Home / Financial Firm (Unknown - Insurer) / Determination 362071

Determination 362071

Claim amount for water-damaged driveway and carpark

FirmFinancial Firm (Unknown - Insurer)
Decided2015-05-28
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant
Amount awarded$45,534
Non-financial loss$500
Amount claimed$45,534
SourceAFCA PDF

Summary

A retail property owner claimed for water-damaged driveway and carpark after a leaking water main, and the FSP offered progressively higher amounts, ending at $31,627. AFCA found the FSP's own engineer recommended full replacement, so it could not reduce the offer for prior council repairs or wear and tear, and ordered payment of the net repair balance of $45,533.64, interest and $500 non-financial loss.

The FSP's own engineering evidence showed the entire driveway needed remediation, so reductions for prior repairs and wear and tear were not reasonable.

Issues

Subjects and remedies

small businesspay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Claim Amount Determination Case No: 362071 Determination Page 1 of 6 Case number : 362071 26 May 2015 1 Overview 1.1 Dispute The Applicant lodged a claim with the Financial Services Provider (FSP) for damage to the driveway/carpark at his retail commercial property due to a leaking water main. The FSP initially offered $1,455.46 to settle the claim based on the majority of the damage being due to wear, tear and/or gradual deterioration. The FSP later increased the offer to $16,913.32 taking into account work already performed by Council and a 50% reduction for existing wear and tear. The FSP subsequently made a final offer of $31,627.00 to settle the claim based on 85% of the remaining repairs not already performed by Council. The Applicant considers he is entitled to the entire amount for repairs totalling $45,533.64, plus GST. The Applicant is also seeking compensation for the stress caused by the FSP’s handling of the claim . 1.2 Issues and key findings Is the Applicant entitled to the total cost of repairs? The Applicant is entitled to receive the total cost of repairs because:  the expert evidence indicates the entire driveway required remediation rather than spot repairs to ensure the entire sub grade was effective  the works performed by Council when repairing the leak in 2010, needed to be re-done as water was still compromising the sub grade after the repairs  the expert evidence indicates the entire area needed remediation to rectify the damage caused by the water leak, irrespective of any existing wear and tear. Is the Applicant entitled to compensation? The Applicant is entitled to $500 compensation, as he has suffered an unusual degree of inconvenience because of the FSP’s handling of the claim . 1.3 Determination This Determination is in favour of the Applicant. The FSP is required to pay the Applicant the balance of the entire repair costs net of GST, plus interest in accordance with section 57 of the Insurance Contracts Act 1984 (the Act), on each payment made from 11 August 2011 (the date of M’s report), to the date paid. The FSP is also required to pay the Applicant $500 compensation. Case No: 362071 Determination Page 2 of 6 2 Reasons for Determination 2.1 Is the Applicant entitled to the total cost of repairs ? Entire area needed replacement to ensure subgrade was effective The FSP has reduced its offer of settlement to the Applicant to account for the section of works performed by Council when it repaired the leaking pipe in 2010. The FSP’s own evidence from engineer M indicates the entire area needed replacement rather than spot repair, to ensure the effectiveness of the sub grade. M outlines the construction works required at the site in his report dated 11 August 2011, which includes lifting all of the asphalt to assess the quality of the sub grade underneath. M’s report also indicat es that despite rectification of the source of the leak in 2010, damage to the sub grade was continuing due to water entering through cracks in the asphalt. It is therefore reasonable to believe the area reinstated by Council may have also experienced some infiltration of water into the sub grade after rectification. Accordingly, it was not reasonable for the FSP to reduce its offer on account of the works already performed by Council, as the entire sub grade within the car park area needed to be evaluated and restored before the rectification works could take place. Entire area needed replacement irrespective of any existing wear and tear The FSP has also reduced the amount offered to the Applicant by 15% to account for existing wear and tear. As outlined above, the FSP’s own engineer recommended the existing asphalt across the entire car park area be taken up so that the sub grade could be assessed and remedied before any reinstatement works took place. Therefore, the entire area required rectification irrespective of any pre-existing damage. Accordingly, it was not reasonable for the FSP to reduce its offer to the Applicant by 15%. 2.2 Is the Applicant entitled to receive compensation? Applicant suffered an unusual degree of inconvenience FOS can award an Applicant compensation of up to $3,000 for non-financial loss, where the Applicant experienced an unusual degree or extent of physical inconvenience, time taken to resolve the dispute or interference with his or her expectation of enjoyment or peace of mind. The FSP did not handle the Applicants’ claim efficiently . De spite having M’s report in August 2011, indicating the entire area required rectification due to deficiency in the sub grade, the FSP continued to make low offers to the Applicant. As time Case No: 362071 Determination Page 3 of 6 went on the Applicant suffered considerable stress as a result of customer complaints and tenants threatening to vacate their leased premises due to the state of the car park. Accordingly, the Applicant has established an entitlement to compensation. An amount of $500 is fair in all the circumstances. Case No: 362071 Determination Page 4 of 6 3 Supporting information 3.1 Key documents Record Key points FSP’s Assessor (C ) 1 st Report 22 Jul 2011  Leak from sewer is said to have been occurring over a prolonged period but the fault was discovered and re ctified in 2010.  Failure of the asphalt surface gradual since 2007.  Repairs by Council appear intact. Other sections repaired at different intervals in the past which insured acknowledged were part of general maintenance.  Current condition is poor with c racks widely spread over various areas of the car park. Approximately 60% of the car park surface indicates failure of varying degree.  Existing damage observed consistent with general wear and tear from vehicle traffic patronising the area. Possibility da mage exacerbated since alleged water intrusion from the sewer line. However, the source of the water inundation is not certain .  Insured holds strong opinion the asphalt surface failure is attributed to the failed sewer line repaired previously by council.  Recommend obtaining engineering report. FSP’s Engineer (M ) 1 st Report 11 Aug 2011  Bitumen driveway is approximately 40m in length and 15m wide.  It is alleged subsequent to a progressive leak within the two separate incidents being Council stormwater and [SW] pipe/main located within the driveway has caused cracking and movement within the asphalt wearing surface and sub grade.  According to the in sured both leaking pipes have been addressed and remediated by SW and Council.  Repairs by Council included the remediation of a portion of entry driveway sub grade and asphalt on completion of stormwater pipe repairs.  Noticeable areas of localised damage within the asphalt that will require remedial works including scattered tensile cracks.  Observed damage categorized as 1. Localised depressions, crocodiling and cracking caused subsequent to bearing failure in the sub grade when induced under pressure from v ehicle tyres 2. Potholes subsequent to failure in the sub base due to compression and sub drainage failure of the driveway.  Damage consistent with the progressive ingress of moisture within the driveway’s subgrade compromising the bearing capacity subject to the alleged pipe leakage. Case No: 362071 Determination Page 5 of 6  In view of the current condition of the asphalt, substantial water penetration in the sub grade is occurring post the pipe repair as surface rain water is permeating through tessellations and crocodiling in asphalt wearing surfac e. This has given cause for further and exacerbated sub grade damage post the original events.  Failure of the subgrade has likely been progressive on rate of water ingress and permeation.  Severity of damage can be estimated as progressively occurring long term over a period of 6 months to a year post leaking pipe date based on the rate of the leak, weather conditions and subjected vehicle loading on the driveway.  On this basis asphalt damage has sequentially eventuated subsequent to vehicle loading and resultant failure causing cracking and subsidence.  Damage present may be up to 3 - 5 years in age.  Reinstatement of the driveway could be completed by repairing sections of localised cracks, depressions and potholes with the application of resealing bitum inous spray to administer a uniform appearance on completion.  Considering the severity, vast quantity of patches required and possible unforeseen defective sub grade conditions, the option in view of future risk mitigation is unfavourable.  It is recommend ed that the entire driveway be remediated in lieu of spot repairs to assure the entire sub grade is effective and future longevity of the driveway is attainable without risk of possible failures post repair completion.  New driveway should be constructed a s follows: 1. existing base course and sub base to be removed and assessment to ascertain suitability for reuse or import new material 2. reinstate 30mm of asphalt over base course and compact accordingly with roller.  It is recommended that the entire driveway a rea excluding the previous council repaired section be remediated in lieu of patch repairs. FSP’s Engineer (M ) Supplementary Report 16 Feb 2012  Total driveway area calculated at approximately 600m2.  Approximately 100m2 identified as council repaired sections of asphalt which do not contain significant surface damage.  Area of driveway has apparent damage consistent with progressive ingress of moisture within the driveway’s sub grade, compromising the bearing capacity subject to the pipe leakage.  Area o f driveway calculated at 500m2 when deducting 100m2 of repaired section from the total.  85% of the total area of the driveway damage is considered attributable to the broken pipe and consequential sub grade damage. Case No: 362071 Determination Page 6 of 6  Remaining 15% is not considered damaged as a result of the pipe breakage with repairs of the asphalt attended to by others.  Subsidence damage and cracking within the driveway is considered attributable to the pipe leakages with further damage exacerbated over time subsequent to the ingress of w ater through the crocodile cracking within the asphalt surface.  Approximately 85% of the total driveway area has been identified damaged as a result of the broken pipe and will require remedial replacement in accordance with the specifications previously o utlined. FSP’s Assessor (C ) 5 th Report 21 Feb 2012  MCS have provided an updated report - the total area of the driveway has been calculated at approximately 600m2.  We have attended to adjustment and are of the opinion the total area is nearer to 500m2.  C ouncil has attended to repair of an existing area of 108m2 leaving an area of 392m2.  Have requested updated quote for reinstatement of remaining area. FSP’s Contractor (K ) Quote 27 Feb 2012  Quote to excavate and reinstate asphalt driveway to area of 510m2 including line marking as per existing.  Supply and lay 400mm base material, rolled and compacted, 3x50mm layers of base course, reinstate 30mm asphalt rolled and compacted.  $48,410 incl GST. App’s Contractor (M) Report on works 19 Jan 2015  Before digging up car park noticed it had been repaired in different places with bitumen but had not held up to expectation.  The only way to fix surface was to concrete whole area.  When excavated near newsagency found a very wet area – had to dig out and r eplace with new fill before concreting.  There were a few other wet areas dug out and filled before concreting. App’s Contractor (M) Cost of works 8 Apr 2015  Car park resurfacing with concrete due to water damage in February 2013.  Total cost $45,533.64 + GST

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.