Home / Financial Firm (Unknown - Insurer) / Determination 361607

Determination 361607

Claim Amount

FirmFinancial Firm (Unknown - Insurer)
Decided2015-06-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home developed new wall cracking after a flood, and the insurer declined the claim as pre-existing foundation movement. AFCA found the flood was the proximate cause and ordered the insurer to pay repair costs up to $15,000 with interest.

Where the new damage is distinct from pre-existing cracking and the flood was the dominant cause, the storm, rainwater and flood cover applies.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount Determination Case No: 361607 Determination Page 1 of 5 Case number : 361607 21 May 2015 1 Overview 1.1 Dispute The Applicant holds a Home and Contents Insurance policy (the policy), underwritten by the Financial Services Provider (FSP). The Applicant lodged a claim for water damage to the property resulting from a storm in March 2011, when the property was flooded. Subsequently, a further claim was lodged for cracking of the front wall, which the Applicant says was caused by the flood. While the FSP accepted the storm related damage from the original claim, the new cracking damage was declined. 1.2 Issues and key findings Is the FSP entitled to deny the claim for the new cracking damage? The FSP is not entitled to deny the claim for the new cracking damage, because  the policy covers damage caused by storm, rainwater or flood  the parties agree there is pre-existing superficial cracking damage at the property  the soil stabilization work has not affected the property  the proximate cause of the new damage is the flood. 1.3 Determination This Determination is in favour of the Applicant. The FSP must pay the cost of repairing the new cracking damage to the property, up to a maximum of $15,000. As to any cash settlement of the claim, the FSP is to pay interest, in accordance with the Insurance Contracts Act 1984, from the date of denial of the claim, until the date of settlement. Case No: 361607 Determination Page 2 of 5 2 Reasons for Determination 2.1 Is the FSP entitled to deny the claim for the new cracking damage? The policy covers damage caused by storm, rainwater and flood It is an accepted principle of general insurance law that an insured bears the onus to establish, on the balance of probabilities, they have suffered a loss caused by an insured event. Once so established, the onus shifts to the insurer to prove a policy exclusion applies to defeat a claim. The policy provides cover for loss or damage caused by an insured event, including storm, rainwater and flood, to a maximum of $15,000. The cover under the policy is subject to several exclusions. The following matters are accepted by both parties:  the foundation of the property consists of old style shallow footings  previous minor cracking damage had been observed at the property  the Applicant engaged the services of „ U ‟ to undertake soil stabilisation work in 2009  a significant storm event i n February 2011, caused flooding, with water inundation within the property of at least 100mm  significant cracking of the internal and external wall at the front left corner of the house was observed a few months after the storm event. What is in dispute is whether the significant cracking at the front left corner of the house, was caused by the flood and is therefore covered under the policy. The parties agree there is pre-existing superficial cracking damage at the property The courts have determined that in order to decide whether a loss is covered by the policy, the proximate cause of the damage must be established. Both parties commissioned e ngineers‟ reports to address the cause of the damage. The FSP ‟s engineer (MC S) found there is a history of cracking at the property due to inadequate foundations. MCS concluded the cause of the new cracking was the inadequate depth of footing and the inconsistent application of the injection technique used by U, to strengthen the subsoil. The MCS also believed the cracking of the front left corner of the house predated the storm event, based on google images of the property. The Applicant‟s engineer (RIB) considers the flood initiated the new cracking damage at the property. While he agrees the house is built to a lower standard by today‟s requirements, he says it conforms to good practice at the time of construction. The Applicant says the soil stabilisation work undertaken by U was a preventative measure to address the superficial cracking of the walls. She argues the images from Google, which the FSP rely on, depict the superficial cracking only, which she does not claim for. She maintains the damage in dispute is more significant and occurred a few months after the flood. RIB further concluded, the Case No: 361607 Determination Page 3 of 5 fact the house has not moved since early 2011, indicates that normal seasonal change do not affect the building greatly and you need a flood to cause the building to move. The soil stabilisation work has not affected the property MCS considered the injection technique used by U was inconsistent and lead to differential movement. RIB found the material used by U did not go underneath the footing and therefore did not affect the movement of the footings. What is agreed by the parties is the work carried out by U has not provided adequate stabilisation to the foundation. Based on the evidence, it is unlikely the work by U caused of the new damage. The proximate cause of the new damage was the flood Both parties have gone to considerable effort to provide evidence to support their respective positions. Unfortunately, the experts engaged are not in complete agreement as to their conclusions. The process of decision making involves a consideration of what weight to give to the evidence presented and making a decision regarding what conclusion is preferred. Both experts agree the foundation depth at the property is inadequate by today‟s standards, particularly given the type of soil on which the property has been built. It is also evident from the pre-existing cracking that the shallow footing has led to some movement at the property. Although the Applicant provides evidence to suggest the property was built to a good standard relative to the requirements in place at the time of construction, in the 1920s, it is accepted there were pre- existing issues of earth movement affecting the property, which is excluded from cover. However, based on the evidence it is also clear the new cracking damage is distinct from the pre-existing cracking damage. It is wider and more severe and such damage has only occurred once at the property, shortly after the storm event in 2011. Despite the argument the property is subject to movement and cracking, similar damage has not occurred since. Both experts agree the flood affected and weakened the soil and MCS concedes the flood may have been the catalyst for the new damage. The nature and extent of the new damage, its proximity to the time of the flood, combined with the fact that such damage has not occurred since the time of the flood suggests the proximate or dominant cause of the new damage was in fact the flood. Having considered all of the evidence presented, I prefer the conclusions pre sented by the Applicant‟s expert, RIB. Accordingly, it is fair in the circumstances, the FSP accepts the costs to repair the new cracking damage, up to a policy maximum of $15,000. Case No: 361607 Determination Page 4 of 5 3 Supporting information 3.1 Expert Evidence Expert report Conclusion Applicant’s experts CS P report  Minor cracking was observed previously .  In 2008, treatment of the soil under existing footings was carried out by (U). It appears this treatment has not provided adequate stabilisation of underlying soils.  We believe the cra cking in the wall is a combination of the old style shallow footing adapted in the 1920s and their interaction with the moisture movement in the moderately reactive soils that has occurred over the last 10 to 15 years with a long period of very dry conditi ons, which has only been alleviated with some heavy rains over the last 12 months. RIB report dated 4 August 2014  I think the flood has in fact initiated the failure in your building.  I am more of the opinion that it (the house) was built to a lower standard by today‟s requirements but to an excellent standard relative to the 1920s when the house was built.  The foundation was structurally built to withstand a flood and I‟m reasonable certain that the builders and Building Surveyors of the Municipal Co uncil would not have fully understood what a silt really was. RIB report dated 17 December 2014  I believe that the flood did initiate the failure.  …the building has not moved since early 2011. It would appear that it has remained stable thus indicating that normal seasonal change, ie rain, hail, shine, wind etc. does not affect the building greatly and you need a flood to actually cause the building to move.  The flood has in fact initiated the failure by methodology of weakening the sits and also swellin g the clays.  …the U material did not in fact go under the footing, therefore it has no capacity to control the footings‟ vertically either before, during, after and/or for any reason.  …the foundations not only conform to historical construction but they p robably were at the better end of the scale. FSP’s Expert MC report dated 22 November 2011.  The cause of the original and subsequent cracking is the lack of bearing strength of the alluvial deposits. The flood incident may have been a catalyst for further movement but not the cause.  The additional damage to the house is the result of inadequate depth of footing and the inconsistent application of the injection technique used to strengthen the subsoil. I do not believe that a single Case No: 361607 Determination Page 5 of 5 flood event would compro mise structurally adequate foundation. MC report dated 5 November 2014.  There is a history of cracking to this property because the foundations are inadequate.  The flood did not initiate failure; the building has been cracking over many years. The foundations do not confirm to historical construction and engineering principals either.  The U process did not appear to be carried out consistently along all wall lengths that were resin injected therefore causing differential movements within those areas … MC report dated 25 March 2015  Images taken from Google streetscape shows the crack claimed to have occurred after the flood event in images pre - dating the flood event. It also shows that the damage is increasing over time.  The continuing damage to the b uilding is caused by on - going differential movements of the foundations due to inadequate depth of foundation which is founded in inappropriate fill material.  The internal cracking which the insured states was pre - existing is related to the settlement of t he left front corner of the house. The external cracking cannot be separated from the internal damage as they both are a result of the same foundation movements. 3.2 Product Disclosure Statement “ General exclusions Like most insurance policies, there are general exclusions that apply to all covers. You are not covered for any loss or damage caused by or resulting from:  …  any eart h movement not caused by earthquake, including erosion, subsidence, landslide, mudslide, collapse, earth shrinkage and expansion…” 3.3 Other information relied on  Submissions by the Applicant.  Submissions by the FSP.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.