to its responsibilities and
obligations to the Applicant, under the terms and conditions of the policy.
Whilst the repair process has taken a lengthy period of time, this is substantially
related to the seriousness of the fire event which destroyed the upper portion of
the Applicant’s home and caused significant damage to the lower portion.
Whilst there have been delays, I note that the delays have occurred for a variety
of reasons, including the time it took the Applicant to sign the contract and the
time it took the local council to approve the construction.
Whilst there is no doubt that this has been a stressful period for the Applicant, I
am not satisfied that it is appropriate that compensation be ordered in the
circumstances of this dispute.
Case No: 362158 Determination Page 7 of 8
3 Supporting information
3.1 Financial Ombudsman Service Approach
It is an accepted principle of general insurance law that an insured bears the onus
to show, on the balance of probabilities, that they have suffered a loss caused by
an event to which the policy responds. This is known as a prima facie claim.
3.2 Relevant policy provisions
“ Temporary accommodation for home owners
If a listed event causes loss or damage to your home and we agree you can’t live in it
and you need to move out so it can be repaired or rebuilt.
Covered under Buildings Insurance
costs for temporary accommodation that we agree are reasonable and appropriate for
you, your family and your pets that you normally keep at your site . ”
3.3 Terms of Reference
Paragraph 9.3
9.3 Other compensation
…
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial
Services Provider compensate the Applicant for non-financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time taken to resolve the
situ ation or interference with the Applicant’s expectation of enjoyment or peace of
mind has occurred; …
The maximum amount of compensation for non-financial loss will be $3,000 per claim
made in the Dispute.
3.4 External reports
Record Key points
FSP’s builder (C)
Email
13 September 2012
Roofer found old faulty repairs to sarking under area of
downpipe spreader – needs to be resarked .
Some of the lead flashing under the spreader has been
incorrectly installed. It is overlapping the wrong way which
is pushing wat er into and over tile watercourse and then
through faulty sarking.
FSP’s roofer ( S )
Undated report
inspection 15 April 2012
Swiss tile generally are not good having excess water on,
as in the case of the downpipe spreader spilling onto the
back section – this is a point of (water) ingress .
Lead step flashing all around the back side of the building
has all been lapped incorrectly and has been glued
unusually and is not good workmanship .
Case No: 362158 Determination Page 8 of 8
Roof is unsarked too but they have put a little square of
sarking underneath tile but then there are holes in the
sarking. They have then put lead over the top of the tiles to
try to stop it, the way they have put the lead on is pretty
unsuccessful and been done to a low standard .
Applicant’s flooring
specialist ( H )
Ema il
26 June 2014
Laminate boards are lifting near first bedroom and landing
downstairs, due to inadequate gaps along the perimeter of
the room .
Seems to be excessive variance in the subfloor in certain
areas of main bedroom a nd near entry to bedroom facing
the park .
Subfloor was not levelled to required specs for an
engineered floating floor to be installed over it .
FSP’s email to flooring
specialist (H)
Email
26 June 2014
Can you also please advise your qualification in order to
provide a report?
FSP’s ai r conditioning
tradesman (E)
Undated letter
On inspection of system it was found that the unit is
working correctly .
Upstairs and downstairs zones were checked and the
temperature and air flow outputs tested ok.