Home / Financial Firm (Unknown - Insurer) / Determination 361694

Determination 361694

Denial of storm-related ridge beam, plaster and loss of rent claims; roof tile rectification

FirmFinancial Firm (Unknown - Insurer)
Decided2015-01-28
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$3,960
Non-financial loss$500
Amount claimed—
SourceAFCA PDF

Summary

The landlord claimed for storm damage to a ridge beam, plaster, roof tiles and lost rent after the FSP's repairs. AFCA found the beam, plaster and rent claims were excluded, but ordered cash settlement of the roof tile rectification and $500 for non-financial loss.

Causation was decided on expert evidence, with the ridge beam found undersized and plaster movement non-storm, while inadequate earlier roof repairs made the tile rectification a consequence of the insured event.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition - Service - Service Quality Determination Case No: 361694 Determination Page 1 of 10 Case number : 361694 3 December 2014 1 Overview 1.1 Dispute The Applicant lodged a claim under her landlord insurance policy with the Financial Service Provider (FSP) following a hail storm in December 2011. The FSP accepted the Applicant’s claim initial claim for damage, however it denied liability for a number of other items subsequently claimed by the Applicant. 1.2 Issues and key findings Is the FSP entitled to deny the claims? The Applicant has not established that the storm and subsequent repairs are the proximate cause of loss or damage relating to the ridge beam, the plaster and cornices in the living room, lounge and kitchen, or the loss of rent. The FSP is therefore entitled to deny these aspects of the Applicant’s claim. The Applicant has established, on balance, that the storm and subsequent repairs are the cause of damage to the roof tiles. This damage is therefore covered by the policy. Is the Applicant entitled to consequential loss or non- financial loss? The FSP is not required to pay for loss of income while the Applicant attended a VCAT hearing. This loss is too remote to be considered consequential loss and is not otherwise covered by the policy. The FSP must pay compensation for non-financial loss given the stress and inconvenience caused by the FSP’s repair process and actions of the repairer. 1.3 Determination This Determination is partly in favour of the Applicant. The FSP must:  Cash s ettle the Applicant’s claim in respect of the roof tiles, in accordance with the terms and conditions of the policy and after having obtained an updated quote for the scope of works as set out by the Applicant’ s roofer (SK) on 12 August 2013.  Pay $500 to the Applicant for non-financial loss. Case No: 361694 Determination Page 2 of 10 2 Reasons for Determination I have decided this case on its merits, doing what is fair in all the circumstances having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties. I am satisfied that the documentation I have relied on has been provided to both parties. This dispute has been expedited to a Determination. No Recommendation was issued. 2.1 Is the Applicant entitled to deny the claims? The Applicant must establish the damage was caused by an insured event The onus of proof rests on the Applicant to establish, on the balance of probabilities, she has suffered a loss caused by an insured risk. Once the Applicant has established the loss was caused by a risk insured against under the policy, the onus then shifts to the FSP to show, on the balance of probabilities, the loss falls within an exclusion clause of the policy. The Applicant claims loss or damage in respect of:  a cracked beam  damage to plaster and cornices in the living room, lounge and kitchen, and  damage to the roof tiles. The Applicant also claims:  loss or rent  loss of income, and  non-financial loss There were several experts engaged by the parties The Applicant engaged the following experts to inspect and report on the damage to her property:  Roofing expert – SK  Roofing expert – BJ  Engineer – G. The FSP engaged the following experts to inspect and report on the damage:  Builder - S  Builder – BP  Engineer – F. Ultimately, the FSP did not produce any report from BP, instead choosing to rely on the opinions of F. According to the FSP, BP provided verbal advice about the repair work he performed. I have given no evidentiary weight to any submissions in re spect of BP’s findings, given:  there is no written report from BP, and  BP’s oral advice is not independent given he was commenting on his own work. Case No: 361694 Determination Page 3 of 10 The cracked beam was not caused by the storm The FSP’s builder completed repairs to the storm damage buil ding in September 2012. No reference had been made to the dip in the roof or the cracked beam by the Applicant or the FSP’s assessor at this time. In January 2013, the Applicant became aware of a sunken roof beam and the cracked ridge beam and emergency r epairs were conducted by the FSP’s builder. The Applicant considers the ridge beam was damaged by either:  the storm (causing underlying damage to the roof truss and water soaking into the insulation), or  foot traffic by the FSP’s builders. In support of this the Applicant refers to approximately 50 cracked roof tiles that were located above the area of the cracked beam. The Applicant’s engineer (G) referred to the design drawings for the building and, applying the Australian Standard relevant at the time, computed that the beam had satisfactory strength for its load. However, G did not provide an opinion as to the cause of the cracked beam only noting that wind gusts can vary and the Applicant should not accept the denial of her claim. G made no comment in respect of the roof truss or the insulation. The FSP’s engineer (F) noted that G’s computations assumed that the relevant beam was as per the design drawings and was therefore 75mm wide. F stated that G had clearly not inspected the premises . Based on F’s inspection, F estimated the beam was 45mm wide. Based on today’s standards and assuming F17 timber, F concluded that the beam had adequate strength to cope with the load applied by maintenance workers and short term wind loading. However, on converting G’s calculations using the standards applicable at the time of construction and using G’s basis of F8 timber (but with 45mm width), F concluded the beam was significantly undersized to cope with long term loading (being self weight and applied dead load from roof tiles and ceiling). While I have some queries in respect of the calculations adopted by F, it is logical that the wider the beam, the greater the applied stress it can tolerate. On balance, I accept F’s conclusions that the beam was undersized for its load. This is particularly given it was significantly narrower than designed. This, rather than the storm, was the proximate cause of the damage to the beam. As such, the FSP is entitled to den y this aspect of the Applicant’s claim. Damage to plaster and cornices in the living room, lounge and kitchen was caused by natural movement and not the storm F inspected the property and concluded the damage to the cornices and plaster was related to differential movement due to long term drying and shri nkage of building material and not related to the storm. Case No: 361694 Determination Page 4 of 10 Builder S who attended the property in May 2013 also concluded this damage was not related to the storm and considered it related to the expansion and contraction of the structure due to temperature fluctuations. The Applicant provided photographs taken shortly before the property was let to the tenants that show the property was in excellent condition before the storm. The damage is near the cracked beam and below where some of the roof tiles were replaced, which is why the Applicant believes the damage was related to the storm. Further, the Applicant notes the property could not have sustained damaged due to movement because the house is on a solid concrete slab. Having reviewed the photographs pro vided by the Applicant, I accept that she maintained her property in excellent condition. However, such maintenance will not prevent natural movement that occurs even when a structure is built on a concrete slab. That the storm was not the cause of the damage is supported by the fact that there is no evidence of water damage in this area. On balance, I accept the conclusions of F and S that the damage was not caused by the storm. As such, the FSP is entitled to deny this aspect of the Applicant’s claim. Th e damaged roof tiles were caused by the storm and the FSP’s repairs The Applicant’s roof experts indicate there are about 70 broken roof tiles that require replacement and the repairs performed are not to standard. This follows an initial 190 tiles replaced in September 2012 and a further 55 tiles being replaced in July 2013. No expert report regarding the tiles was provided by the FSP. The FSP says the photographs presented by the Applicant’s roofing experts SK and BJ do not exhibit this. It also says SK and BJ had provided conflicting findings about the cracking to the pointing. The FSP’s assessor notes that the tiling to the roof had been addressed on two separate occasions and at both times was deemed to be completed. While SK says the damage was not caused by the cracked beam, the FSP relies on a photo from BJ to demonstrate that there is cracking in the vicinity of the valley, suggesting it was caused as a result of the cracked beam. The fact that the damage was not satisfactorily repaired (and hence required another attempt) demonstrates that there were flaws in the first “deemed completion”, that may well have occurred on the second occasion. Given the history of repairs to the roof, on balance I accept that the required rectification works are a consequence of inadequate repairs previously undertaken by the FSP as a result of the storm. The FSP is therefore not entitled to deny this aspect of the Applicant’s claim. It is fair in all the circumstances for the FSP to cash settle this portion of t he Applicant’s claim. This is because: Case No: 361694 Determination Page 5 of 10  it is not clear whether some of the tile rectification works may need to be undone if the roof ultimately requires lifting to repair the cracked beam, and  the deteriorated relationship between the Applicant and the FSP make it suitable for cash settlement. The FSP must cash settle the claim in accordance with the scope of works obtained by the Applicant from SK dated 12 August 2013. The FSP is entitled to deny the claim for loss of rent The Applicant requests the FSP to reimburse her loss of rent for the period between 16 April 2013 and 17 May 2013. She states she was unable to rent out the property during this period because of safety concerns resulting from the cracked beam. The Applicant says she only decided to rent the property after the FSP’s assessor confirmed it was safe to do so. The policy covers loss of rent where the rental property is rendered uninhabitable as the result of an insured event. In this instance:  the cracked beam, and therefore any resulting safety concerns, was not caused by an insured event, and  in any event, the Applicant had received confirmation on 13 March 2013 that the property was safe to occupy. The FSP is therefore entitled to deny the claim for loss of rent. 2.2 Is the Applicant entitled to compensation for consequential loss or non-financial loss? The FSP is not required to compensate the Applicant for loss of income The Applicant is of the view the FSP should reimburse her for loss of income when she attended a three day VCAT hearing due to:  the delay in conducting the repairs which meant the tenants were inconvenienced and unable to use the garage or lounge room of the property, and  damage that had been caused to the tenant’s property during the repairs. The FSP submits there is no provision in the policy for loss of income. It further states that VCAT has adjudicated the dispute and redress has been ordered. As such, the FSP says the matter should not be revisited by FOS. There is provision in the TOR to award $3,000 for consequential loss. However, I consider the loss of income claim arising from a VCAT hearing following a faulty repair job, to be too remote from the insured event (storm) claim to be categorised as consequential loss. In any event, I agree with the Applicant ’ s claim that the correct time to have sought this loss was at VCAT when all parties were before the Tribunal. Case No: 361694 Determination Page 6 of 10 The Applicant is entitled to compensation for non-financial loss FOS may grant compensation if it is satisfied the Applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant’s expectation of enjoyment or peace of mind has occurred. While the Applicant she was only deprived of rental income for a maximum of one month, she has suffered significant stress as a result of the FSP’s builder and resulting VCAT hearing. This is evident in correspondence. Further, review of the Applicant’s claim by the FSP’s legal representatives was delayed due its inability to retrieve the claim file from the FSP. Considering all of the above, I accept the Applicant has suffered in the manner described in the TOR. It is fair in all the circumstances for the FSP to pay $500 compensation to the Applicant. Case No: 361694 Determination Page 7 of 10 3 Supporting information 3.1 Relevant policy extracts The policy covers listed events including “storm, rainwater, flood or wind” but excludes water entering the building “because of a structural defect, fau lty design or faulty workmanship.” General exclusions also include: (page 37 of PDS) “ Buildings and contents cover exclusions We will not cover any loss or damage as a res ult of or caused by:  settling, shrinkage or expansion in the buildings foundations, walls or pavements …  erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear …  a defect in an item, structural defects or faulty or poor workmanship or design ” Building cover is provided for there is an additional benefit for loss of rent. (page 18-19 of PDS) “ Loss of rent Any loss of rent equal to the weekly amount as stated on your Rental Agreement or Periodic Tenancy Agreement for up to 12 months and a maximum of $52,000 if your buildings or sections of your buildings suffer loss or damage and are uninhabitable as a result. … When:  loss or damage to you buildings occurs as a result of an event as listed in this Policy …” 3.2 Summary of expert reports Re port Key points FSP’s builder (S) 17/04/13 “Summary … I am of the opinion that the hairline cracking to the cornice joints in the Living room, Lounge room and Kitchen are as a result of general movement to the structure through everyday wear and tear. I am of the opinion that these cracks are not the result of one storm event but rather caused by a number of temperature fluctuations resulting in expansion and contraction. Therefore I consider this to be a maintenance issue. Given that there has been no impact damage to the roof at this location or other associated damage t o the roof area around this point, I am of the opinion that the break has not been from any storm event. Case No: 361694 Determination Page 8 of 10 Re port Key points The only evidence of repair over this section of roof is the re - bedded capping tiles to the ridge line. I observed that all of the capping tiles to the roof are have been re - bedded. This Insured was also not aware of any damage to the affected area however was confident t hat the break did not exist prior to the storm event . I am unable to determine the cause of the break to the ridge beam. This may have been able to be confirmed by the Tenant to the property or the repairers to the roof after the storm event.” (sic) FSP’s engineer (F) 05/06/13 “ Conclusi ons It is [F]’s opinion that: - The failure of the ridge beam in the lounge/sitting room has been caused by the long term overstressing of the ridge beam, which is undersized and therefore had inadequat e capacity to sustain the applied long term loading from the roof (i.e. the weight of the supported timber framing, roof tiles, ceiling, etc.) The storm event of 25 December 2011 has not caused, nor cont ribut ed to the failure of the subject ridge beam. The owner should engage a Structural Engineer to advise on an appropriate repair/replacement of the failed ridge beam. The other building distress identified by the owner is long term cosmetic damage only and is not attr ibutable to the storm event.” Applicant’s roofer (SK) 12/08/13 “On Monday 12 August, 2013, I ins pected the roof at the above address: Upon inspection, I found tha t the roof has only been re - pointed when the occupier has advised me that it was suppo s e to have been both re - bedded and point ed. Also there was a dip in the roof w here the insurance w orkers have done w o rk . However, there are no sig n s of any cracks in the po inting, and i f the dip in the roof happened after they fixed the pointing, there would be obvious cracks. I a lso found 70 cracked roof tiles that ha ve not been replaced. There are also chipped tiles that have been silicone all over the roof, as you can see in the ph o tos attached. ” (sic) Quote to repair is $3,960 . Applicants roofer (BJ) undated “On inspection there were evident of broken tiles that have been l eft in roof from previous tradesman (70 + see attached photos). A number of those tiles had bee n left under top ridge and hips (will need to b e re - bedded and re pointed) . Broken tile s will need to be replaced. The valley had not been repaired to standard (please refer to attached photo) and will need to b e re - bedded and re - point ed. ” (sic) Applicant’s engineer (G) 19/09/13 “ 1. Roof beam design I have been advised that the dwellin g is 26 ye a rs old: I attach a copy of the section of the floor plan showing the ridge beam. It indicates that the ridge bea m is 27 5x75 F 8 hardwood timber spanning 3 300mm between the face of supports with a load width of 4400mm . This is com pletely c on tradic tory to the estimated size adopted by [F]. In addition, the relevant standard us ed for the design of the timber beam must be the one relevant in 1987 i .e. AS1720 - 1975, SAA Timber Engineering Code . The design for the beam is car ried out using the working stress method . I checked the design of the beam and determined that the 250x75 F8 timber beam is sa tisfact o ry; - fb= 8.18 MPa, Fb =8.60 MPa. I also point out that council approved the design of the building and a certificate of occupancy has been issued. As such the building is suitable for occupation and able to be insured. Case No: 361694 Determination Page 9 of 10 Re port Key points 2. Wind [F] has suggested that the wind load on the roof at the time of the storm was lower than the design load for the structure. I do not argue that the wind gust at [Location T] w as 27.8 m/sec. The fact is that at the property in [Location G] the wind/gust was such that a significant number of roof tiles were dislodged. Tiled roofs must be designed and constructed to withstand similar wind loads as the supporting structure. To sugg est that the wind load recorded at [Location T] can be compared to what occurred at the dwelling is ludicrous. There are oft en in ci dents where a freak storm will cause significant damage to a building but not the adjoining building. ” FSP’s engineer (F ) 05 /12/13 “ Conclusion 4.1 New information provided in the report by [G] demonstrates the following:  The installed ridge beam is significantly narrower than the beam width specified in the design drawings. Hence roof ha s not been constructed in accordance with the original design Intent.  Adjusting the results of the calculations provided by [G] to allow the fact that the i nstalled ridge beam is substantially narrower than the section size specified in the design, demonstrates that the applied bending stress is 44% greater that the permissible bending stress as determined by [G] , i.e. the subject ridge beam, as installed , is significantly undersized. 4.2 Henc e the information provided by [G] appears to confirm the findings of [ F ] 's Report ref: S11958 - 20 9767 , dated 5 June 2013, which i dentified that the failed ridge beam Is "undersized and therefore had inadequate capacity to sustain the applied long t erm loading from the roof (i.e. the weight of the supported timber framing, roof tiles, ceiling, etc.)". 4. 3 For the reasons stated in Section 3.2. it would not be appropriat e for [ F ] to comment on the letters by [SK] and [BJ] . [F] suggests that the Client engage a suitably qualified roofed builder to comment on the letters; it i s recommended the roofer/builder undertake a detailed site inspection of the roof prior to providing comment. 4.4 [F]’ s conclusions in relation to this investigation, as detailed in our Engineering Investigation Report, remain unchanged. In particular, it is [F]’s opinion that the storm event of 25 December 2011 has not caused, nor contributed to, the failure of the subject ridge beam.” 3.3 Chronology Date Event 25 December 2011  Hailstorm causes damage to the Applicant’s tenanted property. 3 March 2012  Ceiling of garage collapsed . 6 March 2012  Applicant made claim for damage . September 2012  Repairs completed by FSP’s builder (BB).  190 roof tiles required work together with replacement of a new ceiling in the garage and repair to plaster in a number of rooms. Case No: 361694 Determination Page 10 of 10 Date Event 15 January 2013  VCAT hearing. Damage to tenants ’ contents found to have been caused by Applicant or agent.  Tenant makes further claims for 57 days of inconvenience, loss of use of garage and lounge. January 2013  Applicant discovers problems to internal cornices, beam, sag i n the roof, cement sheets, brick and split doors on the garage and laundry . This was the Applicant’s first six month inspection of the property and her first opportunity to see the repairs carried out by B B . 15 December 2013  Lease agreement entered into. 13 March 2013  Email from FSP that repairs have made building safe. 1 5 April 2013  Tenants break lease and vacate. They were unhappy that it took 5 months to repair the house, that they could not use the whole of the house during this time, with the constant disruptions and that the repairer mishandled their goods . 18 May 2013  New tenants arranged after the FSP’s building inspector stated the beam was made safe. 22 May 2013  VCAT hearing. Te nant’s further claim for inconvenience of $2,003 al lowed . FSP accepted and paid for the claim. 27 June 2013  Following F’s report, the FSP denies four out of six additional claims made by the Applicant, agr e eing only to pa y the claims in respect of paint damage to the bathroom and sunroom and damage to the cornice in the ensuite. 23 July 2013  Further repairs were done to make the roof watertight, with 55 tiles being replaced together with internal cosmetic works.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.