Determination 362071
Claim amount for water-damaged driveway and carpark
Summary
A retail property owner claimed for water-damaged driveway and carpark after a leaking water main, and the FSP offered progressively higher amounts, ending at $31,627. AFCA found the FSP's own engineer recommended full replacement, so it could not reduce the offer for prior council repairs or wear and tear, and ordered payment of the net repair balance of $45,533.64, interest and $500 non-financial loss.
The FSP's own engineering evidence showed the entire driveway needed remediation, so reductions for prior repairs and wear and tear were not reasonable.
Issues
- Claim amount dispute primary · upheld
“it was not reasonable for the FSP to reduce its offer on account of the works already performed by Council, or by 15% for wear and tear.”
- Poor claim handling secondary · upheld
“The FSP did not handle the Applicants' claim efficiently. Despite having M's report in August 2011... the FSP continued to make low offers.”
Subjects and remedies
small businesspay claimpay interestpay non financial loss
Text of the determination
Determination
General Insurance - Small Business/Farm Insurance - Commercial Property - FSP
Decision - Claim Amount
Determination
Case No: 362071 Determination Page 1 of 6
Case number : 362071 26 May 2015
1 Overview
1.1 Dispute
The Applicant lodged a claim with the Financial Services Provider (FSP) for
damage to the driveway/carpark at his retail commercial property due to a leaking
water main.
The FSP initially offered $1,455.46 to settle the claim based on the majority of the
damage being due to wear, tear and/or gradual deterioration. The FSP later
increased the offer to $16,913.32 taking into account work already performed by
Council and a 50% reduction for existing wear and tear. The FSP subsequently
made a final offer of $31,627.00 to settle the claim based on 85% of the remaining
repairs not already performed by Council.
The Applicant considers he is entitled to the entire amount for repairs totalling
$45,533.64, plus GST. The Applicant is also seeking compensation for the stress
caused by the FSP’s handling of the claim .
1.2 Issues and key findings
Is the Applicant entitled to the total cost of repairs?
The Applicant is entitled to receive the total cost of repairs because:
the expert evidence indicates the entire driveway required remediation rather
than spot repairs to ensure the entire sub grade was effective
the works performed by Council when repairing the leak in 2010, needed to be
re-done as water was still compromising the sub grade after the repairs
the expert evidence indicates the entire area needed remediation to rectify the
damage caused by the water leak, irrespective of any existing wear and tear.
Is the Applicant entitled to compensation?
The Applicant is entitled to $500 compensation, as he has suffered an unusual
degree of inconvenience because of the FSP’s handling of the claim .
1.3 Determination
This Determination is in favour of the Applicant.
The FSP is required to pay the Applicant the balance of the entire repair costs net
of GST, plus interest in accordance with section 57 of the Insurance Contracts Act
1984 (the Act), on each payment made from 11 August 2011 (the date of M’s
report), to the date paid. The FSP is also required to pay the Applicant $500
compensation.
Case No: 362071 Determination Page 2 of 6
2 Reasons for Determination
2.1 Is the Applicant entitled to the total cost of repairs ?
Entire area needed replacement to ensure subgrade was effective
The FSP has reduced its offer of settlement to the Applicant to account for the
section of works performed by Council when it repaired the leaking pipe in 2010.
The FSP’s own evidence from engineer M indicates the entire area needed
replacement rather than spot repair, to ensure the effectiveness of the sub grade.
M outlines the construction works required at the site in his report dated 11
August 2011, which includes lifting all of the asphalt to assess the quality of the
sub grade underneath.
M’s report also indicat es that despite rectification of the source of the leak in
2010, damage to the sub grade was continuing due to water entering through
cracks in the asphalt. It is therefore reasonable to believe the area reinstated by
Council may have also experienced some infiltration of water into the sub grade
after rectification.
Accordingly, it was not reasonable for the FSP to reduce its offer on account of
the works already performed by Council, as the entire sub grade within the car
park area needed to be evaluated and restored before the rectification works
could take place.
Entire area needed replacement irrespective of any existing wear and tear
The FSP has also reduced the amount offered to the Applicant by 15% to account
for existing wear and tear.
As outlined above, the FSP’s own engineer recommended the existing asphalt
across the entire car park area be taken up so that the sub grade could be
assessed and remedied before any reinstatement works took place.
Therefore, the entire area required rectification irrespective of any pre-existing
damage. Accordingly, it was not reasonable for the FSP to reduce its offer to the
Applicant by 15%.
2.2 Is the Applicant entitled to receive compensation?
Applicant suffered an unusual degree of inconvenience
FOS can award an Applicant compensation of up to $3,000 for non-financial loss,
where the Applicant experienced an unusual degree or extent of physical
inconvenience, time taken to resolve the dispute or interference with his or her
expectation of enjoyment or peace of mind.
The FSP did not handle the Applicants’ claim efficiently . De spite having M’s report
in August 2011, indicating the entire area required rectification due to deficiency in
the sub grade, the FSP continued to make low offers to the Applicant. As time
Case No: 362071 Determination Page 3 of 6
went on the Applicant suffered considerable stress as a result of customer
complaints and tenants threatening to vacate their leased premises due to the
state of the car park.
Accordingly, the Applicant has established an entitlement to compensation. An
amount of $500 is fair in all the circumstances.
Case No: 362071 Determination Page 4 of 6
3 Supporting information
3.1 Key documents
Record Key points
FSP’s Assessor (C )
1 st Report
22 Jul 2011
Leak from sewer is said to have been occurring over a
prolonged period but the fault was discovered and re ctified
in 2010.
Failure of the asphalt surface gradual since 2007.
Repairs by Council appear intact. Other sections repaired
at different intervals in the past which insured
acknowledged were part of general maintenance.
Current condition is poor with c racks widely spread over
various areas of the car park. Approximately 60% of the
car park surface indicates failure of varying degree.
Existing damage observed consistent with general wear
and tear from vehicle traffic patronising the area. Possibility
da mage exacerbated since alleged water intrusion from
the sewer line. However, the source of the water
inundation is not certain .
Insured holds strong opinion the asphalt surface failure is
attributed to the failed sewer line repaired previously by
council.
Recommend obtaining engineering report.
FSP’s Engineer (M )
1 st Report
11 Aug 2011
Bitumen driveway is approximately 40m in length and 15m
wide.
It is alleged subsequent to a progressive leak within the
two separate incidents being Council stormwater and [SW]
pipe/main located within the driveway has caused cracking
and movement within the asphalt wearing surface and sub
grade.
According to the in sured both leaking pipes have been
addressed and remediated by SW and Council.
Repairs by Council included the remediation of a portion of
entry driveway sub grade and asphalt on completion of
stormwater pipe repairs.
Noticeable areas of localised damage within the asphalt
that will require remedial works including scattered tensile
cracks.
Observed damage categorized as
1. Localised depressions, crocodiling and cracking caused
subsequent to bearing failure in the sub grade when
induced under pressure from v ehicle tyres
2. Potholes subsequent to failure in the sub base due to
compression and sub drainage failure of the driveway.
Damage consistent with the progressive ingress of
moisture within the driveway’s subgrade compromising the
bearing capacity subject to the alleged pipe leakage.
Case No: 362071 Determination Page 5 of 6
In view of the current condition of the asphalt, substantial
water penetration in the sub grade is occurring post the
pipe repair as surface rain water is permeating through
tessellations and crocodiling in asphalt wearing surfac e.
This has given cause for further and exacerbated sub
grade damage post the original events.
Failure of the subgrade has likely been progressive on rate
of water ingress and permeation.
Severity of damage can be estimated as progressively
occurring long term over a period of 6 months to a year
post leaking pipe date based on the rate of the leak,
weather conditions and subjected vehicle loading on the
driveway.
On this basis asphalt damage has sequentially eventuated
subsequent to vehicle loading and resultant failure causing
cracking and subsidence.
Damage present may be up to 3 - 5 years in age.
Reinstatement of the driveway could be completed by
repairing sections of localised cracks, depressions and
potholes with the application of resealing bitum inous spray
to administer a uniform appearance on completion.
Considering the severity, vast quantity of patches required
and possible unforeseen defective sub grade conditions,
the option in view of future risk mitigation is unfavourable.
It is recommend ed that the entire driveway be remediated
in lieu of spot repairs to assure the entire sub grade is
effective and future longevity of the driveway is attainable
without risk of possible failures post repair completion.
New driveway should be constructed a s follows:
1. existing base course and sub base to be removed and
assessment to ascertain suitability for reuse or import
new material
2. reinstate 30mm of asphalt over base course and
compact accordingly with roller.
It is recommended that the entire driveway a rea excluding
the previous council repaired section be remediated in lieu
of patch repairs.
FSP’s Engineer (M )
Supplementary Report
16 Feb 2012
Total driveway area calculated at approximately 600m2.
Approximately 100m2 identified as council repaired
sections of asphalt which do not contain significant surface
damage.
Area of driveway has apparent damage consistent with
progressive ingress of moisture within the driveway’s sub
grade, compromising the bearing capacity subject to the
pipe leakage.
Area o f driveway calculated at 500m2 when deducting
100m2 of repaired section from the total.
85% of the total area of the driveway damage is
considered attributable to the broken pipe and
consequential sub grade damage.
Case No: 362071 Determination Page 6 of 6
Remaining 15% is not considered damaged as a result of
the pipe breakage with repairs of the asphalt attended to
by others.
Subsidence damage and cracking within the driveway is
considered attributable to the pipe leakages with further
damage exacerbated over time subsequent to the ingress
of w ater through the crocodile cracking within the asphalt
surface.
Approximately 85% of the total driveway area has been
identified damaged as a result of the broken pipe and will
require remedial replacement in accordance with the
specifications previously o utlined.
FSP’s Assessor (C )
5 th Report
21 Feb 2012
MCS have provided an updated report - the total area of
the driveway has been calculated at approximately 600m2.
We have attended to adjustment and are of the opinion the
total area is nearer to 500m2.
C ouncil has attended to repair of an existing area of
108m2 leaving an area of 392m2.
Have requested updated quote for reinstatement of
remaining area.
FSP’s Contractor (K )
Quote
27 Feb 2012
Quote to excavate and reinstate asphalt driveway to area
of 510m2 including line marking as per existing.
Supply and lay 400mm base material, rolled and
compacted, 3x50mm layers of base course, reinstate
30mm asphalt rolled and compacted.
$48,410 incl GST.
App’s Contractor (M)
Report on works
19 Jan 2015
Before digging up car park noticed it had been repaired in
different places with bitumen but had not held up to
expectation.
The only way to fix surface was to concrete whole area.
When excavated near newsagency found a very wet area
– had to dig out and r eplace with new fill before concreting.
There were a few other wet areas dug out and filled before
concreting.
App’s Contractor (M)
Cost of works
8 Apr 2015
Car park resurfacing with concrete due to water damage in
February 2013.
Total cost $45,533.64 + GST